This amendment modifies a solicitation for bridge and road improvement projects located near Auburn, California. The work includes removing and replacing an existing single lane bridge over the American River with 2.4 miles of gravel road improvements, and replacing the existing aggregate surface and bridge railing on a pedestrian bridge to address drainage and safety issues. Bidders must acknowledge this amendment in block 19 of the SF1442 form by May 11, 2022. The solicitation is issued by the Federal Highway Administration for the Department of Transportation under number 698AF22B000007 dated April 12, 2022.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

Page A - 8

A0110 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

410 LNFT $____________ $____________

A0120 15802-0000 WATERING FOR DUST CONTROL

ALL LPSM $___LPSM_____ $____________

A0130 20101-0000 CLEARING AND GRUBBING

0.20 ACRE $____________ $____________

A0140 20301-0100 REMOVAL OF BOLLARD

8 EACH $____________ $____________

A0150 20301-1900 REMOVAL OF PIPE CULVERT

11 EACH $____________ $____________

A0160 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (PERMIT DEPOSIT BOX)

1 EACH $____________ $____________

A0170 20304-2000 REMOVAL OF BRIDGE

ALL LPSM $___LPSM_____ $____________

A0180 20420-0000 EMBANKMENT CONSTRUCTION

190 CUYD $____________ $____________

A0190 20801-0000 STRUCTURE EXCAVATION

230 CUYD $____________ $____________

A0200 20803-0000 STRUCTURAL BACKFILL

160 CUYD $____________ $____________

A0210 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

100.0 CUYD $____________ $____________

A0220 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

20 CUYD $____________ $____________

A0230 30107-1000 SUBBASE GRADING A

15 CUYD $____________ $____________

A0240 30202-2000 ROADWAY AGGREGATE, METHOD 2

4,600 TON $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:CA FTBR PONDEROSA BRIDGE(1) Project Name:Ponderosa Bridge Replacement

Amendment A001 05/11/2022

Sheet and Description

B4 B4 B5 B5 B6 B6 B6 B7 S2

Survey and

Staking

Summary

Erosion

Control

Summary

Removals

Summary

Grading

Summary

Drainage

Summary

Surfacing

Summary

Guardrail

Summary

Permanent

Sign

Summary

Bridge

Summary Allowance

Bid

Schedule

A0010 15101-0000 MOBILIZATION LPSM ALL

A0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 2.38 2.38

A0030 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL

A0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 13 13

A0050 15225-0000 SLOPE, REFERENCE, AND CLEARING AND

GRUBBING CONTROL MILE 0.09 0.09

A0060 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.09 0.09

A0070 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0090 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0100 15705-0100 SOIL EROSION CONTROL, SILT FENCE

(EXCLUSION FENCE) LNFT 5,550 350 5,900

A0110 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 390 20 410

A0120 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0130 20101-0000 CLEARING AND GRUBBING ACRE 0.18 0.02 0.20

A0140 20301-0100 REMOVAL OF BOLLARD EACH 8 8

A0150 20301-1900 REMOVAL OF PIPE CULVERT EACH 11 11

A0160 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

(PERMIT DEPOSIT BOX) EACH 1 1

A0170 20304-2000 REMOVAL OF BRIDGE LPSM All ALL

A0180 20420-0000 EMBANKMENT CONSTRUCTION CUYD 166 24 190

A0190 20801-0000 STRUCTURE EXCAVATION CUYD 230 230 Contract Quantity

A0200 20803-0000 STRUCTURAL BACKFILL CUYD 160 160 Contract Quantity

A0210 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 85.2 14.8 100.0

A0220 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 18 2 20

A0230 30107-1000 SUBBASE GRADING A CUYD 13 2 15

A0240 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 4,280 320 4,600

A0250 30301-4000 ROADBED RECONDITIONING MILE 2.38 2.38

A0260 30301-5000 AGGREGATE SURFACE RECONDITIONING MILE 2.41 2.41

A0270 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 269 269 Contract Quantity

A0280 55235-0000 EXPANSION JOINTS LNFT 35 35 Contract Quantity

A0290 55401-1000 REINFORCING STEEL LB 33,700 33,700 Contract Quantity

A0300 55401-2000 REINFORCING STEEL, EPOXY COATED LB 41,800 41,800 Contract Quantity

A0310 55502-0000 STRUCTURAL STEEL, FURNISHED, Contract Quantity

FABRICATED, AND ERECTED LB 137,400 137,400

A0320 55601-0900 BRIDGE RAILING, STEEL LNFT 453 453 Contract Quantity

A0330 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 22 22 Contract Quantity

A0340 60201-0500 15-INCH PIPE CULVERT LNFT 6 4 10

A0350 60201-0800 24-INCH PIPE CULVERT LNFT 366 34 400

A0360 60210-0500 END SECTION FOR 15-INCH PIPE CULVERT EACH 1 1

MileStone: 100% Submittal

Date Completed: 03/30/22

Report Date: 02/25/22

A

M

E

N

D

Line

Item

No.

Pay Item

Number

SUMMARY OF QUANTITIES - Schedule A -F e b -2

:2

A

M

Remarks and/or

Determination of

Estimated Quantity

Pay Item Description Unit

Estimated

Quantities c p w w o rk in g \c e n tr a l0

\d

C A F

T B R

B ri d g e s

S O

Q P

W B .x ls m

]S h e e t

STATE PROJECT

B1

CA FTBR PONDEROSA

BRIDGE(1)

CA

SHEET

NUMBER

1 TON

30202-2000

5/11/2022

Amendment A001 05/11/2022

Full Appendix B.pdf
APPENDIX B.pdf
subcontractingplan
Text1:
Text2:
0: 1
1: 3
Text3:
0: A001
1: 05/11/2022
2:
0:
1: CA FTBR (1) Bridges
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: __________________

1:

1:
0:
Text6:
0: 6982AF22B000007
1: 04/12/2022
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Yes
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 0*
Text11:
0:
1:
Text12: * See Item 14 Below
Text13: SECTION A

Remove and replace page A-8 with the attached corresponding page.

PLANS SUMMARY OF QUANTITIES - Schedule A Remove and replace Sheet Number B1 with the attached corresponding page.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .