CA FTBR PONDEROSA BRIDGE(1) Final Geotech Report.pdf
PDF 8 MB Posted
- Solicitation number
- 698AF22B000007
About this file
This federal contract opportunity solicitation seeks proposals for two bridge projects located near Auburn, California. The first project involves removing and replacing an existing single lane bridge over the American River and improving 2.4 miles of gravel road. The second project replaces and grades an existing aggregate surface on an existing pedestrian bridge over Mountain Quarry to address drainage issues and replaces the bridge railing to improve safety for pedestrians and equestrians. The solicitation was issued by the Department of Transportation Federal Highway Administration. Proposals are due on the response date specified in the solicitation document. The contract will be awarded to the successful offeror by the date listed. Pricing terms and any set-asides or preferences are defined in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6982AF22B000007 CA FTBR (1) BRIDGES - BID TABS.pdf | ||
| Bid Opening SummaryCA FTBR (1) Bridges.docx | DOCX document | |
| Interested Vendors CA FTBR(1) .docx | DOCX document | |
| Amendment A001.pdf | ||
| 5-10-2022 Q and A.pdf | ||
| 5-5-22 Q and A Template.pdf | ||
| May 3 2022 Q and A.pdf | ||
| 19350101 Unknown As Built.pdf | ||
| CA FTBR PONDEROSA BRDIGE(1) Final Hydraulics Report.pdf | ||
| IFB CA FTBR (1) Bridges.pdf | ||
| FP-14_Eng.pdf | ||
| CA FTBR 1 Bridges Plans 2022-03-11.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FI
N
A L
SUBMITTED TO:
HDR Engineering 1670 Broadway, Suite 3400 Denver, CO 80202
BY:
Shannon & Wilson, Inc.
1722 3rd Street, Suite 100 Sacramento, CA 95811
(916) 438-2300 www.shannonwilson.com
GEOTECHNICAL DESIGN REPORT
CA FTBR (1), Ponderosa Bridge Replacement
PLACER COUNTY, CALIFORNIA
August 04, 2021 Shannon & Wilson No: 103897-002
CA FTBR (1), Ponderosa Bridge Replacement FINAL Geotechnical Design Report
103897-002 August 04, 2021
PAGE INTENTIONALLY LEFT BLANK FOR DOUBLE-SIDED PRINTING
8/4/2021-103897-002-R1.docx i
Submitted To: HDR Engineering
1670 Broadway, Suite 3400
Denver, CO 80202
Attn: Mr. Alexander Whitney
Subject: FINAL GEOTECHNICAL DESIGN REPORT, CA FTBR (1), PONDEROSA
BRIDGE REPLACEMENT, PLACER COUNTY, CALIFORNIA
Shannon & Wilson prepared this report and participated in this project as a subconsultant to
HDR Engineering. Our scope of services was specified in Agreement Number
1000100048865 with HDR Engineering dated September 18, 2020. This report presents our geotechnical engineering design conclusions and recommendations and was prepared by the undersigned. We previously submitted a draft report on April 21, 2021. This final report supersedes the draft report.
We appreciate the opportunity to be of service to you on this project. If you have questions concerning this report, or if we may be of further service, please contact us.
Sincerely, SHANNON & WILSON, INC.
Debanik Chaudhuri, PhD, GE
Senior Associate
RAL:GRF:DXC/ral ii
C O
N
TE
TS
CONTENTS
1 Introduction
1.1 General
1.2 Scope of Services
2 Project Description
3 Field Exploration
3.1 Subsurface Explorations
3.2 Rock Mapping
4 Geotechnical Laboratory Testing
5 Geology and Subsurface Conditions
5.1 Local Geology and Geologic Hazards
5.2 Generalized Subsurface
5.3 Groundwater
6 Conclusions and Recommendations
6.1 Seismic Design Considerations
6.2 Shallow (Spread Footing) Foundation Design
6.2.1 Bearing Resistance
6.2.2 Rock Slope Stability
6.2.3 Settlement
6.2.4 Lateral Resistance
6.3 Abutments
6.3.1 Lateral Earth Pressures
6.3.2 Drainage
6.4 Rock Scour Data
6.4.1 Rock Mass Rating
6.4.2 Erodibility Index
6.5 Soil Corrosion Potential
7 Construction Considerations
7.1 Earthwork
7.2 Excavation
7.3 Foundation Preparation
103897-002 August 04, 2021 iii
C O
N
TE
TS
7.4 Fill Placement and Compaction
7.5 Suitability of On‐Site Soils
8 Limitations
9 References
Exhibits Exhibit 6‐1: Seismic Design Parameters for Soil Profile Type B
Exhibit 6‐2: Abutment Backfill Earth Pressures
Exhibit 6‐3: Summary of Rock Mass Rating
Exhibit 6‐4: Erodibility Index Equation
Exhibit 6‐5: Summary of Erodibility Index
Exhibit 6‐6: Soil Corrosion Testing Results
Figures Figure 1: Vicinity Map
Figure 2: Site and Exploration Plan
Figure 3: Generalized Subsurface Profile A‐Aʹ
Figure 4: Design Caltrans ARS Curve Soil Profile Type B
Figure 5: Recommended Surcharge Loading for Temporary and Permanent Walls
Appendices Appendix A: Subsurface Exploration
Appendix B: Laboratory Testing
Important Information iv
A C
R O
N
YM
S
ACRONYMS
AASHTO American Association of State Highway and Transportation Officials
ARS Acceleration Response Spectrum bgs below ground surface
CALFIRE California Department of Forestry and Fire Protection
FHWA Federal Highway Administration
FS Factor of Safety
HDR HDR Engineering Inc.
K Erodibility Index ksf kilo‐pounds per square foot pcf pounds per cubic foot pH potential of Hydrogen
RMR Rock Mass Rating
SDC Seismic Design Criteria
SEE Safety Evaluation Earthquake
USGS United States Geological Survey
103897-002 August 04, 2021
1 INTRODUCTION
1.1 General
This geotechnical design report presents our geotechnical conclusions and recommendations in support of design for the planned CA FTBR (1) Ponderosa Bridge
Replacement Project (the Project) in Placer County, California. Shannon & Wilson performed our services in general accordance with our subconsultant agreement with HDR
Engineering, Inc. (HDR), dated September 16, 2020. Our understanding of the Project is based on:
a site visit with HDR’s structural engineer (John Maniscalco) on May 15, 2020 email exchanges with Mr. Alexander Whitney documents provided by HDR, including:
o U.S. Forest Service as‐built plan sheets of the existing bridge, dated January
1934 and revised in July 1938 o topographic survey plan sheets and the source AutoCAD drawing file prepared by Kjeldsen Sinnock Neudeck Inc., dated March 2020.
1.2 Scope of Services
Our scope of services included the following:
Drill two exploratory borings, one near each proposed abutment location
Perform laboratory tests on selected soil and rock samples
Perform geotechnical engineering analyses
Develop geotechnical design recommendations
Prepare a geotechnical engineering report summarizing our findings and recommendations.
2 PROJECT DESCRIPTION
The Project site is located where Ponderosa Way crosses the North Fork American River, about 3 miles southeast of Heather Glen, California as shown in the Vicinity Map, Figure 1.
The existing bridge is a one‐lane, three‐span, steel, through‐truss structure with a wood deck. We understand that the existing bridge was constructed in 1935 and has reached the end of its useful life. The bridge is supported on concrete footings founded on bedrock. We
103897-002 August 04, 2021 understand that the Project will replace the existing bridge with a new one‐lane bridge. The new bridge will also consist of three spans and be located on an offset alignment just west
(downstream) of the existing bridge as shown in the Site and Exploration Plan, Figure 2.
The existing bridge has a main span length of 129.5 feet and an overall length of 199.5 feet.
The proposed replacement bridge will be slightly longer with a main span length of 155 feet and an overall length of 223 feet.
3 FIELD EXPLORATION
3.1 Subsurface Explorations
For this Project, we drilled and sampled two geotechnical borings, designated SWB‐1 and
SWB‐2. Boring SWB‐1 was drilled to a depth of 60.5 feet below ground surface (bgs) and was located near the northwestern (north) abutment location. Boring SWB‐2 was drilled to a depth of 37.1 feet bgs and located near the southeastern (south) abutment location.
Approximate boring locations are shown in Figure 2.
A Shannon & Wilson geotechnical staff member observed the drilling, collected samples, and prepared field logs of the borings. Approximate boring locations and ground elevations were determined by measuring distances from existing bridge features and surveying with an optical level and rod with respect to the existing bridge deck. Appendix
A presents additional details regarding the exploration program, including boring logs and drilling and sampling methodology.
3.2 Rock Mapping
In addition to our subsurface explorations, a Shannon & Wilson geological staff member performed rock mapping surveys of rock outcrops throughout the Project site. The initial rock mapping survey was performed on October 16, 2020, and a follow up survey was performed on December 2, 2020. During these rock mapping surveys, we recorded rock discontinuity features including, strike and dip angles, persistence, spacing, aperture width, and roughness. Rock mapping survey data was used to determine the Rock Mass Rating
(RMR) and Erodibility Index (K), see Sections 6.4.1 and 6.4.2, and to develop the rock descriptions shown in the borings logs presented in Appendix A.
4 GEOTECHNICAL LABORATORY TESTING
Geotechnical laboratory tests were performed on selected soil and rock samples collected from the borings. Laboratory tests included visual‐manual classification, moisture content, 103897-002 August 04, 2021 grain size analysis, modified Proctor compaction, soil corrosivity, and rock unconfined compressive strength. Details of the laboratory testing and results of the tests are included in Appendix B.
5 GEOLOGY AND SUBSURFACE CONDITIONS
5.1 Local Geology and Geologic Hazards
We conducted a limited literature review to characterize geology and geologic hazards. Our review of geologic maps indicates that the bedrock near the Project site belongs to the
Mariposa Formation, which is reported to consist primarily of slate and metamorphosed graywacke and conglomerate (Saucedo and Wagner, 1992). These rocks are reported to be
Middle to Late Jurassic, approximately 150 million years or more old. At the Project site, metamorphosed conglomerate has been mapped (Chandra, 1961).
Published maps do not indicate presence of active faults crossing the Project site, and the site is not located in an Alquist‐Priolo Earthquake Fault Zone. The Grass Valley Fault and the Gillis Hill Fault lie about one‐half mile west and one mile east of the site, respectively.
Neither of these faults are considered active by the California Geological Survey (Jennings and Bryant, 2010). The Wolf Creek Fault is the closest active fault, located about 9 miles west of the Project site. Because of its distance to the site, the potential for ground surface fault rupture is low.
5.2 Generalized Subsurface
Near the north abutment location (SWB‐1), we encountered very dense sand, with silt, gravel, and boulders to a depth of 6 feet bgs underlain by moderately hard to hard metaconglomerate bedrock. Near the south abutment location (SWB‐2), we encountered moderately hard to very hard metaconglomerate bedrock beginning at the ground surface.
We observed the metaconglomerate bedrock to be coarse‐grained with gravel and cobble sized particles contained within a dark gray fine‐grained matrix. Discontinuities in the bedrock tended to be closely to widely spaced with localized very closely spaced zones occurring between approximate elevations 785 feet to 800 feet. Discontinuities tended to be smooth to slightly rough, tight to partly open, with some oxide staining, and were oriented near vertical (70‐90 degrees) and near horizontal (5‐15 degrees) resulting in a blocky rock mass. The generalized subsurface conditions for the Project are shown in the Generalized
Subsurface Profile A‐A’, Figure 3.
103897-002 August 04, 2021
5.3 Groundwater
We did not observe groundwater in either of our borings prior to encountering bedrock and switching the drilling method to rock coring. However, we did measure the North Fork
American River’s water surface to be at 37 feet below the deck of the existing bridge (Elev.
786 feet) on October 15, 2020.
6 CONCLUSIONS AND RECOMMENDATIONS
6.1 Seismic Design Considerations
According to Caltrans SDC 2.0, the design Safety Evaluation Earthquake (SEE) response spectrum is based on a design ground motion that has a 5% probability of exceedance in 50 years (975‐year return period). This return period is equivalent to a 7% probability of exceedance in 75 years. This characterization of the design ground motion matches the 75‐ year design life of the proposed bridge. The design ground motion parameters were developed using the Caltrans ARS online tool version 3.0.2, which utilizes the USGS 2014
National Seismic Hazard data. Considering the rock conditions encountered by the explorations advanced at the site, we recommend the bridge design consider Soil Profile
Type B subsurface conditions and be designed using the Caltrans SDC (Caltrans, 2019) parameters presented in Exhibit 6‐1 below. The characteristic moment magnitude is 6.3.
The design SEE acceleration response spectrum is presented in the Design Caltrans ARS
Curve Soil Profile Type B, Figure 4.
Exhibit 6-1: Seismic Design Parameters for Soil Profile Type B
Spectral Acceleration
Peak Ground Acceleration
(g)
Short Period
(0.2 second)
(g)
Long Period
(1 second)
(g)
SEE Response Spectrum Values 0.13 0.27 0.09
NOTES:
g = acceleration due to gravity; SEE = Safety Evaluation Earthquake
6.2 Shallow (Spread Footing) Foundation Design
We understand that the proposed bridge abutment and pier foundations are planned to be spread footings founded on bedrock. Dimensions of the proposed abutment footings will be 5.5 feet long (parallel to bridge alignment) and between 28 and 30 feet wide, while the proposed pier footings will be 11 feet long by 17 feet wide.
103897-002 August 04, 2021
6.2.1 Bearing Resistance
Based on data from our subsurface explorations and our engineering analysis and judgement, we recommend a nominal bearing resistance of 50 ksf for the bedrock material present at the Project site, provided the footings are founded on competent, unweathered bedrock. We recommend a bearing resistance factor of 0.45 for spread footings founded on rock (AASTHO, 2020).
6.2.2 Rock Slope Stability
We performed kinematic and limit equilibrium analyses to evaluate the stability of the rock foundations and slopes and determine if the rock slopes supporting the bridge footings meet design factors of safety or if any additional support measures were needed. The analytical methods and our conclusions are presented in this section.
We used Rocscience’s Dips and Slide2 Modeler software (Rocscience, 2021a and 2020b) to perform kinematic and equilibrium analyses, respectively. Our kinematic analysis identified that plane shear and complex plane shear (multi‐segment plane shear) are kinematically admissible and are critical failure modes for the north and south pier and abutment foundations. We also identified toppling as a kinematically admissible failure mode but toppling is not a critical failure mode due to the site‐specific geometry of the bridge foundation elements.
Based on the results of our kinematic analysis, our limit equilibrium analysis incorporated the potential for plane shear and multi‐segment complex plane shear failure modes but not toppling. We modeled the north and south foundation geometry and external bridge loading using survey data and footing loading summary data provided by HDR. For seismic (pseudo‐static) analysis, we incorporated a horizontal seismic coefficient equal to 50 percent of peak ground acceleration corresponding to the SEE.
For the model’s material properties, we used an anisotropic strength function and generalized Hoek‐Brown strength criteria to model the rock mass strength parameters. We modeled discontinuity shear strength using suggested values published by Wyllie and Mah
(2004) for conglomerate rock. We performed our analysis using the Janbu simplified method of slices and target factors of safety (FS) of 1.5 and 1.1 for static and seismic loading conditions respectively.
During our limit equilibrium analysis, results of a back analysis indicated that rock bridging is present in some form. To model the presence of rock bridges, we used methodologies published by Jennings (1971) and Wyllie and Mah (2004) to determine scaled Mohr‐
Coulomb cohesion and friction angle values for discontinuity shear strength. We performed
103897-002 August 04, 2021 a forward analysis and sensitivity analysis for a range of rock bridging percentages. Based on our analyses and field observations, we concluded that a minimum 3% rock bridges exist and evaluated rock slope stability using 3% rock bridges.
Based on the results of this analysis, we conclude that the proposed bridge foundations meet the target FS values, without requiring additional support (i.e., rock dowels), and the bearing resistance presented in Section 6.2.1 are not impacted by the presence of rock slopes.
6.2.3 Settlement
Foundations bearing on intact rock are expected to experience nominal total settlement of less than 0.5 inch. Total settlement is expected to be comprised solely of immediate (elastic) settlement and to be substantially completed during construction. Total settlement assumes the Contractor will construct spread footing foundations in a manner consistent with the plans, specifications, and our recommendations and stated construction considerations.
6.2.4 Lateral Resistance
Resistance to lateral forces caused by wind, earthquake, and other forces can be provided by the frictional resistance of the rock acting against the base of the foundation. We recommend a nominal coefficient of friction of 0.7 and a resistance factor of 0.8 for cast‐in‐ place concrete (AASHTO, 2020).
6.3 Abutments
6.3.1 Lateral Earth Pressures
We anticipate that imported fill, or suitable recovered on‐site soils, will be used as backfill within a 1H:1V (horizontal to vertical) plane behind the proposed bridge abutments. The active and at‐rest static earth pressures are applied as a triangular equivalent fluid pressure distribution, while the increase in earth pressures due to seismic loading is applied as a uniformly distributed pressure increase, as shown below in Exhibit 6‐2. These estimates are based on the specified fill soil properties described in Section 7.4.
103897-002 August 04, 2021
Exhibit 6-2: Abutment Backfill Earth Pressures
Retained Material
Type
Unit Weight
(pcf)
Friction Angle
(deg)
Active At-Rest
Earth Pressure Coeff., Ka
(dim.)1
Equivalent Fluid
Density
(pcf)
Seismic Uniform.
Dist. Press.
Increase
(psf)
Earth Pressure Coeff., K0
(dim.)1
Equivalent Fluid
Density
(pcf)
Seismic Uniform.
Dist. Press.
Increase
(psf)
Structural Backfill
125 34 0.25 32 5H 0.44 55 4H
NOTES:
deg = degrees; dim. = dimensionless; ft = feet; H = wall height in feet; pcf = pound per cubic foot; psf = pounds per square foot
Surcharge loads from motor vehicles/traffic and construction equipment will induce additional lateral loads on the abutments. For evaluating surcharge loading on the abutments, Figure 5, Recommended Surcharge Loading for Temporary and Permanent
Walls can be used.
6.3.2 Drainage
We assume that the abutments will incorporate a drainage system such that groundwater will not accumulate in the retained fill. Accordingly, our design recommendations do not include hydrostatic pressure behind the abutments.
6.4 Rock Scour Data
We understand that HDR will perform a scour analysis of the bedrock present at the Project site. To support this analysis, we determined the RMR and K values that are characteristic of the bedrock we observed during our field explorations and reconnaissance.
6.4.1 Rock Mass Rating
The RMR is a classification method that characterizes the overall quality of the rock mass
(FHWA, 2012). There are five measurable parameters used to determine a rock massʹ RMR.
These parameters include:
Strength of intact rock material (Point Load Index or Unconfined Compressive Strength)
Drill core quality (i.e., rock quality designation, RQD)
Joint spacings
Joint conditions
Ground water conditions
103897-002 August 04, 2021
A series of relative ratings are assigned to the range of values that may be encountered for each of the five listed parameters. The numerical value of the RMR is determined by summing the individual relative ratings determined for the five parameters.
Our determination of the required input parameters and RMR for the Project site is presented in Exhibit 6‐3. These values were determined by relating the measured data collected from our rock mapping surveys and subsurface exploration against tables published in Section 4.7.2 of the FHWA Hydraulic Engineering Circular No. 18 (FHWA, 2012).
Exhibit 6-3: Summary of Rock Mass Rating
Parameters Parameter Values
Relative Ratings
(dim.)
Rock Mass Rating, RMR1
(dim.)
Strength of Intact Rock Material 10,000 - 17,500 psi 7
Class No. III
Fair Rock
Drill Core Quality 60% 13
Spacings of Joints 1 - 3 ft 20
Condition of Joints Joints open 0.05 in. - 0.2 in., Continuous Joints 6
Ground Water Conditions Moist Only (Interstitial Water) 7
Orientation of Joints
(for Foundations) Fair -7
NOTES:
The Rock Mass Rating is the sum of all relative ratings.
% = percent; ft = feet; in. = inch; psi = pounds per square inch
6.4.2 Erodibility Index
K is a classification system that quantifies the erosion resistance of a rock mass and can be compared to a stream flowʹs erosive power (FHWA, 2012). The equation used to compute K is present in Exhibit 6‐4.
Exhibit 6-4: Erodibility Index Equation
Equation Variable and Definition
K 𝑀 𝐾 𝐾 𝐽
K Erodibility Index
MS Intact Rock Mass Strength Parameter
Kb Block Size Parameter
Kd Shear Strength Parameter
JS Relative Orientation Parameter
Reference: FHWA, 2012
103897-002 August 04, 2021
Our calculation of K for the bedrock observed at the Project site is presented in Exhibit 6‐5.
The input parameters were determined by relating the measured data collected from our rock mapping surveys and subsurface exploration against tables published in Section 4.7.2 of the FHWA Hydraulic Engineering Circular No. 18 (FHWA, 2012).
Exhibit 6-5: Summary of Erodibility Index
Variables Input Parameters Input Parameter Values Variable Numbers
Erodibility Index, K
Rock Mass Strength
Parameter, MS
Rock Hardness Very Hard Rock
70.0
14083
Unconfined Compressive Strength 68.9 – 120.7 MPa
Block Size Parameter, Kb
RQD
Rock Quality Designation 60% 60
17.961
Rock Joint Set Number, Jn
Number of Joint Sets 3 Joint/Fissure Sets + Random 3.34
Shear Strength
Parameter, Kd
Joint Roughness Number, Jr
Condition of Joint Smooth Undulating 2.0
2.02
Joint Alteration Number, Ja
Joint Separation 1.0 mm
1.0 Description of Gouge Unaltered joint walls, surface
staining only
Relative Orientation Parameter, JS
Dip Direction of Closer Spaced Joint Set In Direction of Stream Flow
0.56 Dip Angle of Closer Spaced Joint Set 70°
Ratio of Joint Spacing 1:1
NOTES:
Block Size Parameter is calculated as Kb = RQD/Jn.
Shear Strength Parameter is calculated as Kd = Jr/Ja.
Erodibility Index is calculated as K = (MS)(Kb)(Kd)(JS).
° = degrees; % = percent; MPa = megapascal; mm = millimeters
6.5 Soil Corrosion Potential
As mentioned earlier, we encountered a relatively thin layer of soil above bedrock near the north abutment location. We submitted one soil sample to Sunland Analytical of Rancho
Cordova, California, for analytical testing to evaluate the potential for corrosive attack on buried metals and reinforced concrete using 2020 California Department of Transportation
(Caltrans) Test Methods (CTM). Tests included pH and resistivity (CTM 643), water‐soluble chloride (CTM 422), and water‐soluble sulfate (CTM 417) concentrations (Caltrans, 2020).
Results of the corrosion testing are included in the enclosed Sunland Analytical report and summarized in Exhibit 6‐6 below.
103897-002 August 04, 2021
Exhibit 6-6: Soil Corrosion Testing Results
Boring ID
Sample Depth
(ft) pH
Minimum Resistivity
(ohm-cm x 1,000)
Chloride
(ppm)
Sulfate
(ppm)
SWB-1 1.5 7.08 7.5 2.4 17.6
NOTES:
ft = feet; ohm-cm = ohm centimeter; ppm = parts per million
Caltrans considers a soil to be corrosive to foundation elements if one or more of the following conditions exist: chloride concentration greater than or equal to 500 parts per million (ppm), sulfate concentration greater than or equal to 1,500 ppm, or pH of 5.5 or less
(Caltrans, 2018). The corrosivity test results suggest that the site soils are not corrosive to exposed buried metal or reinforced concrete.
7 CONSTRUCTION CONSIDERATIONS
7.1 Earthwork
Earthwork, including site preparation, embankment construction, placement of fill, and subgrade preparation, should conform to the requirements provided in Division 200 of the
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP‐14 (FHWA, 2014).
7.2 Excavation
The native soil can likely be excavated using conventional excavating equipment. However, excavation equipment should be selected to handle occasional boulders present in the native soil overburden. Specialized equipment will be required to excavate the in‐place bedrock.
If blasting is required to reach the design footing elevations, all blasting activities must be performed in accordance with FP‐14 Division 205 guidelines for controlled blasting (FHWA, 2014). Alternatives to blasting include ripping and hydraulic, or mechanical, splitting or breaking (FHWA, 2011). Based on the strength of the bedrock and orientation of the joints, we expect that the in‐place bedrock will be difficult to effectively excavate by ripping. For these alternatives, the requirements for final slope face, including scaling and dressing, are the same as for slopes formed by blasting.
7.3 Foundation Preparation
We recommend that a Shannon & Wilson representative be present to provide construction support services during construction. For foundations founded on bedrock, the excavated surface shall be cleaned of all loose material and cut to a firm surface exposing competent, 103897-002 August 04, 2021 unfractured bedrock. Seams shall be cleaned out and filled with cement, grout, or mortar.
Prior to installation of the footings, a Shannon & Wilson representative should review the exposed bedrock to confirm the rock type, evaluate joints and fractures, and evaluate the stability of the bedrock. Once the Shannon & Wilson representative has inspected the footing excavations, the Contractor can pour the concrete ʺneatʺ (without forming) against the prepared bedrock. If forming is necessary, we recommend backfilling excavations outside the footing limits with plain structural concrete. If an irregular rock surface and differing rock characteristics are encountered, the use of plain (Class B) concrete is considered appropriate to provide positive contact between the footings and bedrock.
If overexcavation is required to expose competent, intact rock at footing locations, the overexcavation should be backfilled with plain structural concrete to the design footing elevation, up to a depth of 3 feet below the footing. If overexcavation greater than 3 feet is required, Shannon & Wilson should be contacted to evaluate the rock mass and provide supplemental recommendations as necessary.
If blasting is required to excavate the bedrock, any loose, fractured rock caused by overbreak below the design footing elevations should be removed and replaced with concrete at the Contractorʹs expense.
7.4 Fill Placement and Compaction
Abutment backfill should meet the requirements of Structural Backfill (FP‐14 704.04) defined as:
Maximum particle size: 3 in. (75 mm)
Material passing #200 sieve: ≤ 15%, less if below flood stage
Plasticity Index: ≤ 6
Fill should be placed in uniform, horizontal layers with the loose lift thickness not exceeding
8 inches for heavy, self‐propelled compactors, or 4 inches for hand‐operated mechanical compactors. The appropriate lift thickness will depend on the Contractorʹs equipment and the moisture content and quality of the backfill material. Compaction of backfill adjacent to abutments can result in higher lateral earth pressures against the abutments. Therefore, small equipment that is hand‐operated should be required with a line extending upward from the base of the structure at 0.5H:1V, to a maximum horizontal distance of 5 feet from the face of the abutment to reduce this potential.
Backfill material should be moisture conditioned within 2 percent of the optimum moisture content and to at least 95 percent of the maximum dry density as determined by AASHTO
T99 (standard Proctor compaction effort) in accordance with FP‐14 Section 208.
103897-002 August 04, 2021
Backfill material must be free of organics, debris, and other deleterious material. It should be noted that as the fines percent, amount of soil particles passing the No. 200 sieve, increases soil becomes more sensitive to small changes in moisture content, and adequate compaction becomes more difficult to achieve.
7.5 Suitability of On-Site Soils
Gradation and modified Proctor compaction curve testing on a bulk, near surface, soil sample collected from boring SWB‐1 is reported in Appendix B. The gradation testing results indicate that the on‐site soils meet the requirements for FP‐14 Structural Backfill and is suitable as an alternative to import fill if proper preparation of the on‐site soils is performed. Preparation for reuse of on‐site soils must require that all particles greater than
3 inches in size be removed before the on‐site soils may be used. The compaction test results, as determined by ASTM D 1557, indicate that the on‐site soils may be expected to provide:
Maximum Dry Density = 142.4 pcf
Optimum Moisture Content = 5.4%
However, we recommend additional tests on processed soil to determine maximum dry density and optimum moisture content. Verification of the on‐site soilʹs suitability as
Structural Backfill material, as described in Section 7.4, should be performed prior to construction.
8 LIMITATIONS
This report was prepared for the exclusive use of HDR and other members of the design team for specific application to this Project. Our report, conclusions, and interpretations should not be construed as a warranty of subsurface conditions included in this report. The analyses, conclusions, and recommendations contained in this report are based on site conditions as they presently exist and further assume that the explorations are representative of the subsurface conditions throughout the site; that is, the subsurface conditions everywhere are not significantly different from those disclosed by the explorations. If subsurface conditions different from those encountered in the explorations are encountered or appear to be present during construction, we should be advised at once so that we can review these conditions and reconsider our recommendations, where necessary. If there is a substantial lapse of time between the submission of this report and the start of construction at the site, or if conditions have changed because of natural forces or construction operations at or adjacent to the site, we recommend that we review our report to determine the applicability of the conclusions and recommendations.
103897-002 August 04, 2021
Within the limitations of scope, schedule, and budget, the analyses, conclusions, and recommendations presented in this report were prepared in accordance with generally accepted professional geotechnical engineering principles and practice in this area at the time this report was prepared. We make no other warranty, either express or implied.
These conclusions and recommendations were based on our understanding of the Project as described in this report and the site conditions as observed at the time of our explorations.
Unanticipated subsurface conditions are commonly encountered and cannot be fully determined by merely taking soil and rock samples from test borings. Such unexpected conditions frequently require that additional expenditures be made to attain a properly constructed project. Therefore, some contingency fund is recommended to accommodate such potential extra costs.
The scope of our present work did not include environmental assessments or evaluations regarding the presence or absence of hazardous or toxic substances in the soil, surface water, groundwater, or air on, below, or around this site or for the evaluation or disposal of contaminated soils or groundwater should any be encountered.
Shannon & Wilson has prepared the document, “Important Information About Your
Geotechnical/Environmental Report,” to help you and others in understanding the use and limitations of this report.
9 REFERENCES
American Association of State Highway and Transportation Officials (AASHTO), 2020, Bridge Design Specifications, 9th Edition, 555 12th Street, NW, Suite 10000, Washington, DC
California Dept. of Transportation (Caltrans), 2020, California Test Methods: Available:
https://dot.ca.gov/programs/engineering‐services/california‐test‐methods
California Dept. of Transportation (Caltrans), 2018, Corrosion guidelines, ver. 3.0, Sacramento, California.
California Dept. of Transportation (Caltrans), 2019, Seismic Design Criteria, ver. 2.0, Sacramento, California.
Chandra, D. K., 1961, Geology and Mineral Deposits of the Colfax and Foresthill
Quadrangles, California: State of California Division of Mines, Special Report 67, 50 p.
103897-002 August 04, 2021
Federal Highway Administration (FHWA), 2011, Context Sensitive Rock Slope Design
Solutions, FHWA‐CFL/TD‐11‐002, Washington, DC
Federal Highway Administration (FHWA), 2012, Evaluating Scour at Bridges, 5th Edition, Hydraulic Engineering Circular No. 18, Publication No. FHWA‐HIF‐12‐003, Washington, DC
Federal Highway Administration (FHWA), 2014, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP‐14, Washington, DC
Jennings, C., and Bryant, W., 2010, 150th Anniversary fault activity map of California:
California Geological Survey Map No. 6, scale 1:750,000.
Jennings, J.E., 1971, A mathematical theory for the calculation of the stability of slopes in open cast mines, in Van Rensburg, P.W.J., ed., Symposium on the planning open pit mines with special reference to slope stability, 1970, Johannesburg, South
Africa, Proceedings: Cape Town, South Africa, A. A. Balkema, P. 87‐102.
Rocscience, Inc., 2020a, Dips (v. 8.006), Graphical & Statistical Analysis of Orientation Data:
Toronto, Ontario, Rocscience, Inc.
Rocscience, Inc., 2020b, Slide2 Modeler (v. 9.008), 2D Limit Equilibrium Analysis for Slopes:
Toronto, Ontario, Rocscience, Inc.
Saucedo, G. J., and Wagner, D. L., 1992, Geologic Map of the Chico Quadrangle: State of
California Department of Conservation Map No. 7 A, 5 sheets, scale 1:250,000.
Wyllie, D.C., and Mah, C.W., 2004, Rock Slope Engineering – Civil and Mining (4th ed.):
London, Spon Press, p. 431.
VICINITY MAP
PROJECT
LOCATION
CA FTBR (1)
Ponderosa Bridge Replacement
Placer County, California
Aerial imagery downloaded from Google Earth Pro on 11-10-20.
103897-002
Fi le na m e:
E
:\J
D
EN
\1
7\
2\
-0
F ig
Vi ci ni ty M ap _P on de ro sa
B rid ge .d w g
D at e:
1-
-2
L og in
: S
AC
0 8000 16000
Approximate Scale in Feet
FIG. 1
Sacramento
CALIFORNIA
Project Location
Los Angeles
San Francisco
SEE FIGURE 2
SEE INSET
Pon de ros a W ay
Po nd er os a W ay
Heather Glen
Applegate
Clipper Gap
Meadow Vista
Bowman
North Auburn
Chain
Foresthill Rd
G ol de n
Hwy
U pp er L ak e
C le m en tin e
Lake Clementine
Ponderose Way
Foresth ill R d
Cool
1" = 1000 Ft.
August 2021
0+
1+00
2+00
2+56
0+
1+50
2+50
SWB-1
SWB-2
Ponderosa Way
P o n d e r o s a
W y
North Fork
American River
A
A
F i l e n a m e
E
J D
E N
P l a n a n d
P r o f i l e P o n d e r o s a
B r i d g e d y o u t
P l n t e o g i n
S
A C
SITE AND EXPLORATION PLAN
August 2021
40 80
Scale in Feet
FIG. 2
SWB-1
Boring Designation and
Approximate Location
Generalized
Subsurface Profile
(See Figure 3)
LEGEND
NOTE
Drawing based on topo survey, 2307-0020_
Ponderosa_Bridge_Topo, received 12-7-20.
Proposed bridge structures adapted from Drawing
RG3178-A, General Plan and Elevation.pdf Sheet
1 of 30 prepared by HDR, dated April 2021.
APPROXIMATE
PROPOSED BRIDGE
CA FTBR (1)
Ponderosa Bridge Replacement
Placer County, California
103897-002
A
Contour Interval = 5 Feet
Datum: NAD 83
PROPOSED PIER 2
PROPOSED PIER 3
PROPOSED ABUTMENT 4
PROPOSED WINGWALL D
PROPOSED WINGWALL B
PROPOSED ABUTMENT 1
PROPOSED WINGWALL A
PROPOSED WINGWALL C
APPROXIMATE ROADWAY
CENTERLINE ALIGNMENT
E l e v a t i o n i n
F e e t
N
A V
D
Northwest
A
Southeast
A'
APPROXIMATE PROPOSED BRIDGE LIMITS
PROPOSED
PIER 2
PROPOSED
PIER 3
12+00 13+0011+00
PROPOSED
ABUTMENT 4
PROPOSED
ABUTMENT 1
GRAB
50/5"
10-16-20
SWB-1
10-19-20
SWB-2
(Proj. 13' SE) (Proj. 1' NE)
F i l e n a m e
E
J D
E N
P l a n a n d
P r o f i l e P o n d e r o s a
B r i d g e d y o u t
P r o f i l e t e o g i n
S
A C
GENERALIZED SUBSURFACE
PROFILE A-A'
August 2021
FIG. 3
CA FTBR (1)
Ponderosa Bridge Replacement
Placer County, California
103897-002
Existing Ground Surface
1. Ground surface based on topo survey, 2307-0020_ Ponderosa_Bridge_Topo, received
12-7-20. Proposed bridge structures adapted from Drawing RG3178-A, General Plan and
Elevation.pdf Sheet 1 of 30 prepared by HDR, dated April 2021.
2. This subsurface profile is generalized from materials observed in soil borings. Variations may exist between profile and actual conditions.
NOTES
Vertical = Horizontal
SWB-1
10-16-20
(Proj. 13' SE) Designation of Boring
Projected Distance and Direction
Grab Sample
Sample and Penetration
Resistance in Blows/Foot or Blows per Inches Driven
Rock Core Sample
Rock Coring Recovery (%)
Rock Quality Designation (%)
LEGEND
Approximate Rock Contact
USCS Symbol
Bottom of Boring
Date of Completion
20 40
Scale in Feet
0 50 100
50/5"
North Fork American River
Approximate Ordinary High Water
Stationing Along Proposed Roadway Centerline
FIG. 4
CA FTBR (1)
Ponderosa Bridge Replacement
Placer County, California
DESIGN CALTRANS ARS CURVE
SITE CLASS B
August 2021 103897-002
F
IG
. 4
NOTES
1.
2. Abbreviation definitions:
ARS = Acceleration Response Spectrum
Design curve was generated using the Caltrans ARS Online tool (v3.0.2)
0.0
0.1
0.2
0.3
0.4
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
S p e c tr a l A c c e le ra ti o n
S a g
Period (seconds)
RECOMMENDED SURCHARGE
LOADING FOR TEMPORARY AND
PERMANENT WALLS
File: J:\Support\library\Standard Figures\Surcharge Loading Remp-Perm Wall_Letter.dwg Date: 03-12-2014 Author: SAC
103897-002August 2021
FIG. 5
For m ≤ 0.4:
H
= 0.28 (psf) (see Note 3)
W a l l
PLAN VIEW
2.0
1.5 e p t h
F a c t o r
Z
B
1.0
0.0
0.5
W a l l
Z
Wall Line
UNIFORM SURCHARGE
EARTH BERM
(see Note 4)
Note:
H z=nH
Bottom of
Excavation x = mH
Point Load in Pounds
H
(psf)
ELEVATION VIEW
x = mH
H
Bottom of
Excavation
W a l l z=nH
Line Load in
Pounds/Foot
B) LATERAL PRESSURE DUE TO LINE LOAD
i.e. NARROW CONTINUOUS FOOTING
PARALLEL TO WALL
C) LATERAL PRESSURE DUE TO STRIP LOAD
W a l l
W a l l
W a l l
A) LATERAL PRESSURE DUE TO POINT LOAD
i.e. SMALL ISOLATED FOOTING OR WHEEL LOAD
D) LATERAL PRESSURE DUE TO
EARTH BERM OR UNIFORM
SURCHARGE
Bottom of
Excavation
Bottom of
Excavation
E) LATERAL PRESSURE DUE
TO ADJACENT FOOTING
(see Notes 5 and 6)
0 0.5 1.0
L
B
NOTES
Figures are not drawn to scale.
Applicable surcharge pressures should be added to appropriate permanent wall lateral earth and water pressure.
If point or line loads are close to the back of the wall such that m 0.4, it may be more appropriate to model the actual load distribution (i.e., Detail E) or use more rigorous analysis methods.
See text for recommended K values.
The stress is estimated on the back of the wall at the center of the length, L, of loading.
The estimated stress is based on a Poisson's ratio of 0.5.
W a l l
Bearing
Pressure q (psf)
1.
2.
3.
4.
5.
6.
I p
, Influence Factor
= 2(I p
) q s
Lateral Footing
Pressure on Wall
(derived from NAVFAC DM 7.02, 1986; and Sandhu, Earth Pressure on Walls Due to Surcharge , 1974)
(derived from Poulos and Davis, Elastic
Solutions for Soil and Rock Mechanics , 1974; and Terzaghi and Peck, Soil
Mechanics in Engineering Practice , 1967)
(NAVFAC DM 7.02, 1986)
(derived from Fang, Foundation
Engineering Handbook , 1991)
(NAVFAC DM 7.2, 1986)
Point Load in Pounds
= Unit Weight of Earth Berm
Bearing
Pressure
Earth
Berm
= Lateral Pressure in radians
ELEVATION VIEW
(see Note 3)
(see Note 3) q s
L
2B
Q p
H n
(0.16 + n
For m > 0.4:
H
= 1.77 (psf)
Q p
H m n
(m
+ n
Q p
H
H cos
(1.1) (psf)
H
H
For m ≤ 0.4:
H
= 0.20 (psf) (see Note 3)
Q l
H n
(0.16 + n
For m > 0.4:
H
= 1.28 (psf)
Q l
H m n
(m
+ n
Q l
Q p
≤ 33°
H s
≤ 15 Feet
(K)()(H s
= (K)q s
(see Note 4) q
= ( - sin cos2) (psf)
2q
= 0.25
= 0.5
= 1
L
2B
L
2B
L
2B
F I G
CA FTBR (1)
Ponderosa Bridge Replacement
Placer County, California
8/4/2021-103897-002-AA.docx A-i
A
PP
EN
D
IX
A
: S U
B
SU
R
FA
C E
EX
PL
O R
A
TI
O N
S
Appendix A: Subsurface Explorations
Appendix A
Subsurface Explorations
CONTENTS
A.1 Introduction
A.2 Borings
A.3 Sample Classification
A.4 Soil and Rock Sampling
A.4.1 Standard Penetration Test (SPT) Samples
A.4.2 Bulk Samples
A.4.3 Rock Core Samples
Exhibits Exhibit A‐1: Photo of truck rig positioned on boring SWB‐1 location, looking northeast
Exhibit A‐2: Photo of truck rig positioned on boring SWB‐2 location, looking south
Figures Figure A‐1: Soil Description and Log Key (3 sheets)
Figure A‐2: Log of Boring SWB‐1 (3 sheets)
Figure A‐3: Log of Boring SWB‐2 (2 sheets)
A-1
A
PP
EN
D
IX
A
: S U
B
SU
R
FA
C E
EX
PL
O R
A
TI
O N
S
A.1 INTRODUCTION
The subsurface exploration program was conducted from October 15 to 19, 2020, and consisted of drilling and sampling two exploratory borings designated SWB‐1 and SWB‐2.
The borings were advanced at the locations shown in the Site and Exploration Plan, Figure
2. The methods used to conduct the subsurface exploration program are described below.
A.2 BORINGS
Prior to drilling the borings, we screened each boring location for utility conflicts using USA
North 811 public utility location. Boring SWB‐1 was advanced to 60.5 feet below ground surface (bgs) and located near the proposed bridge’s north abutment. Boring SWB‐2 was advanced to 37.1 feet bgs and located near the proposed bridge’s south abutment.
We retained Taber Drilling of West Sacramento, California to perform the borings. Borings were drilled using a truck mounted drill rig, as shown in the following photo Exhibits.
Exhibit A‐1 shows a close up of the rig position at boring SWB‐1 and Exhibit A‐2 shows an overview photo of the rig position at boring SWB‐2. The borings were drilled using a 4‐ inch‐diameter solid‐stem auger through the soil overburden and rock coring was used to advance the borings once bedrock was encountered. The borings were backfilled with neat cement grout up to within 5 feet bgs and the remainder of the borehole was backfilled with soil.
103897-002 August 04, 2021 A-2
A
PP
EN
D
IX
A
: S U
B
SU
R
FA
C E
EX
PL
O R
A
TI
O N
S
Exhibit A-1: Photo of truck rig positioned on boring SWB-1 location, looking northeast.
Exhibit A-2: Photo of truck rig positioned on boring SWB-2 location, looking south.
A-3
A
PP
EN
D
IX
A
: S U
B
SU
R
FA
C E
EX
PL
O R
A
TI
O N
S
A.3 SAMPLE CLASSIFICATION
A representative from Shannon & Wilson observed drilling operations, logged the borings, retrieved representative soil and rock samples for laboratory testing, and prepared logs of the explorations. Soil samples were classified in general accordance with the ASTM
International (ASTM) Designation: D2488, Standard Recommended Practice for Description of Soils (Visual‐Manual Procedure)1. The system is called the Unified Soil Classification
System (USCS) and is summarized in the Soil Description and Log Key, Figure A‐1.
A.4 SOIL AND ROCK SAMPLING
Soil samples were collected during the subsurface explorations at selected borehole depths using a Standard Penetration Test (SPT) split‐spoon sampler or from drill cuttings for bulk soil samples. Rock samples were collected via continuous sampling using a double tube HQ wireline core barrel system once bedrock was encountered in the boring. The types and depths of the sampling are indicated on the boring logs presented in Figures A‐2 and A‐3.
A.4.1 Standard Penetration Test (SPT) Samples
SPTs were performed in the borings at selected depths in general accordance with ASTM
Designation: D1586, Standard Method for Penetration Testing and Split‐barrel Sampling of
Soils (ASTM, 2019). The SPT consists of driving a 2‐inch outside diameter, split‐spoon sampler a distance of 18‐inches into the bottom of the borehole with an automatic 140‐ pound hammer falling 30‐inches. The number of blows required to achieve each three 6‐ inch increments of sampler penetration is recorded and the number of blows required for the last 12‐inches of penetration is termed the Standard Penetration Resistance (N‐value).
The N‐value is an empirical parameter that provides a means for evaluating the relative density, or compactness, of granular soils and the consistency, or stiffness, of cohesive soils.
The N‐values are plotted on the boring logs.
The SPT samplers used during the penetration testing recovered disturbed samples of the soil, which were field classified and recorded on the logs by our field representative. The samples were collected in plastic jars and sealed to preserve the moisture in the sample and transported to our laboratory.
A.4.2 Bulk Samples
In addition to SPTs, a bulk soil sample was collected from near surface drill cuttings in boring SWB‐1. The approximate depth range that the sample was retrieved was estimated
1 ASTM International, 2020, Annual Book of Standards, Construction, v 4.08, Soil and Rock (I); D 1586: West Conshohocken, PA, ASTM International, 1 v.
A-4
A
PP
EN
D
IX
A
: S U
B
SU
R
FA
C E
EX
PL
O R
A
TI
O N
S and noted on the boring log. Approximately 20 to 30 pounds of cuttings were placed in a plastic bag and transported to our laboratory for further evaluation and testing.
A.4.3 Rock Core Samples
Rock samples were collected using HQ double tube wireline coring methods (2.375‐inch nominal diameter rock core). During coring, cuttings were removed from the borehole by circulating water down through the drill rods and back up the annulus of the boring. Core runs were approximately 5 feet in length. Percent recovery and rock quality designation
(RQD) values are shown on the boring logs where coring was completed. Percent recovery is the ratio, expressed as a percent, of the length of recovered core to the total length of the core run. RQD is the ratio, expressed as a percent, of the sum of the length of intact core pieces greater than 4 inches long in a run to the total length of the core run. Following drilling, the core samples were logged by the Shannon & Wilson field representative and stored in plastic corrugated core boxes and transported to our laboratory for review and testing.
August 2021 103897-002
Ponderosa Bridge Replacement
Placer County, California
1Gravel, sand, and fines estimated by mass. Other constituents, such as organics, cobbles, and boulders, estimated by volume.
2Reprinted, with permission, from ASTM D2488 - 09a Standard Practice for Description and Identification of Soils (Visual-Manual Procedure), copyright ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428.
A copy of the complete standard may be obtained from ASTM International, www.astm.org.
140 pounds with a 30-inch free fall.
Rope on 6- to 10-inch-diam. cathead 2-1/4 rope turns, > 100 rpm
NOTE: If automatic hammers are used, blow counts shown on boring logs should be adjusted to account for efficiency of hammer.
10 to 30 inches long Shoe I.D. = 1.375 inches Barrel I.D. = 1.5 inches Barrel O.D. = 2 inches
Sum blow counts for second and third 6-inch increments.
Refusal: 50 blows for 6 inches or less; 10 blows for 0 inches.
RELATIVE
CONSISTENCY
N, SPT,
BLOWS/FT.
5% to 12% fine-grained:
with Silt or with Clay 3
15% or more of a second coarse-grained constituent:
with Sand or with Gravel 5
< 5%
5 to 10%
15 to 25%
30 to 45%
50 to 100%
Surface Cement Seal
Asphalt or Cap
Slough
Inclinometer or Non-perforated Casing
Vibrating Wire Piezometer
N, SPT,
BLOWS/FT.
< 4 4 - 10
10 - 30 30 - 50
> 50
DESCRIPTION
< #200 (0.075 mm = 0.003 in.)
#200 to #40 (0.075 to 0.4 mm; 0.003 to 0.02 in.)
#40 to #10 (0.4 to 2 mm; 0.02 to 0.08 in.)
#10 to #4 (2 to 4.75 mm; 0.08 to 0.187 in.)
SIEVE NUMBER AND/OR APPROXIMATE SIZE
#4 to 3/4 in. (4.75 to 19 mm; 0.187 to 0.75 in.)
3/4 to 3 in. (19 to 76 mm)
3 to 12 in. (76 to 305 mm)
> 12 in. (305 mm)
Fine Coarse
Fine Medium Coarse
BOULDERS
COBBLES
GRAVEL
FINES
SAND
Sheet 1 of 3
CONSTITUENT2
SOIL DESCRIPTION
AND LOG KEY
SHANNON & WILSON, INC.
Geotechnical and Environmental Consultants
Absence of moisture, dusty, dry to the touch
Damp but no visible water
Visible free water, from below water table
FIG. A-1
Shannon & Wilson, Inc. (S&W), uses a soil identification system modified from the Unified Soil Classification System (USCS). Elements of the USCS and other definitions are provided on this and the following pages. Soil descriptions are based on visual-manual procedures (ASTM D2488) and laboratory testing procedures (ASTM D2487), if performed.
STANDARD PENETRATION TEST (SPT)
SPECIFICATIONS
Hammer:
Sampler:
N-Value:
Dry
Moist
Wet
MOISTURE CONTENT TERMS
Modifying (Secondary)
Precedes major constituent
Major
Minor Follows major constituent
1All percentages are by weight of total specimen passing a 3-inch sieve.
2The order of terms is: Modifying Major with Minor.
3Determined based on behavior.
4Determined based on which constituent comprises a larger percentage.
5Whichever is the lesser constituent.
COARSE-GRAINED
SOILS
(less than 50% fines)1
NOTE: Penetration resistances (N-values) shown on boring logs are as recorded in the field and have not been corrected for hammer efficiency, overburden, or other factors.
PARTICLE SIZE DEFINITIONS
RELATIVE DENSITY / CONSISTENCY
Sand or Gravel 4
30% or more coarse-grained:
Sandy or Gravelly 4
More than 12% fine-grained:
Silty or Clayey 3
15% to 30% coarse-grained:
with Sand or with Gravel 4
30% or more total coarse-grained and lesser coarse-grained constituent is 15% or more:
with Sand or with Gravel 5
Very soft Soft Medium stiff Stiff Very stiff Hard
Very loose Loose Medium dense Dense Very dense
RELATIVE
DENSITY
FINE-GRAINED SOILS
(50% or more fines)1
COHESIVE SOILS
< 2 2 - 4 4 - 8
8 - 15 15 - 30
> 30
COHESIONLESS SOILS
Silt, Lean Clay, Elastic Silt, or
Fat Clay 3
PERCENTAGES TERMS 1, 2
Trace
Few
Little
Some
Mostly
WELL AND BACKFILL SYMBOLS
Bentonite Cement Grout
Bentonite Grout
Bentonite Chips
Silica Sand
Perforated or Screened Casing
S&W INORGANIC SOIL CONSTITUENT DEFINITIONS
S O
IL
_C
LA
S
S _K
E Y
_P G
7-
2.
G
P J
S H
A N
_W
IL
.G D
T
/1 1/
Ponderosa Bridge Replacement
Placer County, California
GC
SC
Inorganic
Organic
(more than 50% of coarse fraction retained on No. 4 sieve)
MAJOR DIVISIONS GROUP/GRAPHIC
SYMBOL
CH
OH
ML
CL
TYPICAL IDENTIFICATIONS
Gravel
Sand
Silty Sand; Silty Sand with Gravel
Clayey Sand; Clayey Sand with Gravel
Clayey Gravel; Clayey Gravel with Sand
Sheet 2 of 3
Gravels
Primarily organic matter, dark in color, and organic odor
SW
(more than 12% fines)
Silts and Clays
Silts and Clays
(more than 50% retained on No.
200 sieve)
(50% or more of coarse fraction passes the No. 4 sieve)
(liquid limit less than 50)
(liquid limit 50 or more)
Organic
Inorganic
FINE-GRAINED
SOILS
SM
Sands
Silty or Clayey Gravel
Silt; Silt with Sand or Gravel; Sandy or Gravelly Silt
Organic Silt or Clay; Organic Silt or Clay with Sand or Gravel; Sandy or Gravelly Organic Silt or Clay
HIGHLY-
ORGANIC
SOILS
COARSE-
GRAINED
SOILS
OL
(less than 5% fines)
GW
Geotechnical and Environmental Consultants
SHANNON & WILSON, INC.
(less than 5% fines)
PT
FIG. A-1
(more than 12% fines)
MH
SP
GP
GM
Silty or Clayey Sand
Silty Gravel; Silty Gravel with Sand
(50% or more passes the No.
200 sieve)
SOIL DESCRIPTION
AND LOG KEY
Elastic Silt; Elastic Silt with Sand or Gravel; Sandy or Gravelly Elastic Silt
Fat Clay; Fat Clay with Sand or Gravel;
Sandy or Gravelly Fat Clay
Organic Silt or Clay; Organic Silt or Clay with Sand or Gravel; Sandy or Gravelly Organic Silt or Clay
Poorly Graded Sand; Poorly Graded Sand with Gravel
Well-Graded Sand; Well-Graded Sand with Gravel
Well-Graded Gravel; Well-Graded Gravel with Sand
Poorly Graded Gravel; Poorly Graded Gravel with Sand
Lean Clay; Lean Clay with Sand or Gravel; Sandy or Gravelly Lean Clay
Peat or other highly organic soils (see
ASTM D4427)
NOTES
1. Dual symbols (symbols separated by a hyphen, i.e., SP-SM, Sand with Silt) are used for soils with between 5% and 12% fines or when the liquid limit and plasticity index values plot in the CL-ML area of the plasticity chart.