This document package includes plan sheets and summaries of estimated quantities for a federal highway construction project. The project involves repairs to embankments along Dillon Pass in South Dakota's Black Hills National Forest, and includes removal and replacement of asphalt and concrete features, installation of drainage structures, grading, erosion control measures, and other site work. The work will be performed under Solicitation Number 6982AF19B00005 for the SD FTNP 10(9), Dillon Pass Embankment Repairs project issued by the Department of Transportation Federal Highway Administration. The plan sheets and quantity summaries provide specifications for various pay items and estimated volumes for materials, equipment, labor, and other resources required to complete the project.
SD FTNP BADl 10(9), Dillon Pass Embankment Repairs plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Dillon_Pass.pdf | ||
| QnA_04.25.2019.pdf | ||
| A001.pdf | ||
| FINAL_Report_SD_FTNP_BADL_10(9).pdf | ||
| BADL_10(9)_X-sheets.pdf | ||
| 6982AF19B000005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
B8 B9 B10 B11 B12
GRADING
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15206-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING STAKE MILE 1.253 0.247 1.500
A0060 15210-3000 CENTERLINE, VERIFICATION AND
STAKING MILE 0.291 0.009 0.300
A0080 15214-3000 SURVEY AND STAKING, PARKING
AREA LPSM ALL
A0100 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 12 12
A0120 15216-2000 SURVEY AND STAKING, GRADE
FINISHING STAKES MILE 0.072 0.028 0.100
A0140 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0160 15401-0000 CONTRACTOR TESTING LPSM ALL
A0180 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0200 15703-1500 SOIL EROSION CONTROL,
TEMPORARY SOIL TACKIFIER ACRE 8.8 0.2 9.0
A0220 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 9,852 1,148 11,000
A0240 15706-1000 SOIL EROSION CONTROL, INLET
PROTECTION EACH 25 2 27
A0260 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0280 20101-0000 CLEARING AND GRUBBING ACRE 15.3 0.7 16.0
A0300 20301-0600 REMOVAL OF CATTLE GUARD
(BISON GATE) EACH 1 1
A0320 20301-1400 REMOVAL OF INLET EACH 4 4
A0340 20301-1900 REMOVAL OF PIPE CULVERT EACH 11 1 12
A0360 20301-2800 REMOVAL OF STRUCTURES AND 300 CUYD of buried
OBSTRUCTIONS (SLURRY FILL) EACH 1 1 slurry fill
A0380 20301-2800 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS (GABIONS) EACH 1 1
A0400 20301-3400 REMOVAL OF WHEELSTOP EACH 7 3 10
A0420 20302-0200 REMOVAL OF CURB (TIMBER) LNFT 513 12 525
A0440 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 8,096 104 8,200
A0460 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 287 13 300
A0480 20303-0000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS (RIPRAP) SQYD 114 6 120
A0500 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 658 42 700
A0520 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 530 20 550
A0540 20303-3200 REMOVAL OF SIDEWALK, CONCRETE SQYD 59 1 60
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
-M a r-
:1
A
M N
S D
\b a d l1
(9
R o a d w a y \C
A D
D S h e e ts
\B -S u m m
S c h e d u le
A S u m m a ry o f Q u a n ti ti e s
E E .x ls x ]S h e e t
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B1SD BADL 10(9)SD
SHEET
NUMBER
GRADING
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
ALLOWANCE
Bid
Schedule
A0560 20402-0000 SUBEXCAVATION See Sheet D1 for
CUYD 86 24 110 locations
A0580 20420-0000 EMBANKMENT CONSTRUCTION CUYD 7,989 311 8,300
A0600 20420-0000 EMBANKMENT CONSTRUCTION
(SHALLOW REINFORCED SOIL
SLOPE) CUYD 5,782 218 6,000
A0620 20420-0000 EMBANKMENT CONSTRUCTION
(REINFORCED SOIL SLOPE) CUYD 3,530 270 3,800
A0640 20420-0000 EMBANKMENT CONSTRUCTION (DEEP
PATCH) CUYD 1,145 55 1,200
A0660 20425-1000 DITCH, EXCAVATION LNFT 405 25 430
A0680 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 2,458 142 2,600
A0700 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 208 12 220
A0720 25101-0400 PLACED RIPRAP, METHOD A,
CLASS 4 CUYD 68 7 75
A0740 30202-2000 ROADWAY AGGREGATE, METHOD 2 Millings may be used for Roadway
TON 1,234 66 1,300 Aggregate, Method 2
A0760 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 3,522 178 3,700
A0780 40601-0000 FOG SEAL TON 19 1 20
A0800 41102-1000 PRIME COAT, METHOD 1 SQYD 1,042 58 1,100
A0820 41201-0000 TACK COAT TON 19 1 20
A0840 41301-0200 ASPHALT PAVEMENT MILLING,
1-INCH DEPTH SQYD 31,480 1,520 33,000
A0860 60101-0000 CONCRETE (HDPE TO RCP
CONNECTION) CUYD 2 2
A0880 60103-0140 CONCRETE, HEADWALL FOR
24-INCH PIPE CULVERT EACH 2 2
A0900 60103-0300 CONCRETE, HEADWALL FOR
72-INCH PIPE CULVERT EACH 2 2
A0920 60201-0600 18-INCH PIPE CULVERT
(CONCRETE) LNFT 115 15 130
A0940 60201-0800 24-INCH PIPE CULVERT
(CONCRETE) LNFT 410 20 430
A0960 60201-0800 24-INCH PIPE CULVERT (HDPE) LNFT 353 27 380
A0980 60201-0900 30-INCH PIPE CULVERT
(CONCRETE) LNFT 74 6 80
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
-M a r-
:1
A
M N
S D
\b a d l1
(9
R o a d w a y \C
A D
D S h e e ts
\B -S u m m
S c h e d u le
A S u m m a ry o f Q u a n ti ti e s
E E .x ls x ]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B2SD BADL 10(9)SD
GRADING
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
ALLOWANCE
Bid
Schedule
A1000 60201-1600 72-INCH PIPE CULVERT
(CONCRETE) LNFT 118 12 130
A1020 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT (CONCRETE) EACH 4 4
A1040 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT (CONCRETE) EACH 3 3
A1060 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT (HDPE) EACH 3 3
A1080 60210-0900 END SECTION FOR 30-INCH PIPE
CULVERT (CONCRETE) EACH 1 1
A1100 60231-0000 DISSIPATOR, PIPE EACH 3 3
A1120 60404-0000 CATCH BASIN EACH 5 5
A1140 60404-0000 CATCH BASIN (OVERSIZED) EACH 1 1
A1160 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 150 50 200
A1180 60707-0500 LINING 24-INCH PIPE CULVERT LNFT 185 15 200
A1200 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 10,463 137 10,600
A1220 60915-1000 WHEELSTOP, CONCRETE EACH 7 1 8
A1240 61501-0100 SIDEWALK, CONCRETE SQYD 567 33 600
A1260 61502-1000 DRIVE PAD, CONCRETE SQYD 138 138 Contract Quantity
A1280 61504-1000 ACCESSIBILITY RAMP, CONCRETE SQYD 2 1 3
A1300 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20
A1320 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20
A1340 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 20
A1360 62201-3300 HYDRAULIC EXCAVATOR, 3/4
CUBIC YARD MINIMUM CAPACITY HOUR 20
A1380 62301-0000 GENERAL LABOR HOUR 20
A1400 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 20
A1420 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A1440 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 8.8 0.2 9.0
A1460 62501-0000 TURF ESTABLISHMENT(BIOTIC
SOIL AMENDMENT) ACRE 8.8 0.2 9.0
A1480 62510-1000 SEEDING, DRY METHOD ACRE 8.8 0.2 9.0
A1500 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 4.1 0.4 4.5
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
-M a r-
:1
A
M N
S D
\b a d l1
(9
R o a d w a y \C
A D
D S h e e ts
\B -S u m m
S c h e d u le
A S u m m a ry o f Q u a n ti ti e s
E E .x ls x ]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B3SD BADL 10(9)SD
GRADING
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
MISC.
SUMMARIES
ALLOWANCE
Bid
Schedule
A1520 62901-0800 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.D SQYD 22,685 1,315 24,000
A1540 63301-0000 SIGN SYSTEM EACH 3 3
A1560 63401-0300 PAVEMENT MARKINGS, TYPE B, Match existing
SOLID LNFT 66,768 3,232 70,000 striping
A1580 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 3 3
A1600 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM ALL
A1620 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 250
A1640 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 250
A1660 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 8
A1680 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 4
A1700 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 20
A1720 63503-0700 TEMPORARY TRAFFIC CONTROL, Match existing
PAVEMENT MARKINGS LNFT 16,302 698 17,000 striping
A1740 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 330 70 400
A1760 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 2,500
A1780 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 1,250
A1800 65001-1000 CONSTRUCT AND MAINTAIN
DIVERSION LPSM ALL
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
-M a r-
:1
A
M N
S D
\b a d l1
(9
R o a d w a y \C
A D
D S h e e ts
\B -S u m m
S c h e d u le
A S u m m a ry o f Q u a n ti ti e s
E E .x ls x ]S h e e t
(4
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B4SD BADL 10(9)SD
B13 B14
MISC.
SUMMARIES
MISC.
SUMMARIES
ALLOWANCE
Bid
Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15206-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING STAKE MILE 0.137 0.137
X0060 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 2 2
X0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0100 15401-0000 CONTRACTOR TESTING LPSM ALL
X0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0140 15703-1500 SOIL EROSION CONTROL,
TEMPORARY SOIL TACKIFIER ACRE 1.3 0.2 1.5
X0160 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 4,225 275 4,500
X0180 20101-0000 CLEARING AND GRUBBING ACRE 2.3 0.2 2.5
X0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
X0220 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 318 12 330
X0240 20420-0000 EMBANKMENT CONSTRUCTION CUYD 3,019 281 3,300
X0260 20420-0000 EMBANKMENT CONSTRUCTION
(SHALLOW REINFORCED SOIL
SLOPE) CUYD 6,719 281 7,000
X0280 25101-2200 PLACED RIPRAP, METHOD B,
CLASS 2 CUYD 17 3 20
X0300 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 47 3 50
X0320 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 315 15 330
X0340 40601-0000 FOG SEAL TON 2 2
X0360 41201-0000 TACK COAT TON 2 2
X0380 41301-0200 ASPHALT PAVEMENT MILLING,
1-INCH DEPTH SQYD 2,822 178 3,000
X0400 60101-0000 CONCRETE (HDPE TO RCP
CONNECTION) CUYD 1 1
X0420 60201-0800 24-INCH PIPE CULVERT
(CONCRETE) LNFT 86 4 90
X0440 60201-0800 24-INCH PIPE CULVERT (HDPE) LNFT 246 34 280
X0460 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT (CONCRETE) EACH 1 1
X0480 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT (HDPE) EACH 1 1
X0500 60231-0000 DISSIPATOR, PIPE EACH 1 1
X0520 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 385 15 400
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
-M a r-
:3
A
M N
S D
\b a d l1
(9
R o a d w a y \C
A D
D S h e e ts
\B -S u m m
O p ti o n X
S u m m a ry o f Q u a n ti ti e s
E E .x ls x ]S h e e t
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B5SD BADL 10(9)SD
B13 B14
MISC.
SUMMARIES
MISC.
SUMMARIES
ALLOWANCE
Bid
Schedule
X0540 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20
X0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20
X0580 62201-3300 HYDRAULIC EXCAVATOR, 3/4
CUBIC YARD MINIMUM CAPACITY HOUR 20
X0600 62301-0000 GENERAL LABOR HOUR 20
X0620 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 1.3 0.2 1.5
X0640 62501-0000 TURF ESTABLISHMENT(BIOTIC
SOIL AMENDMENT) ACRE 1.3 0.2 1.5
X0660 62510-1000 SEEDING, DRY METHOD ACRE 1.3 0.2 1.5
X0680 62901-0800 ROLLED EROSION CONTROL
PRODUCT, TYPE 2.D SQYD 6,521 479 7,000
X0700 63401-0300 PAVEMENT MARKINGS, TYPE B, Match existing
SOLID LNFT 5,800 200 6,000 striping
X0720 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 40
X0740 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 40
X0760 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 91 9 100
X0780 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 500
X0800 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 250
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
-M a r-
:3
A
M N
S D
\b a d l1
(9
R o a d w a y \C
A D
D S h e e ts
\B -S u m m
O p ti o n X
S u m m a ry o f Q u a n ti ti e s
E E .x ls x ]S h e e t
(2
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B6SD BADL 10(9)SD
B15
MISC.
SUMMARIES
ALLOWANCE
Bid
Schedule
Y0020 15101-0000 MOBILIZATION LPSM ALL
Y0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0060 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y0100 20301-3400 REMOVAL OF WHEELSTOP EACH 52 3 55 See Sheet D3
Y0120 40901-2000 MICRO SURFACING, TYPE 2 SQYD 6,019 481 6,500 See Sheet D3
Y0140 41401-2000 CRACKS, CLEANING AND SEALING LNFT 1,000 See Sheet D3
Y0160 60920-0000 RESET WHEELSTOP EACH 52 3 55 See Sheet D3
Y0180 62301-0000 GENERAL LABOR HOUR 20
Y0200 63401-0300 PAVEMENT MARKINGS, TYPE B, Match existing
SOLID LNFT 5,566 434 6,000 striping
Y0220 63405-0850 PAVEMENT MARKINGS, TYPE B, See Sheet D3
ACCESSIBILITY SYMBOL EACH 3 3
Y0240 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL See Sheet T27
Estimated
Quantities
Remarks and/or
Determination of Estimated
Quantity
-F e b -2
:5 A
M N
S D
\b a d l1
(9
R o a d w a y \C
A D
D S h e e ts
\B -S u m m
O p ti o n Y
S u m m a ry o f Q u a n ti ti e s
E E .x ls x ]S h e e t
SUMMARY OF QUANTITIES - Option Y
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
STATE PROJECT
B7SD BADL 10(9)SD
B8
GRADING SUMMARIES
SCHEDULE A
STATE PROJECT
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
B
A D
L .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S te v e .S h o r t_
NUMBER
SHEET
SD
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Dillon Pass Embankment Repairs
SD FTNP BADL 10(9)
NPS PMIS NO.: 225939/227427 DRAWING NO.: 137/150018
B11
SUMMARIES
MISCELLANEOUS
SCHEDULE A
STATE PROJECT
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
B
A D
L .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S te v e .S h o r t_
NUMBER
SHEET
SD
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Dillon Pass Embankment Repairs
MISCELLANEOUS SUMMARIES
OPTION X
B14
STATE PROJECT
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts B S u m m S
U M O
P T X
B A
D L .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S te v e .S h o r t_
NUMBER
SHEET
SD
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Dillon Pass Embankment Repairs
MISCELLANIOUS SUMMARIES
OPTION Y
B15
STATE PROJECT
A
M N S
D b a d l1
R o a d w a y C
A D
D S h e e ts B S u m m S
U M O
P T Y
B A
D L .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S te v e .S h o r t_
NUMBER
SHEET
SD
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Dillon Pass Embankment Repairs
| 100%_B-sheets.pdf |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM(OPT-X)_BADL10(9) |
| SUM(OPT-X)_BADL10(9) |
| SUM(OPT-Y)_BADL10(9) |
| 100%_B-sheets.pdf |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM_BADL10(9) |
| SUM(OPT-X)_BADL10(9) |
| SUM(OPT-X)_BADL10(9) |
| SUM(OPT-Y)_BADL10(9) |
File details come from the government source that posted it. Updated .