QnA_04.25.2019.pdf

PDF 74 KB Posted

Attached to
SD FTNP 10(9), Dillon Pass Embankment Repairs
Solicitation number
6982AF19B00005
Issued by

About this file

This document contains questions and answers from an advertisement for solicitation number 6982AF19B00005 for the SD FTNP 10(9), Dillon Pass Embankment Repairs project. The minimum performance grade asphalt concrete required is PG 64-28, to be used with a South Dakota Department of Transportation Class G asphalt concrete mix design approved within the last 12 months. Bidders should plan to commence asphalt paving between mid and late September, with all work to be completed by October 31, 2019. The culvert listed at station 694+63 to 695+22 is a 24-inch concrete pipe culvert, and bidders should bid the item as listed in the bid tabs.

Response to questions

View the file

Other files

File Type Posted
Bid_Opening_Summary_Dillon_Pass.pdf PDF
A001.pdf PDF
FINAL_Report_SD_FTNP_BADL_10(9).pdf PDF
BADL_10(9)_X-sheets.pdf PDF
BADL_10(9)_Plan_Sheets.pdf PDF
6982AF19B000005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for SD FTNP BADL 10(9), Dillon Pass Embankment Repairs

April 25, 2019

Questions Answers 1 Contract specifications reference, AASHTO M 320 designates that a Perfromance Graded AC needs to be used, and a SDDOT Class G Asphalt Concrete JMF will work for what you are asking for on this project. However, we have been unable to find an actual PG AC minimum specified, and typically to meet the TSR requirement, along with allowing a SDDOT Class G, the minimum AC needed is a PG64-28! Can you please clarify what the minimum PG AC that needs to be utilized for this contract?

According to Materials, the PG 64-28 binder with an SDDOT Class G Asphalt Concrete JMF is the binder that we are wanting. It is the binder used most often by SDDOT. In accordance with the SCR, the JMF to include SDDOT approval within the past 12 months and a production certification conforming to the SDDOT specifications.

2 With the bid date of May 1st, and an anticipated NTP of June 16, the residual effects of the Sturgis Bike Rally, along with the amount of work volume needed to be completed prior to the just the Asphalt Pavement portion of the work, are you anticipating mid-to-late September for the surfacing operation to be commence?

This is entirely up to the contractor’s schedule and the weather. We have given a completion date of October 31, 2019 in which all work needs to be completed.

3 I noticed a 36-inch Pipe Culvert (Concrete) at STA 694+63 to 695+22 Rt. There is no bid item listed in schedule A for 36-inch Pipe Culvert (Concrete). There is a bid item for 18-inch Pipe Culvert (Concrete) but I have not found any 18-inch Pipe Culvert on this project.

The culvert is listed as a 24-INCH PIPE CULVERT (CONCRETE) in the Drainage Summary on Sheet B10 and is totaled in the Summary of Quantities and Bid Tabs as such. The contractor should bid the item as it is listed in the Bid Tabs.