Results of Bid Opening - NP-MACA 15(3).pdf
PDF 120 KB Posted
- Attached to
- Mammoth Cave National Park
- Solicitation number
- 693C73-20-B-000023
About this file
This document summarizes the results of a bid opening for a federal contract solicitation to rehabilitate Brownsville Road in Mammoth Cave National Park. Eleven contractors submitted bids for the base schedule of work and two option schedules that could be awarded. Bid prices for the base schedule ranged from $1,954,052 to $3,357,162, while total prices including both options ranged from $2,817,569 to $4,528,705. The Eastern Federal Lands Highway Division will award the contract for the Department of Transportation Federal Highway Administration. The selected contractor must complete all work within 278 calendar days if all schedules are combined, or within separate periods for each schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212 Form.pdf | ||
| IFB Solicitation - NP-MACA 15(3).pdf | ||
| Report 2_Pavement Memo.pdf | ||
| Report 1_NEPA.pdf | ||
| Plans_Adv.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Mammoth Cave National Park
PROJECT: NP-MACA 15(3)
SOLICITATION NO. 693C73-20-B-000023
July 30, 2020 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-20-B-000023 Project: NP-MACA 15(3)
July 30, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Adams Contracting, LLC SCHEDULE A
$3,253,330.00
SCHEDULE B (GOVERNMENT OPTION 1)
$40,900.00
SCHEDULE C (GOVERNMENT OPTION 2)
$875,905.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,170,135.00
Bluegrass Contracting Corp. SCHEDULE A
$2,863,855.00
SCHEDULE B (GOVERNMENT OPTION 1)
$51,775.00
SCHEDULE C (GOVERNMENT OPTION 2)
$1,080,505.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,996,135.00
Contractors Corporation SCHEDULE A
$2,822,764.00
SCHEDULE B (GOVERNMENT OPTION 1)
$55,139.50
SCHEDULE C (GOVERNMENT OPTION 2)
$1,044,608.25
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,922,511.75
If the Government awards the contract as Schedules A + B + C, the performance period will be 278 calendar days.
If separate: Schedule A will be 278 calendar days; Schedule B will be 30 calendar days; and Schedule C will be 238 calendar days.
BID OPENING for SOLICITATION NO. 693C73-20-B-000023 Project: NP-MACA 15(3)
July 30, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Central Southern Construction Corp.
SCHEDULE A
$2,922,640.00
SCHEDULE B (GOVERNMENT OPTION 1)
$31,639.50
SCHEDULE C (GOVERNMENT OPTION 2)
$1,019,468.25
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,973,747.75
GC Works Inc. SCHEDULE A
$3,357,162.00
SCHEDULE B (GOVERNMENT OPTION 1)
$120,747.00
SCHEDULE C (GOVERNMENT OPTION 2)
$599,179.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,077,088.00
Howard W. Pence, Inc. SCHEDULE A
$2,816,159.20
SCHEDULE B (GOVERNMENT OPTION 1)
$36,759.10
SCHEDULE C (GOVERNMENT OPTION 2)
$1,140,295.51
SCHEDULE A + OPTION 1 + OPTION 2 =
$3,993,213.81
If the Government awards the contract as Schedules A + B + C, the performance period will be 278 calendar days.
If separate: Schedule A will be 278 calendar days; Schedule B will be 30 calendar days; and Schedule C will be 238 calendar days.
BID OPENING for SOLICITATION NO. 693C73-20-B-000023 Project: NP-MACA 15(3)
July 30, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Lee Construction Group SCHEDULE A
$2,828,479.77
SCHEDULE B (GOVERNMENT OPTION 1)
$62,433.70
SCHEDULE C (GOVERNMENT OPTION 2)
$1,216,253.70
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,107,167.17
T & T Construction Enterprises, LLC
SCHEDULE A
$3,284,535.74
SCHEDULE B (GOVERNMENT OPTION 1)
$32,384.00
SCHEDULE C (GOVERNMENT OPTION 2)
$1,211,784.88
SCHEDULE A + OPTION 1 + OPTION 2 =
$4,528,704.62
IST – Charles DeWeese SCHEDULE A
$1,954,052.32
SCHEDULE B (GOVERNMENT OPTION 1)
$76,837.65
SCHEDULE C (GOVERNMENT OPTION 2)
$786,679.49
SCHEDULE A + OPTION 1 + OPTION 2 =
$2,817,569.46
If the Government awards the contract as Schedules A + B + C, the performance period will be 278 calendar days.
If separate: Schedule A will be 278 calendar days; Schedule B will be 30 calendar days; and Schedule C will be 238 calendar days.
BID OPENING for SOLICITATION NO. 693C73-20-B-000023 Project: NP-MACA 15(3)
July 30, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Engineer’s Estimate SCHEDULE A
$2,017,000.00
SCHEDULE B (GOVERNMENT OPTION 1)
$50,000.00
SCHEDULE C (GOVERNMENT OPTION 2)
$575,000.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$2,642,000.00
If the Government awards the contract as Schedules A + B + C, the performance period will be 278 calendar days.
If separate: Schedule A will be 278 calendar days; Schedule B will be 30 calendar days; and Schedule C will be 238 calendar days.
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000023� Project: NP-MACA 15(3)�July 30, 2020, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000023� Project: NP-MACA 15(3)�July 30, 2020, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000023� Project: NP-MACA 15(3)�July 30, 2020, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000023� Project: NP-MACA 15(3)�July 30, 2020, 2:00 p.m. local time � |
File details come from the government source that posted it. Updated .