7-5-CS27017-Stage I-27013810-Hazmat Survey.pdf
PDF 5 MB Posted
- Solicitation number
- CS27017-Stage 1
- Issued by
- Utah
About this file
This is an Asbestos Inspection Report Review and Update letter prepared by R & R Environmental, Inc. for the State of Utah Division of Facilities Construction & Management (DFCM) regarding the Weber State University Student Services Building located at 3885 Central Campus Drive, Ogden, Utah. The report documents a comprehensive asbestos survey and assessment conducted in February 2019, with a review and update completed in September 2026 in accordance with State of Utah DEQ/DAQ rule R307-80-9(4). The original inspection identified asbestos-containing materials (ACM) within the approximately 28,000 square foot building, which was constructed in the 1980s with concrete structural systems and a flat membrane roof. One homogeneous area, M-35 (Parapet Wall Tar), was found to contain 18% chrysotile asbestos across approximately 40,000 square feet of roof surface. The review concluded that the original inspection report findings remained essentially unchanged, with the updated inspection letter serving as documentation that the report remains accurate for the purposes of the planned renovation project.
The asbestos survey identified 34 homogeneous areas within the building, of which only one (M-35) tested positive for asbestos content. Bulk sample analysis was conducted using polarized light microscopy (PLM) by Reservoirs Environmental, Inc., an NIST-NVLAP and AIHA-accredited laboratory. The report notes that all asbestos-containing materials were classified as non-friable and non-regulated ACM (N-R-ACM) under current conditions, though the materials are subject to EPA NESHAP regulations and must be removed prior to any renovation activities that could disturb or render them friable. The estimated abatement cost for the identified ACM is listed as not applicable (NA), indicating that actual removal costs would be determined during the abatement design phase. The report emphasizes that while the building is occupied, a comprehensive asbestos operations and maintenance program should be implemented to reduce exposure to airborne asbestos fibers, and that all renovation activities must comply with OSHA regulation 29 CFR 1926.1101 and applicable state and local regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R & R Environmental, Inc.
47 West 9000 South, Suite #2, Sandy, Utah 84070
(801) 352-2380: Office (801) 352-2381: Fax
September 9, 2026
Mrs. Aubrey Stapel
HazMat Program Manager
Division of Facilities, Construction & Management
Department of Government Operations
PH (801) 641-0964
astapel@utah.gov
RE: Asbestos Inspection Report Review & Update
WSU Student Services Building, Ogden, Utah
Mrs. Stapel, Pursuant to State of Utah DEQ/DAQ rule *R307-80-9 (4) R & R Environmental, Inc. (R & R) has reviewed the original survey we conducted at the facility (March 2024). Please note the following:
▪ Portions of the building are scheduled to undergo renovation. R & R was asked to review the original inspection report as it relates to the upcoming renovation of the building. The conclusions reached in the original inspection report remain essentially unchanged.
*R307-801-9. Asbestos Abatement, Renovation, and Demolition Projects: Requirement to Inspect:
(4) Asbestos inspections older than three years shall be reviewed and updated, as necessary, by an inspector who is certified according to R307-801-6 and working for a company certified according to
R307-801-5, and if applicable, shall be reviewed and updated prior to an asbestos abatement, renovation, or demolition project. If the inspection report is still accurate, then the inspector shall provide a letter of review, or some other form of documentation, stating that the inspection report is still accurate.
If you have any questions or desire further clarification please feel free to contact me at (801) 541-1035.
Sincerely, R & R ENVIRONMENTAL, INC.
David C. Roskelley, MSPH, CIH, CSP
President
Appendix A: R & R Environmental, Inc. Asbestos Survey and Assessment (March 2024)
APPENDIX A
R & R Environmental, Inc. Asbestos Survey and Assessment
March 2024
ASBESTOS, LEAD AND HAZARDOUS MATERIALS
INSPECTION, SURVEY AND ASSESSMENT
FOR THE
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY
OGDEN, UTAH 84403
ASBESTOS SURVEY AND ASSESSMENT
FOR THE
STUDENT SERVICES CENTER
April 26, 2024
Prepared for:
Mr. Rick Wade Director of Campus Services
Weber State University 2601 University Circle
Ogden, Utah 94408-2601 rwade2@weber.edu
Mobile: (801) 721-4944 Office: (801) 626-7938
Prepared by:
David C. Roskelley, MSPH, CIH, CSP R & R Environmental, Inc. (R & R)
47 West 9000 South, Suite #2 Sandy, Utah 84070 dave@rrenviro.com Phone (801) 541-1035
State of Utah Company Certification #ASBC-237
STUDENT SERVICES CENTER
TABLE OF CONTENTS
TITLE PAGE
1.0 Executive Summary
2.0 Introduction
3.0 Building Description
4.0 Survey Procedures
4.1 Building Survey
4.2 Bulk Sample Collection
4.3 Bulk Sample Analysis
5.0 Survey Results
5.1 Asbestos-Containing Materials
5.2 Non-Asbestos-Containing Materials
5.3 Bulk Sample Analytical Results
5.4 Damage and Hazard Assessment
5.5 Hazard Ranking
5.6 Homogeneous Areas with Special Considerations
5.7 Presumed Asbestos-Containing Materials
5.8 Inaccessible Areas
5.9 Materials(s) assumed to contain 1.0% asbestos
6.0 Response Action Comments
6.1 EPA Requirements
6.2 Renovation Options
7.0 Cost Estimates
8.0 Limitations and Exclusion of Warranty
Appendices
A. Data Tables Table 1 – Asbestos-Containing Materials Table 2 – Non-Asbestos-Containing Materials Table 3 – Bulk Sample Analytical Results Sorted by Sample Number Table 4 – Bulk Sample Analytical Results Sorted by Homogeneous Area
Number
Table 5 – Damage Assessment of Asbestos-Containing Materials Table 6 – Estimated Abatement Cost by Homogeneous Area
B. Building Floor Plan(s)
C. Photograph Log
D. Laboratory Analytical Reports(s)
E. State of Utah Certifications
Student Services Center Asbestos Survey and Assessment Weber State University Page 1
1.0 EXECUTIVE SUMMARY
Asbestos Survey and Assessment for the
Student Services Center Weber State University
Ogden, Utah 84403
An asbestos survey was conducted at the subject facility during February 2019. The building was visually inspected to identify building materials that might contain asbestos.
Bulk samples were collected from suspect materials and analyzed to determine if they contained asbestos. All asbestos-containing materials (ACM) were assessed for damage and the potential for exposure. This survey was requested and approved by Mr. Rick Wade.
Asbestos-Containing Materials by Homogeneous Area
Homogeneous Area Number1
Material Description / Locations
Asbestos Content
Quantity
Cost Estimate
M-35 Parapet Wall Tar (Black) Roof
18% Chrysotile ~40,000 ft2 NA
M-31 Roofing Tar (White) Assumed ~50 ft2 NA M-32 Roofing Tar Sealant (Black) Assumed ~25 ft2 NA M-33 Roofing Caulk (Gray) Assumed ~10 ft2 NA
Notes:
1. Homogeneous Area Number (Not related to building room numbers.)
Weber State University Page 2
Asbestos Survey and Assessment
2.0 INTRODUCTION
During February 2019, R & R Environmental, Inc., conducted an asbestos survey of the Student Services Center located at Weber State University, Ogden, Utah. The purpose of this survey was to identify the existence, extent, and condition of both friable and non-friable asbestos-containing materials (ACM) within the facility. Bulk samples were collected from suspect materials and analyzed for asbestos content. Each occurrence of ACM was assessed for damage and friability.
The following accredited and certified inspectors performed the inspection, collected the samples and made assessment:
February 20, 2019 Jason Moss Date State of Utah, Division of Air Quality Inspector Certification Number: ASB-6358
Petu Eteuati State of Utah, Division of Air Quality Inspector March1, 2024 Certification Number: ASB-7938 Date
This report was reviewed by:
David C. Roskelley, MSPH, CIH, CSP Date State of Utah, Division of Air Quality Inspector Certification Number: ASB-1370 AHERA Inspector #5 PSI 65451 I Certified Safety Professional #15774 Certified Industrial Hygienist #8529
Weber State University Page 3
3.0 BUILDING DESCRIPTION
Building Identification
Building Name ........................................................ Student Services Center Building Address ............ 3885 Central Campus Drive, Ogden, Utah 84408
Building Construction
Building Construction Date ............................................................. ~1980’s Building Type ..................................................... Classrooms, Labs, Offices Building Total Sq. Ft.................................................................... ~28,000 ft2
Structural System ............................................................................ Concrete Exterior Wall Construction ............................................................. Concrete Floor Deck Construction ................................................................. Concrete Roof Construction ................................................................ Flat, Membrane Floors Above Grade Floors Below Grade
Interior Finishes
Floors ........................................ Concrete, Carpet, Ceramic, Vinyl Flooring Walls ........................................ Plaster, Concrete, Wallboard, Ceramic Tile Attic....................................................................................................... None Crawlspace ........................................................................................ Tunnels
Building Mechanical
Heating Plant .................................................................. Campus, Hot Water Main Heating Distribution ........................................................... Forced Air Cooling Plant ........................................................... Campus, Chilled Water Main A / C Distribution ............................................................... Forced Air
Weber State University Page 4
4.0 SURVEY PROCEDURES
4.1 Building Survey
All accessible areas of the facility were visually inspected to identify suspect asbestos containing materials (ACM.) All accessible surfaces, structures, and mechanical systems within these areas were examined and all suspected ACM was touched to determine friability.
Suspect ACM was identified and assessed in homogeneous areas. A homogeneous area is defined as a single material, uniform in texture and appearance, installed at one time, and unlikely to consist of more than one type, or formulation, of material. In cases where joint compound and / or tape has been applied to wallboard (gypsum board) and cannot be visually distinguished from the wallboard, it is considered an integral part of the wallboard and in effect becomes one material forming a wall or ceiling “system.”
Each homogeneous area was given a unique material identification number. Each ID number begins with a letter: “S” for surfacing materials, “T” for thermal system insulation, or “M” for miscellaneous materials. This letter is followed by a three-digit number, assigned in consecutive order. This number is used to identify the homogeneous area throughout the inspection report.
4.2 Bulk Sample Collection
Bulk samples were collected from all accessible homogeneous areas of suspect ACM for subsequent laboratory analysis to determine actual asbestos content. Sampling was conducted in a manner that minimized damage to the building, did not leave any unsightly marks, and did not create a health hazard for the inspectors.
The number of samples collected from each homogeneous area generally followed the EPA AHERA regulations (40 CFR 763.86). Friable surfacing materials were sampled using the random sampling scheme given in the EPA publication 560 / 5-85-30a, titled “Asbestos in buildings: Simplified Sampling Scheme for Friable Surfacing Materials."” Between three and seven samples were collected from friable surfacing materials, depending on the size of the homogeneous area.
4.3 Bulk Sample Analysis
Bulk samples were analyzed using polarized light microscopy (PLM) and visual estimation in accordance with the EPA Interim Method for the Determination of Asbestos in Bulk Insulation Samples, EPA-600 / M4-82-020. Samples were analyzed by Reservoirs Environmental, Inc., 5801 Logan Street, Suite 100, Denver, Colorado, 80216. The laboratory is accredited under the National Institute of Standards and Technology – National voluntary Laboratory Accreditation Program (NIST-NVLAP) for bulk-asbestos sample analysis and is also accredited by the American Industrial Hygiene Association
(AIHA).
Weber State University Page 5
Federal EPA’s NESHAP and AHERA regulations define ACM as material containing greater than 1% asbestos by weight; materials containing less than 1% asbestos are not considered regulated ACM.
Further, the NESHAP regulations state that any sample found to contain less than 10% asbestos but greater than “none detected,” by visual estimation, must be assumed to contain greater than 1% asbestos unless confirmed to be less than 1.0% asbestos by point counting analysis. Any samples found to contain asbestos in this concentration range were assumed to contain greater than 1.0% asbestos and are listed in Section 5.8 of this report. All samples that have been point counted are identified as such in the sample result tables.
The laboratories reports can be found in Appendix D of this report.
Weber State University Page 6
5.0 SURVEY RESULTS
5.1 Asbestos-Containing Materials
Homogeneous areas of suspect ACM are identified as being ACM if the laboratory analysis shows the material to contain any detectable asbestos, unless subsequent TEM analysis resulted in less than 0.1% asbestos being detected. Table 1 of the Executive Summary and in Appendix A lists all homogeneous areas that were found to be ACM. Each material is described by type of material, friability and visual appearance.
Friability is defined in accordance with EPA’s NESHAP regulations.
“Friable ACM” is any material containing more than 1% asbestos (as determined by PLM) that, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure and also includes non-friable ACM that may become friable during building demolition.
“Non-friable ACM” is any material containing more than 1% asbestos (as determined by PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
“Category I non-friable ACM” are asbestos-containing resilient floor coverings (commonly known as vinyl asbestos tile (VAT), asphalt roofing products, packings, and gaskets.
“Category II non-friable ACM” encompasses all other non-friable ACM.
“Non-friable RACM” is used to denote thermal system insulation that is in good condition but would become friable during renovation or demolition and therefore is “regulated asbestos containing material” (RACM).
Weber State University Page 7
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY
DATE OF SURVEY: FEBRUARY 2019
NESHAP - REGULATED
ASBESTOS-CONTAINING MATERIALS (R-ACM)
1. Friable asbestos material (>1% asbestos and can be crumbled, pulverized or reduced to powder by hand pressure) Thermal system insulation (TSI)* Textured ceiling material (TCM)* Spray-on insulation or fireproofing* Blown-in insulation* Ceiling tiles/panels* Plaster, gypsum board, gypsum board joint compound* Cloth materials* Paper materials* Electrical wiring insulation* Sink undercoating (loose)* Other*
2. Category I ACM which has become friable
Packings Gaskets Resilient floor coverings (floor tile and sheet vinyl) Asphalt roofing products
3. Category I ACM that will be or has been subjected to sanding, grinding, cutting or abrading
Packings Gaskets Resilient floor coverings (floor tile and sheet vinyl) Asphalt roofing products
4. Category II ACM that has a high probability of becoming or has become friable in the course of demolition or renovation operations Asbestos cement materials* Asphalt, tar and rubber-base ACM products other than roofing products* Non-asphalt and non-paper roofing products* Paint* Fire brick and/or mortar* Stainless steel sink undercoating (solid)* Encapsulated TCM* Encapsulated TSI* Mastic for floor tile, ceiling tile, cove molding, etc.* Other* (Fire Door Insulation)
Weber State University Page 8
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY
DATE OF SURVEY: FEBRUARY 2019
NESHAP - NON-REGULATED
ASBESTOS-CONTAINING MATERIAL (N-R-ACM)
1. > 1% asbestos
2. Category I Non-friable (cannot be crumbled, pulverized, or reduced to powder by hand pressure)
ACM with >1% asbestos by new PLM procedure Packings Gaskets Resilient floor coverings (floor tile) X Asphalt roofing products
3. Category II Non-friable ACM with >1% asbestos by new PLM procedure (Category includes items meeting Category I definition but not specifically listed in that category) Asbestos cement materials (transite)* Asphalt, tar and rubber-base ACM products other than roofing products* Non-asphalt and non-paper roofing products* Paint* Fire brick and/or mortar* Sink undercoating (solid)* Mastic for floor tile, ceiling tile, cove molding, etc.* Other* (CMU Block Filler Material)
1. (*) denotes R & R’s interpretation of materials included in this category.
2. New PLM procedure is outlined in Appendix A, Subpart F, 40 CFR, Part 783, Section 1, Polarized
Light Microscopy.
3. The Environmental Protection Agency (EPA) National Emission Standard for Hazardous Air
Pollutants (NESHAP) asbestos revision as outlined in 40 CFR, Part 61, became effective November 20, 1990. The asbestos classification system outlined in the revision and included in this section is dynamic in nature. Asbestos materials classified as “NON-REGULATED” at the time of the survey may become “REGULATED” due to ongoing or planned maintenance, renovation, or demolition actions, which can transform a material containing greater than 1% asbestos from a “non-friable” and NON-REGULATED to a friable and REGULATED condition.
Classification of ACM in this section and in the executive summary of this report is, therefore, based on the observations of the surveyor at the time of the survey and may or may not be appropriate at later dates.
4. Maintenance, renovation, demolition, weathering, normal wear, water or other damage can alter the “NON-REGULATED” status of materials, and necessitate precautions required for handling them as “REGULATED” asbestos-materials.
Weber State University Page 9
5.2 Non-Asbestos-Containing Materials
Homogeneous areas of suspect ACM are identified as non-ACM if the laboratory analysis shows the material to contain no detectable asbestos. Table 2, located in Appendix A of this report, lists all homogeneous areas that were found to be non-ACM.
5.3 Bulk Sample Analytical Results
Table 3, located in Appendix A of this report, lists all of the bulk samples in order by sample number, that were collected from homogeneous areas of suspect ACM, along with the laboratory analytical results. Each sample was given a unique sample number. There may be more than one sample number for the same homogeneous area of suspect ACM.
The homogeneous areas of suspect ACM are identified on this table by their material identification numbers. The sample location listed on this table provides a brief, but specific, description of the location where the sample was collected. This is different than the homogeneous area location provided on Tables 1 and 2. Table 4 is the same as Table 3 except the entries has been sorted by homogeneous area number.
5.4 Damage and Hazard Assessment
Each homogeneous area of ACM has been assessed for existing damage, accessibility, and potential for future damage, and this information is presented in Table 5, located in Appendix A of this report. This table also lists the substrate present beneath each homogeneous area of ACM.
Each homogeneous area of friable ACM and asbestos-containing building material (ACBM) was classified into one of the following seven categories, as specified in EPA’s AHERA regulations (40 CFR 763.88):
(1) Damaged or significantly damaged thermal system insulation ACM.
(2) Damaged friable surfacing ACM.
(3) Significantly damaged friable surfacing ACM.
(4) Damaged or significantly damaged friable miscellaneous ACM.
(5) ACBM with potential for damage.
(6) ACBM with potential for damage.
(7) Any remaining friable ACBM or friable suspected ACBM.
The damage categories are defined as follows:
“Undamaged” means the material had no visible damage, or extremely minor damage or surface marring (i.e., a room full of floor tile with only two or three small corners chipped off on the tile).
“Damaged” means the material had visible damage evenly distributed over less than 10% of its surface, or localized over less than 25% of its surface.
Weber State University Page 10
“Significantly Damaged” means the material had visible damage that is evenly distributed over 10% or more of its surface, or localized over 25% or more if its surface.
Each homogeneous area of ACM was evaluated for accessibility to the building occupants and the general public, assuming the building was fully occupied, using the following assessment categories.
“Inaccessible” means the material was located in an area that people had no reason to enter and could not access without special measures. One example would be above a solid ceiling.
“Rarely Accessed” identifies a material that was in a location that could be accessed but wasn’t unless there was a specific need. An example would be a pipe tunnel.
Another example would be a high ceiling that is out of reach and not subject to any specific disturbance.
“Periodic Access” identifies a material that was in a location that was accessible, was not occupied full time, but was accessed on a routine basis. An example would be a mechanical room or boiler room.
“Continuous Access” identifies a material that was in a location that was occupied full time and was within reach of the occupants, or was frequently subject to direct disturbance. Examples would be exposed floor tile or a normal height ceiling.
5.5 Hazard Ranking
A hazard ranking has been determined for every ACM, in each functional space (room), and is listed in Table 7, Appendix A. The Hazard Rank is derived from the material’s current condition and potential for future disturbance.
The DFCM required hazard assessment process used here produces seven hazard Ranks.
The rankings of potential hazard range from 7, most hazardous, to 1, least hazardous, and are used to determine abatement priority. The highest ranking is reserved for ACM that is “significantly damaged”. Hazard rankings 6 to 4 reflect ACM that is “damaged” (slight damage is the term used in Table 7), with a ranking of 6 indicating a “potential for significant damage”, and a ranking of 5 indicating a “potential for damage.” Hazard rankings of 3 to 1 are reserved for materials currently in good condition, but with a range of moderate to low in the likelihood for future disturbance.
Note that these seven rankings are different from, and should not be confused with, the seven AHERA categories of damage and potential damage described in Section 5.4, above, and listed in Table 5. This hazard assessment scheme is also completely reversed from the current EPA Management Planner hazard assessment scheme where a hazard rank of 1 is the most hazardous.
Weber State University Page 11
5.6 Homogeneous Areas with Special Considerations
None
5.7 Suspect Materials Presumed to be Asbestos-Containing Materials without
Laboratory Analysis
5.8 Inaccessible Areas
Walls
5.9 Material(s) assumed to contain >1.0% asbestos without subsequent TEM or
Point Count Analysis
Weber State University Page 12
6.0 RESPONSE ACTION COMMENTS
6.1 EPA Requirements
Asbestos is regulated as a hazardous air pollutant by the Environmental Protection Agency (EPA) under the authority of the Clean Air Act. The asbestos regulations are included in the National Emissions Standards for Hazardous Air Pollutants (NESHAP) and referenced as 40 CFR 61, Subpart M. ACMs identified in this report are subject to those regulations.
Those regulations, and state and local regulations, should be carefully examined prior to renovation, demolition, cleanup, or any other activity which could disturb the ACMs, to ensure that all activities are in compliance with applicable requirements.
ACM is defined by the EPA, as any material containing greater than one percent of asbestos. ACMs are categorized as being either friable or non-friable. Friable ACMs are those materials that can be easily crumbled, pulverized, or otherwise broken up using hand or finger pressure when dry, and are materials considered more likely to produce airborne asbestos fibers. Non-friable ACMs are materials that do not meet the above test, and are considered less likely to produce airborne asbestos fibers. Not all ACMs are regulated under NESHAP. Regulated ACM (RACM) means (a) Friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of regulated demolition or renovation operations. Regulated demolition and renovation operations are those where the quantity of ACM affected is 260 linear feet or more on pipes, 160 square feet or more on other components, or 35 cubic feet or more in volume. There are certain notification requirements for demolition projects involving less than the above quantities.
Briefly, EPA requires that RACM be removed from facilities scheduled for demolition or renovation before any activity begins that would break up, dislodge, or similarly disturb the materials or preclude access to the materials for subsequent removal. Category I non-friable ACM that is not in poor condition and is not friable does not have to be removed prior to demolition of a facility. However, these materials are exempt from mandatory removal only during demolition, not renovation. Removal is mandated when renovation activities are expected to disturb these ACMs and render them friable.
Category II non-friable ACM also does not have to be removed prior to demolition if the probability is low that the material will become crumbled, pulverized, or reduced to powder (made friable) during demolition. However, state regulations may require the removal of these materials. Additionally, Category I non-friable ACM that has not become crumbled, pulverized, or reduced to powder during demolition activities may be disposed of as ordinary construction waste.
In any situation where ACM remains in a building, it should be managed under a comprehensive operations and maintenance program (O&M). The procedures and guidelines described in an O&M program should be followed whenever building maintenance activities may disturb any ACMs present in the building.
Weber State University Page 13
6.2 Renovation Options
NESHAP regulations require the removal of non-friable ACMs before they are disturbed and made friable during renovation activities. Therefore, we recommend that all of these materials be removed and properly disposed of by a licensed asbestos abatement contractor before renovation activities begin which have the potential of disturbing and making these materials friable. The removal project must follow the requirements of the OSHA regulation outlined in 29 CFR 1926.1101. While these materials remain in place, a comprehensive asbestos O&M program should be implemented when the building is occupied to reduce human exposure to airborne asbestos fibers.
Weber State University Page 14
7.0 COST ESTIMATES
A breakdown of the estimated removal costs by homogeneous area can be found in the Table 6, Appendix A. These cost estimates are provided for use in long-term budgeting and planning only, and do not have a level of accuracy sufficient to be used as a construction design cost estimate. The actual cost of asbestos removal is highly dependent on a number of factors such as the size of the project, the required time frame for removal, the time of year the job is conducted, the regulatory climate at the time, etc., therefore, actual abatement costs could vary significantly from these estimates. Replacement costs have not been included in these figures.
The cost for abatement design and management services is not included in these figures.
These additional fees can range from 15% of the estimated abatement costs for large projects to greater than 50% for very small projects. The design and management fees cover the cost of preparing plans and specifications, conducting the bidding process as well as third-party oversight during abatement.
Weber State University Page 15
8.0 LIMITATIONS AND EXCLUSIONS OF WARRANTY
This asbestos survey and assessment were performed using procedures and a level of diligence typically exercised by professional consultants performing similar services.
However, asbestos-containing material (ACM) can be present in a structure, but not identified using ordinary investigative procedures.
No asbestos survey can completely eliminate uncertainty regarding the presence of ACM.
R & R Environmental, Inc. level of diligence and investigative procedures are intended to reduce, but not eliminate, potential uncertainty regarding the presence of ACM. The procedures used for this survey attempt to establish a balance between the competing goals of limiting investigative costs, time, and building damage, and reducing the uncertainty about unknown conditions. Therefore, the determinations in this report should not be construed as a guarantee that all ACM present in the subject property has been included in this report.
This report presents R & R Environmental, Inc.’s professional determinations, which are dependent upon information obtained during performance of consulting services. R &R Environmental, Inc. assumes no responsibility for omissions or errors resulting from inaccurate information provided by sources outside of R & R Environmental, Inc.
No warranty or guarantee, expressed or implied, is made regarding the findings, conclusions, or recommendations contained in this report. The limitations presented above supersede the requirements or provisions of all other contracts or scopes of work, implied or otherwise, except those stated or acknowledged herein.
Appendix A
Data Tables
Table 1
Asbestos-containing Materials by Homogeneous Area
Area Number
Material Description
Friability
Asbestos Content
Location/ Quantity
M-35 Parapet Wall Tar (Black) -Black tar and felt with brown fibrous woven material
Non-Friable 18% Chrysotile
Roof / ~40,000 ft2
Table 2
Homogeneous Areas That Do Not Contain Asbestos
Material Location / Quantity
M-01 Wall System -Off-white/white tape -White joint compound
Throughout / 78,822 ft2
M-02 End Sealant -Off white sealant -Yellow insulation
Throughout building above ceiling and in mechanical rooms and chases / 454 ft2
M-03 Duct Sealant
-Gray sealant Throughout building above
/ 181 ft2
M-04 Duct Sealant
-Light green sealant
Throughout building above
/ 1,517 ft2
M-05 Vibration Isolator
-Black resinous material
Mechanical Rooms, Room 101 to Room 107 / 120 ft2
M-06 Insulation Pin Adhesive Gray Adhesive
Rooms 101 to Room 107 / 650 ft2
M-07 Fire Stop Putty -Green putty
Electrical Rooms 130, 221, and 177, Also the 1st and 2nd Floor South Hallways / 44 ft2
M-08 Fire Stop Putty -White compound
2nd Floor South Hallway / 12 ft2
M-09 Fire Stop Putty -Dark red putty
Room 101A, 101B, 107, 121, 120, 126, 124, 140A – 140W / 235 ft2
M-10 Fire Stop Putty
-Blue putty
Electrical Room 130 and 221, Rooms 250 / 40 ft2
M-11 Fire Stop Putty -Off white putty
Mechanical Rooms, Electrical Room 003, Hallway 001A / 25 ft2
M12 Fire Stop Putty -Light red putty
South Mechanical Suite, Rooms 1CD, 143 / 38 ft2
M13 Vinyl Sheet Flooring -Gray sheet vinyl flooring -Tan flooring mastic
Rooms 190 – Rooms 198 / 854 ft2
Material Location / Quantity
M-14 Fire Stop Putty -Brown putty
Electrical Room 177 / 10 ft2
M-15 Drain Pipe Hanger Insulation -Pink fibrous plaster -White/silver paper wrap
1st and 2nd Floor South Hallway / 10 ft2
M-16 Ceiling Tile #1 -White ceiling tile
1st Floor North and South, 2nd Floor South Men’s and Women’s Restrooms, / 1002 ft2
M-17 Ceiling Tile #1 Adhesive -Tan adhesive
1st Floor North and South, 2nd Floor South Men’s and Women’s Restrooms, / 1002 ft2
M-18 Rubber Stair Flooring Adhesive
-Gray rubber flooring -Tan adhesive
North, South and East Stairs / 750 ft2
M-19 Vinyl Cove Base and Adhesive -Brown cove base -Cream adhesive
North, South and East Stairs / 336 lf
M-20 Vinyl Cove Base and Adhesive
- Gray cove base
- Cream adhesive
Scattered Throughout / 11,187 lf
M-21 Sink Undercoating -Gray resinous material
Room 153 / 10 ft2
M-22 Sink Undercoating -Black resinous material
Rooms 143E, 166, 232J, 281, 108, 140M, Rooms 191 – 197, 124, and 215/ 170 ft2
M-23 2’x2’ Ceiling Panel #1 -White ceiling tile with rough texture
Scattered Throughout / 25,922 ft2
M-24 2’x2’ Ceiling Panel #2 -Whiter ceiling tile with rough texture
- Silver foil backing
1st Floor North Hallway and Room 140R / 235 ft2
M-25 2’x2’ Ceiling Panel #3 -White ceiling tile with white texture
Rooms 150 – 153 / 1,612 ft2
M-26 2’x2’ Ceiling Panel #5 -White ceiling tile with long crevasse
Rooms 181, 181A – 181F, Throughout / 315 ft2
M-27 2’x2’ Ceiling Panel #4 -White ceiling tile with holes
Rooms 143F, 143G, and 168 / 856 ft2
M-28 Wall Sealant -Black tar
Tunnels / 120 ft2
Material Location / Quantity
M-29 Boiler Gasket -Black fibrous tar
Mechanical Room 001 / 20 ft2
M-31 Roofing Tar (White) -White roofing caulk
Roof / 50 ft2
M-32 Roofing Tar Sealant (Black) -Black resinous tar
Roof / 25 ft2
M-33 Roofing Caulk (Gray) -Black resinous tar -Gray Caulk
Roof / 10 ft2
M-34 Pipe Sealant (Black) -Black tar -Black fibrous tar
Roof / 5 ft2
S-01 Wall Texture -Off-white tape -White joint compound -Tan fibrous material -White compound w/ white paint
Throughout / 31,580 ft2
S-02 Ceiling Texture -Off-white tape -White joint compound -Tan fibrous material -White compound w/ white paint
2nd Floor North Men’s and Women’s Restroom / 339 ft2
T-01 End Sealant
-White/silver/off-white/multi-colored wrap -Black cove base -Orange/yellow/peach insulation -Tan fibrous material -Off-white sealant w/ white paint
Scattered Throughout Above Ceiling and Mechanical Rooms/ 654 ft2
Table 3
Bulk Sample Analytical Results by Sample Number
Sample
Material Samples
Sample Location
Analytical Results
WSS-01 M-01 Wall System Room 217 None Detected WSS-02 M-01 Wall System Room 232J None Detected WSS-03 M-01 Wall System Room 268 None Detected WSS-04 M-01 Wall System Room 166 None Detected WSS-05 M-01 Wall System Room 150N None Detected WSS-06 M-01 Wall System Room 140M None Detected WSS-07 M-01 Wall System Room 108 None Detected WSS-08 S-01 Wall Texture #1 Room 217 None Detected WSS-09 S-01 Wall Texture #1 Room 232J None Detected WSS-10 S-01 Wall Texture #1 Room 268 None Detected WSS-11 S-01 Wall Texture #1 Room 166 None Detected WSS-12 S-01 Wall Texture #1 Room 150N None Detected WSS-13 S-01 Wall Texture #1 Room 140L None Detected WSS-14 S-01 Wall Texture #1 Room 108 None Detected WSS-15 S-02 Ceiling Texture (Knockdown) North 2nd Floor Women’s None Detected WSS-16 S-02 Ceiling Texture (Knockdown) North 2nd Floor Men’s None Detected WSS-17 S-02 Ceiling Texture (Knockdown) North 2nd Floor Men’s None Detected WSS-18 M-02 End Sealant Room 100 None Detected WSS-19 M-02 End Sealant Room 218 None Detected WSS-20 M-02 End Sealant Women Bathroom None Detected WSS-21 M-02 End Sealant Room 217 None Detected WSS-22 M-02 End Sealant Room 202 None Detected WSS-23 M-03 Duct Sealant (Gray) North Restroom Chase None Detected WSS-24 M-04 Duct Sealant (Light Green) Room 250 None Detected WSS-25 M-05 Vibration Isolator (Black) Basement Mechanical None Detected WSS-26 M-06 Insulation Pin Adhesive Room 184 None Detected WSS-27 M-07 Fire Stop Putty (Green) Room 200D None Detected WSS-28 M-08 Fire Stop Putty (White) Room 200D None Detected WSS-29 M-09 Fire Stop Putty (Dark Red) Room 126 None Detected WSS-30 M-10 Fire Stop Putty (Blue) Room 221 None Detected WSS-31 M-11 Fire Stop Putty (Off White) South Mechanical Room None Detected WSS-32 M-12 Fire Stop Putty (Red) South Mechanical Room None Detected WSS-33 M-13 Vinyl Sheet Flooring (Gray) Room 191 None Detected WSS-34 M-14 Fire Stop Putty (Brown) Room 138 None Detected WSS-35 M-15 Drain Pipe Hanger Insulation Room 100J None Detected WSS-36 M-15 Drain Pipe Hanger Insulation Room 100J None Detected WSS-37 M-15 Drain Pipe Hanger Insulation Room 100J None Detected WSS-38 M-16 Ceiling Tile #1 South 1st Floor Men’s None Detected WSS-39 M-17 Ceiling Tile #1 Adhesive South 1st Floor Men’s None Detected WSS-40 M-18 Rubber Stair Flooring Adhesive South Stairs None Detected WSS-41 M-19 Vinyl Cove Base and Adhesive (Brown) South Stairs None Detected WSS-42 M-20 Vinyl Cove Base and Adhesive (Gray) Room 253 None Detected WSS-43 M-21 Sink Undercoating (Gray) Room 153 None Detected WSS-44 M-22 Sink Undercoating (Black) Room 190C None Detected WSS-45 M-23 2’x2’ Ceiling Panel #1 Room 160 None Detected WSS-46 M-24 2’x2’ Ceiling Panel #2 Room 140R None Detected WSS-47 M-25 2’x2’ Ceiling Panel #3 Room 150 None Detected
Results
WSS-48 M-26 2’x2’ Ceiling Panel #5 Room 200B None Detected WSS-49 M-27 2’x2’ Ceiling Panel #4 Room 200B None Detected WSS-50 M-28 Tar Wall Sealant (Black) Tunnel None Detected WSS-51 T-01 Pipe Lagging Insulation Room 250 None Detected WSS-52 T-01 Pipe Lagging Insulation Room 211 None Detected WSS-53 T-01 Pipe Lagging Insulation Room 206 None Detected WSS-54 M-29 Tar Boiler Gasket (Black) Room 218H None Detected WSS-718-01* M-30 Roofing System Second Floor Walkway None Detected WSS-718-02* M-30 Roofing System Second Floor Walkway None Detected WSS-718-03* M-30 Roofing System Second Floor Walkway None Detected WSS-718-04* M-30 Roofing System Main Roof None Detected WSS-718-05* M-30 Roofing System Main Roof None Detected WSS-718-06* M-30 Roofing System Main Roof None Detected WSS-718-07* M-30 Roofing System Main Roof None Detected WSS-718-08* M-30 Roofing System Upper Level Roof None Detected WSS-718-09* M-35 Roofing System Parapet Wall 18% Chrysotile WSS-718-10* M-30 Roofing System Main Roof None Detected WSS-718-11* M-31 Roofing Tar (White) Upper Level Roof None Detected WSS-718-12* M-32 Roofing Tar Sealant (Black) Upper Level Roof None Detected WSS-718-13* M-33 Roofing Caulk (Gray) Main Roof None Detected WSS-718-14* M-34 Pipe Sealant (Black) Main Roof None Detected WSS-55+ M-03 Duct Sealant (Gray) North Restroom Chase None Detected WSS-56+ M-04 Duct Sealant (Light Green) Room 250 None Detected WSS-57+ M-05 Vibration Isolator (Black) Basement Mechanical None Detected WSS-58+ M-06 Insulation Pin Adhesive Room 184 None Detected WSS-59+ M-07 Fire Stop Putty (Green) Room 200D None Detected WSS-60+ M-08 Fire Stop Putty (White) Room 200D None Detected WSS-61+ M-09 Fire Stop Putty (Dark Red) Room 126 None Detected WSS-62 + M-10 Fire Stop Putty (Blue) Room 221 None Detected WSS-63+ M-11 Fire Stop Putty (Off White) South Mechanical Room None Detected WSS-64+ M-12 Fire Stop Putty (Red) South Mechanical Room None Detected WSS-65+ M-13 Vinyl Sheet Flooring (Gray) Room 191 None Detected WSS-66+ M-14 Fire Stop Putty (Brown) Room 138 None Detected
WSS-67+
M-16, M-17 Ceiling Tile #1 & Ceiling Tile #1 Adhesive
South 1st Floor Men’s None Detected
WSS-68+ M-18 Rubber Stair Flooring Adhesive South Stairs None Detected WSS-69+ M-19 Vinyl Cove Base and Adhesive (Brown) South Stairs None Detected WSS-70+ M-20 Vinyl Cove Base and Adhesive (Gray) Room 253 None Detected WSS-71+ M-21 Sink Undercoating (Gray) Room 153 None Detected WSS-72+ M-22 Sink Undercoating (Black) Room 190C None Detected WSS-73+ M-23 2x2 Ceiling Panel #1 Room 160 None Detected WSS-74+ M-24 2x2 Ceiling Panel #2 Room 140R None Detected WSS-75+ M-25 2x2 Ceiling Panel #3 Room 150 None Detected WSS-76+ M-27 2x2 Ceiling Panel #4 Room 200B None Detected WSS-77+ M-26 2x2 Ceiling Panel #5 Room 200B None Detected WSS-78+ M-28 Tar Wall Sealant (Black) Tunnel None Detected WSS-79+ M-29 Tar Boiler Gasket (Black) Room 218H None Detected
Notes: *Duplicate sample number is differentiated by date listed, where no date is listed sample was taken at report date of February 20, 2019
+ Indicates additional samples taken at report date of February 12, 2024
Table 4
Bulk Sample Analytical Results by Homogeneous Area Number
Results
WSS-01 M-01 Wall System Room 217 None Detected WSS-02 M-01 Wall System Room 232J None Detected WSS-03 M-01 Wall System Room 268 None Detected WSS-04 M-01 Wall System Room 166 None Detected WSS-05 M-01 Wall System Room 150N None Detected WSS-06 M-01 Wall System Room 140M None Detected WSS-07 M-01 Wall System Room 108 None Detected WSS-18 M-02 TSI – End Sealant Room 100 None Detected WSS-19 M-02 TSI – End Sealant Room 218 None Detected WSS-20 M-02 TSI – End Sealant Women Bathroom None Detected WSS-21 M-02 TSI – End Sealant Room 217 None Detected WSS-22 M-02 TSI – End Sealant Room 202 None Detected WSS-23 M-03 Duct Sealant (Gray) North Restroom Chase None Detected WSS-24 M-04 Duct Sealant (Light Green) Room 250 None Detected WSS-25 M-05 Vibration Isolator (Black) Basement Mechanical None Detected WSS-26 M-06 Insulation Pin Adhesive Room 184 None Detected WSS-27 M-07 Fire Stop Putty (Green) Room 200D None Detected WSS-28 M-08 Fire Stop Putty (White) Room 200D None Detected WSS-29 M-09 Fire Stop Putty (Dark Red) Room 126 None Detected WSS-30 M-10 Fire Stop Putty (Blue) Room 221 None Detected WSS-31 M-11 Fire Stop Putty (Off White) South Mechanical Room None Detected WSS-32 M-12 Fire Stop Putty (Red) South Mechanical Room None Detected WSS-33 M-13 Vinyl Sheet Flooring (Gray) Room 191 None Detected WSS-34 M-14 Fire Stop Putty (Brown) Room 138 None Detected WSS-35 M-15 Drain Pipe Hanger Insulation Room 100J None Detected WSS-36 M-15 Drain Pipe Hanger Insulation Room 100J None Detected WSS-37 M-15 Drain Pipe Hanger Insulation Room 100J None Detected WSS-38 M-16 Ceiling Tile #1 South 1st Floor Men’s None Detected WSS-39 M-17 Ceiling Tile #1 Adhesive South 1st Floor Men’s None Detected WSS-40 M-18 Rubber Stair Flooring Adhesive South Stairs None Detected WSS-41 M-19 Vinyl Cove Base and Adhesive (Brown) South Stairs None Detected WSS-42 M-20 Vinyl Cove Base and Adhesive (Gray) Room 253 None Detected WSS-43 M-21 Sink Undercoating (Gray) Room 153 None Detected WSS-44 M-22 Sink Undercoating (Black) Room 190C None Detected WSS-45 M-23 2’x2’ Ceiling Panel #1 Room 160 None Detected WSS-46 M-24 2’x2’ Ceiling Panel #2 Room 140R None Detected WSS-47 M-25 2’x2’ Ceiling Panel #3 Room 150 None Detected WSS-48 M-26 2’x2’ Ceiling Panel #5 Room 200B None Detected WSS-49 M-27 2’x2’ Ceiling Panel #4 Room 200B None Detected WSS-50 M-28 Tar Wall Sealant (Black) Tunnel None Detected WSS-54 M-29 Tar Boiler Gasket (Black) Room 218H None Detected WSS-718-01* M-30 Roofing System Second Floor Walkway None Detected WSS-718-02* M-30 Roofing System Second Floor Walkway None Detected WSS-718-03* M-30 Roofing System Second Floor Walkway None Detected WSS-718-04* M-30 Roofing System Main Roof None Detected WSS-718-05* M-30 Roofing System Main Roof None Detected WSS-718-06* M-30 Roofing System Main Roof None Detected
Results
WSS-718-07* M-30 Roofing System Main Roof None Detected WSS-718-08* M-30 Roofing System Upper Level Roof None Detected WSS-718-10* M-30 Roofing System Main Roof None Detected WSS-718-11* M-31 Roofing Tar (White) Upper-Level Roof None Detected WSS-718-12* M-32 Roofing Tar Sealant (Black) Upper-Level Roof None Detected WSS-718-13* M-33 Roofing Caulk (Gray) Main Roof None Detected WSS-718-14* M-34 Pipe Sealant (Black) Main Roof None Detected WSS-718-09* M-35 Roofing System Parapet Wall 18% Chrysotile WSS-55+ M-03 Duct Sealant (Gray) North Restroom Chase None Detected WSS-56+ M-04 Duct Sealant (Light Green) Room 250 None Detected WSS-57+ M-05 Vibration Isolator (Black) Basement Mechanical None Detected WSS-58+ M-06 Insulation Pin Adhesive Room 184 None Detected WSS-59+ M-07 Fire Stop Putty (Green) Room 200D None Detected WSS-60+ M-08 Fire Stop Putty (White) Room 200D None Detected WSS-61+ M-09 Fire Stop Putty (Dark Red) Room 126 None Detected WSS-62 + M-10 Fire Stop Putty (Blue) Room 221 None Detected WSS-63+ M-11 Fire Stop Putty (Off White) South Mechanical Room None Detected WSS-64+ M-12 Fire Stop Putty (Red) South Mechanical Room None Detected WSS-65+ M-13 Vinyl Sheet Flooring (Gray) Room 191 None Detected WSS-66+ M-14 Fire Stop Putty (Brown) Room 138 None Detected
WSS-67+
M-16, M-17 Ceiling Tile #1 & Ceiling Tile #1 Adhesive
South 1st Floor Men’s None Detected
WSS-68+ M-18 Rubber Stair Flooring Adhesive South Stairs None Detected WSS-69+ M-19 Vinyl Cove Base and Adhesive (Brown) South Stairs None Detected WSS-70+ M-20 Vinyl Cove Base and Adhesive (Gray) Room 253 None Detected WSS-71+ M-21 Sink Undercoating (Gray) Room 153 None Detected WSS-72+ M-22 Sink Undercoating (Black) Room 190C None Detected WSS-73+ M-23 2x2 Ceiling Panel #1 Room 160 None Detected WSS-74+ M-24 2x2 Ceiling Panel #2 Room 140R None Detected WSS-75+ M-25 2x2 Ceiling Panel #3 Room 150 None Detected WSS-76+ M-27 2x2 Ceiling Panel #4 Room 200B None Detected WSS-77+ M-26 2x2 Ceiling Panel #5 Room 200B None Detected WSS-78+ M-28 Tar Wall Sealant (Black) Tunnel None Detected WSS-79+ M-29 Tar Boiler Gasket (Black) Room 218H None Detected
+ Indicates additional samples taken at report date of February 12, 2024
Table 5
Damage and Hazard Assessment by Homogeneous Area
Area
Material Type
Substrate
Assessment Category
Damage
Accessibility
Disturbance Potential
M-30 Parapet Wall Tar (Black)
NA X No Damage Inaccessible Low
Note: Assessment Categories: 1-Damaged or significantly damaged thermal system insulation ACM 2-Damaged friable surfacing ACM 3-Significantly damaged friable surfacing ACM 4-Damaged or significantly damaged friable miscellaneous ACM 5-ACM with potential for damage 6-ACM with potential for significant damage 7-Any remaining friable ACM or friable suspect ACM X-Not applicable (material is non-friable surfacing or miscellaneous material)
Table 6
Estimated Abatement Costs by Homogeneous Area
Material
Quantity
Average Unit Cost
Abatement Cost
M-30 Parapet Wall Tar (Black)
~ 40,000 ft2 NA NA
TOTAL ESTIMATED ABATEMENT COST $0
1. Estimated abatement costs do not include replacement costs or costs for a consultant to manage the abatement (see section 7.0).
Appendix B
Building Floor Plans
07 14
FIRST FLOOR - SECTION 1
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY 3885 W CAMPUS DR
OGDEN, UT 84408
MARCH 2019
# SAMPLE NUMBER AND LOCATION
N
34 18
06 13
FIRST FLOOR - SECTION 2
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY 3885 W CAMPUS DR
OGDEN, UT 84408
MARCH 2019
# SAMPLE NUMBER AND LOCATION
Mobile User
11 04
44332619
39383736
FIRST FLOOR - SECTION 3
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY 3885 W CAMPUS DR
OGDEN, UT 84408
MARCH 2019
# SAMPLE NUMBER AND LOCATION
01 08 4849 30 16 17 23 15 02 09
SECOND FLOOR - SECTION 1
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY 3885 W CAMPUS DR
OGDEN, UT 84408
MARCH 2019
# SAMPLE NUMBER AND LOCATION
2827 24 42 10 03
SECOND FLOOR - SECTION 2
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY 3885 W CAMPUS DR
OGDEN, UT 84408
MARCH 2019
# SAMPLE NUMBER AND LOCATION
51 50
74 SF
STAIR
099 79 SF
HALL
001B
ELECTRICAL
UP
ELECTRICAL
313 SF
MECHANICAL
836 SF
TELECOM
459 SF
STUDENT SERVICE CENTER
BASEMENT FLOOR PLAN
08' 4' 16'
113 SF
HALL
001A
583 SF
BASEMENT
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY 3885 W CAMPUS DR
OGDEN, UT 84408
MARCH 2019
# SAMPLE NUMBER AND LOCATION
MECHANICAL
896 SF
MECHANICAL
1024 SF
300-A
301-A
ROOF AND MECHANICAL SUITES
STUDENT SERVICES CENTER
WEBER STATE UNIVERSITY 3885 W CAMPUS DR
OGDEN, UT 84408
MARCH 2019
# SAMPLE NUMBER AND LOCATION
ASBESTOS CONTAINING TAR IN PARAPET WALL
Appendix C
Photograph Log
Photograph Log
1. Weber State University Student Center
2. Parapet Wall Tar (Black)
PHOTO 1
PHOTO 2
R & R Environmental, Inc.
47 West 9000 South, Suite #2, Sandy, Utah 84070
(801) 352-2380 • Fax: (801) 352-2381
SITE PHOTOGRAPHS
PROJECT NO:
DESIGNED BY:
SCALE:
REVIEWED BY:
DRAWN BY:
DATE:
FILE:
Appendix D
Laboratory Analytical Reports
Reservoirs Environmental, Inc.
Reservoirs Environmental QA Manual
Effective April 2, 2018
Q:\QAQC\Lab\Reservoirs Environmental QA Manual.doc
Subcontract Number: NA
Laboratory Report: RES 414510-1
Project # / P.O. # None Given
Project Description: Weber State University - Student
Services Building Roof
RES 414510-1
Sincerely, July 30, 2018
Dear Customer, Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of Industrial Hygiene and
Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code 101896-0 for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM) analysis and the American
Industrial Hygiene Association (AIHA), Lab ID 101533 - Accreditation Certificate #480 for Phase Contrast
Microscopy (PCM) analysis. This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively.
Reservoirs Environmental, Inc. has analyzed the following samples for asbestos content as per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office.
R & R Environmental
47 West 9000 South #2
Sandy UT 84070
Steve Smith is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed.
This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the
U.S. Government. This report shall not be reproduced except in full, without written approval from Reservoirs
Environmental, Inc. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303-964-1986.
Jeanne Spencer
President
P: 303-964-1986
F: 303-477-4275
5801 Logan Street, Suite 100 Denver, CO 80216
1-866-RESI-ENV
www.reilab.com
RES Job Number:
Client:
Client Project Number / P.O.:
Client Project Description:
Date Samples Received:
Turnaround:
Date Samples Analyzed:
RES 414510-1
R & R Environmental None Given Weber State University - Student Services Building Roof July 26, 2018
Priority July 30, 2018
TABLE: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
Reservoirs Environmental, Inc.
Reservoirs Environmental QA Manual
Effective April 2, 2018 Q:\QAQC\LAB\Reservoirs Environmental QA Manual.doc
RESERVOIRS ENVIRONMENTAL INC.
NVLAP Lab Code 101896-0
Client Sample Number
Lab ID Number
L A Y E R
Mineral
Method: EPA 600/R-93/116 - Short Report, Bulk
Physical Description
Sub Part
Visual Estimate
ND=None Detected TR=Trace, <1% Visual Estimate Trem/Act=Tremolite/Actinolite
Non Asbestos Fibrous
Components
Non- Fibrous
Components
Asbestos Content
8515WSS-01 EM 2134381 Black fibrous tarA 3 ND 8515Black fibrous tarB 4 ND
1000Black resinous materialC 5 ND 1000Black resinous tarD 88 ND
8515WSS-02 EM 2134382 Black fibrous tarA 10 ND 1000Black resinous tarB 90 ND
8515WSS-03 EM 2134383 Black fibrous tarA 15 ND 1000Black resinous materialB 85 ND
8515WSS-04 EM 2134384 Black fibrous tarA 12 ND 1000Black tarB 20 ND
1585Brown fibrous perlitic materialC 68 ND
TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.
P: 303-964-1986 F: 303-477-4275
1-866-RESI-ENV
www.reilab.com
5801 Logan Street, Suite 100, Denver, CO 80216
Client Project Number / P.O.:
Client Project Description:
Date Samples Received:
Turnaround:
Date Samples Analyzed:
RES 414510-1
R & R Environmental None Given Weber State University - Student Services Building Roof July 26, 2018
Priority July 30, 2018
TABLE: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
Reservoirs Environmental, Inc.
Reservoirs Environmental QA Manual
Effective April 2, 2018 Q:\QAQC\LAB\Reservoirs Environmental QA Manual.doc
RESERVOIRS ENVIRONMENTAL INC.
NVLAP Lab Code 101896-0
Client Sample Number
Lab ID Number
L A Y E R
Mineral
Method: EPA 600/R-93/116 - Short Report, Bulk
Physical Description
Sub Part
Visual Estimate
ND=None Detected TR=Trace, <1% Visual Estimate Trem/Act=Tremolite/Actinolite
Non Asbestos Fibrous
Components
Non- Fibrous
Components
Asbestos Content
1000WSS-05 EM 2134385 Black tarA 5 ND 8515Black fibrous tarB 5 ND
10…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .