This document contains an amendment to a solicitation for highway and bridge design services and the related federal contract opportunity. The amendment provides responses to contractor questions about a project for the rehabilitation of Brownsville Road in Mammoth Cave National Park, Kentucky, with an estimated cost between $1-5 million. A polishing resistant asphalt mix is required, and utilizing 40% dolomite aggregate would meet resistance needs. No escalation factors will be added to the contract. The sealed bid opportunity is available only to certified small businesses, with bids due on July 30, 2020. The work includes asphalt resurfacing, guardrail work, drainage improvements, and signage and striping. Interested vendors must register at SAM.gov and complete annual representations and certifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-MACA 15(3).pdf | ||
| Report 1_NEPA.pdf | ||
| FP14_Eng.pdf | ||
| Report 2_Pavement Memo.pdf | ||
| Plans_Adv.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| VETS-4212 Form.pdf | ||
| IFB Solicitation - NP-MACA 15(3).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7320B000023 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
693C73
STERLING VA 20166-6511
21400 Ridgetop Circle
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
693C73
STERLING VA 20166-6511
21400 RIDGETOP CIRCLE
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
See Block 1006/30/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/30/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Purpose of this modification is to:
1. Formally respond to contractors' questions.
2. The bid due date remains July 30, 2020 at 2:00 PM EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001 Page 2 of 3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project: NP MACA 15(3)
Solicitation: 693C73-20-B-000023
The purpose of this Amendment is to:
1. Provide a summary of responses to questions/clarifications asked by potential contractors.
2. Bid due date remains unchanged. Bids are due July30, 2020 at 2:00PM EST.
Questions / Clarifications:
The following questions were submitted to Eastern Federal Lands Highway Division regarding the project name NP MACA 15(3). The Government response or clarification is provided.
The Government’s responses are as follow:
Question/Comment:
1. QUESTION: SCR 401.03 permits that “an alternate state department of transportation asphalt concrete pavement mixture that has the same nominal maximum size aggregate, traffic level (design ESAL), asphalt binder grade as specified, and conforming to Table
401-1 may be submitted for approval.”
We have a current (within the past 12 months) state DOT (Kentucky Transportation
Cabinet) JMF that will conform to Table 401-1. This JMF is typical for what would be specified by the state DOT if this particular project were a state DOT project, based on state DOT warrants for mix type selection and compaction. However, this mix does not conform to section 703.07 of FP 14:
“For the surface course, do not use aggregates known to polish or carbonate aggregates containing less than 25 percent by mass of insoluble residue when tested according to
ASTM D3042.”, as the aggregates in the current JMF are not subjected to the insoluble residue test. Would the current state DOT JMF described in question
#1 be accepted for use on this project without conforming to section 703.07? If not, and section 703.07 would overrule the SCR, then please see question #2.
2. QUESTION: There are no local aggregate sources that perform the insoluble residue test on their materials. A regional source of dolomite is used on state DOT projects where increased polish resistance is specified, based on state DOT warrants for mix type selection and compaction. As with the locally sourced aggregates, this material is not
Amendment No. 0001 Page 3 of 3 tested for insoluble residue either. Additionally, asphalt mixtures with aggregate from the regional source have shown to provide increased polish resistance. We have a current (within the past 12 months) state DOT JMF that will conform to Table 401-1 utilizing 40% of the dolomite material and providing a higher ESAL class than specified for this project. Would the current state DOT JMF described in question #2 be accepted for use on this project without conforming to section 703.07? If not, then please see question #3.
3. If the response to question #1 and question #2 are both “No”, then please provide information as to the polish resistance values the FHWA will require so that we can source aggregate material for the asphalt mix.
4. Would the FHWA consider including a SCR for “Escalation Factors” for fuel and asphalt
(FP-14 section 109.06)?
Government Response:
1. GOVERNMENT’s RESPONSE: A polishing resistant asphalt mix is required for the project.
2. GOVERNMENT’S RESPONSE: Asphalt mixes cannot be evaluated for approval until after the project award, however, utilizing 40% dolomite would provide sufficient polishing resistance.
3. GOVERNMENT’S RESPONSE: See response for Question 2.
4. GOVERNMENT’S RESPONSE: No escalation factor will be added to the contract.