This document provides details on a federal solicitation opportunity for transportation infrastructure work. The solicitation number is 6982AF22B000032 issued by the Department of Transportation Federal Highway Administration for the CA FLAP ED CR 147(2) Ice House Road project. Interested vendors are sought to reconstruct approximately 2 miles of Ice House Road including drainage improvements, guardrail installation, and signage updates. The response deadline is not specified in the file attachment but the 18MB PDF file may contain additional requirements, specifications, and terms for the opportunity.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: 6982AF22B000032
SOLICITATION TYPE: FULL & OPEN (OPEN COMPETITION)
PROJECT NUMBER: CA FLAP ED CR147(2)
PROJECT NAME: ICE HOUSE ROAD
BID OPENING DATE:
See Page A-1, Item 13A
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-14 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov https://highways.dot.gov/federal-lands mailto:CFLContracts@dot.gov
PROJECT CA FLAP ED CR147(2)
LOCATION ELDORADO NATIONAL FOREST
COUNTY EL DORADO
STATE CALIFORNIA
LENGTH SCHEDULE A: 14.95 MILES
OPTION X: 2.67 MILES
OPTION Y: BRIDGE BARRIER
REPLACEMENT
TYPE OF IMPROVEMENT 3R (RESTORATION, RESURFACING, AND
REHABILITATION), FULL DEPTH
RECLAMATION, ASPHALT CONCRETE
PAVEMENT, DRAINAGE AND BARRIER
REPLACEMENT
TABLE OF CONTENTS
Notice to Bidders ............................................................................................................. A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award and Bid Schedule ................................................................................ A-4
Solicitation Provisions .....................................................................................................B-7
Contract Clauses ..............................................................................................................C-1
Construction Wage Rate Requirement ............................................................................ D-1
Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-19 Division 200 ................................................................................................................... E-37 Division 300 ................................................................................................................... E-41 Division 400 ................................................................................................................... E-43 Division 500 ................................................................................................................... E-57 Division 600 ................................................................................................................... E-58 Division 700 ................................................................................................................... E-73
APPENDICES
Appendix A ............................................................................................................. Fire Plan
Appendix B ...........................................................................................401 and 404 Permits
Appendix C .............................................................. FHWA Subcontracting Plan Template
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
PROJECT OVERVIEW
Ice House Road, also designated as County Road 147, is located in El Dorado County, California, and provides recreational access to the world-renowned off-highway vehicle Rubicon Trail, the Crystal Basin Recreation Area within the ENF, the Desolation Wilderness area, Loon Lake, Union Valley Reservoir, and Ice House Reservoir. The proposed action is generally described as a 3R rehabilitation project. The improvements consist of a full-depth reclamation which will pulverize and replace the existing two-lane paved roadway with new 11-foot lanes and 1-foot shoulders along Ice House Road from Peavine Ridge Road to Wentworth Springs.
NOTICE TO BIDDERS
A-i
I. PRE-BID INFORMATION
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Submit the following documents with your Bid Package–
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2
• Indication of interest in formal Partnering, Page A-6
• Bid Schedule Pages A-7 through A-19
• Completed an applicable Authority to Bind certificate, pages A-20 through A-24
• Buy American Act & Hazardous Materials, Pages A-25 through A-26
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
o Digital copies may be downloaded at https://www.gsa.gov/forms-library/bid-bond
• Completed the VETS-4212 declaration, Page A-ii; Bidders’ Information, Pages B-3 through B-6.
• HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C of the IFB.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed envelope and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at https://sam.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
The FP-14 was utilized for the design of this project. Paper copies of the FP-14 will not be provided to bidders or the awarded Prime Contractor. The FP-14 is available electronically at https://flh.fhwa.dot.gov/resources/specs/ and a copy is uploaded with this solicitation. A single paper copy can be obtained from the Research & Technology Distribution Center (RTPDC) by email report.center@dot.gov.
https://www.gsa.gov/forms-library/bid-bond https://sam.gov/ https://flh.fhwa.dot.gov/resources/specs/ mailto:report.center@dot.gov
A-ii
Applicable FAR/TAR provisions and clauses in this IFB are incorporated by reference or full text.
FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/content/regulations.
Notice of SAM Registration – you must be registered in the System for Award Management (SAM) prior to submission of a bid in response to this solicitation. Failure to register prior to submission of a bid may require award to the next successful registered offeror. See FAR Subpart
4.1102. Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million. If your average annual gross receipts for the past 5 years are above $45 million, you are a large business for this solicitation. If they are below $45 million you are a small business. Before submitting bids, you must ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov. Include NAICS 237310 in your SAM profile.
Vets-4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: https://www.dol.gov/agencies/vets/contractor/instructions-for-electronic-submission-vets-4212-reports.
• My firm had a qualifying Federal Contract in 2022 and has complied with the reporting requirements.
• My firm did not have a qualifying Federal Contract in 2022 and is therefore exempt from the reporting requirements
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to the price of all offers except HUBZone small business concerns that have not waived the evaluation preference and otherwise successful offers from small business concerns. See FAR Clause 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.219-14, Limitations on Subcontracting will apply.
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-14. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
Accuracy and Completeness of Bid- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).
https://www.acquisition.gov/content/regulations http://www.sam.gov/ http://www.sam.gov/
A-iii
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON OCTOBER 19, 2023
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov
Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov
II. POST AWARD INFORMATION
CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1.5 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of request of the CO, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) https://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of mailto:CFLContracts@dot.gov https://sam.gov/ https://web.sba.gov/subnet/
A-iv
Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at https://www.sam.gov.
See Appendix C for Sample Small Business Subcontracting Plan.
NOTE:
• Consider the following FHWA small business goals in development of Subcontracting plans and efforts:
FHWA Small Business Subcontracting Goals (As of FY 2023) Business Size Goal (%)
SB 43.0%
SDB 5.0%
HUBZone 3.0%
WOSB 5.0%
SDVOSB 3.0%
Insurance requirements - See Subsection 107.05 of the FP-14.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.
The Contractor shall be required to submit a user account form to gain access to the EEBACS system.
See Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at https://highways.dot.gov/federal-lands/estimates/eebacs-guide https://www.sam.gov/ https://highways.dot.gov/federal-lands/estimates/eebacs-guide
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
PAGE OF PAGES1. SOLICITATION NUMBER
6982AF22B000032 1 OF 2
3. DATE ISSUED
09/22/2023
HFLCEO230477PR CA FLAP ED CR147(2)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE
LAKEWOOD, CO 80228
Leslie Karsten, Contract Specialist
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE
LAKEWOOD, CO 80228
SEE PAGE A-3 SEE PAGE A-3
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORTATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENTS
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence.
10 * X X 108.01 as amended in the
Special Contract Requirements.
X
0 2:00 pm
10/31/2023
X
X
A - 1
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
SEE INDIVIDUAL BID SCHEDULE(S)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE
LAKEWOOD, CO 80228
A - 2
Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.
Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov .
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee (Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-
14. All bid guarantees must have original signatures with original corporate seals.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE
DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY
RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to https://sam.gov.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-14.
ESTIMATED
PRICE: The price range of the project work is between $20,000,000 and $30,000,000.
A - 3 mailto:CFLContracts@dot.gov mailto:CFLContracts@dot.gov https://sam.gov/
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule and two options.
Before preparing the bid, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Pay Item 15401-0000, Contractor testing
Bidders must provide prices on alternative Contractor Testing pay items for EACH SCHEDULE.
Bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory for each schedule. The price for this item will be included in the Construction Cost Total for each schedule and all totals on the Bid Summary, pages A-8 thru A-19, therefore, included in the evaluation for award.
Bidders must also provide a stand alone price on the last page of each schedule for the alternative item, Contractor Testing using a Government-furnished field laboratory, at the end of each bid schedule.
This price will not be factored into the evaluation for award.
The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
Basis for Award
To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A and Option X and Option Y. Accordingly, award of contract, if made, will be made to the lowest responsive, responsible bidder, if funds are available and the Contracting Officer determines the price to be reasonable.
Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule A.
A - 4
Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 60 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).
A - 5
Partnering
A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.
CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.
A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.
Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-14. Costs of partnering would be in addition to the contract award amount.
Please indicate your desire to participate in a formal partnering meeting on this project.
(___) We would like to participate in a formal partnering meeting.
(___) We do not want to participate in a formal partnering meeting.
A - 6
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CA FLAP ED CR147(2)
Project Name:Ice House Road
A - 8
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0001 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0011 15210-3000 CENTERLINE, VERIFICATION AND STAKING
14.953 MILE $____________ $____________
A0021 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
4 EACH $____________ $____________
A0031 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0041 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0051 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0061 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
6,000 LNFT $____________ $____________
A0071 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0081 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A0091 20202-0000 SELECTIVE CLEARING
2,400 SQYD $____________ $____________
A0101 20220-1000 REMOVAL, INDIVIDUAL TREE
8 EACH $____________ $____________
A0111 20301-2400 REMOVAL OF SIGN
41 EACH $____________ $____________
A0121 20302-0400 REMOVAL OF CURB, ASPHALT
100 LNFT $____________ $____________
A0131 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP ED CR147(2)
(CONTRACTOR FURNISHED LAB)
A - 9
A0141 20315-0000 SAWCUTTING PAVEMENT
23,710 LNFT $____________ $____________
A0151 20402-0000 SUBEXCAVATION
4,600 CUYD $____________ $____________
A0161 20420-0000 EMBANKMENT CONSTRUCTION
55 CUYD $____________ $____________
A0171 20441-0000 WASTE
10,500 CUYD $____________ $____________
A0181 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
110 CUYD $____________ $____________
A0191 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
170 LNFT $____________ $____________
A0201 30202-2000 ROADWAY AGGREGATE, METHOD 2
2,330 TON $____________ $____________
A0211 30302-1000 DITCH RECONDITIONING
9,200 LNFT $____________ $____________
A0221 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
14.820 MILE $____________ $____________
A0241 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
36,400 TON $____________ $____________
A0251 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
365 TON $____________ $____________
A0271 41102-1000 PRIME COAT, METHOD 1
225,750 SQYD $____________ $____________
A0281 41105-0000 BLOTTER
320 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0291 41201-0000 TACK COAT
95 TON $____________ $____________
A0301 60201-0600 18-INCH PIPE CULVERT
15 LNFT $____________ $____________
A0311 60201-0800 24-INCH PIPE CULVERT (HDPE)
85 LNFT $____________ $____________
A0321 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
45 LNFT $____________ $____________
A0331 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
3 EACH $____________ $____________
A0341 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
1 EACH $____________ $____________
A0351 60404-1000 CATCH BASIN, FLH TYPE 1
1 EACH $____________ $____________
A0361 60501-0000 STANDARD UNDERDRAIN SYSTEM
600 LNFT $____________ $____________
A0371 60704-0000 CLEANING CULVERT IN PLACE
129 EACH $____________ $____________
A0381 60705-0000 REPAIRING DRAINAGE STRUCTURE
4 EACH $____________ $____________
A0391 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
7,010 LNFT $____________ $____________
A0401 60908-1000 PAVED DITCH, ASPHALT (New or Replaced)
2,250 SQYD $____________ $____________
A0411 60908-1000 PAVED DITCH, ASPHALT (Overlay)
9,250 SQYD $____________ $____________
A0421 61701-4100 GUARDRAIL SYSTEM CRG, TYPE 2, CLASS A
75 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A0431 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS
800 LNFT $____________ $____________
A0441 61702-0400 TERMINAL SECTION, TYPE G4-CRT
2 EACH $____________ $____________
A0451 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
5 EACH $____________ $____________
A0461 61702-1600 TERMINAL SECTION, TYPE MGS FLARED
11 EACH $____________ $____________
A0471 61707-4000 STRUCTURE TRANSITION RAILING, MGS SYSTEM
400 LNFT $____________ $____________
A0481 61901-0000 FENCE (TEMPORARY PLASTIC)
3,950 LNFT $____________ $____________
A0491 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
90 HOUR $____________ $____________
A0501 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
90 HOUR $____________ $____________
A0511 62201-1050 WHEEL LOADER, 5 CUBIC YARD MINIMUM RATED CAPACITY
90 HOUR $____________ $____________
A0521 62201-2750 MOTOR GRADER
90 HOUR $____________ $____________
A0531 62201-3000 HYDRAULIC EXCAVATOR
90 HOUR $____________ $____________
A0541 62301-0000 GENERAL LABOR
150 HOUR $____________ $____________
A0551 62302-0100 SPECIAL LABOR, SLOPE SCALING
32 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A0561 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
80 HOUR $____________ $____________
A0571 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
80 HOUR $____________ $____________
A0581 62511-2000 SEEDING, HYDRAULIC METHOD (Riparian)
1,750 SQYD $____________ $____________
A0591 62511-2000 SEEDING, HYDRAULIC METHOD (Upland)
71,900 SQYD $____________ $____________
A0601 62516-2000 MULCHING, HYDRAULIC METHOD
147,370 SQYD $____________ $____________
A0611 62520-0000 FERTILIZER
15.0 ACRE $____________ $____________
A0621 63301-0000 SIGN SYSTEM
92 EACH $____________ $____________
A0631 63308-0000 OBJECT MARKER
260 EACH $____________ $____________
A0641 63402-0700 PAVEMENT MARKINGS, TYPE D, SOLID
57.4 MILE $____________ $____________
A0651 63402-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
0.8 MILE $____________ $____________
A0661 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE D)
10 EACH $____________ $____________
A0671 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
A0681 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP ED CR147(2)
Project Name:Ice House Road
A0041 15401-0000 CONTRACTOR TESTING (GOVERNMENT FURNISHED LAB)
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM $_____________ $_____________
A - 14
X0001 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0011 15210-3000 CENTERLINE, VERIFICATION AND STAKING
2.670 MILE $____________ $____________
X0021 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
2 EACH $____________ $____________
X0031 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0041 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X0051 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X0061 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
500 LNFT $____________ $____________
X0071 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
X0081 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
X0091 20202-0000 SELECTIVE CLEARING
1,300 SQYD $____________ $____________
X0101 20301-2400 REMOVAL OF SIGN
8 EACH $____________ $____________
X0111 20302-0400 REMOVAL OF CURB, ASPHALT
260 LNFT $____________ $____________
X0121 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ALL LPSM $___LPSM_____ $____________
X0131 20315-0000 SAWCUTTING PAVEMENT
5,630 LNFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FLAP ED CR147(2)
(CONTRACTOR FURNISHED LAB)
A - 15
X0141 20402-0000 SUBEXCAVATION
1,000 CUYD $____________ $____________
X0151 20441-0000 WASTE
1,780 CUYD $____________ $____________
X0161 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
5 CUYD $____________ $____________
X0171 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
120 LNFT $____________ $____________
X0181 30202-2000 ROADWAY AGGREGATE, METHOD 2
330 TON $____________ $____________
X0191 30302-1000 DITCH RECONDITIONING
315 LNFT $____________ $____________
X0201 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
2.670 MILE $____________ $____________
X0221 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
6,780 TON $____________ $____________
X0231 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
70 TON $____________ $____________
X0251 41102-1000 PRIME COAT, METHOD 1
41,860 SQYD $____________ $____________
X0261 41105-0000 BLOTTER
60 TON $____________ $____________
X0271 41201-0000 TACK COAT
20 TON $____________ $____________
X0281 60201-0800 24-INCH PIPE CULVERT (HDPE)
45 LNFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 16
X0291 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
2 EACH $____________ $____________
X0301 60501-0000 STANDARD UNDERDRAIN SYSTEM
55 LNFT $____________ $____________
X0311 60704-0000 CLEANING CULVERT IN PLACE
12 EACH $____________ $____________
X0321 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
2,320 LNFT $____________ $____________
X0331 60908-1000 PAVED DITCH, ASPHALT (New or Replaced)
880 SQYD $____________ $____________
X0341 60908-1000 PAVED DITCH, ASPHALT (Overlay)
2,430 SQYD $____________ $____________
X0351 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
X0361 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
40 HOUR $____________ $____________
X0371 62201-1050 WHEEL LOADER, 5 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
X0381 62201-2750 MOTOR GRADER
40 HOUR $____________ $____________
X0391 62201-3000 HYDRAULIC EXCAVATOR
40 HOUR $____________ $____________
X0401 62301-0000 GENERAL LABOR
25 HOUR $____________ $____________
X0411 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
20 HOUR $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 17
X0421 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
20 HOUR $____________ $____________
X0431 62511-2000 SEEDING, HYDRAULIC METHOD (Upland)
13,080 SQYD $____________ $____________
X0441 62516-2000 MULCHING, HYDRAULIC METHOD
26,320 SQYD $____________ $____________
X0451 62520-0000 FERTILIZER
2.7 ACRE $____________ $____________
X0461 63301-0000 SIGN SYSTEM
25 EACH $____________ $____________
X0471 63308-0000 OBJECT MARKER
25 EACH $____________ $____________
X0481 63402-0700 PAVEMENT MARKINGS, TYPE D, SOLID
10.8 MILE $____________ $____________
X0491 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE D)
2 EACH $____________ $____________
X0501 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FLAP ED CR147(2)
Project Name:Ice House Road
X0041 15401-0000 CONTRACTOR TESTING (GOVERNMENT FURNISHED LAB)
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM $_____________ $_____________
A - 18
Y0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
Y0040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Y0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Y0080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Y0100 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
Y0120 20302-0150 REMOVAL OF BRIDGE RAILING
1,467 LNFT $____________ $____________
Y0140 20305-1000 REMOVAL OF CONCRETE
3 CUYD $____________ $____________
Y0160 20801-0000 STRUCTURE EXCAVATION
30 CUYD $____________ $____________
Y0180 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
29 CUYD $____________ $____________
Y0200 55401-1000 REINFORCING STEEL
400 LB $____________ $____________
Y0220 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL
1,467 LNFT $____________ $____________
Y0240 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CA FLAP ED CR147(2)
Project Name:Ice House Road
(CONTRACTOR FURNISHED LAB)
X0041 15401-0000 CONTRACTOR TESTING (GOVERNMENT FURNISHED LAB)
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM $_____________ $_____________
A - 19
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(A - 13)
Schedule X - Option(A - 17)
Schedule Y - Option(A - 18)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.
Corporate Certificate
I, (name), certify that I am the
(title), of the corporation named as the
Offeror/Principal herein;
that (name), who signed this offer and/or bid bond on behalf of (company name) is
(title) of this corporation;
that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.
(signature) Affix Corporate Seal
(title)
A - 20
INSTRUCTIONS: When the offeror/principal is a limited liability corporation, include this certification with your offer/bid.
Limited Liability Certificate
I, (name), certify that I am the
(title), of the limited liability company named as the Offeror/Principal herein;
that (name), who signed this offer and/or bid bond on behalf of (company name) is
(title) of this company;
that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.
(signature) Affix Company Seal (as applicable)
(title)
A - 21
INSTRUCTIONS: When the offeror/principal is a partnership, include this certification with your offer/bid.
Authority to Bind Partnership
This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting
Officer.
(Include names and signatures of all partners)
A - 22
INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification with your offer/bid.
Authority to Bind Joint Venture
This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting
Officer.
(Include names and signatures of all applicable individuals)
A - 23
INSTRUCTIONS: When the offeror/principal is a sole proprietorship, include this certification with your offer/bid.
Sole Proprietorship Requirement
An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor. If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.
A - 24
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A - 25
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material
Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
A - 26
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (REV. 8/2016)
Previous edition is NOT usable Prescribed by GSA - FAR (48 CFR) 53.228(a)
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0045
Expiration Date: 8/31/2025 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of
1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F
Street, NW, Washington, DC 20405.
SURETY(IES) (Name and business address)
PENAL SUM OF BOND BID IDENTIFICATION
PERCENT
OF BID
PRICE
20%
AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER
6982AF22B000032 MILLION(S)
THOUSAND(S)
HUNDRED(S)
CENTS
00 FOR (Construction, Supplies or
Services) Construction
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.
Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
(Seal)
3.
(Seal) Corporate
Seal
NAME(S) &
TITLE(S)
(Typed)
1. 2. 3.
INDIVIDUALSURETY(IES)
SIGNATURE(S) 1.
(Seal)
2.
(Seal)
NAME(S)
(Typed)
1. 2.
CORPORATE SURETY(IES)
SU
R
ET
Y
A
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S) 1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
INDIVIDUAL PARTNERSHIP JOINT VENTURE
CORPORATION OTHER (Specify)
STATE OF INCORPORATION
B - 1
STANDARD FORM 24 (REV. 8/2016) BACK
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .