Bid Opening Summary CO FTNP ROMO 11(4) Beaver Meadows Road.pdf
PDF 86 KB Posted
- Attached to
- CO FTNP ROMO 11(4) Beaver Meadows Road
- Solicitation number
- 6982AF19B000022
About this file
This document contains a bid opening summary and description for a federal construction contract opportunity. The bid opening summary shows that American Civil Constructors submitted the highest total bid of $8,908,385 for the Beaver Meadows Road Project in Rocky Mountain National Park, while Granite Construction Company submitted the second highest total bid of $7,959,344. The project description indicates that the work involves 3R rehabilitation treatment along 4.85 miles of Beaver Meadows Road and improvements to the Beaver Meadows Entrance Station. Significant work items include full depth reclamation, asphalt paving, concrete curb and gutter installation, excavation and asphalt patching. The total cost is estimated between $5-7 million. The construction period is from May to October 2020, with bidding anticipated in October-November 2019 and award in late November 2019. The soliciting agency is the US Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids.pdf | ||
| A002.pdf | ||
| QnA 12.03.19.pdf | ||
| First Page of Interested Vendors 11.25.19.pdf | ||
| A001.pdf | ||
| Cross_Sections_-_CO_FTNP_ROMO_11(4).pdf | ||
| FP-14.pdf | ||
| Plans_-_CO_FTNP_ROMO_11(4).pdf | ||
| CO_FTNP_ROMO_11(4)_Beaver_Meadows_Road_Pavement_Report_Signed.pdf | ||
| 6982AF19B000022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
All bids subject to verification.
Bid Opening Summary
Project Name: Beaver Meadows Road Project Number: CO FTNP ROMO 11(4)
Bid Opening Date: 12/10/2019 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Leslie Karsten
Amendments: (1) 11/07/2019 (2) 12/03/2019
Bidder’s Name Bid Total
1. American Civil Constructors Littleton, CO
A: $4,652,140.00 W: $2,220,350.00 X: $1,816,235.00 Y: $219,660.00 Total: $8,908,385.00
2. Granite Construction Company Watsonville, CA
A: $4,129,957.00 W: $2,032,843.00 X: $1,625,029.00 Y: $171,515.00 Total: $7,959,344.00
Engineer’s Estimate
A: $ 2,794,160.00 W: $1,651,240.00 X: $1,254,640.00 Y: $340,000.00 Total: $6,040,040.00
| Bid Opening Summary |
| Bid Opening Date: 12/10/2019 Time: 2:00 p.m. MST |