A0001 Questions_Answers.pdf
PDF 207 KB Posted
- Attached to
- DOCKSIDE (DS): USCGC ALERT DS Federal contract opportunity
- Solicitation number
- 70Z080-22-Q-MEC-ALERTDS
About this file
This document contains questions and answers regarding maintenance and repair work on USCGC ALERT. The work includes tasks such as operating and inspecting a wind speed transmitter and anemometer accessible only by crane or scaffolding, removing an isolated flow meter, preserving coatings on 100% of designated surfaces using a specified coating system, and requesting contract modifications to extend rental of toilet/shower trailers if maintenance items are activated requiring additional time. The solicitation is for dockside maintenance and repair of USCGC ALERT from February 4th to March 31st, 2023 under solicitation number 70Z080-22-Q-MEC-ALERTDS through the Department of Homeland Security US Coast Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0005 Page 1.pdf | ||
| A0005 Page 2.pdf | ||
| Amendment 0004 Page 1.pdf | ||
| A0004 Page 2.pdf | ||
| A0003.pdf | ||
| Specification_REV1.pdf | ||
| UPDATED Schedule of Services.xls | XLS spreadsheet | |
| Amendment 002_CGC ALERT_.pdf | ||
| QUESTIONS_RESPONSES_2.pdf | ||
| Amendment 0001_CGC ALERT_.pdf | ||
| Solicitation USCGC_ALERT_ 9.29.pdf | ||
| ALERT_Schedule_of_Services.xls | XLS spreadsheet | |
| ALERT_Statement_of_work.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION 3: Is the Windspeed Transmitter and Anemometer accessible with out a crane of scaffold?
RESPONSE:
A crane or scaffolding will be needed to access the wind speed transmitter and anemometer.
QUESTION: Q4: Can the Flow Meter be isolated from the fuel source for removal?
Yes, the Flow Meter can be isolated from the fuel source for removal.
QUESTION 5: QA: 3.4.2 Do these Tanks have “Steam Heater Tubes”?
QB: 3.4.3 Or do these tanks have “Electrical Heating Elements”?
RESPONSE:
These tanks have both “Electrical Heating Elements” and “Steam Heater Tubes”. Both paragraphs are applicable.
QUESTION: Q6: It is assumed that all Table 1 Task are intended for the “New Davit” and remaining Components not being renewed?
QB; The required CIRs are at the end of the installation, however CIR are due in the first 25% Can the contractor just issue a CFR if they do make the first 25%?
QA: Tasks #1 and #2 are for the existing Single Point Davit. Task #3 and further apply to the “New Davit”.
QB: With the above clarified information, a deadline of the first 25% of the contract is reasonable for the CIRs required by “3.4 Maintenance particulars, Task 1 – Operate and Inspect, Initial” and “3.5 Operational and Weight Test Plan”. That being said if a contractor cannot meet the first 25% deadline for a CIR then the contractor must submit a CFR explaining why and provide a proposed new CIR date. The proposed new CIR date will then be either accepted or denied. After this has been done the COR and KS/KO will discuss whether the situation warrants the issuing of a CDR.
QUESTION: Q7: 3.5 Is the intent to power tool all failing coatings back to tight, feather in, prime
Stripe Coat and Full Overcoat?
The intent is for the contractor to prepare and preserve 100% of the designated surfaces. Para. 3.5 states, “using the coating system specified for “Bilges, Cofferdams, and Forepeaks, Option III”, in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems)”. This publicly available reference calls for a preparation method of:
SSPC-SP 10/NACE No. 2 using grit conforming to MIL-A-22262 / (1.5-3.5), near white blast cleaning or SSPC-SP WJ-2(L)/NACE WJ-2(L), Waterjet Cleaning of Metals – Very Thorough Cleaning
This is for 100% of surfaces, not just failed coatings.
QUESTION: Q9; Should either Item OI-022 or 023 be activated, can the contractor put in a CFR
Requesting a CR to extend the rental of the Toilet/Shower Trailers?
RESPONSE:
Yes, a CFR requesting a CR would be necessary as the rental of the Toilet/Shower Trailers only covers the service disruption caused by repairs in Work Items D-019, D-020, and D-021.