A0001 Questions_Answers.pdf

PDF 207 KB Posted

Attached to
DOCKSIDE (DS): USCGC ALERT DS Federal contract opportunity
Solicitation number
70Z080-22-Q-MEC-ALERTDS
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains questions and answers regarding maintenance and repair work on USCGC ALERT. The work includes tasks such as operating and inspecting a wind speed transmitter and anemometer accessible only by crane or scaffolding, removing an isolated flow meter, preserving coatings on 100% of designated surfaces using a specified coating system, and requesting contract modifications to extend rental of toilet/shower trailers if maintenance items are activated requiring additional time. The solicitation is for dockside maintenance and repair of USCGC ALERT from February 4th to March 31st, 2023 under solicitation number 70Z080-22-Q-MEC-ALERTDS through the Department of Homeland Security US Coast Guard.

View the file

Other files for this federal contract opportunity

Other files attached to DOCKSIDE (DS): USCGC ALERT DS, newest first.
File Type Posted
A0005 Page 1.pdf PDF
A0005 Page 2.pdf PDF
Amendment 0004 Page 1.pdf PDF
A0004 Page 2.pdf PDF
A0003.pdf PDF
Specification_REV1.pdf PDF
UPDATED Schedule of Services.xls XLS spreadsheet
Amendment 002_CGC ALERT_.pdf PDF
QUESTIONS_RESPONSES_2.pdf PDF
Amendment 0001_CGC ALERT_.pdf PDF
Solicitation USCGC_ALERT_ 9.29.pdf PDF
ALERT_Schedule_of_Services.xls XLS spreadsheet
ALERT_Statement_of_work.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION 3: Is the Windspeed Transmitter and Anemometer accessible with out a crane of scaffold?

RESPONSE:

A crane or scaffolding will be needed to access the wind speed transmitter and anemometer.

QUESTION: Q4: Can the Flow Meter be isolated from the fuel source for removal?

Yes, the Flow Meter can be isolated from the fuel source for removal.

QUESTION 5: QA: 3.4.2 Do these Tanks have “Steam Heater Tubes”?

QB: 3.4.3 Or do these tanks have “Electrical Heating Elements”?

RESPONSE:

These tanks have both “Electrical Heating Elements” and “Steam Heater Tubes”. Both paragraphs are applicable.

QUESTION: Q6: It is assumed that all Table 1 Task are intended for the “New Davit” and remaining Components not being renewed?

QB; The required CIRs are at the end of the installation, however CIR are due in the first 25% Can the contractor just issue a CFR if they do make the first 25%?

QA: Tasks #1 and #2 are for the existing Single Point Davit. Task #3 and further apply to the “New Davit”.

QB: With the above clarified information, a deadline of the first 25% of the contract is reasonable for the CIRs required by “3.4 Maintenance particulars, Task 1 – Operate and Inspect, Initial” and “3.5 Operational and Weight Test Plan”. That being said if a contractor cannot meet the first 25% deadline for a CIR then the contractor must submit a CFR explaining why and provide a proposed new CIR date. The proposed new CIR date will then be either accepted or denied. After this has been done the COR and KS/KO will discuss whether the situation warrants the issuing of a CDR.

QUESTION: Q7: 3.5 Is the intent to power tool all failing coatings back to tight, feather in, prime

Stripe Coat and Full Overcoat?

The intent is for the contractor to prepare and preserve 100% of the designated surfaces. Para. 3.5 states, “using the coating system specified for “Bilges, Cofferdams, and Forepeaks, Option III”, in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems)”. This publicly available reference calls for a preparation method of:

SSPC-SP 10/NACE No. 2 using grit conforming to MIL-A-22262 / (1.5-3.5), near white blast cleaning or SSPC-SP WJ-2(L)/NACE WJ-2(L), Waterjet Cleaning of Metals – Very Thorough Cleaning

This is for 100% of surfaces, not just failed coatings.

QUESTION: Q9; Should either Item OI-022 or 023 be activated, can the contractor put in a CFR

Requesting a CR to extend the rental of the Toilet/Shower Trailers?

RESPONSE:

Yes, a CFR requesting a CR would be necessary as the rental of the Toilet/Shower Trailers only covers the service disruption caused by repairs in Work Items D-019, D-020, and D-021.