Bid Tabs CA FLAP ED CR147 Ice house Road.pdf
PDF 699 KB Posted
- Attached to
- CA FLAP ED CR 147(2) Ice House Road
- Solicitation number
- 6982AF22B000032
About this file
This document is a bid tabulation report for the CA FLAP ED CR147(2) Ice House Road project. The report evaluates bids received in response to solicitation number 6982AF22B000032 issued by the Department of Transportation Federal Highway Administration. Seven contractors submitted bids for the base schedule and optional items. The low bidder for the base schedule alone was Steve Manning Construction at $16,568,934, while the low bidder for the base schedule and both options was George Reed at $22,836,559. The report provides line item details of contractor bids for mobilization, surveying, quality control, testing and other construction activities. It indicates the engineer's estimate and whether each bid was deemed responsive. The document evaluates contractor pricing for road and drainage construction work in connection with the Ice House Road project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 11/08/23
1 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Contractor Responsive?
Engineer's Estimate
GEORGE REED, INC.
Granite Construction Company
Hat Creek Construction & Materials, Inc.
Herback General Engineering
Martin Brothers Construction
Steve Manning Construction, Inc
Base Schedule A
$17,439,640.00
$18,081,450.00
$19,842,880.00
$18,175,484.00
$19,622,356.41
$16,568,934.00
$20,789,513.00
Option: X
$3,267,280.00
$2,958,702.00
$3,833,338.25
$3,025,479.00
$3,491,041.03
$3,228,927.00
$4,505,096.00
Option: Y
$858,000.00
$1,796,407.00
$2,473,985.00
$889,026.00
$1,151,198.00
$1,497,139.00
$2,497,375.00
Contractor Responsive?
Engineer's Estimate
GEORGE REED, INC.
Granite Construction Company
Hat Creek Construction & Materials, Inc.
Herback General Engineering
Martin Brothers Construction
Steve Manning Construction, Inc
Total Base Schedule A and Option(s): X
$20,706,920.00
$21,040,152.00
$23,676,218.25
$21,200,963.00
$23,113,397.44
$19,797,861.00
$25,294,609.00
Total Base Schedule A and Option(s): XY
$21,564,920.00
$22,836,559.00
$26,150,203.25
$22,089,989.00
$24,264,595.44
$21,295,000.00
$27,791,984.00
Total Base Schedule A and Option(s): Y
$18,297,640.00
$19,877,857.00
$22,316,865.00
$19,064,510.00
$20,773,554.41
$18,066,073.00
$23,286,888.00
2 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF22B000032
Division: Central Federal Lands
State: CA County: El Dorado
Federal Land: Eldorado National Forest Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 11/07/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
GEORGE REED, INC. $2,958,702.00
140 Empire Avenue Modesto, CA 95354
Hat Creek Construction & Materials, Inc. $3,025,479.00 24339 Highway 89 N Burney, CA 96013
Martin Brothers Construction $3,228,927.00 8801 Folsom Blvd Suite 260 Sacramento, CA 95826
Herback General Engineering $3,491,041.03 2531 Nowlin Road Minden, NV 89423
Granite Construction Company $3,833,338.25 4001 Bradshaw Road Sacramento, CA 95827
Steve Manning Construction, Inc $4,505,096.00 5211 Churn Creek Road Redding, CA 96002
Engineer's Estimate $3,267,280.00
Contract Specialist
11/08/2023
Leslie Karsten
3 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0001 15101-0000 MOBILIZATION
GEORGE REED, INC. Lump Sum $45,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $50,000.00 Martin Brothers Construction Lump Sum $310,000.00 Herback General Engineering Lump Sum $244,830.00 Granite Construction Company Lump Sum $380,000.00 Steve Manning Construction, Inc Lump Sum $400,000.00 Engineer's Estimate ALL LPSM Lump Sum $350,185.00
X0011 15210-3000 CENTERLINE, VERIFICATION AND STAKING
GEORGE REED, INC. $8,000.00 $21,360.00
Hat Creek Construction & Materials, Inc. $5,000.00 $13,350.00 Martin Brothers Construction $6,000.00 $16,020.00 Herback General Engineering $17,385.00 $46,417.95 Granite Construction Company $40,000.00 $106,800.00 Steve Manning Construction, Inc $6,000.00 $16,020.00 Engineer's Estimate 2.670 MILE $8,500.00 $22,695.00
X0021 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
GEORGE REED, INC. $3,000.00 $6,000.00
Hat Creek Construction & Materials, Inc. $2,500.00 $5,000.00 Martin Brothers Construction $2,050.00 $4,100.00 Herback General Engineering $1,225.00 $2,450.00 Granite Construction Company $560.00 $1,120.00 Steve Manning Construction, Inc $3,000.00 $6,000.00 Engineer's Estimate 2 EACH $1,700.00 $3,400.00
X0031 15301-0000 CONTRACTOR QUALITY CONTROL
GEORGE REED, INC. Lump Sum $117,100.00 Hat Creek Construction & Materials, Inc. Lump Sum $40,000.00 Martin Brothers Construction Lump Sum $60,000.00 Herback General Engineering Lump Sum $212,000.00 Granite Construction Company Lump Sum $235,000.00 Steve Manning Construction, Inc Lump Sum $120,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
X0041 15401-0000 CONTRACTOR TESTING
GEORGE REED, INC. Lump Sum $1.00 Hat Creek Construction & Materials, Inc. Lump Sum $40,000.00 Martin Brothers Construction Lump Sum $82,000.00 Herback General Engineering Lump Sum $61,400.00 Granite Construction Company Lump Sum $95,000.00 Steve Manning Construction, Inc Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
4 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0051 15501-0000 CONSTRUCTION SCHEDULE
GEORGE REED, INC. Lump Sum $2,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $5,000.00 Martin Brothers Construction Lump Sum $7,000.00 Herback General Engineering Lump Sum $2,650.00 Granite Construction Company Lump Sum $5,000.00 Steve Manning Construction, Inc Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
X0061 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
GEORGE REED, INC. $20.00 $10,000.00
Hat Creek Construction & Materials, Inc. $22.00 $11,000.00 Martin Brothers Construction $4.00 $2,000.00 Herback General Engineering $11.90 $5,950.00 Granite Construction Company $6.75 $3,375.00 Steve Manning Construction, Inc $8.00 $4,000.00 Engineer's Estimate 500 LNFT $10.00 $5,000.00
X0071 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
GEORGE REED, INC. Lump Sum $1,500.00 Hat Creek Construction & Materials, Inc. Lump Sum $7,500.00 Martin Brothers Construction Lump Sum $6,000.00 Herback General Engineering Lump Sum $6,865.00 Granite Construction Company Lump Sum $3,500.00 Steve Manning Construction, Inc Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
X0081 15802-0000 WATERING FOR DUST CONTROL
GEORGE REED, INC. Lump Sum $25,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $30,000.00 Martin Brothers Construction Lump Sum $15,000.00 Herback General Engineering Lump Sum $28,650.00 Granite Construction Company Lump Sum $75,000.00 Steve Manning Construction, Inc Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
X0091 20202-0000 SELECTIVE CLEARING
GEORGE REED, INC. $11.00 $14,300.00
Hat Creek Construction & Materials, Inc. $30.00 $39,000.00 Martin Brothers Construction $10.00 $13,000.00 Herback General Engineering $13.00 $16,900.00 Granite Construction Company $12.00 $15,600.00 Steve Manning Construction, Inc $14.00 $18,200.00 Engineer's Estimate 1,300 SQYD $50.00 $65,000.00
5 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0101 20301-2400 REMOVAL OF SIGN
GEORGE REED, INC. $900.00 $7,200.00
Hat Creek Construction & Materials, Inc. $300.00 $2,400.00 Martin Brothers Construction $155.00 $1,240.00 Herback General Engineering $140.00 $1,120.00 Granite Construction Company $175.00 $1,400.00 Steve Manning Construction, Inc $300.00 $2,400.00 Engineer's Estimate 8 EACH $150.00 $1,200.00
X0111 20302-0400 REMOVAL OF CURB, ASPHALT
GEORGE REED, INC. $70.00 $18,200.00
Hat Creek Construction & Materials, Inc. $25.00 $6,500.00 Martin Brothers Construction $50.00 $13,000.00 Herback General Engineering $16.00 $4,160.00 Granite Construction Company $27.00 $7,020.00 Steve Manning Construction, Inc $39.00 $10,140.00 Engineer's Estimate 260 LNFT $8.00 $2,080.00
X0121 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
GEORGE REED, INC. Lump Sum $25,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $5,000.00 Martin Brothers Construction Lump Sum $10,000.00 Herback General Engineering Lump Sum $8,125.00 Granite Construction Company Lump Sum $28,000.00 Steve Manning Construction, Inc Lump Sum $80,000.00 Engineer's Estimate ALL LPSM Lump Sum $4,000.00
X0131 20315-0000 SAWCUTTING PAVEMENT
GEORGE REED, INC. $3.50 $19,705.00
Hat Creek Construction & Materials, Inc. $3.50 $19,705.00 Martin Brothers Construction $7.00 $39,410.00 Herback General Engineering $3.30 $18,579.00 Granite Construction Company $2.20 $12,386.00 Steve Manning Construction, Inc $2.00 $11,260.00 Engineer's Estimate 5,630 LNFT $2.00 $11,260.00
X0141 20402-0000 SUBEXCAVATION
GEORGE REED, INC. $170.00 $170,000.00
Hat Creek Construction & Materials, Inc. $210.00 $210,000.00 Martin Brothers Construction $75.00 $75,000.00 Herback General Engineering $98.00 $98,000.00 Granite Construction Company $185.00 $185,000.00 Steve Manning Construction, Inc $200.00 $200,000.00 Engineer's Estimate 1,000 CUYD $200.00 $200,000.00
6 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0151 20441-0000 WASTE
GEORGE REED, INC. $75.00 $133,500.00
Hat Creek Construction & Materials, Inc. $45.00 $80,100.00 Martin Brothers Construction $100.00 $178,000.00 Herback General Engineering $65.00 $115,700.00 Granite Construction Company $85.00 $151,300.00 Steve Manning Construction, Inc $60.00 $106,800.00 Engineer's Estimate 1,780 CUYD $60.00 $106,800.00
X0161 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
GEORGE REED, INC. $970.00 $4,850.00
Hat Creek Construction & Materials, Inc. $950.00 $4,750.00 Martin Brothers Construction $750.00 $3,750.00 Herback General Engineering $400.00 $2,000.00 Granite Construction Company $220.00 $1,100.00 Steve Manning Construction, Inc $236.00 $1,180.00 Engineer's Estimate 5 CUYD $190.00 $950.00
X0171 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
GEORGE REED, INC. $60.00 $7,200.00
Hat Creek Construction & Materials, Inc. $175.00 $21,000.00 Martin Brothers Construction $200.00 $24,000.00 Herback General Engineering $88.00 $10,560.00 Granite Construction Company $110.00 $13,200.00 Steve Manning Construction, Inc $125.00 $15,000.00 Engineer's Estimate 120 LNFT $40.00 $4,800.00
X0181 30202-2000 ROADWAY AGGREGATE, METHOD 2
GEORGE REED, INC. $145.00 $47,850.00
Hat Creek Construction & Materials, Inc. $215.00 $70,950.00 Martin Brothers Construction $125.00 $41,250.00 Herback General Engineering $120.00 $39,600.00 Granite Construction Company $187.00 $61,710.00 Steve Manning Construction, Inc $130.00 $42,900.00 Engineer's Estimate 330 TON $90.00 $29,700.00
X0191 30302-1000 DITCH RECONDITIONING
GEORGE REED, INC. $17.00 $5,355.00
Hat Creek Construction & Materials, Inc. $100.00 $31,500.00 Martin Brothers Construction $27.00 $8,505.00 Herback General Engineering $13.00 $4,095.00 Granite Construction Company $4.25 $1,338.75 Steve Manning Construction, Inc $30.00 $9,450.00 Engineer's Estimate 315 LNFT $8.00 $2,520.00
7 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0201 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
GEORGE REED, INC. $97,000.00 $258,990.00
Hat Creek Construction & Materials, Inc. $47,000.00 $125,490.00 Martin Brothers Construction $110,000.00 $293,700.00 Herback General Engineering $157,450.00 $420,391.50 Granite Construction Company $55,000.00 $146,850.00 Steve Manning Construction, Inc $84,000.00 $224,280.00 Engineer's Estimate 2.670 MILE $80,000.00 $213,600.00
X0221 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
GEORGE REED, INC. $200.00 $1,356,000.00
Hat Creek Construction & Materials, Inc. $161.00 $1,091,580.00 Martin Brothers Construction $193.00 $1,308,540.00 Herback General Engineering $212.00 $1,437,360.00 Granite Construction Company $155.00 $1,050,900.00 Steve Manning Construction, Inc $230.00 $1,559,400.00 Engineer's Estimate 6,780 TON $200.00 $1,356,000.00
X0231 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
GEORGE REED, INC. $410.00 $28,700.00
Hat Creek Construction & Materials, Inc. $565.00 $39,550.00 Martin Brothers Construction $775.00 $54,250.00 Herback General Engineering $663.00 $46,410.00 Granite Construction Company $630.00 $44,100.00 Steve Manning Construction, Inc $797.00 $55,790.00 Engineer's Estimate 70 TON $700.00 $49,000.00
X0251 41102-1000 PRIME COAT, METHOD 1
GEORGE REED, INC. $2.20 $92,092.00
Hat Creek Construction & Materials, Inc. $1.75 $73,255.00 Martin Brothers Construction $1.50 $62,790.00 Herback General Engineering $1.50 $62,790.00 Granite Construction Company $2.50 $104,650.00 Steve Manning Construction, Inc $1.20 $50,232.00 Engineer's Estimate 41,860 SQYD $1.00 $41,860.00
X0261 41105-0000 BLOTTER
GEORGE REED, INC. $165.00 $9,900.00
Hat Creek Construction & Materials, Inc. $111.00 $6,660.00 Martin Brothers Construction $275.00 $16,500.00 Herback General Engineering $187.00 $11,220.00 Granite Construction Company $385.00 $23,100.00 Steve Manning Construction, Inc $130.00 $7,800.00 Engineer's Estimate 60 TON $110.00 $6,600.00
8 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0271 41201-0000 TACK COAT
GEORGE REED, INC. $260.00 $5,200.00
Hat Creek Construction & Materials, Inc. $500.00 $10,000.00 Martin Brothers Construction $775.00 $15,500.00 Herback General Engineering $1,770.00 $35,400.00 Granite Construction Company $1,100.00 $22,000.00 Steve Manning Construction, Inc $1,900.00 $38,000.00 Engineer's Estimate 20 TON $1,100.00 $22,000.00
X0281 60201-0800 24-INCH PIPE CULVERT (HDPE)
GEORGE REED, INC. $400.00 $18,000.00
Hat Creek Construction & Materials, Inc. $600.00 $27,000.00 Martin Brothers Construction $500.00 $22,500.00 Herback General Engineering $345.00 $15,525.00 Granite Construction Company $560.00 $25,200.00 Steve Manning Construction, Inc $450.00 $20,250.00 Engineer's Estimate 45 LNFT $220.00 $9,900.00
X0291 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
GEORGE REED, INC. $500.00 $1,000.00
Hat Creek Construction & Materials, Inc. $4,000.00 $8,000.00 Martin Brothers Construction $5,500.00 $11,000.00 Herback General Engineering $860.00 $1,720.00 Granite Construction Company $250.00 $500.00 Steve Manning Construction, Inc $1,900.00 $3,800.00 Engineer's Estimate 2 EACH $1,300.00 $2,600.00
X0301 60501-0000 STANDARD UNDERDRAIN SYSTEM
GEORGE REED, INC. $140.00 $7,700.00
Hat Creek Construction & Materials, Inc. $350.00 $19,250.00 Martin Brothers Construction $225.00 $12,375.00 Herback General Engineering $116.00 $6,380.00 Granite Construction Company $110.00 $6,050.00 Steve Manning Construction, Inc $300.00 $16,500.00 Engineer's Estimate 55 LNFT $140.00 $7,700.00
X0311 60704-0000 CLEANING CULVERT IN PLACE
GEORGE REED, INC. $2,800.00 $33,600.00
Hat Creek Construction & Materials, Inc. $2,900.00 $34,800.00 Martin Brothers Construction $1,250.00 $15,000.00 Herback General Engineering $1,215.00 $14,580.00 Granite Construction Company $1,500.00 $18,000.00 Steve Manning Construction, Inc $3,200.00 $38,400.00 Engineer's Estimate 12 EACH $1,600.00 $19,200.00
9 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0321 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
GEORGE REED, INC. $13.00 $30,160.00
Hat Creek Construction & Materials, Inc. $17.50 $40,600.00 Martin Brothers Construction $15.00 $34,800.00 Herback General Engineering $20.00 $46,400.00 Granite Construction Company $13.00 $30,160.00 Steve Manning Construction, Inc $10.00 $23,200.00 Engineer's Estimate 2,320 LNFT $10.00 $23,200.00
X0331 60908-1000 PAVED DITCH, ASPHALT (New or Replaced)
GEORGE REED, INC. $35.00 $30,800.00
Hat Creek Construction & Materials, Inc. $95.00 $83,600.00 Martin Brothers Construction $50.00 $44,000.00 Herback General Engineering $75.00 $66,000.00 Granite Construction Company $50.00 $44,000.00 Steve Manning Construction, Inc $125.00 $110,000.00 Engineer's Estimate 880 SQYD $55.00 $48,400.00
X0341 60908-1000 PAVED DITCH, ASPHALT (Overlay)
GEORGE REED, INC. $48.00 $116,640.00
Hat Creek Construction & Materials, Inc. $53.00 $128,790.00 Martin Brothers Construction $35.00 $85,050.00 Herback General Engineering $32.00 $77,760.00 Granite Construction Company $25.00 $60,750.00 Steve Manning Construction, Inc $120.00 $291,600.00 Engineer's Estimate 2,430 SQYD $40.00 $97,200.00
X0351 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
GEORGE REED, INC. $175.00 $7,000.00
Hat Creek Construction & Materials, Inc. $200.00 $8,000.00 Martin Brothers Construction $225.00 $9,000.00 Herback General Engineering $181.00 $7,240.00 Granite Construction Company $200.00 $8,000.00 Steve Manning Construction, Inc $160.00 $6,400.00 Engineer's Estimate 40 HOUR $160.00 $6,400.00
X0361 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
GEORGE REED, INC. $235.00 $9,400.00
Hat Creek Construction & Materials, Inc. $165.00 $6,600.00 Martin Brothers Construction $290.00 $11,600.00 Herback General Engineering $200.00 $8,000.00 Granite Construction Company $215.00 $8,600.00 Steve Manning Construction, Inc $190.00 $7,600.00 Engineer's Estimate 40 HOUR $190.00 $7,600.00
10 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0371 62201-1050 WHEEL LOADER, 5 CUBIC YARD MINIMUM RATED CAPACITY
GEORGE REED, INC. $285.00 $11,400.00
Hat Creek Construction & Materials, Inc. $285.00 $11,400.00 Martin Brothers Construction $350.00 $14,000.00 Herback General Engineering $300.00 $12,000.00 Granite Construction Company $255.00 $10,200.00 Steve Manning Construction, Inc $210.00 $8,400.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
X0381 62201-2750 MOTOR GRADER
GEORGE REED, INC. $305.00 $12,200.00
Hat Creek Construction & Materials, Inc. $275.00 $11,000.00 Martin Brothers Construction $398.00 $15,920.00 Herback General Engineering $300.00 $12,000.00 Granite Construction Company $290.00 $11,600.00 Steve Manning Construction, Inc $290.00 $11,600.00 Engineer's Estimate 40 HOUR $180.00 $7,200.00
X0391 62201-3000 HYDRAULIC EXCAVATOR
GEORGE REED, INC. $290.00 $11,600.00
Hat Creek Construction & Materials, Inc. $225.00 $9,000.00 Martin Brothers Construction $400.00 $16,000.00 Herback General Engineering $300.00 $12,000.00 Granite Construction Company $260.00 $10,400.00 Steve Manning Construction, Inc $290.00 $11,600.00 Engineer's Estimate 40 HOUR $190.00 $7,600.00
X0401 62301-0000 GENERAL LABOR
GEORGE REED, INC. $90.00 $2,250.00
Hat Creek Construction & Materials, Inc. $85.00 $2,125.00 Martin Brothers Construction $133.00 $3,325.00 Herback General Engineering $100.00 $2,500.00 Granite Construction Company $110.00 $2,750.00 Steve Manning Construction, Inc $110.00 $2,750.00 Engineer's Estimate 25 HOUR $100.00 $2,500.00
X0411 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
GEORGE REED, INC. $175.00 $3,500.00
Hat Creek Construction & Materials, Inc. $200.00 $4,000.00 Martin Brothers Construction $375.00 $7,500.00 Herback General Engineering $275.00 $5,500.00 Granite Construction Company $250.00 $5,000.00 Steve Manning Construction, Inc $350.00 $7,000.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
11 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0421 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
GEORGE REED, INC. $175.00 $3,500.00
Hat Creek Construction & Materials, Inc. $460.00 $9,200.00 Martin Brothers Construction $415.00 $8,300.00 Herback General Engineering $275.00 $5,500.00 Granite Construction Company $300.00 $6,000.00 Steve Manning Construction, Inc $350.00 $7,000.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
X0431 62511-2000 SEEDING, HYDRAULIC METHOD (Upland)
GEORGE REED, INC. $1.10 $14,388.00
Hat Creek Construction & Materials, Inc. $1.10 $14,388.00 Martin Brothers Construction $0.50 $6,540.00 Herback General Engineering $1.30 $17,004.00 Granite Construction Company $0.55 $7,194.00 Steve Manning Construction, Inc $0.80 $10,464.00 Engineer's Estimate 13,080 SQYD $1.50 $19,620.00
X0441 62516-2000 MULCHING, HYDRAULIC METHOD
GEORGE REED, INC. $1.80 $47,376.00
Hat Creek Construction & Materials, Inc. $1.80 $47,376.00 Martin Brothers Construction $0.60 $15,792.00 Herback General Engineering $2.10 $55,272.00 Granite Construction Company $1.00 $26,320.00 Steve Manning Construction, Inc $1.00 $26,320.00 Engineer's Estimate 26,320 SQYD $0.75 $19,740.00
X0451 62520-0000 FERTILIZER
GEORGE REED, INC. $3,250.00 $8,775.00
Hat Creek Construction & Materials, Inc. $3,250.00 $8,775.00 Martin Brothers Construction $3,100.00 $8,370.00 Herback General Engineering $3,785.00 $10,219.50 Granite Construction Company $735.00 $1,984.50 Steve Manning Construction, Inc $3,800.00 $10,260.00 Engineer's Estimate 2.7 ACRE $1,500.00 $4,050.00
X0461 63301-0000 SIGN SYSTEM
GEORGE REED, INC. $950.00 $23,750.00
Hat Creek Construction & Materials, Inc. $2,500.00 $62,500.00 Martin Brothers Construction $1,700.00 $42,500.00 Herback General Engineering $785.00 $19,625.00 Granite Construction Company $1,440.00 $36,000.00 Steve Manning Construction, Inc $1,500.00 $37,500.00 Engineer's Estimate 25 EACH $450.00 $11,250.00
12 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0471 63308-0000 OBJECT MARKER
GEORGE REED, INC. $160.00 $4,000.00
Hat Creek Construction & Materials, Inc. $125.00 $3,125.00 Martin Brothers Construction $270.00 $6,750.00 Herback General Engineering $175.00 $4,375.00 Granite Construction Company $1,440.00 $36,000.00 Steve Manning Construction, Inc $280.00 $7,000.00 Engineer's Estimate 25 EACH $110.00 $2,750.00
X0481 63402-0700 PAVEMENT MARKINGS, TYPE D, SOLID
GEORGE REED, INC. $4,200.00 $45,360.00
Hat Creek Construction & Materials, Inc. $4,200.00 $45,360.00 Martin Brothers Construction $4,325.00 $46,710.00 Herback General Engineering $4,255.00 $45,954.00 Granite Construction Company $4,600.00 $49,680.00 Steve Manning Construction, Inc $8,500.00 $91,800.00 Engineer's Estimate 10.8 MILE $1,400.00 $15,120.00
X0491 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE D)
GEORGE REED, INC. $650.00 $1,300.00
Hat Creek Construction & Materials, Inc. $650.00 $1,300.00 Martin Brothers Construction $670.00 $1,340.00 Herback General Engineering $15,758.00 $31,516.00 Granite Construction Company $17,250.00 $34,500.00 Steve Manning Construction, Inc $900.00 $1,800.00 Engineer's Estimate 2 EACH $600.00 $1,200.00
X0501 63501-0000 TEMPORARY TRAFFIC CONTROL
GEORGE REED, INC. Lump Sum $83,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $400,000.00 Martin Brothers Construction Lump Sum $130,000.00 Herback General Engineering Lump Sum $70,347.08 Granite Construction Company Lump Sum $620,000.00 Steve Manning Construction, Inc Lump Sum $410,000.00 Engineer's Estimate ALL LPSM Lump Sum $250,000.00
Total Schedule - All Items
GEORGE REED, INC. $2,958,702.00
Hat Creek Construction & Materials, Inc. $3,025,479.00 Martin Brothers Construction $3,228,927.00 Herback General Engineering $3,491,041.03 Granite Construction Company $3,833,338.25 Steve Manning Construction, Inc $4,505,096.00 Engineer's Estimate $3,267,280.00
13 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: Y
Schedule Type: Options
Solcitation No: 6982AF22B000032
Division: Central Federal Lands
State: CA County: El Dorado
Federal Land: Eldorado National Forest Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 11/07/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Hat Creek Construction & Materials, Inc. $889,026.00 24339 Highway 89 N Burney, CA 96013
Herback General Engineering $1,151,198.00 2531 Nowlin Road Minden, NV 89423
Martin Brothers Construction $1,497,139.00 8801 Folsom Blvd Suite 260 Sacramento, CA 95826
GEORGE REED, INC. $1,796,407.00
140 Empire Avenue Modesto, CA 95354
Granite Construction Company $2,473,985.00 4001 Bradshaw Road Sacramento, CA 95827
Steve Manning Construction, Inc $2,497,375.00 5211 Churn Creek Road Redding, CA 96002
Engineer's Estimate $858,000.00
14 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0020 15101-0000 MOBILIZATION
Hat Creek Construction & Materials, Inc. Lump Sum $40,000.00 Herback General Engineering Lump Sum $73,300.00 Martin Brothers Construction Lump Sum $228,000.00 GEORGE REED, INC. Lump Sum $33,000.00 Granite Construction Company Lump Sum $245,000.00 Steve Manning Construction, Inc Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $92,465.00
Y0040 15301-0000 CONTRACTOR QUALITY CONTROL
Hat Creek Construction & Materials, Inc. Lump Sum $20,000.00 Herback General Engineering Lump Sum $22,000.00 Martin Brothers Construction Lump Sum $15,000.00 GEORGE REED, INC. Lump Sum $26,790.00 Granite Construction Company Lump Sum $150,000.00 Steve Manning Construction, Inc Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
Y0060 15401-0000 CONTRACTOR TESTING
Hat Creek Construction & Materials, Inc. Lump Sum $30,000.00 Herback General Engineering Lump Sum $30,660.00 Martin Brothers Construction Lump Sum $25,000.00 GEORGE REED, INC. Lump Sum $1.00 Granite Construction Company Lump Sum $60,000.00 Steve Manning Construction, Inc Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
Y0080 15501-0000 CONSTRUCTION SCHEDULE
Hat Creek Construction & Materials, Inc. Lump Sum $5,000.00 Herback General Engineering Lump Sum $2,650.00 Martin Brothers Construction Lump Sum $5,000.00 GEORGE REED, INC. Lump Sum $2,000.00 Granite Construction Company Lump Sum $5,000.00 Steve Manning Construction, Inc Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
Y0100 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Hat Creek Construction & Materials, Inc. Lump Sum $2,000.00 Herback General Engineering Lump Sum $6,865.00 Martin Brothers Construction Lump Sum $4,500.00 GEORGE REED, INC. Lump Sum $1,500.00 Granite Construction Company Lump Sum $3,500.00 Steve Manning Construction, Inc Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00
15 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0120 20302-0150 REMOVAL OF BRIDGE RAILING
Hat Creek Construction & Materials, Inc. $75.00 $110,025.00 Herback General Engineering $88.00 $129,096.00 Martin Brothers Construction $77.00 $112,959.00
GEORGE REED, INC. $290.00 $425,430.00
Granite Construction Company $220.00 $322,740.00 Steve Manning Construction, Inc $125.00 $183,375.00 Engineer's Estimate 1,467 LNFT $50.00 $73,350.00
Y0140 20305-1000 REMOVAL OF CONCRETE
Hat Creek Construction & Materials, Inc. $3,300.00 $9,900.00 Herback General Engineering $9,780.00 $29,340.00 Martin Brothers Construction $1,025.00 $3,075.00
GEORGE REED, INC. $14,300.00 $42,900.00
Granite Construction Company $16,100.00 $48,300.00 Steve Manning Construction, Inc $6,000.00 $18,000.00 Engineer's Estimate 3 CUYD $1,000.00 $3,000.00
Y0160 20801-0000 STRUCTURE EXCAVATION
Hat Creek Construction & Materials, Inc. $400.00 $12,000.00 Herback General Engineering $795.00 $23,850.00 Martin Brothers Construction $205.00 $6,150.00
GEORGE REED, INC. $1,100.00 $33,000.00
Granite Construction Company $610.00 $18,300.00 Steve Manning Construction, Inc $500.00 $15,000.00 Engineer's Estimate 30 CUYD $200.00 $6,000.00
Y0180 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Hat Creek Construction & Materials, Inc. $1,250.00 $36,250.00 Herback General Engineering $6,500.00 $188,500.00 Martin Brothers Construction $15,000.00 $435,000.00
GEORGE REED, INC. $3,500.00 $101,500.00
Granite Construction Company $1,405.00 $40,745.00 Steve Manning Construction, Inc $5,000.00 $145,000.00 Engineer's Estimate 29 CUYD $3,000.00 $87,000.00
Y0200 55401-1000 REINFORCING STEEL
Hat Creek Construction & Materials, Inc. $15.00 $6,000.00 Herback General Engineering $20.00 $8,000.00 Martin Brothers Construction $5.00 $2,000.00
GEORGE REED, INC. $50.00 $20,000.00
Granite Construction Company $4.50 $1,800.00 Steve Manning Construction, Inc $10.00 $4,000.00 Engineer's Estimate 400 LB $6.00 $2,400.00
16 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0220 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL
Hat Creek Construction & Materials, Inc. $353.00 $517,851.00 Herback General Engineering $411.00 $602,937.00 Martin Brothers Construction $365.00 $535,455.00
GEORGE REED, INC. $658.00 $965,286.00
Granite Construction Company $800.00 $1,173,600.00 Steve Manning Construction, Inc $1,000.00 $1,467,000.00 Engineer's Estimate 1,467 LNFT $355.00 $520,785.00
Y0240 63501-0000 TEMPORARY TRAFFIC CONTROL
Hat Creek Construction & Materials, Inc. Lump Sum $100,000.00 Herback General Engineering Lump Sum $34,000.00 Martin Brothers Construction Lump Sum $125,000.00 GEORGE REED, INC. Lump Sum $145,000.00 Granite Construction Company Lump Sum $405,000.00 Steve Manning Construction, Inc Lump Sum $360,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
Total Schedule - All Items
Hat Creek Construction & Materials, Inc. $889,026.00 Herback General Engineering $1,151,198.00 Martin Brothers Construction $1,497,139.00
GEORGE REED, INC. $1,796,407.00
Granite Construction Company $2,473,985.00 Steve Manning Construction, Inc $2,497,375.00 Engineer's Estimate $858,000.00
17 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF22B000032
Division: Central Federal Lands
State: CA County: El Dorado
Federal Land: Eldorado National Forest Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 11/07/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Martin Brothers Construction $16,568,934.00 8801 Folsom Blvd Suite 260 Sacramento, CA 95826
GEORGE REED, INC. $18,081,450.00
140 Empire Avenue Modesto, CA 95354
Hat Creek Construction & Materials, Inc. $18,175,484.00 24339 Highway 89 N Burney, CA 96013
Herback General Engineering $19,622,356.41 2531 Nowlin Road Minden, NV 89423
Granite Construction Company $19,842,880.00 4001 Bradshaw Road Sacramento, CA 95827
Steve Manning Construction, Inc $20,789,513.00 5211 Churn Creek Road Redding, CA 96002
Engineer's Estimate $17,439,640.00
18 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0001 15101-0000 MOBILIZATION
Martin Brothers Construction Lump Sum $2,281,731.00 GEORGE REED, INC. Lump Sum $1,850,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $1,800,000.00 Herback General Engineering Lump Sum $1,861,790.00 Granite Construction Company Lump Sum $1,976,000.00 Steve Manning Construction, Inc Lump Sum $1,985,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,920,882.00
A0011 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Martin Brothers Construction $6,000.00 $89,718.00
GEORGE REED, INC. $8,000.00 $119,624.00
Hat Creek Construction & Materials, Inc. $5,000.00 $74,765.00 Herback General Engineering $17,385.00 $259,957.91 Granite Construction Company $13,500.00 $201,865.50 Steve Manning Construction, Inc $6,000.00 $89,718.00 Engineer's Estimate 14.953 MILE $8,500.00 $127,100.50
A0021 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Martin Brothers Construction $2,050.00 $8,200.00
GEORGE REED, INC. $3,000.00 $12,000.00
Hat Creek Construction & Materials, Inc. $2,500.00 $10,000.00 Herback General Engineering $1,225.00 $4,900.00 Granite Construction Company $560.00 $2,240.00 Steve Manning Construction, Inc $2,000.00 $8,000.00 Engineer's Estimate 4 EACH $1,700.00 $6,800.00
A0031 15301-0000 CONTRACTOR QUALITY CONTROL
Martin Brothers Construction Lump Sum $172,000.00 GEORGE REED, INC. Lump Sum $505,450.00 Hat Creek Construction & Materials, Inc. Lump Sum $941,308.00 Herback General Engineering Lump Sum $261,524.00 Granite Construction Company Lump Sum $1,207,000.00 Steve Manning Construction, Inc Lump Sum $375,000.00 Engineer's Estimate ALL LPSM Lump Sum $370,000.00
A0041 15401-0000 CONTRACTOR TESTING
Martin Brothers Construction Lump Sum $237,000.00 GEORGE REED, INC. Lump Sum $188,400.00 Hat Creek Construction & Materials, Inc. Lump Sum $750,000.00 Herback General Engineering Lump Sum $421,720.00 Granite Construction Company Lump Sum $521,000.00 Steve Manning Construction, Inc Lump Sum $490,000.00 Engineer's Estimate ALL LPSM Lump Sum $370,000.00
19 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0051 15501-0000 CONSTRUCTION SCHEDULE
Martin Brothers Construction Lump Sum $15,000.00 GEORGE REED, INC. Lump Sum $48,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $5,000.00 Herback General Engineering Lump Sum $18,400.00 Granite Construction Company Lump Sum $25,000.00 Steve Manning Construction, Inc Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0061 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Martin Brothers Construction $4.00 $24,000.00
GEORGE REED, INC. $9.00 $54,000.00
Hat Creek Construction & Materials, Inc. $22.00 $132,000.00 Herback General Engineering $11.90 $71,400.00 Granite Construction Company $6.75 $40,500.00 Steve Manning Construction, Inc $8.00 $48,000.00 Engineer's Estimate 6,000 LNFT $10.00 $60,000.00
A0071 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Martin Brothers Construction Lump Sum $15,000.00 GEORGE REED, INC. Lump Sum $12,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $25,000.00 Herback General Engineering Lump Sum $46,640.00 Granite Construction Company Lump Sum $3,500.00 Steve Manning Construction, Inc Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0081 15802-0000 WATERING FOR DUST CONTROL
Martin Brothers Construction Lump Sum $93,000.00 GEORGE REED, INC. Lump Sum $89,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $150,000.00 Herback General Engineering Lump Sum $540,000.00 Granite Construction Company Lump Sum $260,000.00 Steve Manning Construction, Inc Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $200,000.00
A0091 20202-0000 SELECTIVE CLEARING
Martin Brothers Construction $10.00 $24,000.00
GEORGE REED, INC. $11.00 $26,400.00
Hat Creek Construction & Materials, Inc. $16.00 $38,400.00 Herback General Engineering $23.00 $55,200.00 Granite Construction Company $15.00 $36,000.00 Steve Manning Construction, Inc $14.00 $33,600.00 Engineer's Estimate 2,400 SQYD $50.00 $120,000.00
20 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0101 20220-1000 REMOVAL, INDIVIDUAL TREE
Martin Brothers Construction $3,000.00 $24,000.00
GEORGE REED, INC. $1,600.00 $12,800.00
Hat Creek Construction & Materials, Inc. $2,000.00 $16,000.00 Herback General Engineering $1,990.00 $15,920.00 Granite Construction Company $1,800.00 $14,400.00 Steve Manning Construction, Inc $3,000.00 $24,000.00 Engineer's Estimate 8 EACH $2,300.00 $18,400.00
A0111 20301-2400 REMOVAL OF SIGN
Martin Brothers Construction $155.00 $6,355.00
GEORGE REED, INC. $900.00 $36,900.00
Hat Creek Construction & Materials, Inc. $300.00 $12,300.00 Herback General Engineering $140.00 $5,740.00 Granite Construction Company $165.00 $6,765.00 Steve Manning Construction, Inc $200.00 $8,200.00 Engineer's Estimate 41 EACH $150.00 $6,150.00
A0121 20302-0400 REMOVAL OF CURB, ASPHALT
Martin Brothers Construction $70.00 $7,000.00
GEORGE REED, INC. $90.00 $9,000.00
Hat Creek Construction & Materials, Inc. $25.00 $2,500.00 Herback General Engineering $16.00 $1,600.00 Granite Construction Company $27.00 $2,700.00 Steve Manning Construction, Inc $39.00 $3,900.00 Engineer's Estimate 100 LNFT $8.00 $800.00
A0131 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Martin Brothers Construction Lump Sum $25,000.00 GEORGE REED, INC. Lump Sum $183,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $40,000.00 Herback General Engineering Lump Sum $40,600.00 Granite Construction Company Lump Sum $28,000.00 Steve Manning Construction, Inc Lump Sum $140,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
A0141 20315-0000 SAWCUTTING PAVEMENT
Martin Brothers Construction $7.00 $165,970.00
GEORGE REED, INC. $3.50 $82,985.00
Hat Creek Construction & Materials, Inc. $3.50 $82,985.00 Herback General Engineering $3.30 $78,243.00 Granite Construction Company $2.20 $52,162.00 Steve Manning Construction, Inc $1.00 $23,710.00 Engineer's Estimate 23,710 LNFT $2.00 $47,420.00
21 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0151 20402-0000 SUBEXCAVATION
Martin Brothers Construction $75.00 $345,000.00
GEORGE REED, INC. $190.00 $874,000.00
Hat Creek Construction & Materials, Inc. $210.00 $966,000.00 Herback General Engineering $98.00 $450,800.00 Granite Construction Company $185.00 $851,000.00 Steve Manning Construction, Inc $200.00 $920,000.00 Engineer's Estimate 4,600 CUYD $200.00 $920,000.00
A0161 20420-0000 EMBANKMENT CONSTRUCTION
Martin Brothers Construction $227.00 $12,485.00
GEORGE REED, INC. $95.00 $5,225.00
Hat Creek Construction & Materials, Inc. $300.00 $16,500.00 Herback General Engineering $500.00 $27,500.00 Granite Construction Company $165.00 $9,075.00 Steve Manning Construction, Inc $400.00 $22,000.00 Engineer's Estimate 55 CUYD $170.00 $9,350.00
A0171 20441-0000 WASTE
Martin Brothers Construction $97.00 $1,018,500.00
GEORGE REED, INC. $82.00 $861,000.00
Hat Creek Construction & Materials, Inc. $45.00 $472,500.00 Herback General Engineering $65.00 $682,500.00 Granite Construction Company $85.00 $892,500.00 Steve Manning Construction, Inc $60.00 $630,000.00 Engineer's Estimate 10,500 CUYD $60.00 $630,000.00
A0181 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
Martin Brothers Construction $430.00 $47,300.00
GEORGE REED, INC. $370.00 $40,700.00
Hat Creek Construction & Materials, Inc. $500.00 $55,000.00 Herback General Engineering $400.00 $44,000.00 Granite Construction Company $220.00 $24,200.00 Steve Manning Construction, Inc $236.00 $25,960.00 Engineer's Estimate 110 CUYD $190.00 $20,900.00
A0191 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
Martin Brothers Construction $290.00 $49,300.00
GEORGE REED, INC. $70.00 $11,900.00
Hat Creek Construction & Materials, Inc. $230.00 $39,100.00 Herback General Engineering $88.00 $14,960.00 Granite Construction Company $110.00 $18,700.00 Steve Manning Construction, Inc $125.00 $21,250.00 Engineer's Estimate 170 LNFT $40.00 $6,800.00
22 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0201 30202-2000 ROADWAY AGGREGATE, METHOD 2
Martin Brothers Construction $97.00 $226,010.00
GEORGE REED, INC. $145.00 $337,850.00
Hat Creek Construction & Materials, Inc. $215.00 $500,950.00 Herback General Engineering $102.00 $237,660.00 Granite Construction Company $187.00 $435,710.00 Steve Manning Construction, Inc $90.00 $209,700.00 Engineer's Estimate 2,330 TON $90.00 $209,700.00
A0211 30302-1000 DITCH RECONDITIONING
Martin Brothers Construction $11.00 $101,200.00
GEORGE REED, INC. $9.50 $87,400.00
Hat Creek Construction & Materials, Inc. $18.00 $165,600.00 Herback General Engineering $13.00 $119,600.00 Granite Construction Company $4.25 $39,100.00 Steve Manning Construction, Inc $10.00 $92,000.00 Engineer's Estimate 9,200 LNFT $8.00 $73,600.00
A0221 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
Martin Brothers Construction $105,000.00 $1,556,100.00
GEORGE REED, INC. $105,000.00 $1,556,100.00
Hat Creek Construction & Materials, Inc. $42,000.00 $622,440.00 Herback General Engineering $157,450.00 $2,333,409.00 Granite Construction Company $55,000.00 $815,100.00 Steve Manning Construction, Inc $84,000.00 $1,244,880.00 Engineer's Estimate 14.820 MILE $80,000.00 $1,185,600.00
A0241 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
Martin Brothers Construction $190.00 $6,916,000.00
GEORGE REED, INC. $200.00 $7,280,000.00
Hat Creek Construction & Materials, Inc. $161.00 $5,860,400.00 Herback General Engineering $212.00 $7,716,800.00 Granite Construction Company $155.00 $5,642,000.00 Steve Manning Construction, Inc $230.00 $8,372,000.00 Engineer's Estimate 36,400 TON $200.00 $7,280,000.00
23 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0251 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Martin Brothers Construction $775.00 $282,875.00
GEORGE REED, INC. $410.00 $149,650.00
Hat Creek Construction & Materials, Inc. $565.00 $206,225.00 Herback General Engineering $663.00 $241,995.00 Granite Construction Company $630.00 $229,950.00 Steve Manning Construction, Inc $797.00 $290,905.00 Engineer's Estimate 365 TON $700.00 $255,500.00
A0271 41102-1000 PRIME COAT, METHOD 1
Martin Brothers Construction $1.00 $225,750.00
GEORGE REED, INC. $2.20 $496,650.00
Hat Creek Construction & Materials, Inc. $1.80 $406,350.00 Herback General Engineering $1.50 $338,625.00 Granite Construction Company $2.50 $564,375.00 Steve Manning Construction, Inc $1.20 $270,900.00 Engineer's Estimate 225,750 SQYD $1.00 $225,750.00
A0281 41105-0000 BLOTTER
Martin Brothers Construction $215.00 $68,800.00
GEORGE REED, INC. $165.00 $52,800.00
Hat Creek Construction & Materials, Inc. $111.00 $35,520.00 Herback General Engineering $187.00 $59,840.00 Granite Construction Company $385.00 $123,200.00 Steve Manning Construction, Inc $130.00 $41,600.00 Engineer's Estimate 320 TON $110.00 $35,200.00
A0291 41201-0000 TACK COAT
Martin Brothers Construction $775.00 $73,625.00
GEORGE REED, INC. $125.00 $11,875.00
Hat Creek Construction & Materials, Inc. $500.00 $47,500.00 Herback General Engineering $1,770.00 $168,150.00 Granite Construction Company $1,100.00 $104,500.00 Steve Manning Construction, Inc $1,900.00 $180,500.00 Engineer's Estimate 95 TON $1,100.00 $104,500.00
A0301 60201-0600 18-INCH PIPE CULVERT
Martin Brothers Construction $450.00 $6,750.00
GEORGE REED, INC. $725.00 $10,875.00
Hat Creek Construction & Materials, Inc. $1,100.00 $16,500.00 Herback General Engineering $505.00 $7,575.00 Granite Construction Company $550.00 $8,250.00 Steve Manning Construction, Inc $400.00 $6,000.00 Engineer's Estimate 15 LNFT $250.00 $3,750.00
24 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0311 60201-0800 24-INCH PIPE CULVERT (HDPE)
Martin Brothers Construction $500.00 $42,500.00
GEORGE REED, INC. $620.00 $52,700.00
Hat Creek Construction & Materials, Inc. $620.00 $52,700.00 Herback General Engineering $340.00 $28,900.00 Granite Construction Company $560.00 $47,600.00 Steve Manning Construction, Inc $450.00 $38,250.00 Engineer's Estimate 85 LNFT $220.00 $18,700.00
A0321 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Martin Brothers Construction $550.00 $24,750.00
GEORGE REED, INC. $700.00 $31,500.00
Hat Creek Construction & Materials, Inc. $700.00 $31,500.00 Herback General Engineering $488.00 $21,960.00 Granite Construction Company $560.00 $25,200.00 Steve Manning Construction, Inc $480.00 $21,600.00 Engineer's Estimate 45 LNFT $230.00 $10,350.00
A0331 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Martin Brothers Construction $5,500.00 $16,500.00
GEORGE REED, INC. $1,500.00 $4,500.00
Hat Creek Construction & Materials, Inc. $2,700.00 $8,100.00 Herback General Engineering $860.00 $2,580.00 Granite Construction Company $250.00 $750.00 Steve Manning Construction, Inc $1,900.00 $5,700.00 Engineer's Estimate 3 EACH $1,300.00 $3,900.00
A0341 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
Martin Brothers Construction $7,500.00 $7,500.00
GEORGE REED, INC. $7,200.00 $7,200.00
Hat Creek Construction & Materials, Inc. $8,000.00 $8,000.00 Herback General Engineering $1,615.00 $1,615.00 Granite Construction Company $300.00 $300.00 Steve Manning Construction, Inc $2,200.00 $2,200.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
A0351 60404-1000 CATCH BASIN, FLH TYPE 1
Martin Brothers Construction $11,000.00 $11,000.00
GEORGE REED, INC. $15,000.00 $15,000.00
Hat Creek Construction & Materials, Inc. $23,000.00 $23,000.00 Herback General Engineering $10,500.00 $10,500.00 Granite Construction Company $8,000.00 $8,000.00 Steve Manning Construction, Inc $8,500.00 $8,500.00 Engineer's Estimate 1 EACH $8,000.00 $8,000.00
25 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0361 60501-0000 STANDARD UNDERDRAIN SYSTEM
Martin Brothers Construction $125.00 $75,000.00
GEORGE REED, INC. $125.00 $75,000.00
Hat Creek Construction & Materials, Inc. $180.00 $108,000.00 Herback General Engineering $116.00 $69,600.00 Granite Construction Company $110.00 $66,000.00 Steve Manning Construction, Inc $300.00 $180,000.00 Engineer's Estimate 600 LNFT $140.00 $84,000.00
A0371 60704-0000 CLEANING CULVERT IN PLACE
Martin Brothers Construction $1,050.00 $135,450.00
GEORGE REED, INC. $2,800.00 $361,200.00
Hat Creek Construction & Materials, Inc. $2,900.00 $374,100.00 Herback General Engineering $1,215.00 $156,735.00 Granite Construction Company $1,500.00 $193,500.00 Steve Manning Construction, Inc $3,200.00 $412,800.00 Engineer's Estimate 129 EACH $1,600.00 $206,400.00
A0381 60705-0000 REPAIRING DRAINAGE STRUCTURE
Martin Brothers Construction $5,350.00 $21,400.00
GEORGE REED, INC. $8,250.00 $33,000.00
Hat Creek Construction & Materials, Inc. $3,500.00 $14,000.00 Herback General Engineering $2,500.00 $10,000.00 Granite Construction Company $1,850.00 $7,400.00 Steve Manning Construction, Inc $7,000.00 $28,000.00 Engineer's Estimate 4 EACH $3,500.00 $14,000.00
A0391 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
Martin Brothers Construction $12.00 $84,120.00
GEORGE REED, INC. $12.00 $84,120.00
Hat Creek Construction & Materials, Inc. $17.50 $122,675.00 Herback General Engineering $18.50 $129,685.00 Granite Construction Company $13.00 $91,130.00 Steve Manning Construction, Inc $10.00 $70,100.00 Engineer's Estimate 7,010 LNFT $10.00 $70,100.00
A0401 60908-1000 PAVED DITCH, ASPHALT (New or Replaced)
Martin Brothers Construction $23.00 $51,750.00
GEORGE REED, INC. $35.00 $78,750.00
Hat Creek Construction & Materials, Inc. $95.00 $213,750.00 Herback General Engineering $67.00 $150,750.00 Granite Construction Company $50.00 $112,500.00 Steve Manning Construction, Inc $125.00 $281,250.00 Engineer's Estimate 2,250 SQYD $55.00 $123,750.00
26 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0411 60908-1000 PAVED DITCH, ASPHALT (Overlay)
Martin Brothers Construction $29.00 $268,250.00
GEORGE REED, INC. $42.00 $388,500.00
Hat Creek Construction & Materials, Inc. $53.00 $490,250.00 Herback General Engineering $32.00 $296,000.00 Granite Construction Company $25.00 $231,250.00 Steve Manning Construction, Inc $120.00 $1,110,000.00 Engineer's Estimate 9,250 SQYD $40.00 $370,000.00
A0421 61701-4100 GUARDRAIL SYSTEM CRG, TYPE 2, CLASS A
Martin Brothers Construction $82.00 $6,150.00
GEORGE REED, INC. $256.00 $19,200.00
Hat Creek Construction & Materials, Inc. $80.00 $6,000.00 Herback General Engineering $89.00 $6,675.00 Granite Construction Company $82.00 $6,150.00 Steve Manning Construction, Inc $100.00 $7,500.00 Engineer's Estimate 75 LNFT $90.00 $6,750.00
A0431 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS
Martin Brothers Construction $57.00 $45,600.00
GEORGE REED, INC. $191.00 $152,800.00
Hat Creek Construction & Materials, Inc. $55.00 $44,000.00 Herback General Engineering $61.00 $48,800.00 Granite Construction Company $66.00 $52,800.00 Steve Manning Construction, Inc $70.00 $56,000.00 Engineer's Estimate 800 LNFT $70.00 $56,000.00
A0441 61702-0400 TERMINAL SECTION, TYPE G4-CRT
Martin Brothers Construction $4,000.00 $8,000.00
GEORGE REED, INC. $5,300.00 $10,600.00
Hat Creek Construction & Materials, Inc. $3,875.00 $7,750.00 Herback General Engineering $4,300.00 $8,600.00 Granite Construction Company $6,000.00 $12,000.00 Steve Manning Construction, Inc $5,000.00 $10,000.00 Engineer's Estimate 2 EACH $3,500.00 $7,000.00
A0451 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
Martin Brothers Construction $5,600.00 $28,000.00
GEORGE REED, INC. $6,000.00 $30,000.00
Hat Creek Construction & Materials, Inc. $5,500.00 $27,500.00 Herback General Engineering $6,099.00 $30,495.00 Granite Construction Company $5,600.00 $28,000.00 Steve Manning Construction, Inc $6,000.00 $30,000.00 Engineer's Estimate 5 EACH $6,000.00 $30,000.00
27 out of 31
Project No: CA FLAP ED CR147(2)
Project Name: Ice House Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0461 61702-1600 TERMINAL SECTION, TYPE MGS FLARED
Martin Brothers Construction $5,600.00 $61,600.00
GEORGE REED, INC. $6,000.00 $66,000.00
Hat Creek Construction & Materials, Inc. $5,500.00 $60,500.00 Herback General Engineering $6,099.00 $67,089.00 Granite Construction Company $5,500.