SF30_A005.pdf

PDF 2 MB Posted

Attached to
NM FLAP 100(1) Soledad Canyon Road Federal contract opportunity
Solicitation number
698219B000026
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment to the plan set

View the file

Other files for this federal contract opportunity

Other files attached to NM FLAP 100(1) Soledad Canyon Road, newest first.
File Type Posted
Bid_Tabulation_NM_FLAP_100(1).pdf PDF
Bid_Opening_Summary.pdf PDF
Soledad_Q_A_11.28.2018.pdf PDF
SF30_A004.pdf PDF
SF30_A003.pdf PDF
SF30_A002.pdf PDF
Soledad_Q_A_11.19.2018.pdf PDF
6982AF18B000026_Amendment_A001_11-15-18.pdf PDF
6982AF18B000026.pdf PDF
NM_FLAP_100(1)_Cross_Sections.pdf PDF
NM_FLAP_100(1)_Soledad_Final_Plans.pdf PDF
Soledad_Canyon_Pavement_Report_20180731.pdf PDF
NM_FLAP_100(1)_Drainage_Report.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment A005 11/27/2018

NO SCALE

LENGTH AND SPACING TABLE

SPEED*

APPROACH

AREA

TAPER

SPACE

BUFFER

SPACE

WORK

CHANNELIZING DEVICE

not the advisory speed.

Approach speed based on the regulatory posted speed, *

SIGN SPACING TABLE

ROAD TYPE

DISTANCE BETWEEN

A B C

STOP

HERE ON

RED

ROAD WORK

END

ROAD WORK

END STOP

HERE ON

RED

LENGTH

BUFFER SPACE

Expressway / Freeway xx

MPH

ONE LANE

ROAD

AHEAD

WORK

ROAD

AHEAD

635-9

STANDARD APPROVED FOR USE 6/2005

DRAFT: 9/2016

REVISED:

MPH FEET

SPACING IN FEET

Rural greater than 50 MPH

Urban and Rural 35 MPH to 50 MPH

Urban and Rural 30 MPH and less

SIGNS IN FEET

(WITH SIGNALS)

SINGLE LANE CLOSURE LAYOUT

TEMPORARY TRAFFIC CONTROL

STATE PROJECT

NUMBER

SHEET

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

B o r d e r .U

S c m y fi le s p w p r o d u c ti o n d F L

H C e ll s .d g n li b

A

M

F e b r u a r y

FEDERAL LANDS HIGHWAY

U.S. CUSTOMARY STANDARD

STANDARD

(optional) light warning

Type B

See Note 5

STOP LINE

Channelizing devices

See Note 5

STOP LINE

See Note 2

Temporary traffic signal to provide access to work space downstream taper if necessary

Reduce or eliminate drums in

See Note 2

Temporary traffic signal it has two signal faces that are at least 8 feet apart and meets the other

50' - 100' 50' - 100' (optional)

See Note 7

10' min.

40' - 180'

40' - 180'

(optional)

W1-4

(optional) (optional)

WORK SPACE

Traffic flow

Traffic flow

W3-3

R10-6

See Note 6

G20-2

See Note 6

G20-2

Spacing Table)

(See Length and

8.

7.

6.

5.

4.

3.

2.

1.

See Note 6

W20-1 W20-4

(optional)

W13-1P

R10-6

NOTE:

A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.

Signs are shown for one direction of travel only. Place devices similar to those

ADVANCE WARNING AREA (See Sign Spacing Table)

ABC

(See Length and Spacing Table) VARIABLE TERMINATION AREA

BUFFER SPACETAPER AREA BUFFER SPACE TAPER AREA A

Device spacingSee Note 5 the buffer space.

Do not allow equipment, materials, or vehicles to be parked or stored in

Section 156.

For project specific minimum width, refer to Special Contract Requirements, AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.

If closure is completely within the project limits, eliminate the "ROAD WORK pavement markings.

Removeable pavement markings may be used for stop lines and no-passing advance of the stop line that comply with MUTCD Section 3B.02.

markers between the work space and the stop line. Add no-passing lines in

Section 3B.16. Remove existing conflicting pavement markings and raised

For paved roadway surfaces, install stop lines complying with MUTCD must be determined by a qualified engineer.

conditions as approved by the CO. If signals are moved, revised signal timing

Final location and spacing of signs and devices may be changed to fit field automatically, ensure red signal indications are flashed to both approaches.

engineer. When the signal is changed to the flashing mode either manually or provisions of the MUTCD, Part 4. Signal timing shall be established by a qualified

Install and operate temporary traffic control signals in accordance with the requirements of Part 4 of the MUTCD.

Amendment A005 11/27/2018

NM FLAP 100(1) 100% SCRs 2018-11-21.pdf
SPECIAL CONTRACT REQUIREMENTS
Section 101. – TERMS, FORMAT, AND DEFINITIONS
Section 105. — CONTROL OF MATERIAL
Section 106. — ACCEPTANCE OF WORK
Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 108. — PROSECUTION AND PROGRESS
Section 109. — MEASUREMENT AND PAYMENT
Section 152. — CONSTRUCTION SURVEY AND STAKING
Section 153. — CONTRACTOR QUALITY CONTROL
Section 154. — CONTRACTOR SAMPLING AND TESTING
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
Section 156. — PUBLIC TRAFFIC
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Section 204. — EXCAVATION AND EMBANKMENT
Section 301. — UNTREATED AGGREGATE COURSES
Section 304. — FULL DEPTH RECLAMATION
Section 401. — ASPHALT CONCRETE PAVEMENT BY GYRATORY MIX DESIGN METHOD
Section 501. — MINOR CONCRETE PAVEMENT
Section 601. — MINOR CONCRETE STRUCTURES
Section 609. — CURB AND GUTTER
Section 611. — WATER SYSTEMS
Section 615. — SIDEWALKS, PADS, AND PAVED MEDIANS
Section 623. — GENERAL LABOR
Section 625. — TURF ESTABLISHMENT
Section 628. — MAILBOX ASSEMBLY (NEW SECTION)
Section 633. — PERMANENT TRAFFIC CONTROL
Section 634. — PERMANENT PAVEMENT MARKINGS
Section 635. — TEMPORARY TRAFFIC CONTROL
Section 646. — BUILDING, FIXTURES, AND MAINTENANCE
Section 702. — ASPHALT MATERIAL
Section 703. — AGGREGATE
Section 704. – SOIL
Section 705. — ROCK
Section 713. — ROADSIDE IMPROVEMENT MATERIAL
Section 718. — TRAFFIC SIGNING AND MARKING MATERIAL
Section 725. — MISCELLANEOUS MATERIAL
ALL NM FLAP 10091) Soledad Summary 2018-11-26 A004.pdf
B1 NM FLAP 10091) Soledad Summary 2018-11-26 HSH
B2 NM FLAP 10091) Soledad Summary 2018-11-26 HSH
B3 NM FLAP 10091) Soledad Summary 2018-11-26 HSH
B4 NM FLAP 10091) Soledad Summary 2018-11-26 HSH
B5 NM FLAP 10091) Soledad Summary 2018-11-26 HSH
B6 NM FLAP 10091) Soledad Summary 2018-11-26 HSH
B7 NM FLAP 10091) Soledad Summary 2018-11-26 HSH
Std635-9 - T-28.pdf
FLH Standard Drawings
635-9 : Temporary Traffic Control, Single Lane Closure Layout (with Signals)
Metric
US Customary
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: A005
Code[0]: 6905001
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: Project: NM FLAP 100(1), Soledad Canyon Road Solicitation:

Replace page A1 of the Plan Set with new page A1 dated 11/27/2018.

Replace page T28 of the Plan Set with new page T28 dated 11/27/2018

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

FacilityCode[0]:
Code[2]:
IssuedBy[0]: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 6982AF18B000026
ModificationNo[0]:
ProjectNo[0]: NM FLAP 100(1)
Page[0]: 1
Pages[0]: 3
EffectiveDate[0]: 11/27/2018
Dated9B[0]: 10/17/2018
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 0*
CopiesReturned[0]: *See Item 14
State: NM
Project: NM FLAP 100(1)
635-9: T28
NPS:

File details come from the government source that posted it.