This is an HVAC design and construction document prepared by Evan Lloyd Associates, Inc. for a project located at the Stratton Building, 401 S. Spring Street, Springfield, Illinois. The project is sponsored by the State of Illinois for the installation of new air handling units in the LPU Print Shop North End. The document is dated August 7, 2025, with project number 25-049 and an expiration date of November 30, 2026.

The scope of work includes the installation of two new air handling units (AHU-1 and AHU-2), each rated at 800 CFM, and one heat pump unit rated at 48,000 BTUH cooling capacity. The HVAC contractor is responsible for providing shop drawings, installing all equipment per manufacturer specifications and the 2018 International Mechanical Code, furnishing a one-year guarantee covering labor and materials from the date of substantial completion, and providing operation and maintenance manuals. All condensate piping must be Schedule 40 PVC with solvent-welded connections. The contractor must provide a minimum of three sets of shop drawings and is required to perform all work as indicated on the drawings with any field changes made at no additional cost. Work encompasses new suction and liquid refrigerant lines, condensate drain lines pitched to existing floor drains, electrical connections at 208 volts, and thermostat controls with specific wiring configurations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

HV-1

TCR

© Evan Lloyd Associates, Inc.

TC

S

E

CRADE

IO

N

AT

TIMOTHY

B. SMITH

L

SN

E

IC

S

TIH

F

TE

O ILIL

001-017445

Date:

Drawn By:

Revised:

Revised:

Project No.

SHEET

OF SHEETS.

Date Signed:

Expiration Date:

S ou th Si xth S tre et

Sp rin gfi eld

, Il lin ois

Ph on e

7.7

.70

NE

W

A

IR

H

AN

DL

IN

G

UN

IT

S

FO

R

TH

E

LP

U

PR

IN

T

SH

OP

N

OR

TH

E

ND

ST

RA

TT

ON

B

UI

LD

IN

G

1 S . S

PR

IN

G

ST

SP

RI

NG

FI

EL

D, IL

LIN

OI

S

AUG. 7, 2025

25-049

AUG. 7, 2025

NOV. 30, 2026

SCALE: 18" = 1'-0"

PARTIAL BASEMENT HVAC PLAN

NO

RT

H

EXISTINGSTORAGE

EXISTING PRINTSHOP

EXISTING STORAGE

EXISTING SECURITYOFFICE EXISTING MECHANICALROOM

EXISTINGTOILET

EXISTING LOADINGDOCK

HP

48,000 BTUH

COOLING

D

D

D

D

RISE UP ABOVE THE CEILING

AND RUN AS HIGH AS POSSIBLE.

HVAC CONTRACTOR SHALL REMOVE

PORTIONS OF THE EXISTING CEILING

TO INSTALL THE NEW CONDENSATE

DRAIN LINE ABOVE THE CEILING.

EXTEND TO NEAREST

EXISTING FLOOR DRAIN.

AHU

800 CFM

AHU

800 CFM

RUN NEW 5/8" PVC DRAIN LINE

FROM EACH UNIT HIGH ON WALL.

EXISTING STORAGE

EXISTINGCORRIDOR

EXISTING POST OFFICE

EXISTING SECURITYOFFICE

NEW 5/8" PVC DRAIN LINE

FROM EACH UNIT.D

PITCH DN.

PITCH DN.

EXISTINGCORRIDOR

RUN NEW SUCTION LINE AND LIQUID LINE

HIGH ON WALL, RUN ONE ABOVE THE OTHER.

USAGE

AREA OF

710 3/4

O/A

DUCT

HP

PHASE

AHU-1

MARK COOLING

AIR HANDLING UNIT SCHEDULE

CFM

COOLING

HIGH SPEED

.50"

( KW-BTUH)

HEATING CAPACITYE.S.P. COIL

VOLT.

CONFIG.

UNIT REMARKS

HORIZONTAL

AMPS

.63N/A

AND MODEL NUMBER

MANUFACTURER

TRANE TPKFYP024KM142B GENERAL

1, 2, 3

PROVIDE MOUNTING WALL BRACKET, MOUNT UNIT 1'-0" BELOW CEILING.

PROVIDE A CONDENSATE PUMP.

PIPE CONDENSATE DRAIN LINES PER MANUFACTURER'S REQUIREMENTS.

1.

2.

3.

REMARKS:

3/4710AHU-2 .50" GENERAL- N/A 1

HORIZONTAL

HORIZONTALHORIZONTAL 208.63

SEER

MIN.

TRANE NTXMSM48A182BA

MARK

HEAT PUMP SCHEDULE

REMARKSAND MODEL NUMBER

MANUFACTURER

28.0

COOLING CAPACITY

NOMINAL

PHASE

VOLT.

208 1HP-1 AHU-1 & 2

UNIT

INDOOR

AMPS

MOCD

50.048,000 1, 2, 3, 4

PROVIDE PRE-CHARGED REFRIGERANT LINE SETS W/

3/4" INSULATION.

PROVIDE WALL MOUNTING BRACKET.

1.

2.

REMARKS:

PROVIDE LOCKED, TAMPER RESISTANT CAPS ON THE

REFRIGERANT LINES PER THE I.M.C. M110.10

MOUNT THE TOP OF THE UNIT AT 8'-0" A.F.F.

3.

4.

AHU-1

TYPICAL HEATING AND

COOLING THERMOSTAT

NTXMSM48A182BA

TB7L1L2L3

TB3 G DIP SWITCH 3-7 OFF

(S)

J1 P1

L1L2 G

CN105 TB5 TB15

16-2 AWG (S)

L1L2 G

CN105 TB5 TB15

TPKFYP024KM142B TPKFYP024KM142B

MIFH2 MIFH2

MRCH2 MRCH2

SCALE: N.T.S.

AHU-1 & 2 REFRIGERANT & CONTROL WIRING DIAGRAM

GRD.

DIAGRAM SYMBOL LEGEND

DISPLAY DESCRIPTION

CONTROL WIRE

REF. PIPE

TRANE TPKFYP024KM142B

AHU-2

SCALE: N.T.S.

KEY PLAN

NO

RT

H

PROJECT AREA

GENERAL HVAC NOTES

HVAC CONTRACTOR SHALL NOT SCALE THE DRAWINGS FOR EQUIPMENT SIZES. HVAC CONTRACTOR SHALL OBTAIN THE LATEST SHOP DRAWINGS FROM THE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AND USE IT FOR ACTUAL DIMENSIONS.

ALL WORK SHALL BE PERFORMED BY A HVAC CONTRACTOR EXPERIENCED IN THE TRADE. HVAC CONTRACTOR SHALL INSTALL SYSTEMS, EQUIPMENT AND COMPONENTS IN ACCORDANCE WITH MINIMUM REQUIREMENTS SHOWN IN THESE PLANS. ANY DEVIATION FROM THE DESIGN PLANS SHALL ONLY BE PERFORMED IF APPROVED BY THE ARCHITECT. ALL WORK SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. HOWEVER, ANY DEVIATION FROM THE DESIGN PLANS IMPLIED BY LOCAL CODES THAT SUGGESTS INSTALLATION OF LESS THAN THE REQUIREMENTS SPECIFIED IN THESE DESIGN PLANS SHALL NOT BE ALLOWED WITHOUT APPROVAL BY THE ARCHITECT.

ALL THE HVAC WORK SHALL BE INSTALLED PER THE 2018 INTERNATIONAL MECHANICAL CODE AND THE 2021 INTERNATIONAL

ENERGY CONSERVATION CODE.

THE HVAC SUBCONTRACTOR SHALL PROVIDE A MINIMUM OF 3 SETS OF SHOP DRAWINGS: 1 SET FOR THE USING AGENCY, 1 SET FOR THE ARCHITECT AND 1 SET FOR THEMSELVES. THE HVAC CONTRACTOR SHALL ALSO PROVIDE AN OPERATION AND

MAINTENANCE MANUAL FOR THE OWNER.

THE HVAC SUBCONTRACTOR SHALL PROVIDE THE OWNER WITH A WRITTEN ONE (1) YEAR GUARANTEE COVERING ALL LABOR AND MATERIALS FURNISHED AND INSTALLED AS PART OF THIS PROJECT. THE GUARANTEE SHALL COMMENCE FROM THE DATE

OF SUBSTANTIAL COMPLETION.

THE HVAC SUBCONTRACTOR SHALL INSTALL THE NEW EQUIPMENT PER THE MANUFACTURER REQUIREMENTS.

ALL WORK SHALL BE PERFORMED AS INDICATED ON DRAWINGS UNLESS FIELD CONDITIONS REQUIRE MINOR CHANGES SHALL

BE MADE WITH NO ADDITIONAL COST.

ALL CONDENSATE PIPING SHALL BE SCHEDULE 40 PVC PIPING AND FITTINGS WITH SOLVENT WELDED CONNECTIONS.