Amendment A003 corrects an error that occurred in Amendment A002 SCRs E section. Section 646 is added to the SCRs in this Amendment.

View the file

Other files for this federal contract opportunity

Other files attached to NM FLAP 100(1) Soledad Canyon Road, newest first.
File Type Posted
Bid_Tabulation_NM_FLAP_100(1).pdf PDF
Bid_Opening_Summary.pdf PDF
Soledad_Q_A_11.28.2018.pdf PDF
SF30_A005.pdf PDF
SF30_A004.pdf PDF
SF30_A002.pdf PDF
Soledad_Q_A_11.19.2018.pdf PDF
6982AF18B000026_Amendment_A001_11-15-18.pdf PDF
NM_FLAP_100(1)_Drainage_Report.pdf PDF
6982AF18B000026.pdf PDF
NM_FLAP_100(1)_Cross_Sections.pdf PDF
NM_FLAP_100(1)_Soledad_Final_Plans.pdf PDF
Soledad_Canyon_Pavement_Report_20180731.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

E-1

NM FLAP 100(1)

Soledad Canyon Road

SPECIAL CONTRACT REQUIREMENTS

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges, on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

Amendment A003 11/21/2018

E-2

Soledad Canyon Road

Section 101. – TERMS, FORMAT, AND DEFINITIONS

101.03 Abbreviations.

(a) Acronyms. Add the following:

EEBACS — Engineer’s Estimating, Bidding, Award, and Construction System GSA – General Services Administration

(b) US Customary abbreviations and symbols. Delete the text and add the following:

A — ampere electric current

ac. — acre area BTU — British Thermal Unit energy

cu. in. or in3 — cubic inches volume

cu. ft., cf, ft3 or CUFT — cubic feet volume

cu. yd., cy, yd3 or CUYD — cubic yards volume D — day time deg. or º — degree plane angle Fc — foot-candles luminous intensity

fl. oz. — fluid ounces volume

ft. or ' — foot or feet length gal. or GAL — gallon volume H — Henry inductance

hr. or HR — hour time Hz — hertz (s-1) frequency

in. or " inch or inches length K — kelvin temperature lb or LB, lbs — pound, pounds mass Lbf — pound-force force lnft or LNFT linear foot length

mi. — miles length min. or m — minute time min. or ' — minute plane angle ºF — degrees Fahrenheit temperature

oz. — ounces mass Psi — pounds/square inch pressure Q — cubic feet/second flow rate sec. or s — second time sec. or " — second plane angle

sq. in. or in2 — square inches area

sq. ft., sf, ft2 or SQFT — square feet area

sq. yd., sy, yd2 or SQYD — square yards area

E-3

T — short ton (2000 lbs) mass V — volt (W/A) electric potential W — watt (J/s) power YD — yard or yards length Ω — ohm V/A electric resistance

(c) Metric unit abbreviations and symbols. Delete the text and add the following:

A — ampere electric current Cd — candella luminous intensity oC — degree Celsius temperature D — day time deg. or º — degree plane angle g or gram — gram mass H — Henry inductance Ha — hectare area

hr. or HR — hour time Hz — hertz (s-1) frequency J — Joule (N.m) energy K — kelvin temperature Kg — kilogram mass L — liter volume Lx — lux illuminance M — meter length mm — millimeter length m2 — meter squared area m3 — cubic meter volume min. or m — minute time min. or ' — minute plane angle N — Newton (kg.m/s2) force Pa — Pascal (N/m2) pressure sec. or s — second time sec. or " — second plane angle Sta. — station Length T — metric ton Mass V — volt (W/A) electric potential W — watt (J/s) Power Ω — ohm V/A electric resistance

101.04 Definitions.

Add the following:

E-4

EEBACS — Engineer’s Estimating, Bidding, Award, and Construction System. A web-based system used by the Government, Construction Contractors, and Subcontractors on this Government contract to prepare “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes and field measurement documentation).

Roadway Prism Delete the text and substitute the following:

Roadway Prism – The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance between the centroids (geometric center) of the area.

Subcontractor Delete the text and substitute the following:

Subcontractor – An individual or legal entity with which the Contractor sublets part of the work.

This includes subcontractors and material suppliers at any tier.

Section 105. — CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements. Add the following:

Materials containing petroleum-based solvents such as cutback asphalts and traffic paints may be restricted from use by local laws or ordinances in certain geographic areas. Upon presenting proof of such restrictions, alternate materials considered acceptable to the CO may be substituted for the materials specified in the contract.

Add the following:

Certify, according to Subsection 107.10 (d)(2), that sources of rock, sand, gravel, earth, subsoil, or other natural material imported into the project construction limits are noxious weed free.

105.04 Storing and Handling Material. Add the following after the third sentence of the second paragraph:

For Contractor-located, non-commercial staging, storing, and material handling areas, secure environmental clearances according to Subsection 107.10.

Add the following:

The Contractor may use the County land adjacent to the fire station or the open area at the intersection of Dripping Springs and Soledad Canyon Road for a staging area. Verify the location(s), staging area limits, and terms of use with the CO prior to use.

E-5

Section 106. — ACCEPTANCE OF WORK

106.01 Conformity with Contract Requirements. Delete (a) and (b) and substitute the following:

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method

(2) Number of samples

(3) Sample transport

(4) Test procedures

(5) Testing laboratories

(6) Reporting

(7) Estimated time and costs

(8) Validation process

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

Add the following after (b):

The number of significant figures used in the calculations will be according to ASTM E 29, absolute method.

Where sample/testing procedures make reference to AASHTO, ASTM, or other standards (designated as FLH T), the procedure as modified in the Materials Manual shall govern. Where the specifications make reference to AASHTO Test T11, “Procedure B - Washing Using a Wetting Agent” shall be the procedure followed.

E-6

Where the specifications make reference to AASHTO Test T310, “Direct Transmission Method of In-Place Nuclear Density and Moisture Content” shall be the procedure followed.

106.02 Visual Inspection. Delete the Subsection and substitute the following:

106.02 Visual Inspection. Acceptance is based on visual inspection of the work for compliance with the contract requirements. In the absence of specific contract requirements or tolerances, use prevailing industry standards.

106.03 Certification. Add the following after the second paragraph:

See Table 106-3 for schedule for full or partial acceptance by material certification. Submit certification and sample of material for testing as required.

Delete the third paragraph and substitute the following:

Check certifications before incorporating the material into the work to ensure that the requirements of the contract have been met. Mark the certifications with the following information:

• Project number and name;

• Pay item number and description;

• Contractor signed certification stating “to the best of our knowledge the materials certified by the attached certification represent the materials incorporated into the work of this contract”; and

• Date.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification. Add Table 106-3 following Table 106-2.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification

Section Description Material Material Property Or Specification

Frequency Certification Sample

302 Minor Crushed Aggregate Crushed Aggregate Source, Quality and Gradation 1 per source 1 per source

312 Dust Palliative

Calcium Chloride Magnesium Chloride, Lignosulfonate, As specified 1 per shipment First shipment

403 Asphalt Concrete Aggregate Asphalt Mix

Source quality, Gradation, Stability, and Grade

1 per mix 1 per source

634 and

Permanent Pavement Markings,

634.02 as applicable, 635 as applicable As specified 1 per source -----

E-7

Section Description Material Material Property Or Specification

Frequency Certification Sample

Temporary Traffic Control

701 Hydraulic Cement

Portland Cement, Blended Hydraulic Cement, Masonry and Mortar Cement

AASHTO M 85, M

240, ASTM C 91 and ASTM C1392 as applicable

1 per shipment 1 per 100 tons

702.01 Asphalt Material Asphalt Cement

AASHTO M 226

or M 320, as applicable

1 per shipment 1 per shipment

702.02 Asphalt Material Emulsified Asphalt

AASHTO M 140

or

M 208 as applicable

1 per shipment 1 per shipment

702.03 Asphalt Material

Asphalt Materials used for Damproofing and Waterproofing

Concrete and Masonry Surfaces

As specified for each type of asphalt material 1 per shipment -----

702.05 Antistrip As specified As applicable 1 per shipment -----

706 Concrete and Plastic Pipe As specified As applicable 1 per shipment -----

707 Metal Pipe As specified As applicable 1 per shipment ----- 708 Plastic Pipe As specified As applicable 1 per shipment -----

709 Reinforcing and Prestressing Steel As specified As applicable 1 per shipment

For 709.01 submit 3, 1-yard (1-meter) bars of each size and grade of bar furnished.

709.02 submit

6-foot (2-meter) length for each size furnished

710 Fence and Guardrail As specified As applicable 1 per shipment -----

Concrete Curing

Material and Admixtures

As specified As applicable 1 per material source per material type

712 Joint Material (all) As specified As applicable 1 per shipment -----

Roadside

Improvement Materials (all)

As specified As applicable 1 per shipment -----

714 Geosynthetic Material (all) As specified As applicable 1 per shipment 1 per project per type

E-8

Section Description Material Material Property Or Specification

Frequency Certification Sample

715 Piling As specified As applicable 1 per shipment -----

716 Material for Timber Structures

Timber and Hardware As applicable 1 per shipment -----

717 Structural Metal As specified As applicable 1 per shipment

717.01(e) minimum

6 per shipment for each size used.

717.10

1 per project

Traffic Signing and Marking Material (all)

As specified As applicable 1 per shipment -----

719 Paint As specified As applicable 1 per batch\lot

1 sample for quantities

> 25 gallons (100L)

Structural Wall and Stabilized Embankment Material (all)

As specified As applicable 1 per shipment per material type

Electrical and Illumination Material (all)

As specified As applicable 1 per shipment per material type

722 Anchor Material As specified As applicable 1 per shipment per material type

725 Miscellaneous materials As specified As applicable

1 per shipment per material type

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.01 Laws to be Observed. Add the following:

Section 401 and 404 of the Clean Water Act.

Comply with the terms and conditions of any permits that are issued for the performance of work within the jurisdictional waters of the U.S., including Section 404 permits and Section 401water quality certifications.

National Pollutant Discharge Elimination System (NPDES) in New Mexico

E-9

Comply with the requirements of the EPA NPDES Construction General Permit (CGP) NMR100000 for erosion and sediment control due to storm water runoff. A copy of the 2017 permit is located at:

https://www.epa.gov/npdes/epas-2017-construction-general-permit-cgp-and-related-documents

This permit is scheduled to expire on 02/16/2022. Amend the SWPPP and site plan when the new permit goes into effect to meet new permit conditions.

(a) General. Designate a qualified Erosion Control Supervisor according to Subsection 157.03.

Obtain a separate NPDES permit associated with industrial activity for any mobile asphalt and concrete plants that provide material for the project. Provide a copy of the permit and acknowledgement letter to the CO for their records.

(b) Preparation of the Storm Water Pollution Prevention Plan (SWPPP). The Government has prepared a preliminary SWPPP. Update the preliminary SWPPP and site plans for the project or develop a new SWPPP and provide to the CO for review. When the SWPPP is accepted by the CO and signed by both the CO and the Contractor, it will be the document in force on the project. Implement the SWPPP as required throughout the construction period.

Modify the erosion control details and layout sheets included in the plans, as necessary, to accommodate project site conditions and proposed construction operations and include them in the SWPPP.

(c) Notice of Intent (NOI). All operators are required to submit a notice of intent at least 14 days prior to start of earth disturbance. Provide a copy of the contractor’s NOI and confirmation letter to the CO. The Government will also file a NOI and provide that information to the Contractor for inclusion in the SWPPP. Do not perform any ground disturbing activities including clearing, grubbing, or earthwork until an acknowledgement letter is received from the EPA and the SWPPP has been approved and implemented.

Post all project authorization numbers and other requirements at a location accessible to the public according to Section 1.5 of the CGP.

(d) Inspections and Revisions to the SWPPP. Perform inspections as required in the CGP.

Document inspections and retain records in the SWPPP. Update the SWPPP and ensure that all procedures, practices, and inspections are current.

Place the SWPPP and all updates in a three-ring binder so that completed inspection forms and other records may be inserted. Make the SWPPP available for public inspection and for use by the CO.

Revisions to the SWPPP may be necessary during construction to make improvements or to respond to unforeseen conditions noted during construction or site inspections. For that purpose, specify in the SWPPP the mechanism whereby revisions may be proposed by the Contractor or the CO and incorporated into the plan, including review and approval of minor changes. Jointly

Amendment A003 https://www.epa.gov/npdes/epas-2017-construction-general-permit-cgp-and-related-documents

E-10 approve and sign each revision to the SWPPP. Implement approved changes according to the

CGP.

(e) Notice of Termination (NOT). File a NOT when the conditions listed in the CGP have been met or transfer the permit to FHWA when project has reached final acceptance.

At the completion of the project, provide the CO with the complete SWPPP, including inspection forms, logs, and all other required documentation added during the project.

Add the following:

Adhere to all terms and conditions of the non-notifying Nationwide Permit #14 and applicable regional conditions.

107.02 Protection and Restoration of Property and Landscape

Add the following at the end of this subsection:

The locations of the utilities shown in the plans have been certified to a Quality Level B, with spot locations certified to a Quality Level B according to the CFLHD Utility Data Quality Certification requirements:

http://flh.fhwa.dot.gov/resources/row/cfl/documents/UtilityDataQualityLevelCertification.doc Table 107-1

Status of Utilities

Company Utility Type Contact Name

Phone Number Status 1, 2, 3, or 4

1 Talavera Water Coop

Water Karen Perez (575) 312-

2 Moongate Water Company

Water Jeff Gariano (575) 382-

3 CenturyLink Fiber Optic Jaime Limon

(575) 525-

1 and 3

4 El Paso Electric Electric (575) 523-

1 and 3

5 City of Las Cruces

Gas Carl Clark (575) 528-

Status 1: The utilities are in conflict with the project and REQUIRE relocation by OTHERS DURING construction.

Status 2: The utilities are in conflict with the project and REQUIRE relocation by the Contractor DURING construction.

Amendment A003 http://flh.fhwa.dot.gov/resources/row/cfl/documents/UtilityDataQualityLevelCertification.doc

E-11

Status 3: The utilities are in conflict with the project and REQUIRE relocation BEFORE construction.

Status 4: The utilities are located within the project rights of way but require NO relocation.

There are no relocations necessary on Talavera Water Coop water lines except water valve adjustments as noted on the Plans. There are no relocations necessary for the City of Las Cruces gas line. Fire hydrants on Moongate Water Company water lines are being replaced at new locations and pipe extensions to the new fire hydrants are being added. Additionally, Moongate Water Company valves will be adjusted to grade by the Contractor. CenturyLink will be moving pedestals and lowering cable before construction and will be adjusting manhole lids to grade in conjunction with construction. El Paso Electric will be relocating power poles and guys before construction where possible and will be adjusting vaults to grade in conjunction with construction.

107.05 Responsibility for Damage Claims. Delete the first sentence of the third paragraph and substitute the following:

Before work begins, submit “certificates of insurance” certifying that the policies will not be changed or canceled until 30 days written notice has been given to the Government.

107.10 Environmental Protection.

(a) Federal Water Pollution Control Act (Clean Water Act) 33 USC § 1251 et seq. Add the following:

(4) Do not ford running streams with construction equipment. Obtain approval from the CO to use temporary bridges or other structures whenever crossings are necessary.

(5) Immediately clear ephemeral drainages, intermittent and perennial streams, lakes and reservoirs of all work items, debris or other obstructions placed by or resulting from construction operations.

(6) Locate machinery servicing and refueling areas away from streambeds and washes to reduce the possibility and minimize the impacts of accidental spills or discharges.

(b) Oil and hazardous substances. Add the following to the end of the third paragraph:

Sand or soils are not approved absorbent materials.

Add the following to the end of the fourth paragraph:

Report the spill to the appropriate federal, state, and local authorities as required by the SPCC plan or hazardous spill plan.

(c) Dirt, plant, and foreign material. Add the following:

All vehicles and equipment entering the project area must be clean of noxious weeds and free from oil leaks and are subject to inspection. Wash all construction equipment to thoroughly

E-12 remove all dirt, plant, and other foreign material prior to entering the project. Particular attention must be shown to the under carriage and any surface where soil containing exotic seeds may exist. Allow the CO to inspect each piece of equipment before entering the project. Provide the cleaning and inspection records to the CO. Equipment found operating on the project that has not been inspected, or has oil leaks will be shut down and subject to citation.

(d) Clearances for Contractor-selected, noncommercial areas. Add the following to the end of the first paragraph:

Do not import into the project limits rock, sand, gravel, earth, subsoil, or other natural materials from a Contractor-selected non-commercial materials source, that have not been certified free of noxious weeds. Materials imported into the project limits which do not include a noxious weed free certification may be rejected and ordered by the CO to be removed from the project limits. The CO has the discretion of requesting inspection of certified materials by a third party, and rejecting the use of the source if noxious weeds or seeds thereof are found to be present.

(e)Biological Protection.

When clearing occurs during the migratory bird breeding season (March 1 to July 31), conduct biological surveys 2 weeks prior to clearing operations to ensure that active nests are avoided. Prior to conducting surveys, provide the qualifications of the Biologist to the CO for approval. The biologist must provide a report of field survey’s, findings, and recommendations to the CO. Do not begin clearing operations without prior approval of the CO. If active nests are located, the CO and biologist will determine a buffer space around the nest in which clearing cannot be completed prior to August 31 or as approved by the CO.

Payment for biological surveys will be measured under the Special Labor, Hired Technical Services pay item.

Add the following:

The Contractor shall contract with, and provide, a certified paleontological monitor to be on-site during ground disturbing activities within areas with the highest potential fossil yield classification (the Camp Rice Formation, of the Upper Santa Fe Group). These areas are shown in the plans.

Add the following:

(5) Any required Certifications.

Section 108. — PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work. Add the following:

E-13

Access during construction is expected to remain open with reduced speed and single lane closures as necessary. Access may be restricted at times during critical construction events, as determined by the Contracting Officer or their designated representative. At least 48 hours’ notice must be provided prior to any access restriction.

Perform no work except to maintain traffic control devices, erosion control devices, the roadway driving surface, and to control dust during the listed Federal holidays and surrounding days as shown in Table 108-2.

Table 108-2 Federal Holidays and Surrounding Days

Federal Holiday Time Remarks

Memorial Day 12:00 Noon Friday to 6:00 am Tuesday -

Independence Day

12:00 Noon July 3 to 6:00 am July 5

If July 4 falls on a weekend, Friday, or Monday, do not work the weekend.

Labor Day 12:00 Noon Friday to 6:00 am Tuesday -

Thanksgiving 12:00 Noon

Wednesday to 6:00 am Monday

Christmas / New Year’s

12:00 Noon December 23 to

6:00 am January 2

If December 23 or January 1 falls on a Monday, do not work the adjacent weekend and do not work on December 23. If January 1 falls on a Friday, do not work the weekend.

Schedule at least 2 non-work days out of every 14 calendar days. The selected non-work days do not need to be consecutive, but they must be scheduled. Provide at least 2 weeks notice before changing the scheduled days off.

Exemptions to scheduled days off may be granted by written approval from the CO for specific project operations and/or for periods of limited duration.

Perform no work during the rainy season (July 1st to October 31st).

Add the following:

Access will be restricted for no more than 2 hours for critical construction events.

E-14

A Notice to Proceed must be issued before commencement of any work. The contract completion date is June 28, 2019. No additional time will be granted for Option Y after the completion date for Schedule A or Schedule B.

Add the following:

Before beginning work, verify with the CO that Right of Entry and easements has been received for the following locations: 138+80 to 141+00 RT, 197+75 to 198+70 RT, 221+80 to 222+75 RT, and 319+80 to 323+80 RT. The right of entry and easements will be acquired before December 1, 2018.

Use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes and field measurement documentation).

Attend a training session on the use of EEBACS. The training session will require up to 4 hours.

No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.

Complete and electronically submit “EEBACS User Account Form” (Form EEBACS-001) for each individual requiring EEBACS access. Submit forms to the CO at the preconstruction conference or at least 10 days prior to the start of any contract work or EEBACS training. As needed, request additional system access using Form EEBACS-001 and allow 7 days for system access.

Maintain active EEBACS accounts for all contractor staff who use EEBACS and ensure that the CO is notified within 24 hours after an account holder is reassigned or no longer employed by the Contractor. Within 24 hours after an account holder is reassigned or no longer employed by the Contractor, submit an EEBACS-001 form requesting that the account be disabled.

The electronic version of EEBACS-001 is available at:

http://flh.fhwa.dot.gov/resources/pse/estimate/accounts.htm

108.02 Subcontracting. Delete the third paragraph and substitute the following:

Within 14 days of subcontract award, submit a completed SF 1413 and 1413S. Complete Part I for each Subcontractor, and include Part II when the Subcontractor performs on-site work.

Complete other forms that may be required by the Government to show the work subcontracted

Amendment A003 http://flh.fhwa.dot.gov/resources/pse/estimate/accounts.htm

E-15 and the total dollar amount of the subcontract. Submit the above required information for each Subcontractor at lower tiers.

Section 109. — MEASUREMENT AND PAYMENT

109.01 Measurement of Work. Add the following after the sixth paragraph:

Prepare, sign, and submit electronic measurement notes (pay notes and supporting field documentation) using EEBACS. Measurement notes will be reviewed by the CO. Unacceptable measurement notes will be electronically rejected and returned. Correct rejected measurement notes and resubmit electronically.

109.02 Measurement Terms and Definitions.

(o) Square foot and Square yard (Square meter). Add the following: Do not measure overlaps.

109.08 Progress Payments.

(b) Closing date and invoice submittal date. Delete the text and substitute the following:

Submit invoices to the designated billing office by the 7th day after the closing date. Invoices received by the designated billing office after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following months invoice.

(d) Government’s receiving report. Delete the first sentence and substitute the following:

The Government’s receiving report will be developed using the measurements and quantities from Pay Notes received by the CO in EEBACS and determined acceptable.

(e) Processing progress payment requests.

(1) Proper invoices. Delete the title and text and substitute the following:

(1) Invoices received by the 7th day following the closing date.

(a) Proper invoices. If the invoice meets the requirements of Subsection 109.08(c), and the quantities and unit prices shown on the Contractor's invoice agree with the corresponding quantities and unit prices shown on the Government's receiving report, the invoice will be paid.

(b) Defective invoices. If the invoice does not meet the requirements of Subsection 109.08(c), or if any of the quantities or unit prices shown on the Contractor's invoice

E-16 exceed the corresponding quantities and unit prices shown on the Government's receiving report, the invoice will be deemed defective and the Contractor so notified according to FAR Clause 52.232-27(a)(2). Defective invoices will not be corrected by the Government and will be returned to the Contractor within 7 days after the Government's designated billing office receives the invoice.

Revise and resubmit returned invoices by the 18th day following the closing date. The CO will evaluate the revised invoice. If the invoice still does not meet the requirements of Subsection 109.08(c), the Contractor will be so notified according to FAR Clause 52.232- 27(a)(2), and no progress payment will be made that month. Correct the deficiencies and resubmit the invoice the following month.

If the revised invoice meets the requirements of Subsection 109.08(c), but still had quantities or unit prices exceeding the corresponding quantities and unit prices shown on the Government's receiving report, the Government's data for that item or work will be used.

The Contractor's invoice, as revised by the Government's receiving report, will be forwarded for processing by the 23rd day following the closing date. The Contractor will be notified by the 23rd day following the closing date of the reasons for any changes to the invoice.

(2) Defective invoices. Delete the title and text and substitute the following:

(2) Invoices received between the 8th and 16th day following the closing date.

(a) Proper invoices. If the invoice meets the requirements of Subsection 109.08(c), and the quantities and unit prices shown on the Contractor's invoice agree with the corresponding quantities and unit prices shown on the CO's receiving report, the invoice will be deemed proper and forwarded for processing within 7 days of receipt.

(b) Defective invoices. If the invoice does not meet the requirements of Subsection 109.08(c), the invoice will be deemed defective, the Contractor so notified according to FAR Clause 52.232-27(a)(2), and no progress payment will be made that month. Correct the deficiencies and resubmit the invoice the following month.

If the invoice meets the requirements of Subsection 109.08(c), but has quantities or unit prices exceeding the corresponding quantities and unit prices shown on the Government's receiving report, the Government's data for that item of work will be used. The Contractor's invoice, as revised by the Government's receiving report, will be forwarded for processing within 7 days of the Government's receipt of the invoice. The Contractor will be notified of the reasons for any changes to the invoice.

(f) Partial payments. Delete the subsection and substitute the following:

(f) Partial payments. Progress payments may include partial payment for material to be incorporated in the work according to FAR Clause 52.232-5(b)(2), provided the material meets the requirements of the contract and is delivered on, or in the vicinity of, the project site or stored in acceptable storage places.

E-17

Partial payments for stockpiled manufactured material (aggregates) will be based on Contractor process control test results. If test results show the material to be out-of-specification, or in “reject” where statistical evaluation procedures are used, no payment for stockpiled materials will be made.

Partial payment for material does not constitute acceptance of such material for use in completing items of work. Partial payments will not be made for living or perishable material until incorporated into the project.

Individual and cumulative partial payments for preparatory work and material will not exceed the lesser of:

(1) 80 percent of the contract bid price for the item; or

(2) 100 percent of amount supported by copies of invoices submitted.

The quantity paid will not exceed the corresponding quantity estimated in the contract. The CO may adjust partial payments as necessary to protect the Government.

Section 152. — CONSTRUCTION SURVEY AND STAKING

Construction Requirements

152.04General. Add the following to the second paragraph:

The Government will establish basic survey control points for vertical and horizontal control of the project.

The Government will furnish the following:

(1) 3D coordinates and offset distance from centerline for subgrade and surface course finishing stakes at 50-foot (20-meter) intervals and miscellaneous intermediate stations.

(2) Slope stake data containing centerline grade and slope staking information at 50-foot (20-meter) station intervals and miscellaneous intermediate stations.

(3) Computer listings containing: horizontal alignment, vertical alignment, earthwork quantities, and staking details showing superelevation template data and slope information.

Delete the last sentence of the fourth paragraph from the bottom of the subsection and substitute the following:

Reestablish missing control points and stakes before slope staking begins.

E-18

152.05 Survey and Staking Requirements.

(b) Centerline establishment. Add the following:

Reestablishment of centerline may be ordered by the CO and paid for under Section 623 for purposes other than to control the work.

(g) Culverts. Delete the first paragraph and substitute the following:

Field verify the location of each individual culvert with the CO prior to surveying, designing, and staking culverts. Perform the following if the culvert design shown in the plans does not fit field conditions or when the CO requires adjustment to a culvert location:

(4) Delete the first paragraph and substitute the following:

Recommend a revised culvert location and alignment. Plot the centerline of the proposed culvert at a clear and readable scale. Show the natural ground, the flow line, the roadway section, and the culvert including end treatments and other appurtenances. Provide the elevations, grade, culvert length, degree of elbow, catch points, and hinge points on the plot.

Add the following:

(m) Centerline verification and staking. Verify stationing shown in the plans by measuring along the existing centerline with a method approved by the CO. Calibrate all measuring devices and furnish calibration data to CO before use. Use landmarks (e.g., culverts, turnouts, approach roads) to verify that the ground stationing matches the stationing shown on the plans. Use white spray paint to mark each centerline station. Add station equations to adjust field stationing to match the plans. Notify the CO on any readjustment or change to stationing or establishment of additional centerline points.

Measure the existing surface width at 200 foot (60 meters) stationing intervals on tangent and at 50 foot (15 meter) intervals on curves. At each location, each side of the roadway and outside the construction limits, place an offset stake of adequate dimensions to place all required information. Label each stake with the following information corresponding to each respective lane:

(1) Station

(2) Offset from striped centerline or other location as directed by the CO

(3) Offset from the proposed edge of pavement

Measure stations to the nearest foot (meter), offsets to the nearest 2 inches (50 millimeters).

Record the above information and provide to the CO.

Use this recorded information to control the proposed roadway width and reestablish striping.

E-19

Measurement

152.07 Delete the third paragraph and substitute the following:

Do not measure miscellaneous survey and staking.

152.07 Add the following to the fourth paragraph:

Reestablishing missing control points and stakes will be measured under Special labor, Hired survey services when it is paid by the hour.

152.07 Add the following:

Measure centerline verification and staking only one time per project.

Section 153. — CONTRACTOR QUALITY CONTROL

Description

153.01 Add the following:

This work also consists of using EEBACS to prepare electronic “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes), including entering labor, equipment, subcontractors, and inspection records into the system.

Construction Requirements

153.02 Qualifications.

(a)(1) Full-time, on-site QCM. Delete subsections (a) and (b) and substitute the following:

(a) Four years of experience managing quality control on highway construction projects of similar type and scope, and

(b) National Institute for Certification in Engineering Technologies (NICET) Level III certification, or equivalent, in highway construction or highway material.

153.03 Quality Control Plan (QCP).

(b) Quality control procedures

(2) Add the following: List the material to be tested by pay item, tests to be conducted, the location of sampling, and the frequency of testing.

E-20

Soledad Canyon Road

Add the following:

(d) Subcontractors and suppliers. Include the work of all subcontractors. If a subcontractor is to perform work under this Section, explain how the subcontractor’s inspection plan will interface with the Prime Contractor first tier subcontractors and lower tier subcontractors and organizations, and the CO. Include the work of major suppliers and suppliers of structural and geotechnical services and materials.

Add the following:

Modifications or additions may be required to any part of the plan that is not adequately covered.

Acceptance of the quality control plan will be based on the inclusion of the required information.

Acceptance does not imply any warranty by the Government that the plan will result in consistent contract compliance. It remains the responsibility of the Contractor to demonstrate such compliance.

153.04 Prosecution of Work. Delete the sentence and substitute the following:

Address each of the subjects shown for each phase of construction:

(a) Preparatory phase.

(1) Delete the paragraph and substitute the following:

In a preparatory phase meeting, review the contract requirements for the work; the process for constructing the work; and the plan for inspecting, testing, measuring, and reporting the work. Include the project superintendent, the quality control supervisor (QCS), the foreman for the work to be performed, and the CO in the meeting.

Schedule and conduct a preparatory meeting for each type of work to be performed at least one week prior to beginning the work.

(b) Start-up phase.

(1) Delete the paragraph and substitute the following:

(1) In a start-up phase meeting, review the contract requirements and the processes for constructing the work with the personnel who will be performing the work. Invite the CO, project superintendent, QCS, testers, and inspectors of the work being performed, and the personnel directly supervising and performing the work. Review the planned testing, inspection, and reporting requirements with the quality control personnel responsible for the testing and inspection. Explain the reporting procedures to be used when defective work is identified. Conduct a start-up meeting for each type of work to be performed upon beginning the work.

E-21

Soledad Canyon Road

(c) Production phase. Add the following:

(4) Provide feedback on processes and deficiencies. Identify root causes of deficiencies, and make timely and effective changes to work processes to prevent repeated deficiencies.

153.05 Sampling and Testing. Delete the text and substitute the following:

153.05 Sampling and Testing.

Perform sampling and testing required by the accepted QCP. As a minimum perform process control testing according to the Sampling, Testing and Acceptance Requirements tables at the end of each Section where applicable. Where no minimums are specified, submit proposed tests to be performed and the proposed sampling and testing frequencies.

(a) Sample Splitting. Schedules and times or locations for obtaining on-site split samples for Government use will be provided by the CO using a procedure for random sampling.

Sample any material that appears defective or inconsistent with similar material being produced, unless such material is voluntarily removed and replaced or otherwise corrected according to Subsection 106.01

(b) Testing. Furnish a laboratory equipped with all test equipment necessary to satisfy the requirements of the contract. Ensure test equipment has been checked, calibrated, standardized and/or otherwise verified in accordance with AASHTO and ASTM standards by an individual qualified to perform the work. Perform an equipment inspection after the laboratory has been moved to its permanent location on the project site, and anytime it is moved thereafter. Inspect equipment within 45 days of actual use for project testing, and at least once a year thereafter. Do not use equipment that has not been inspected or is found to be deficient. Mark deficient equipment and take it out-of-service until repaired or replaced and shown by subsequent inspection to perform as required. Maintain records documenting laboratory equipment inspections. Provide certification(s) stating the equipment conforms to testing requirements and provide evidence of current inspection. Keep laboratory facilities clean and maintain equipment in proper working condition. Allow the CO unrestricted access to the laboratory for inspection and review.

The CO may require a demonstration of proficiency in sampling and testing capabilities.

One or more proficiency samples may be provided by the Government to verify basic qualifications. Provide the results of the proficiency samples to the CO within 48 hours of receipt of the material.

153.06 Certifications. Delete the text and substitute the following:

E-22

For materials or work accepted by certification according to Subsection 106.03, review all certifications to insure compliance with the requirements of the contract prior to incorporating materials into the work and provide a signed copy of the reviewed certification(s) to the CO.

According to FAR Subpart 46.407, materials or work without proper certification will be rejected in writing, and payment for such material or work will be withheld until proper certification has been provided to the CO.

153.07 Records and Control Charts. Delete the first sentence and substitute the following:

Maintain complete testing and inspection records by pay item number and make them accessible to the CO.

(a) Quality control and construction operations reports. Delete the text and substitute the following:

For each day of the contract, prepare an “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports (CDR)) using EEBACS. Enter initial data for Labor/Equipment and Subcontractors prior beginning any work. Maintain and update the Labor/Equipment and Subcontractors data to reflect ongoing changes as they occur. Report operations or items of work separately, with manpower and equipment assigned to each operation separately. Detail inspection results, including deficiencies observed and corrective actions taken. Complete a CDR for each contractor and subcontractor working that day.

When submitting test results on material being incorporated into the work, report test results within the reporting times indicated in the sampling and testing requirements at the end of each section or as specified in the contract.

Enter the following data into EEBACS:

(1) Subcontractors data.

(2) Labor/Equipment.

(a) All manpower and equipment, including contractor and subcontractors. Complete all data fields.

(b) Labor: Type/classification, move-in date, move-out date, hourly rate, the contractor or subcontractor, and name.

(c) Equipment: Type/classification, move-in date, move-out date, make, model, and year of equipment manufacture.

Certify all CDR’s using the following statement:

E-23

Soledad Canyon Road

“I certify that the information contained in this record is accurate and that work documented herein complies with the contract. Exceptions to this certification are documented as a part of this record.”

Submit certified CDR’s that have been signed by a person who has both responsibility for the inspection system and signature authority.

Submit the record and certification within 24 hours of the work being performed. If the CDR is incomplete, in error, or otherwise misleading, the CDR will be rejected and returned within EEBACS with corrections noted. Correct rejected CDRs and resubmit the revised CDR within 24 hours. When chronic errors or omissions occur, correct the procedures by which the records are produced.

153.08 Acceptance. Add the following:

Performance of the work may be stopped according to Subsection 108.05, either in whole or in part, for failure to comply with the requirements of this Section. The Government may charge to the Contractor the cost of any additional inspections required when the work being inspected is found not to comply with contract requirements during the initial inspection. Work stop orders, due to recurring deficiencies of work required by this Section, will be rescinded after the Contractor demonstrates to the CO that changes were made to the quality control plan and system which resulted in the correction of those deficiencies. There will be no adjustment in the contract time, or payments to the Contractor for any impacts, delays or other costs due to any periods of work stoppage resulting from failure to comply with the requirements of this Section.

EEBACS electronic documentation will be evaluated under Subsection 106.02.

153.09 Measurement and Payment. Delete the text and substitute the following:

Measurement

153.09 Measure contractor quality control according to Subsection 109.02.

Do not measure EEBACS electronic documentation for payment.

Payment

153.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 153 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Progress payments for Contractor quality control will be paid as follows:

E-24

Soledad Canyon Road

(1) 25 percent of the item amount, not to exceed 0.5 percent of the original contract amount, will be paid after the contractor quality control plan is accepted; all testing facilities are in place; qualified quality control supervisor, inspection, and sampling and testing personnel are in position to provide quality control activities; and the work being inspected or tested has started.

(2) 65 percent of the total lump sum will be prorated for payment based on the completed portion of the total work not including the original 25 percent completed under (1) above.

(3) Payment of the remaining 10 percent of the lump sum will be paid when all inspections, test results, submittals, and reports are complete and accepted.

Section 154. — CONTRACTOR SAMPLING AND TESTING

Construction Requirements

154.03 Sampling. Add the following:

Perform the initial curing of all concrete test cylinders. Provide for transporting the government verification cylinders to the FHWA-Central Federal Lands Highway’s Laboratory unless other testing facilities are authorized by the CO.

Label each concrete mold with the name and number of the Project, the cylinder number, date molded, location of the sample, and the test age (i.e. – 7, 14, or 28 days). Label the mold after casting and the cylinder after stripping to ensure the sample can be identified throughout the entire curing process.

Provide the required cylinder molds.

154.04 Testing Add the following:

Where Process Control Sampling and Testing frequencies are identical to the Sampling, Testing, and Acceptance Tables at the end of each Section for all applicable work, the Process Control Samples may be used for acceptance.

Add the following subsections:

154.04B Field Laboratory (Contractor-Furnished). Furnish a laboratory equipped with all test equipment necessary to satisfy the requirements of the contract.

The sampling and testing services of a commercial laboratory meeting or exceeding the requirements described herein may be used if all contract sampling and testing requirements are satisfied by the use of the commercial facility.

E-25

Soledad Canyon Road

Ensure test equipment has been checked, calibrated, standardized and/or otherwise verified in accordance with AASHTO and ASTM standards by an individual qualified to do this work.

Ensure mobile laboratories receive an equipment inspection after the laboratory has been moved to its permanent location on the project site and anytime it is moved thereafter.