Bid Opening Summary CO FTNP ROMO 11(4) Beaver Meadows Road.pdf

PDF 86 KB Posted

Attached to
CO FTNP ROMO 11(4) Beaver Meadows Road
Solicitation number
6982AF19B000022
Issued by

About this file

This document contains a bid opening summary and description for a federal construction contract opportunity. The bid opening summary shows that American Civil Constructors submitted the highest total bid of $8,908,385 for the Beaver Meadows Road Project in Rocky Mountain National Park, while Granite Construction Company submitted the second highest total bid of $7,959,344. The project description indicates that the work involves 3R rehabilitation treatment along 4.85 miles of Beaver Meadows Road and improvements to the Beaver Meadows Entrance Station. Significant work items include full depth reclamation, asphalt paving, concrete curb and gutter installation, excavation and asphalt patching. The total cost is estimated between $5-7 million. The construction period is from May to October 2020, with bidding anticipated in October-November 2019 and award in late November 2019. The soliciting agency is the US Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
A002.pdf PDF
QnA 12.03.19.pdf PDF
First Page of Interested Vendors 11.25.19.pdf PDF
A001.pdf PDF
Cross_Sections_-_CO_FTNP_ROMO_11(4).pdf PDF
FP-14.pdf PDF
Plans_-_CO_FTNP_ROMO_11(4).pdf PDF
CO_FTNP_ROMO_11(4)_Beaver_Meadows_Road_Pavement_Report_Signed.pdf PDF
6982AF19B000022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

All bids subject to verification.

Bid Opening Summary

Project Name: Beaver Meadows Road Project Number: CO FTNP ROMO 11(4)

Bid Opening Date: 12/10/2019 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Leslie Karsten

Amendments: (1) 11/07/2019 (2) 12/03/2019

Bidder’s Name Bid Total

1. American Civil Constructors Littleton, CO

A: $4,652,140.00 W: $2,220,350.00 X: $1,816,235.00 Y: $219,660.00 Total: $8,908,385.00

2. Granite Construction Company Watsonville, CA

A: $4,129,957.00 W: $2,032,843.00 X: $1,625,029.00 Y: $171,515.00 Total: $7,959,344.00

Engineer’s Estimate

A: $ 2,794,160.00 W: $1,651,240.00 X: $1,254,640.00 Y: $340,000.00 Total: $6,040,040.00

Bid Opening Summary
Bid Opening Date: 12/10/2019 Time: 2:00 p.m. MST