This document contains questions and answers from a pre-bid meeting for the NV FLAP US50(1) Round Hill Pines Access federal construction project. The project involves widening 0.34 miles of US 50 and constructing 0.13 miles of new entrance road to the Round Hill Pines Beach Resort near Lake Tahoe to improve safety and accessibility. Work includes widening US 50 to add a median left turn lane and acceleration lane, milling and overlay of the existing roadway, and constructing the new access road including large 30 foot fills near the US 50 intersection. Drainage improvements, signing and striping are also part of the scope. A pre-bid meeting was held and questions were answered regarding the site visit policy, HUBZone price preference evaluation process, specified rolled erosion control product and staple requirements, approval to use the specified local seed mix, and prohibition of fertilizer due to project proximity to Lake Tahoe.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for NV FLAP US50(1) Round Hill Pines Access

March 8, 2022

Questions Answers 1 Is there a pre-bid meeting for this project?

Refer to Provision 52.236-27 Site Visit (Construction) on pages B-11 and B-12 of the solicitation.

2 The Invitation For Bid for this project shows the Solicitation Type as "Full and Open Competition with HUBZone Price Preference". Would you please define this and explain how the HUBZone Price Preference works?

“Full and Open Competition with HUBZone Price Preference” means that any contractor (LBC or SBC) may bid on this project, but if the contractor is a HUBZone, a price preference will be applied when evaluating the bids.

This process is outlined on page A-ii of the Invitation For Bid (IFB), in the section titled “This Solicitation Contains a Price Evaluation Factor.”

3 Please advise which Rolled Erosion Control Product is specified for 62901-0000? What kind of staple/stakes and length should are to be used?

Rolled Erosion Control Product, Type 4. Staples type/length according to manufacturer’s recommendations (see note 1 on T13).

4 The seed mix specifies seed stock from a local high elevation seed source. Please note that this requires special collection and availability pending this year’s harvest.

The USFS approved the use of the seed mix. Please bid according to what is in the plans and specifications.

5 Please specify what type of fertilizer and rate of application?

Refer to Amendment A002. Fertilizer not allowed due to close proximity to Lake Tahoe.