BADL_10(9)_X-sheets.pdf
PDF 7 MB Posted
- Attached to
- SD FTNP 10(9), Dillon Pass Embankment Repairs
- Solicitation number
- 6982AF19B00005
About this file
This document package includes cross-section sheets and design plans for the SD FTNP 10(9), Dillon Pass Embankment Repairs project. The project involves repairs to embankments along Dillon Pass in the FTNP area. The design plans show existing and proposed grade elevations, slopes, and other roadway features at regular station intervals along the route. Product and material specifications are not included, but the level of design detail provided indicates this is a solicitation package for a construction project.
SD FTNP BADl 10(9), Dillon Pass Embankment Repairs cross sections
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Dillon_Pass.pdf | ||
| QnA_04.25.2019.pdf | ||
| A001.pdf | ||
| FINAL_Report_SD_FTNP_BADL_10(9).pdf | ||
| BADL_10(9)_Plan_Sheets.pdf | ||
| 6982AF19B000005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130140
2670 2670
2680 2680
2690 2690
679+00.16
2670 2670
2680 2680
2690 2690
679+50.00
2670 2670
2680 2680
2690 2690
679+60.83
2670 2670
2680 2680
2690 2690
679+70.00
X2SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d g n
U s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2677.2
Off=14.0 Elev=2679.6
1:101:41:20
Sta. 679+00.00 R 1
Des. Grade = 2678.52
Orig. Grnd. = 2678.44
CL
Off=17.0 Elev=2676.1
Off=17.3 Elev=2678.6
1:101:41:20
Sta. 679+50.00 R 1
Des. Grade = 2677.49
Orig. Grnd. = 2677.41
CL
Off=17.0 Elev=2675.9
1:20
1:0
Sta. 679+60.83 R 1
Des. Grade = 2677.25
Orig. Grnd. = 2677.16
CL
Off=17.0 Elev=2675.7
1:20
1:0
Sta. 679+70.00 R 1
Des. Grade = 2677.02
Orig. Grnd. = 2676.94
2680 2680
2690 2690
679+80.00
2670 2670
2680 2680
2690 2690
679+90.00
2670 2670
2680 2680
2690 2690
680+00.00
2670 2670
2680 2680
2690 2690
680+10.00
X3SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2675.4
1:20
1:0
Sta. 679+80.00 R 1
Des. Grade = 2676.77
Orig. Grnd. = 2676.68
CL
Off=17.0 Elev=2675.2
1:20 1:0
Sta. 679+90.00 R 1
Des. Grade = 2676.50
Orig. Grnd. = 2676.41
CL
Off=17.0 Elev=2674.9
1:20
1:0
Sta. 680+00.00 R 1
Des. Grade = 2676.22
Orig. Grnd. = 2676.13
CL
Off=17.0 Elev=2674.6
1:10
1:0
Sta. 680+10.00 R 1
Des. Grade = 2675.94
Orig. Grnd. = 2675.83
2680 2680
2690 2690
680+20.00
2670 2670
2680 2680
2690 2690
680+30.00
2670 2670
2680 2680
2690 2690
680+40.00
2670 2670
2680 2680
2690 2690
680+45.00
X4SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2674.3
1:10
1:0
Sta. 680+20.00 R 1
Des. Grade = 2675.66
Orig. Grnd. = 2675.58
CL
Off=17.0 Elev=2674.1
1:10 1:0
Sta. 680+30.00 R 1
Des. Grade = 2675.39
Orig. Grnd. = 2675.33
CL
Off=17.0 Elev=2673.8
1:10
1:0
Sta. 680+40.00 R 1
Des. Grade = 2675.11
Orig. Grnd. = 2675.05
CL
Off=17.0 Elev=2673.6
Off=20.3 Elev=2676.1
1:10 1:10
Sta. 680+45.00 R 1
Des. Grade = 2674.95
Orig. Grnd. = 2674.87
2680 2680
2690 2690
680+50.00
2660 2660
2670 2670
2680 2680
2690 2690
681+00.00
2660 2660
2670 2670
2680 2680
2690 2690
681+50.00
2660 2660
2670 2670
2680 2680
682+00.00
X5SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2673.5
Off=20.7 Elev=2675.9
1:10 1:10
Sta. 680+50.00 R 1
Des. Grade = 2674.79
Orig. Grnd. = 2674.71
CL
Off=17.0 Elev=2671.7
Off=21.0 Elev=2673.7
1:10 1:10
Sta. 681+00.00 R 1
Des. Grade = 2673.08
Orig. Grnd. = 2673.01
CL
Off=17.0 Elev=2669.5
Off=21.0 Elev=2671.6
1:10 1:10
Sta. 681+50.00 R 1
Des. Grade = 2670.85
Orig. Grnd. = 2670.79
CL
Off=17.0 Elev=2667.3
Off=21.0 Elev=2669.3
1:10 1:10
Sta. 682+00.00 R 1
Des. Grade = 2668.57
Orig. Grnd. = 2668.49
2660 2660
2670 2670
2680 2680
682+50.00
2650 2650
2660 2660
2670 2670
2680 2680
683+00.00
2650 2650
2660 2660
2670 2670
2680 2680
683+50.00
2650 2650
2660 2660
2670 2670
684+00.00
X6SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2664.8
Off=21.0 Elev=2666.9
1:10 1:10
Sta. 682+50.00 R 1
Des. Grade = 2666.09
Orig. Grnd. = 2666.03
CL
Off=17.0 Elev=2661.7
Off=21.0 Elev=2664.0
1:10 1:10
Sta. 683+00.00 R 1
Des. Grade = 2663.20
Orig. Grnd. = 2663.12
CL
Off=17.0 Elev=2658.5
Off=21.0 Elev=2660.9
1:10 1:10
Sta. 683+50.00 R 1
Des. Grade = 2660.00
Orig. Grnd. = 2659.91
CL
Off=17.0 Elev=2654.9
Off=21.0 Elev=2657.2
1:10 1:10
Sta. 684+00.00 R 1
Des. Grade = 2656.37
Orig. Grnd. = 2656.29
2640 2640
2650 2650
2660 2660
2670 2670
684+50.00
2640 2640
2650 2650
2660 2660
2670 2670
684+60.00
2640 2640
2650 2650
2660 2660
684+85.00
2640 2640
2650 2650
2660 2660
685+00.00
X7SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2651.2
Off=21.0 Elev=2652.9
1:101:4 1:10
Sta. 684+50.00 R 1
Des. Grade = 2652.45
Orig. Grnd. = 2652.36
CL
Off=17.0 Elev=2650.5
Off=21.0 Elev=2652.0
1:101:4 1:10
Sta. 684+60.00 R 1
Des. Grade = 2651.64
Orig. Grnd. = 2651.56
CL
Off=17.0 Elev=2648.5
Off=17.0 Elev=2650.0
1:101:4 1:10
Sta. 684+85.00 R 1
Des. Grade = 2649.60
Orig. Grnd. = 2649.53
CL
Off=17.0 Elev=2647.4
Off=17.0 Elev=2648.6
1:101:4 1:10
Sta. 685+00.00 R 1
Des. Grade = 2648.38
Orig. Grnd. = 2648.30
2650 2650
2660 2660
685+44.00
2630 2630
2640 2640
2650 2650
2660 2660
685+50.00
2630 2630
2640 2640
2650 2650
2660 2660
685+69.00
2630 2630
2640 2640
2650 2650
2660 2660
685+73.00
X8SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2644.1
Off=17.0 Elev=2644.8
1:101:4 1:10
Sta. 685+44.00 R 1
Des. Grade = 2644.81
Orig. Grnd. = 2644.71
CL
Off=18.5 Elev=2643.6
Off=17.0 Elev=2644.3
1:10 1:10
Sta. 685+50.00 R 1
Des. Grade = 2644.33
Orig. Grnd. = 2644.23
CL
Off=23.2 Elev=2642.0
Off=18.0 Elev=2642.5
1:101:3
Sta. 685+69.00 R 1
Des. Grade = 2642.79
Orig. Grnd. = 2642.70
CL
Off=23.2 Elev=2641.6
Off=18.7 Elev=2642.1
1:10 1:10
Sta. 685+73.00 R 1
Des. Grade = 2642.46
Orig. Grnd. = 2642.38
2630 2630
2640 2640
2650 2650
2660 2660
685+74.00
2630 2630
2640 2640
2650 2650
2660 2660
685+87.00
2630 2630
2640 2640
2650 2650
2660 2660
685+92.00
X9SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2642.0
Off=18.8 Elev=2642.0
1:10 1:10
Sta. 685+74.00 R 1
Des. Grade = 2642.38
Orig. Grnd. = 2642.30
CL
Off=17.0 Elev=2641.0
Off=20.9 Elev=2640.7
1:10 1:10
Sta. 685+87.00 R 1
Des. Grade = 2641.33
Orig. Grnd. = 2641.24
CL
Off=17.0 Elev=2640.7
Off=20.8 Elev=2640.3
1:101:4 1:10
Sta. 685+92.00 R 1
Des. Grade = 2640.92
Orig. Grnd. = 2640.84
2640 2640
2650 2650
2660 2660
686+00.00
2630 2630
2640 2640
2650 2650
686+50.00
2620 2620
2630 2630
2640 2640
2650 2650
687+00.00
2620 2620
2630 2630
2640 2640
687+50.00
X10SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2640.1
Off=17.0 Elev=2639.8
1:101:4 1:10
Sta. 686+00.00 R 1
Des. Grade = 2640.27
Orig. Grnd. = 2640.19
CL
Off=17.0 Elev=2636.6
Off=17.0 Elev=2635.5
1:101:4 1:10
Sta. 686+50.00 R 1
Des. Grade = 2636.47
Orig. Grnd. = 2636.39
CL
Off=17.0 Elev=2632.7
Off=17.0 Elev=2631.3
1:101:4 1:101:3
Sta. 687+00.00 R 1
Des. Grade = 2632.29
Orig. Grnd. = 2632.32
CL
Off=17.0 Elev=2628.4 Off=17.0
Elev=2626.5
1:101:4 1:10
Sta. 687+50.00 R 1
Des. Grade = 2627.95
Orig. Grnd. = 2627.70
2610 2610
2620 2620
2630 2630
2640 2640
688+00.00
2610 2610
2620 2620
2630 2630
688+50.00
2610 2610
2620 2620
2630 2630
688+60.00
2610 2610
2620 2620
2630 2630
688+68.00
X11SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2623.7
Off=17.0 Elev=2622.0
1:101:4 1:10
Sta. 688+00.00 R 1
Des. Grade = 2623.47
Orig. Grnd. = 2623.28
CL
Off=18.0 Elev=2619.1
Off=17.0 Elev=2617.6
1:10 1:10
Sta. 688+50.00 R 1
Des. Grade = 2619.00
Orig. Grnd. = 2618.71
CL
Off=20.2 Elev=2617.9
Off=17.4 Elev=2616.6
1:10 1:10
Sta. 688+60.00 R 1
Des. Grade = 2618.10
Orig. Grnd. = 2617.88
CL
Off=22.1 Elev=2617.1
Off=19.1 Elev=2615.8
1:10 1:10
Sta. 688+68.00 R 1
Des. Grade = 2617.38
Orig. Grnd. = 2617.18
2620 2620
2630 2630
688+72.00
2610 2610
2620 2620
2630 2630
688+73.00
2610 2610
2620 2620
2630 2630
688+85.00
2610 2610
2620 2620
2630 2630
688+90.00
X12SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=22.0 Elev=2616.8
Off=19.9 Elev=2615.4
1:10 1:10
Sta. 688+72.00 R 1
Des. Grade = 2617.02
Orig. Grnd. = 2616.83
CL
Off=17.0 Elev=2617.1
Off=20.1 Elev=2615.3
1:10 1:10
Sta. 688+73.00 R 1
Des. Grade = 2616.94
Orig. Grnd. = 2616.74
CL
Off=17.0 Elev=2616.2 Off=22.1
Elev=2614.0
1:10 1:10
Sta. 688+85.00 R 1
Des. Grade = 2615.86
Orig. Grnd. = 2615.66
CL
Off=17.0 Elev=2615.9 Off=22.5
Elev=2613.6
1:101:2 1:10
Sta. 688+90.00 R 1
Des. Grade = 2615.41
Orig. Grnd. = 2615.21
2600 2600
2610 2610
2620 2620
2630 2630
689+00.00
2600 2600
2610 2610
2620 2620
2630 2630
689+50.00
2600 2600
2610 2610
2620 2620
690+00.00
2590 2590
2600 2600
2610 2610
2620 2620
690+50.00
X13SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2614.9
Off=17.0 Elev=2613.2
1:101:4 1:10
Sta. 689+00.00 R 1
Des. Grade = 2614.52
Orig. Grnd. = 2614.35
CL
Off=17.0 Elev=2610.3
Off=17.0 Elev=2608.7
1:101:4
1:10
Sta. 689+50.00 R 1
Des. Grade = 2610.04
Orig. Grnd. = 2609.95
CL
Off=17.0 Elev=2605.6
Off=17.0 Elev=2604.3
1:101:4 1:10
Sta. 690+00.00 R 1
Des. Grade = 2605.48
Orig. Grnd. = 2605.39
CL
Off=17.0 Elev=2600.6
Off=17.0 Elev=2600.1
1:101:4 1:10
Sta. 690+50.00 R 1
Des. Grade = 2600.80
Orig. Grnd. = 2600.87
2590 2590
2600 2600
2610 2610
691+00.00
2580 2580
2590 2590
2600 2600
2610 2610
691+50.00
2570 2570
2580 2580
2590 2590
2600 2600
2610 2610
691+61.00
X14SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=17.0 Elev=2595.5
Off=17.0 Elev=2595.7
1:101:41:10
Sta. 691+00.00 R 1
Des. Grade = 2596.11
Orig. Grnd. = 2596.07
CL
Off=17.5 Elev=2590.7
Off=17.0 Elev=2591.3
1:101:4 1:10
Sta. 691+50.00 R 1
Des. Grade = 2591.42
Orig. Grnd. = 2591.34
CL
Off=19.3 Elev=2589.7
Off=17.0 Elev=2590.2
1:101:41:101:4
Sta. 691+61.00 R 1
Des. Grade = 2590.39
Orig. Grnd. = 2590.31
2570 2570
2580 2580
2590 2590
2600 2600
691+71.00
2570 2570
2580 2580
2590 2590
2600 2600
691+76.00
2570 2570
2580 2580
2590 2590
2600 2600
691+77.00
X15SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=20.9 Elev=2588.9
Off=19.2 Elev=2589.1
1:101:41:10 1:4
Sta. 691+71.00 R 1
Des. Grade = 2589.45
Orig. Grnd. = 2589.37
CL
Off=21.0 Elev=2588.5
Off=20.4 Elev=2588.5
1:101:41:10 1:4
Sta. 691+76.00 R 1
Des. Grade = 2588.98
Orig. Grnd. = 2588.90
CL
Off=14.0 Elev=2588.5
Off=20.7 Elev=2588.4
1:101:41:10
Sta. 691+77.00 R 1
Des. Grade = 2588.89
Orig. Grnd. = 2588.81
2580 2580
2590 2590
2600 2600
691+86.00
2570 2570
2580 2580
2590 2590
2600 2600
691+91.00
2570 2570
2580 2580
2590 2590
2600 2600
692+00.00
X16SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2587.6
Off=22.8 Elev=2587.5
1:101:41:101:3
Sta. 691+86.00 R 1
Des. Grade = 2588.05
Orig. Grnd. = 2587.96
CL
Off=14.0 Elev=2587.6
Off=22.8 Elev=2587.0
1:101:41:10
1:3
Sta. 691+91.00 R 1
Des. Grade = 2587.58
Orig. Grnd. = 2587.49
CL
Off=14.0 Elev=2586.8
Off=17.0 Elev=2586.5
1:10
1:2
1:10
Sta. 692+00.00 R 1
Des. Grade = 2586.79
Orig. Grnd. = 2586.71
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
692+44.00
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
692+50.00
X17SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2582.7
Off=17.0 Elev=2582.6
1:10
1:2
1:10
Sta. 692+44.00 R 1
Des. Grade = 2582.98
Orig. Grnd. = 2582.89
CL
Off=14.0 Elev=2582.2
Off=18.2 Elev=2582.1
1:10
1:2
1:10
Sta. 692+50.00 R 1
Des. Grade = 2582.46
Orig. Grnd. = 2582.37
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
692+69.00
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
693+00.00
X18SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2580.6
Off=22.3 Elev=2580.2
1:101:41:10
1:2
Sta. 692+69.00 R 1
Des. Grade = 2580.79
Orig. Grnd. = 2580.71
CL
Off=14.0 Elev=2577.8
Off=22.1 Elev=2577.4
1:101:41:10
1:2
Sta. 693+00.00 R 1
Des. Grade = 2578.07
Orig. Grnd. = 2577.99
2530 2530
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
693+50.00
2530 2530
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
694+00.00
X19SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2573.3
Off=21.9 Elev=2573.0
1:10 1:4 1:10
1:2
Sta. 693+50.00 R 1
Des. Grade = 2573.68
Orig. Grnd. = 2573.59
CL
Off=14.0 Elev=2569.2
Off=21.6 Elev=2569.0
1:10 1:4 1:10
1:2
Sta. 694+00.00 R 1
Des. Grade = 2569.50
Orig. Grnd. = 2569.41
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
694+50.00
2530 2530
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
694+67.00
X20SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2565.3
Off=21.4 Elev=2565.0
1:101:41:10
1:2
Sta. 694+50.00 R 1
Des. Grade = 2565.61
Orig. Grnd. = 2565.53
CL
Off=14.0 Elev=2564.1
Off=21.3 Elev=2563.6
1:101:41:10
1:2
Sta. 694+67.00 R 1
Des. Grade = 2564.31
Orig. Grnd. = 2564.23
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
695+00.00
2530 2530
2540 2540
2550 2550
2560 2560
2570 2570
695+49.00
X21SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2561.8
Off=18.4 Elev=2561.4
1:10
1:2
1:10 1:3
Sta. 695+00.00 R 1
Des. Grade = 2561.87
Orig. Grnd. = 2561.79
CL
Off=14.0 Elev=2558.2
1:10
1:2
1:10
Sta. 695+49.00 R 1
Des. Grade = 2558.45
Orig. Grnd. = 2558.37
2540 2540
2550 2550
2560 2560
2570 2570
695+50.00
2530 2530
2540 2540
2550 2550
2560 2560
2570 2570
696+00.00
2540 2540
2550 2550
2560 2560
2570 2570
696+45.00
X22SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2558.1
1:10
1:2
1:10
Sta. 695+50.00 R 1
Des. Grade = 2558.39
Orig. Grnd. = 2558.31
CL
Off=14.0 Elev=2554.9
1:10
1:2
1:10 1:3
Sta. 696+00.00 R 1
Des. Grade = 2555.44
Orig. Grnd. = 2555.35
CL
Off=14.0 Elev=2552.6
1:10 1:2
1:10 1:2
Sta. 696+45.00 R 1
Des. Grade = 2553.40
Orig. Grnd. = 2553.32
2550 2550
2560 2560
2570 2570
696+50.00
2530 2530
2540 2540
2550 2550
2560 2560
697+00.00
2530 2530
2540 2540
2550 2550
2560 2560
697+50.00
X23SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2552.3
1:10 1:3
1:10
1:3
Sta. 696+50.00 R 1
Des. Grade = 2553.11
Orig. Grnd. = 2553.03
CL
Off=14.0 Elev=2549.6
1:101:4 1:10
1:2 Sta. 697+00.00 R 1
Des. Grade = 2550.49
Orig. Grnd. = 2550.42
CL
Off=14.0 Elev=2547.1
1:10 1:4 1:10
1:2 Sta. 697+50.00 R 1
Des. Grade = 2548.24
Orig. Grnd. = 2548.16
2540 2540
2550 2550
2560 2560
698+00.00
2530 2530
2540 2540
2550 2550
2560 2560
698+50.00
2530 2530
2540 2540
2550 2550
2560 2560
699+00.00
X24SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2544.9
1:101:4 1:10
1:2 Sta. 698+00.00 R 1
Des. Grade = 2546.15
Orig. Grnd. = 2546.08
CL
Off=14.0 Elev=2543.2
1:101:4 1:10
1:2 Sta. 698+50.00 R 1
Des. Grade = 2544.43
Orig. Grnd. = 2544.37
CL
Off=14.0 Elev=2542.1
1:10 1:3
1:71
Sta. 699+00.00 R 1
Des. Grade = 2543.12
Orig. Grnd. = 2543.03
2540 2540
2550 2550
2560 2560
699+50.00
2530 2530
2540 2540
2550 2550
2560 2560
700+00.00
2530 2530
2540 2540
2550 2550
2560 2560
700+50.00
2530 2530
2540 2540
2550 2550
700+75.00
X25SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2541.4
1:4 1:101:4
Sta. 699+50.00 R 1
Des. Grade = 2542.34
Orig. Grnd. = 2542.28
CL
Off=14.0 Elev=2541.1
1:41:4 1:101:4
Sta. 700+00.00 R 1
Des. Grade = 2541.97
Orig. Grnd. = 2541.88
CL
Off=14.0 Elev=2540.8
1:41:4 1:101:4
Sta. 700+50.00 R 1
Des. Grade = 2541.72
Orig. Grnd. = 2541.61
CL
1:41:4 1:41:18
Sta. 700+75.00 R 1
Des. Grade = 2541.60
Orig. Grnd. = 2541.46
2540 2540
2550 2550
701+00.00
2530 2530
2540 2540
2550 2550
701+50.00
2530 2530
2540 2540
2550 2550
702+00.00
2530 2530
2540 2540
2550 2550
702+50.00
X26SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
1:41:201:4
Sta. 701+00.00 R 1
Des. Grade = 2541.47
Orig. Grnd. = 2541.38
CL
1:41:201:4
1:2
Sta. 701+50.00 R 1
Des. Grade = 2541.33
Orig. Grnd. = 2541.25
CL
1:41:201:4
Sta. 702+00.00 R 1
Des. Grade = 2541.42
Orig. Grnd. = 2541.32
CL
1:41:471:4
Sta. 702+50.00 R 1
Des. Grade = 2541.15
Orig. Grnd. = 2541.07
2540 2540
2550 2550
703+00.00
2530 2530
2540 2540
703+50.00
2530 2530
2540 2540
2550 2550
2560 2560
704+00.00
2530 2530
2540 2540
2550 2550
2560 2560
704+50.00
X27SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
1:41:20 1:41:20
Sta. 703+00.00 R 1
Des. Grade = 2541.10
Orig. Grnd. = 2541.03
CL
1:41:20 1:41:20
Sta. 703+50.00 R 1
Des. Grade = 2541.07
Orig. Grnd. = 2540.98
CL
Off=14.0 Elev=2541.2
1:4 1:4
1:101:2
Sta. 704+00.00 R 1
Des. Grade = 2541.41
Orig. Grnd. = 2541.30
CL
Off=14.0 Elev=2541.6
1:4 1:3
1:101:2
Sta. 704+50.00 R 1
Des. Grade = 2541.78
Orig. Grnd. = 2541.70
2540 2540
2550 2550
2560 2560
705+00.00
2530 2530
2540 2540
2550 2550
2560 2560
705+50.00
2530 2530
2540 2540
2550 2550
2560 2560
706+00.00
X28SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2542.1
1:101:21:15
Sta. 705+00.00 R 1
Des. Grade = 2542.30
Orig. Grnd. = 2542.21
CL
Off=14.0 Elev=2542.7
1:101:2 1:2
Sta. 705+50.00 R 1
Des. Grade = 2542.90
Orig. Grnd. = 2542.80
CL
Off=14.0 Elev=2543.6
1:101:21:12
Sta. 706+00.00 R 1
Des. Grade = 2543.87
Orig. Grnd. = 2543.75
2540 2540
2550 2550
2560 2560
706+50.00
2530 2530
2540 2540
2550 2550
2560 2560
707+00.00
2530 2530
2540 2540
2550 2550
2560 2560
707+50.00
X29SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2544.6
1:4 1:101:3
Sta. 706+50.00 R 1
Des. Grade = 2544.86
Orig. Grnd. = 2544.78
CL
Off=14.0 Elev=2545.9
1:10 1:41:4
Sta. 707+00.00 R 1
Des. Grade = 2546.12
Orig. Grnd. = 2546.03
CL
Off=14.0 Elev=2547.3
1:4 1:10
1:2
Sta. 707+50.00 R 1
Des. Grade = 2547.37
Orig. Grnd. = 2547.29
2540 2540
2550 2550
2560 2560
708+00.00
2530 2530
2540 2540
2550 2550
2560 2560
2570 2570
708+50.00
2530 2530
2540 2540
2550 2550
2560 2560
2570 2570
709+00.00
X30SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2548.7
1:41:4 1:10
1:2Sta. 708+00.00 R 1
Des. Grade = 2549.13
Orig. Grnd. = 2549.07
CL
Off=14.0 Elev=2550.6
1:41:4 1:10
1:2Sta. 708+50.00 R 1
Des. Grade = 2550.93
Orig. Grnd. = 2550.84
CL
Off=14.0 Elev=2552.1
1:41:20 1:10
1:2Sta. 709+00.00 R 1
Des. Grade = 2552.55
Orig. Grnd. = 2552.47
2550 2550
2560 2560
2570 2570
709+50.00
2550 2550
2560 2560
2570 2570
710+00.00
2550 2550
2560 2560
2570 2570
710+41.00
X31SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2554.0
1:41:20 1:10 1:3
Sta. 709+50.00 R 1
Des. Grade = 2554.91
Orig. Grnd. = 2554.83
CL
Off=14.0 Elev=2556.8
1:10 1:3
1:4
Sta. 710+00.00 R 1
Des. Grade = 2557.58
Orig. Grnd. = 2557.49
CL
Off=14.0 Elev=2559.5
1:6 1:10 1:3
Sta. 710+41.00 R 1
Des. Grade = 2559.96
Orig. Grnd. = 2559.88
2560 2560
2570 2570
2580 2580
710+50.00
2550 2550
2560 2560
2570 2570
2580 2580
711+00.00
2550 2550
2560 2560
2570 2570
2580 2580
711+50.00
X32SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2560.1
1:10 1:4 1:6
Sta. 710+50.00 R 1
Des. Grade = 2560.51
Orig. Grnd. = 2560.43
CL
Off=14.0 Elev=2562.7
1:6 1:101:3
Sta. 711+00.00 R 1
Des. Grade = 2563.17
Orig. Grnd. = 2563.10
CL
Off=14.0 Elev=2565.1
1:6 1:10 1:3
Sta. 711+50.00 R 1
Des. Grade = 2565.99
Orig. Grnd. = 2565.88
2560 2560
2570 2570
2580 2580
712+00.00
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
712+50.00
2560 2560
2570 2570
2580 2580
2590 2590
713+00.00
X33SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2567.9
1:6 1:10
1:2 Sta. 712+00.00 R 1
Des. Grade = 2568.88
Orig. Grnd. = 2568.78
CL
Off=14.0 Elev=2570.7
1:6
1:2
1:10
Sta. 712+50.00 R 1
Des. Grade = 2571.54
Orig. Grnd. = 2571.43
CL
Off=14.0 Elev=2573.7
1:6 1:10 1:3
Sta. 713+00.00 R 1
Des. Grade = 2574.17
Orig. Grnd. = 2574.10
2580 2580
2590 2590
713+50.00
2570 2570
2580 2580
2590 2590
2600 2600
714+00.00
2570 2570
2580 2580
2590 2590
2600 2600
714+50.00
X34SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2576.9
1:6 1:10 1:3
Sta. 713+50.00 R 1
Des. Grade = 2577.38
Orig. Grnd. = 2577.29
CL
Off=14.0 Elev=2580.4
Off=14.0 Elev=2579.6
1:10 1:4
1:10 1:3
Sta. 714+00.00 R 1
Des. Grade = 2580.24
Orig. Grnd. = 2580.12
CL
Off=14.0 Elev=2582.7
Off=14.0 Elev=2582.4
1:10 1:4
1:10 1:3
Sta. 714+50.00 R 1
Des. Grade = 2582.98
Orig. Grnd. = 2582.89
2580 2580
2590 2590
2600 2600
714+60.00
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
715+00.00
X35SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2583.2
Off=14.0 Elev=2582.9
1:10
1:2
1:10 1:3
Sta. 714+60.00 R 1
Des. Grade = 2583.53
Orig. Grnd. = 2583.44
CL
Off=14.0 Elev=2584.9
Off=14.0 Elev=2585.0
1:10
1:2
1:10 1:3
Sta. 715+00.00 R 1
Des. Grade = 2585.43
Orig. Grnd. = 2585.35
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
715+50.00
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
716+00.00
(See Drainage Cross Sections)
Soil Slope toe of Shallow Reinforced
Install 72-inch RCP under
(See Special 251-A)
Soil Slope toe of Shallow Reinforced
Install Riprap Ditch at
X36SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2587.3
Off=14.0 Elev=2587.4
1:10
1:2
1:10 1:3
Sta. 715+50.00 R 1
Des. Grade = 2587.79
Orig. Grnd. = 2587.70
CL
Off=14.0 Elev=2589.8
Off=14.0 Elev=2589.9
1:10
1:2
1:10 1:3
Sta. 716+00.00 R 1
Des. Grade = 2590.29
Orig. Grnd. = 2590.21
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
2610 2610
716+50.00
2540 2540
2550 2550
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
2610 2610
717+00.00
(See Drainage Cross Sections)
Soil Slope toe of Shallow Reinforced
Install 72-inch RCP under
(See Special 251-A)
Soil Slope toe of Shallow Reinforced
Install Riprap Ditch at
X37SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2592.5
Off=14.0 Elev=2592.7
1:10
1:2
1:10 1:3
Sta. 716+50.00 R 1
Des. Grade = 2592.90
Orig. Grnd. = 2592.81
CL
Off=14.0 Elev=2595.6
Off=14.0 Elev=2595.7
1:10
1:2
1:10 1:3
Sta. 717+00.00 R 1
Des. Grade = 2595.82
Orig. Grnd. = 2595.73
2560 2560
2570 2570
2580 2580
2590 2590
2600 2600
2610 2610
717+50.00
2590 2590
2600 2600
2610 2610
717+65.00
2590 2590
2600 2600
2610 2610
2620 2620
718+00.00
X38SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2598.6
Off=14.0 Elev=2598.7
1:10 1:3
1:2
1:10
Sta. 717+50.00 R 1
Des. Grade = 2598.80
Orig. Grnd. = 2598.71
CL
Off=14.0 Elev=2599.6
Off=14.0 Elev=2599.6
1:10 1:3
1:10 1:2
Sta. 717+65.00 R 1
Des. Grade = 2599.75
Orig. Grnd. = 2599.66
CL
Off=14.0 Elev=2601.8
Off=14.0 Elev=2601.6
1:10 1:3
1:10
Sta. 718+00.00 R 1
Des. Grade = 2601.97
Orig. Grnd. = 2601.89
2600 2600
2610 2610
2620 2620
718+10.00
2590 2590
2600 2600
2610 2610
2620 2620
718+11.00
2590 2590
2600 2600
2610 2610
2620 2620
718+12.00
X39SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2602.5
Off=14.0 Elev=2602.2
1:10 1:2
1:21
Sta. 718+10.00 R 1
Des. Grade = 2602.61
Orig. Grnd. = 2602.52
CL
Off=14.0 Elev=2602.5
Off=14.0 Elev=2602.3
1:10 1:3
1:21
Sta. 718+11.00 R 1
Des. Grade = 2602.67
Orig. Grnd. = 2602.59
CL
Off=21.3 Elev=2602.3
Off=14.0 Elev=2602.3
1:10 1:3
1:14
Sta. 718+12.00 R 1
Des. Grade = 2602.73
Orig. Grnd. = 2602.65
2600 2600
2610 2610
2620 2620
718+19.00
2590 2590
2600 2600
2610 2610
2620 2620
718+44.00
2590 2590
2600 2600
2610 2610
2620 2620
718+50.00
X40SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=21.5 Elev=2602.7
Off=14.0 Elev=2602.8
1:10 1:3
1:14
Sta. 718+19.00 R 1
Des. Grade = 2603.18
Orig. Grnd. = 2603.09
CL
Off=14.0 Elev=2604.5
Off=14.0 Elev=2604.5
1:10 1:2
1:19
Sta. 718+44.00 R 1
Des. Grade = 2604.77
Orig. Grnd. = 2604.68
CL
Off=14.0 Elev=2604.9
Off=14.0 Elev=2604.9
1:19 1:10 1:3
Sta. 718+50.00 R 1
Des. Grade = 2605.15
Orig. Grnd. = 2605.06
2610 2610
2620 2620
719+00.00
2600 2600
2610 2610
2620 2620
2630 2630
719+41.00
2600 2600
2610 2610
2620 2620
2630 2630
719+42.00
X41SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2607.9
Off=14.0 Elev=2608.4
1:10 1:3
1:20
Sta. 719+00.00 R 1
Des. Grade = 2608.39
Orig. Grnd. = 2608.31
CL
Off=14.0 Elev=2610.9
Off=14.0 Elev=2611.6
1:101:41:20
Sta. 719+41.00 R 1
Des. Grade = 2611.40
Orig. Grnd. = 2611.32
CL
Off=14.0 Elev=2610.9
Off=20.0 Elev=2611.3
1:101:4 1:20
Sta. 719+42.00 R 1
Des. Grade = 2611.46
Orig. Grnd. = 2611.38
2610 2610
2620 2620
2630 2630
719+45.00
2600 2600
2610 2610
2620 2620
2630 2630
719+50.00
2600 2600
2610 2610
2620 2620
2630 2630
719+70.00
X42SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2611.1
Off=20.0 Elev=2611.5
1:101:4 1:20
Sta. 719+45.00 R 1
Des. Grade = 2611.64
Orig. Grnd. = 2611.56
CL
Off=14.0 Elev=2611.4
Off=19.5 Elev=2611.9
1:101:4 1:20
Sta. 719+50.00 R 1
Des. Grade = 2611.94
Orig. Grnd. = 2611.85
CL
Off=14.0 Elev=2612.6
Off=17.0 Elev=2613.2
1:20 1:101:4
Sta. 719+70.00 R 1
Des. Grade = 2613.13
Orig. Grnd. = 2613.05
2620 2620
2630 2630
720+00.00
2610 2610
2620 2620
2630 2630
720+50.00
2610 2610
2620 2620
2630 2630
2640 2640
721+00.00
X43SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2614.5
Off=17.0 Elev=2614.9
1:20 1:101:4
Sta. 720+00.00 R 1
Des. Grade = 2614.92
Orig. Grnd. = 2614.84
CL
Off=14.0 Elev=2617.7
Off=17.0 Elev=2618.1
1:20 1:10
Sta. 720+50.00 R 1
Des. Grade = 2618.15
Orig. Grnd. = 2618.07
CL
Off=14.0 Elev=2620.9
Off=17.0 Elev=2621.3
1:10 1:10
Sta. 721+00.00 R 1
Des. Grade = 2621.31
Orig. Grnd. = 2621.22
2620 2620
2630 2630
2640 2640
721+50.00
2620 2620
2630 2630
2640 2640
722+00.00
2620 2620
2630 2630
2640 2640
2650 2650
722+50.00
X44SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2623.9
Off=17.0 Elev=2624.6
1:10 1:10
Sta. 721+50.00 R 1
Des. Grade = 2624.37
Orig. Grnd. = 2624.26
CL
Off=14.0 Elev=2626.9
Off=17.0 Elev=2627.6
1:10 1:10
Sta. 722+00.00 R 1
Des. Grade = 2627.50
Orig. Grnd. = 2627.38
CL
Off=14.0 Elev=2629.9
Off=17.0 Elev=2631.1
1:101:4 1:10
Sta. 722+50.00 R 1
Des. Grade = 2630.75
Orig. Grnd. = 2630.70
2620 2620
2630 2630
2640 2640
2650 2650
722+52.00
2620 2620
2630 2630
2640 2640
2650 2650
722+56.00
2620 2620
2630 2630
2640 2640
2650 2650
722+80.00
X45SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2630.0
Off=17.0 Elev=2631.2
1:101:4 1:10
Sta. 722+52.00 R 1
Des. Grade = 2630.88
Orig. Grnd. = 2630.83
CL
Off=21.4 Elev=2629.5
Off=17.0 Elev=2631.5
1:10 1:3
1:10
Sta. 722+56.00 R 1
Des. Grade = 2631.15
Orig. Grnd. = 2631.10
CL
Off=14.2 Elev=2631.8
Off=17.0 Elev=2633.2
1:101:4 1:10
Sta. 722+80.00 R 1
Des. Grade = 2632.74
Orig. Grnd. = 2632.66
2620 2620
2630 2630
2640 2640
2650 2650
723+00.00
2630 2630
2640 2640
2650 2650
723+50.00
2630 2630
2640 2640
2650 2650
2660 2660
724+00.00
X46SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2633.0
Off=17.0 Elev=2634.6
1:101:3 1:10
Sta. 723+00.00 R 1
Des. Grade = 2633.98
Orig. Grnd. = 2633.89
CL
Off=14.0 Elev=2635.7
Off=17.0 Elev=2637.8
1:10 1:3
1:10
Sta. 723+50.00 R 1
Des. Grade = 2636.93
Orig. Grnd. = 2636.84
CL
Off=14.0 Elev=2638.4
Off=17.0 Elev=2640.6
1:101:3 1:10
Sta. 724+00.00 R 1
Des. Grade = 2639.86
Orig. Grnd. = 2639.69
2640 2640
2650 2650
2660 2660
724+50.00
2630 2630
2640 2640
2650 2650
2660 2660
724+79.00
2640 2640
2650 2650
2660 2660
725+00.00
X47SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2641.8
Off=17.0 Elev=2643.5
1:101:4 1:10
Sta. 724+50.00 R 1
Des. Grade = 2642.79
Orig. Grnd. = 2642.71
CL
Off=14.0 Elev=2643.7
Off=17.0 Elev=2645.3
1:101:4 1:10
Sta. 724+79.00 R 1
Des. Grade = 2644.62
Orig. Grnd. = 2644.54
CL
Off=20.2 Elev=2644.8
Off=17.0 Elev=2646.8
1:101:4 1:10
Sta. 725+00.00 R 1
Des. Grade = 2646.06
Orig. Grnd. = 2646.00
2650 2650
2660 2660
725+50.00
2640 2640
2650 2650
2660 2660
2670 2670
726+00.00
2640 2640
2650 2650
2660 2660
2670 2670
726+36.00
X48SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2648.3
Off=17.0 Elev=2649.8
1:101:4 1:10
Sta. 725+50.00 R 1
Des. Grade = 2649.15
Orig. Grnd. = 2649.11
CL
Off=14.0 Elev=2651.2
Off=17.0 Elev=2652.6
1:101:4 1:10
Sta. 726+00.00 R 1
Des. Grade = 2652.19
Orig. Grnd. = 2652.12
CL
Off=14.0 Elev=2653.3
Off=17.0 Elev=2654.5
1:101:4 1:10
Sta. 726+36.00 R 1
Des. Grade = 2654.15
Orig. Grnd. = 2654.09
2650 2650
2660 2660
2670 2670
726+40.00
2650 2650
2660 2660
2670 2670
726+50.00
2650 2650
2660 2660
2670 2670
726+80.00
X49SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=24.5 Elev=2652.4
Off=17.0 Elev=2654.7
1:10 1:10
Sta. 726+40.00 R 1
Des. Grade = 2654.35
Orig. Grnd. = 2654.29
CL
Off=22.3 Elev=2653.4
Off=17.0 Elev=2655.1
1:10 1:10
Sta. 726+50.00 R 1
Des. Grade = 2654.89
Orig. Grnd. = 2654.80
CL
Off=14.0 Elev=2656.1
Off=17.0 Elev=2656.8
1:101:4 1:10
Sta. 726+80.00 R 1
Des. Grade = 2656.66
Orig. Grnd. = 2656.58
2650 2650
2660 2660
2670 2670
727+00.00
2650 2650
2660 2660
2670 2670
2680 2680
727+50.00
2650 2650
2660 2660
2670 2670
2680 2680
727+65.00
X50SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2657.3
Off=17.0 Elev=2658.0
1:101:4 1:10
Sta. 727+00.00 R 1
Des. Grade = 2657.80
Orig. Grnd. = 2657.71
CL
Off=14.0 Elev=2660.4
Off=17.0 Elev=2660.8
1:101:4 1:10
Sta. 727+50.00 R 1
Des. Grade = 2660.86
Orig. Grnd. = 2660.70
CL
Off=14.0 Elev=2661.3
Off=17.0 Elev=2661.7
1:101:4 1:10
Sta. 727+65.00 R 1
Des. Grade = 2661.78
Orig. Grnd. = 2661.59
2650 2650
2660 2660
2670 2670
2680 2680
727+89.00
2650 2650
2660 2660
2670 2670
2680 2680
728+00.00
2660 2660
2670 2670
2680 2680
728+50.00
X51SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2662.8
Off=20.9 Elev=2662.9
1:101:4 1:10
Sta. 727+89.00 R 1
Des. Grade = 2663.24
Orig. Grnd. = 2663.06
CL
Off=14.0 Elev=2663.5
Off=21.0 Elev=2663.5
1:101:4 1:10
Sta. 728+00.00 R 1
Des. Grade = 2663.92
Orig. Grnd. = 2663.74
CL
Off=14.0 Elev=2666.7
Off=21.0 Elev=2666.5
1:10 1:101:4
Sta. 728+50.00 R 1
Des. Grade = 2666.97
Orig. Grnd. = 2666.87
2670 2670
2680 2680
729+00.00
2660 2660
2670 2670
2680 2680
2690 2690
729+50.00
2660 2660
2670 2670
2680 2680
2690 2690
729+85.00
X52X52SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2669.9
Off=21.0 Elev=2669.5
1:10 1:101:4
Sta. 729+00.00 R 1
Des. Grade = 2669.97
Orig. Grnd. = 2669.92
CL
Off=14.0 Elev=2672.6
Off=21.0 Elev=2672.2
1:10 1:10 1:4
Sta. 729+50.00 R 1
Des. Grade = 2672.83
Orig. Grnd. = 2672.73
CL
Off=14.0 Elev=2674.3
Off=21.0 Elev=2673.8
1:101:41:9
Sta. 729+85.00 R 1
Des. Grade = 2674.62
Orig. Grnd. = 2674.49
2670 2670
2680 2680
2690 2690
729+86.00
2670 2670
2680 2680
2690 2690
729+92.00
2670 2670
2680 2680
2690 2690
730+00.00
X53SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=20.4 Elev=2673.6
Off=21.0 Elev=2673.9
1:10 1:101:4
Sta. 729+86.00 R 1
Des. Grade = 2674.67
Orig. Grnd. = 2674.54
CL
Off=20.2 Elev=2673.9
Off=21.0 Elev=2674.4
1:10 1:101:4
Sta. 729+92.00 R 1
Des. Grade = 2674.98
Orig. Grnd. = 2674.84
CL
Off=19.2 Elev=2674.5
Off=21.0 Elev=2675.0
1:10 1:101:4
Sta. 730+00.00 R 1
Des. Grade = 2675.39
Orig. Grnd. = 2675.25
2680 2680
2690 2690
730+40.00
2670 2670
2680 2680
2690 2690
730+50.00
2670 2670
2680 2680
2690 2690
2700 2700
731+00.00
X54SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2677.1
Off=21.0 Elev=2677.1
1:10 1:10
Sta. 730+40.00 R 1
Des. Grade = 2677.43
Orig. Grnd. = 2677.32
CL
Off=14.0 Elev=2677.7
Off=21.0 Elev=2677.6
1:10 1:10
Sta. 730+50.00 R 1
Des. Grade = 2677.95
Orig. Grnd. = 2677.84
CL
Off=14.0 Elev=2680.3
Off=21.0 Elev=2680.2
1:10 1:101:4
Sta. 731+00.00 R 1
Des. Grade = 2680.48
Orig. Grnd. = 2680.41
2680 2680
2690 2690
2700 2700
731+50.00
2680 2680
2690 2690
2700 2700
732+00.00
2680 2680
2690 2690
2700 2700
732+50.00
X55SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2682.7
Off=21.0 Elev=2682.9
1:10 1:101:4
Sta. 731+50.00 R 1
Des. Grade = 2682.90
Orig. Grnd. = 2682.83
CL
Off=14.0 Elev=2684.8
Off=21.0 Elev=2685.2
1:10 1:101:4
Sta. 732+00.00 R 1
Des. Grade = 2685.10
Orig. Grnd. = 2685.09
CL
Off=14.0 Elev=2687.1
Off=21.0 Elev=2687.3
1:10 1:101:4
Sta. 732+50.00 R 1
Des. Grade = 2687.30
Orig. Grnd. = 2687.24
2680 2680
2690 2690
2700 2700
733+00.00
2680 2680
2690 2690
2700 2700
2710 2710
733+50.00
2680 2680
2690 2690
2700 2700
2710 2710
734+00.00
X56SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2689.1
Off=21.0 Elev=2689.2
1:10 1:101:4
Sta. 733+00.00 R 1
Des. Grade = 2689.26
Orig. Grnd. = 2689.18
CL
Off=14.0 Elev=2690.8
Off=21.0 Elev=2690.8
1:101:4 1:101:4
Sta. 733+50.00 R 1
Des. Grade = 2691.02
Orig. Grnd. = 2690.93
CL
Off=14.0 Elev=2692.8
Off=21.0 Elev=2692.4
1:101:4 1:10 1:4
Sta. 734+00.00 R 1
Des. Grade = 2692.69
Orig. Grnd. = 2692.58
2680 2680
2690 2690
2700 2700
2710 2710
734+02.00
2680 2680
2690 2690
2700 2700
2710 2710
734+27.00
2680 2680
2690 2690
2700 2700
2710 2710
734+50.00
X57SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2692.9
Off=20.9 Elev=2692.5
1:101:4 1:10 1:4
Sta. 734+02.00 R 1
Des. Grade = 2692.76
Orig. Grnd. = 2692.64
CL
Off=14.0 Elev=2693.3
1:20 1:101:4
Sta. 734+27.00 R 1
Des. Grade = 2693.63
Orig. Grnd. = 2693.49
CL
Off=14.0 Elev=2694.2
1:20 1:10
1:4
Sta. 734+50.00 R 1
Des. Grade = 2694.44
Orig. Grnd. = 2694.32
2690 2690
2700 2700
2710 2710
735+00.00
2690 2690
2700 2700
2710 2710
735+50.00
2690 2690
2700 2700
2710 2710
736+00.00
2690 2690
2700 2700
2710 2710
736+50.00
X58SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2696.0
1:20 1:10
1:3
Sta. 735+00.00 R 1
Des. Grade = 2696.16
Orig. Grnd. = 2696.07
CL
Off=14.0 Elev=2697.4
1:20 1:10
1:3
Sta. 735+50.00 R 1
Des. Grade = 2697.65
Orig. Grnd. = 2697.57
CL
Off=14.0 Elev=2698.7
1:20 1:10
1:3
Sta. 736+00.00 R 1
Des. Grade = 2698.92
Orig. Grnd. = 2698.86
CL
Off=14.0 Elev=2699.9
1:20 1:10
1:3
Sta. 736+50.00 R 1
Des. Grade = 2700.15
Orig. Grnd. = 2700.08
2700 2700
2710 2710
2720 2720
737+00.00
2690 2690
2700 2700
2710 2710
2720 2720
737+50.00
2690 2690
2700 2700
2710 2710
737+93.00
2690 2690
2700 2700
2710 2710
738+00.00
X59SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Off=14.0 Elev=2701.1
1:20 1:10
1:3
Sta. 737+00.00 R 1
Des. Grade = 2701.33
Orig. Grnd. = 2701.25
CL
Off=14.0 Elev=2702.1
1:20 1:10
1:3
Sta. 737+50.00 R 1
Des. Grade = 2702.41
Orig. Grnd. = 2702.33
CL
1:41:20 1:20
Sta. 737+93.00 R 1
Des. Grade = 2703.28
Orig. Grnd. = 2703.20
CL
1:41:20 1:20
Sta. 738+00.00 R 1
Des. Grade = 2703.43
Orig. Grnd. = 2703.35
2700 2700
2710 2710
738+50.00
2700 2700
2710 2710
739+00.00
2700 2700
2710 2710
739+50.00
2700 2700
2710 2710
740+00.00
X60SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
1:41:4 1:4
Sta. 738+50.00 R 1
Des. Grade = 2704.44
Orig. Grnd. = 2704.35
CL
1:41:4 1:4
Sta. 739+00.00 R 1
Des. Grade = 2705.34
Orig. Grnd. = 2705.23
CL
1:41:4 1:15
Sta. 739+50.00 R 1
Des. Grade = 2706.13
Orig. Grnd. = 2706.05
CL
1:41:4 1:41:4
Sta. 740+00.00 R 1
Des. Grade = 2706.85
Orig. Grnd. = 2706.74
2700 2700
2710 2710
740+29.00
2700 2700
2710 2710
740+30.00
2700 2700
2710 2710
740+40.00
2700 2700
2710 2710
740+50.00
2700 2700
2710 2710
740+60.00
X61SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
1:01:41:4
Sta. 740+29.00 R 1
Des. Grade = 2707.23
Orig. Grnd. = 2707.14
CL
1:01:41:4
Sta. 740+30.00 R 1
Des. Grade = 2707.24
Orig. Grnd. = 2707.15
CL
1:0
1:41:4
Sta. 740+40.00 R 1
Des. Grade = 2707.37
Orig. Grnd. = 2707.28
CL
1:0
1:41:4
Sta. 740+50.00 R 1
Des. Grade = 2707.45
Orig. Grnd. = 2707.37
CL
1:0
1:41:4
Sta. 740+60.00 R 1
Des. Grade = 2707.53
Orig. Grnd. = 2707.44
2700 2700
2710 2710
740+70.00
2700 2700
2710 2710
740+79.00
2700 2700
2710 2710
741+00.00
X62SD
Dillon Pass Embankment Repairs
FTNP BADL 10(9)SD
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
B ig fo o t9
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
1:0
1:41:4
Sta. 740+70.00 R 1
Des. Grade = 2707.61
Orig. Grnd. = 2707.53
CL
1:4 1:4
Sta. 740+79.00 R 1
Des. Grade = 2707.69
Orig. Grnd. = 2707.60
CL
1:41:4 1:41:4
Sta. 741+00.00 R 1
Des. Grade = 2707.79
Orig. Grnd. = 2707.72
2790 2790
2800 2800
2810 2810
2820 2820
1330+67.00
2790 2790
2800 2800
2810 2810
2820 2820
1330+75.00
2790 2790
2800 2800
2810 2810
2820 2820
1331+00.00
SD X63Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
D il lo n
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1330+67.00 R 1
Des. Grade = 2803.40
Subgrade = 2802.07
Orig. Grnd. = 2803.39
Off=26.7 Elev=2802.9
-1.39% -2.86% 1:41:3
1:10 1:2
CL
Sta. 1330+75.00 R 1
Des. Grade = 2803.68
Subgrade = 2802.35
Orig. Grnd. = 2803.63
Off=26.7 Elev=2803.1
-1.69% -2.31% 1:41:31:10
1:2
CL
Sta. 1331+00.00 R 1
Des. Grade = 2804.55
Subgrade = 2803.22
Orig. Grnd. = 2804.54
Off=24.6 Elev=2803.8
-2.92% -0.58% 1:41:41:10
1:2
2800 2800
2810 2810
2820 2820
1331+25.00
2760 2760
2770 2770
2780 2780
2790 2790
2800 2800
2810 2810
2820 2820
1331+50.00
SD Dillon Pass Embankment Repairs
SD FTNP BADL 10(9) X64
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
D il lo n
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1331+25.00 R 1
Des. Grade = 2805.42
Subgrade = 2804.09
Orig. Grnd. = 2805.40
Off=18.3 Elev=2804.7
-4.66% +1.15% 1:41:41:10 1:2
CL
Sta. 1331+50.00 R 1
Des. Grade = 2806.30
Subgrade = 2804.96
Orig. Grnd. = 2806.30
Off=15.2 Elev=2805.6
-5.14%+2.89%1:10 1:4
1:1 .5
2750 2750
2760 2760
2770 2770
2780 2780
2790 2790
2800 2800
2810 2810
2820 2820
1331+75.00
2760 2760
2770 2770
2780 2780
2790 2790
2800 2800
2810 2810
2820 2820
1331+95.00
SD Dillon Pass Embankment Repairs
SD FTNP BADL 10(9) X65
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
D il lo n
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1331+75.00 R 1
Des. Grade = 2807.17
Subgrade = 2805.84
Orig. Grnd. = 2807.17
Off=14.9 Elev=2806.4
-5.62%+4.62% 1:41:201:10
1:1 .5
CL
Sta. 1331+95.00 R 1
Des. Grade = 2807.87
Subgrade = 2806.53
Orig. Grnd. = 2807.87
Off=14.3 Elev=2807.1
-6.00%+6.00% 1:41:201:10
1:1
2760 2760
2770 2770
2780 2780
2790 2790
2800 2800
2810 2810
2820 2820
1332+00.00
2770 2770
2780 2780
2790 2790
2800 2800
2810 2810
2820 2820
1332+25.00
SD Dillon Pass Embankment Repairs
SD FTNP BADL 10(9) X66
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
D il lo n
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1332+00.00 R 1
Des. Grade = 2808.04
Subgrade = 2806.71
Orig. Grnd. = 2808.04
Off=14.3 Elev=2807.3
-6.00%+5.63% 1:41:201:10
1:1 .5
CL
Sta. 1332+25.00 R 1
Des. Grade = 2808.91
Subgrade = 2807.58
Orig. Grnd. = 2808.91
Off=13.9 Elev=2808.2
-6.00%+3.75% 1:41:201:10
2800 2800
2810 2810
2820 2820
1332+50.00
2800 2800
2810 2810
2820 2820
1332+55.00
SD Dillon Pass Embankment Repairs
SD FTNP BADL 10(9) X67
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
D il lo n
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1332+50.00 R 1
Des. Grade = 2809.79
Subgrade = 2808.45
Orig. Grnd. = 2809.81
Off=14.7 Elev=2809.0
-6.00%+1.88% 1:41:41:10
CL
Sta. 1332+55.00 R 1
Des. Grade = 2809.96
Subgrade = 2808.63
Orig. Grnd. = 2809.96
Off=15.0 Elev=2809.1
-6.00% +1.51% 1:41:41:10
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
1343+25.00
2800 2800
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1343+50.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X68
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1343+25.00 R 1
Des. Grade = 2850.49
Orig. Grnd. = 2850.40
Off=20.6 Elev=2849.1
1:10 1:19
CL
Sta. 1343+50.00 R 1
Des. Grade = 2851.29
Orig. Grnd. = 2851.20
Off=19.6 Elev=2850.1
1:101:10
2800 2800
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1343+75.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X69
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1343+75.00 R 1
Des. Grade = 2852.18
Orig. Grnd. = 2852.10
Off=20.3 Elev=2850.9
1:101:10
2800 2800
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1344+00.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X70
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1344+00.00 R 1
Des. Grade = 2853.03
Orig. Grnd. = 2852.95
Off=20.3 Elev=2851.6
1:10
2800 2800
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1344+25.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X71
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1344+25.00 R 1
Des. Grade = 2854.03
Orig. Grnd. = 2853.95
Off=21.9 Elev=2852.6
1:10
2780 2780
2790 2790
2800 2800
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1344+50.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X72
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1344+50.00 R 1
Des. Grade = 2854.99
Orig. Grnd. = 2854.91
Off=24.5 Elev=2853.6
1:4
2800 2800
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1344+75.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X73
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1344+75.00 R 1
Des. Grade = 2855.86
Orig. Grnd. = 2855.78
Off=25.7 Elev=2854.5
1:4
2800 2800
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1345+00.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X74
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1345+00.00 R 1
Des. Grade = 2856.74
Orig. Grnd. = 2856.65
Off=27.3 Elev=2855.4
1:41:10
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1345+25.00
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1345+50.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X75
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1345+25.00 R 1
Des. Grade = 2857.59
Orig. Grnd. = 2857.50
Off=26.4 Elev=2856.3
1:41:10
1:2
CL
Sta. 1345+50.00 R 1
Des. Grade = 2858.48
Orig. Grnd. = 2858.40
Off=25.4 Elev=2857.3
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
1345+75.00
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1346+00.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X76
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1345+75.00 R 1
Des. Grade = 2859.37
Orig. Grnd. = 2859.29
Off=23.8 Elev=2858.5
1:41:10
1:2
CL
Sta. 1346+00.00 R 1
Des. Grade = 2860.33
Orig. Grnd. = 2860.24
Off=23.3 Elev=2859.5
Off=14.2 Elev=2860.4
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1346+25.00
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1346+50.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X77
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1346+25.00 R 1
Des. Grade = 2861.32
Orig. Grnd. = 2861.23
Off=22.8 Elev=2860.6
Off=14.4 Elev=2861.4
1:41:10
1:2
CL
Sta. 1346+50.00 R 1
Des. Grade = 2862.38
Orig. Grnd. = 2862.29
Off=22.5 Elev=2861.7
Off=14.0 Elev=2862.4
00 1010 2020 3030 4040 5050 6060 7070 8080 9090100110120130140
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1346+75.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X78
150160170
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1346+75.00 R 1
Des. Grade = 2863.44
Orig. Grnd. = 2863.35
Off=22.2 Elev=2862.9
Off=13.7 Elev=2863.4
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1347+00.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X79
00 1010 2020 3030 4040 5050 6060 7070 8080 9090100110120130140150160170
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1347+00.00 R 1
Des. Grade = 2864.40
Orig. Grnd. = 2864.32
Off=21.8 Elev=2863.9
Off=14.2 Elev=2864.3
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1347+25.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X80
00 1010 2020 3030 4040 5050 6060 7070 8080 9090100110120130140150160170
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1347+25.00 R 1
Des. Grade = 2865.35
Orig. Grnd. = 2865.27
Off=21.5 Elev=2864.9
Off=14.7 Elev=2865.2
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1347+50.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X81
00 1010 2020 3030 4040 5050 6060 7070 8080 9090100110120130140150160170
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1347+50.00 R 1
Des. Grade = 2866.25
Orig. Grnd. = 2866.17
Off=21.5 Elev=2865.9
Off=14.3 Elev=2866.1
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1347+75.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X82
00 1010 2020 3030 4040 5050 6060 7070 8080 9090100110120130140150160170
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1347+75.00 R 1
Des. Grade = 2867.14
Orig. Grnd. = 2867.06
Off=21.5 Elev=2867.0
Off=13.9 Elev=2866.9
1:71:10
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1348+00.00
SD
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
OPTION X
X83
00 1010 2020 3030 4040 5050 6060 7070 8080 9090100110120130140150160170
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1348+00.00 R 1
Des. Grade = 2868.09
Orig. Grnd. = 2868.01
Off=21.2 Elev=2868.2
Off=14.0 Elev=2867.8
1:91:10
2810 2810
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1348+25.00
2820 2820
2830 2830
2840 2840
2850 2850
2860 2860
2870 2870
2880 2880
1348+50.00
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
SD
OPTION X
X84
PROJECTSTATE
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts X
M L
X s e c X
S S
O p t-
X
B A
D L .d s e r S te v e .S h o r t_
NUMBER
SHEET
CL
Sta. 1348+25.00 R 1
Des. Grade =…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .