This solicitation package is for the rehabilitation of Brownsville Road at Mammoth Cave National Park in Kentucky. The project includes asphalt resurfacing, guardrail replacement, drainage improvements, shoulder hardening, signage and striping. The work is split into multiple schedules that can be awarded separately or together. Schedule A is the base contract, with Schedules B and C as optional additional work. The total cost is estimated between $1-5 million.
Sealed bids from small businesses are due by the date specified in Block 13a of the SF1442. In addition to the bid, offerors must be registered in SAM and complete annual representations in SAM prior to award. The contract will be awarded based on the total evaluated price of Schedules A+B+C. The performance period for Schedules A+B+C together is 278 days, with separate periods if Schedules B and C are awarded later. The Department of Transportation Federal Highway Administration is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-MACA 15(3).pdf | ||
| Amendment 0001.pdf | ||
| Report 1_NEPA.pdf | ||
| FP14_Eng.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Report 2_Pavement Memo.pdf | ||
| Plans_Adv.pdf | ||
| VETS-4212 Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
IFB No. 693C73- 20-B-000023
This Contract Cites
STANDARD SPECIFICATIONS (FP-14)
U.S. Customary Units
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NP-MACA 15(3)
MAMMOTH CAVE NATIONAL PARK
REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S
CROSSING TO THE WESTERN PARK BOUNDARY
Contract No.
PMIS #190063
ADDRESS:
CONTRACTOR:
STATE Kentucky
COUNTY EDMONSON
PARK Mammoth Cave National Park
Schedule Parking Area Roadway / Parking Area / Other Stations / SQFT Linear
Feet Route Miles
Lane Miles
A BROWNSVILLE ROAD 0+00 To 268+31 26,770 5.07 10.15
B BROWNSVILLE ROAD- Traffic Control
0+00 To 268+31 0 0.00 0.00
C BROWNSVILLE ROAD- Drainage 0+00 To 268+31 0 0.00 0.00
Project Length Totals 5.07 10.15
For Parking Areas, Lane Miles is calculated as SQFT / 11ft (nominal) lane
TYPE OF IMPROVEMENT
Work includes asphalt pavement resurfacing, guardrail removal and replacement, drainage improvements, shoulder hardening, signing and striping and other miscellaneous work.
TABLE OF CONTENTS
Page
Notice to Bidders 1 through 2
Checklist for Bid Submission 1 through 2
*SF-1442 Solicitation, Offer, and Award 1 through 4
Bid Schedule Instructions 1 through 3
*Bid Schedule B-1 through B-8
*SF-24 Bid Bond C-1 through C-2
FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION
REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES
Index to Federal and Transportation Acquisition Regulations 1 through 7
Representations and Certifications (SAMs online) D-1 through D-3
Instructions to Bidders E-1
*Socioeconomic Program Requirements F-1 through F-4
Minimum Wage Schedule F-5 through F-24
*General Contract Requirements G-1 through G-7
Construction Contract Requirements H-1 through H-5
Special Contract Requirements J-1 through J-32
Section K K-1 through K-3
SPECIFICATIONS On CD
Plans 1 through 67 Categorical Exclusion Form (NEPA) 1 through 24 Pavement Report 1 through 9
* Bidder’s Qualifications Form 1 through 7
* Federal Contractor Veterans’ Employment Report VETS-4212 1 through 5
*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE
NOTICE TO BIDDERS
CONTRACT FORMAT:
Bidders should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet.
FAR provisions and clauses incorporated by reference can be accessed on the Internet website at https://www.acquisition.gov/. Bidders are encouraged to review the documents thoroughly before bidding.
PROPOSAL BOOKLET AND OFFER SUBMITTAL:
It is the responsibility of the Bidder to verify that this proposal is complete as listed in the Table of Contents. The Bidder is responsible for submitting all required forms and documents with the offer.
Offerors should use the Checklist for Bid Submission included in this booklet to check that their bids are complete.
HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDS's within two weeks after bid opening.
INTERNET BASED DATA BASES - REQUIRED INPUT:
According to the FAR Subpart 4.1102 contractors MUST be registered in System for Award Management (SAM) prior to contract award. Access the following web site to register:
https://www.sam.gov/.
According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application prior to contract award online at https://www.sam.gov/.
According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-4212 Form in order to be eligible for a contract award. It can be completed on-line at http://www.dol.gov/vets/vets4212.htm. 2017 VETS-4212 Filing Cycle Effective August 1, 2017 and ends on September 30, 2018, Customers will no longer be able to electronically file a VETS-4212 Report. Customers may still file, but must first download the form from the VETS website http://www.dol.gov/vets/vets4212.htm, fill out the form and mail or email it to: VETS-4212 Service Center C/O Department of Labor National Contact Center (DOL-NCC), 7425 Boston Blvd, Springfield, VA (866) 237-0275 Or email to: VETS4212-customersupport@dol.gov.
PAYMENT:
Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.
PROGRESS PAYMENTS:
ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.
https://www.sam.gov/ http://www.dol.gov/vets/vets4212.htm http://www.dol.gov/vets/vets4212.htm mailto:VETS4212-customersupport@dol.gov
NOTICE TO BIDDERS
WELFARE-TO-WORK INITIATIVE:
The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.
INCREASING SEAT BELT USE IN THE UNITED STATES:
The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.
OBTAINING BID DOCUMENTS:
Bid documents will not be mailed. All bid documents are available for direct download from the Contract Opportunities website: https://beta.sam.gov/. Contractors are encouraged to register on the website (for this specific project) in order to receive automatic notifications when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:
eflhd.contracts@dot.gov.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES
NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID
CHANGES.
PLEASE NOTE: for security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to schedule bid opening. All visitors must register with the receptionist in Room 100. A Government employee will collect all bids. Prior to bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made.
https://beta.sam.gov/ mailto:eflhd.contracts@dot.gov
CHECKLIST FOR BID SUBMISSION
The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.
1. Bid Envelope:
a. Addressed as shown in Block 7 of SF-1442
b. In lower left corner, indicate the following: Solicitation No., Project Name & Number, mail to room
105, if proposals are hand delivered bring them to Reception Area Room 100 and a Contract Specialist will be notified.
2. Standard Form 1442: Solicitation, Offer and Award
a. Block 14: Name and Address of Bidder.
b. Block 15: Telephone Number of Bidder.
c. Block 16: Remittance Address if different from Block 14.
d. Block 19: All Amendments Acknowledged, with dates of Amendments.
e. Block 20: Bid is signed and dated.
3. Bid Schedule - (Pages B-1 through B-8)
a. Unit bid price and bid amount provided for each pay item in numbers.
b. Corrections initialed.
4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)
a. Date executed
b. Legal name and address of bidder.
c. Type of organization.
d. State of incorporation (if applicable).
e. Name and business address of Treasury approved surety.
f. Penal sum of bond (not less than 20% of bid total).
g. Bid identification.
h. Signature of Bidder
i. Seal, if corporation
j. Signature of Surety
k. Seal, if corporation
BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.
5. Power of Attorney.
a. Dated on or before execution date of bond
b. Power has original signature of surety, or is embossed with surety's seal in the certification section
BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.
CHECKLIST FOR BID SUBMISSION
6. Bidder's Qualifications form (provided separately as part of the Bid Documents Package).
Form completed, signed and submitted with bid
THE FOLLOWING THREE ITEMS IF NOT SUBMITTED WITH THE BID; MUST
BE COMPLETED ELECTRONICALLY PRIOR TO CONTRACT AWARD.
7. System for Award Management (SAM): The Contractor is currently registered in the Internet-Based SAM database at https://www.sam.gov/. If contractor elects to not have SAM viewed by public they must submit a copy with Bidder’s Qualification Package.
8. Online Representations and Certifications Application: The Contractor's Representations and Certifications have been input online via the Internet-Based electronic database at https://www.sam.gov/.
9. VETS – 4212 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at http://www.dol.gov/vets/vets4212.htm.
VETS 4212 Filing Cycle Effective August 1, 2017 and ends on September 30, 2018, Customers will no longer be able to electronically file a VETS 4212 Report. Customers may still file, but must first download the form from the VETS website http://www.dol.gov/vets/programs/fcp/vets-4212.pdf, fill out the form and mail or email it to: vets-4212 Service Center, In Care of: Department of Labor National Contact Center (DOL-NCC), 15000 Conference Center Drive, Suite B0132 Chantilly, VA 20151 (866) 237-0275 Or email to: VETS4212-customersupport@dol.gov.
NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL
DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A BID PACKAGE IS
SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR UPDATE YOUR DATA
PRIOR TO CONTRACT AWARD MAY CAUSE THE BID TO BE REJECTED.
https://www.sam.gov/ https://www.sam.gov/SAM/ http://www.dol.gov/vets/vets4212.htm http://www.dol.gov/vets/programs/fcp/main.htm mailto:VETS4212-customersupport@dol.gov
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Federal Highway Administration
FHWA EASTERN FED LANDS DIVISION
21400 RIDGETOP CIRCLE
STERLING VA 20166-6511
693C73
See Block 7
a. NAME
C. Shawn Long
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
EFLHD.CONTRACTS@DOT.GOV
See Block 10 x
06/30/2020
693C7320B000023
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This Invitation for Bids is for the Mammoth Cave National Park, Project No. NP-MACA
15(3), located in Edmonson County, Kentucky in strict accordance with the
Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.
FP - Standard Specification for Construction of Roads & Bridges on Federal Highway
Projects.
Bid Schedule, Section B - pages B-1 through B-8.
Special Contract Requirements, Section J - pages J-1 through J-32.
Plans, Sheets 1 through 67.
Categorical Exclusion Form (NEPA), pages 1 through 24.
Pavement Report, pages 1 through 9.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 278 calendar days and complete it within ________________ ________________ calendar days after receiving
Continuation Sheet, Block 11
07/30/2020
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
�����./�0::/303�#73//5�20�9/3:03;�2./�=03D�3/AB83/>�#2�2./�9384/5�59/48:8/>�$/60=�81�523842�#4403>#14/�=82.�2./�2/3;5�0:�2.85�5068482#2801?�8:�2.85�0::/3�85�#44/92/>
$@�2./��0E/31;/12�81�=382817�=82.81�--------------------�4#6/1>#3�>#@5�#:2/3�2./�>#2/�0::/35�#3/�>B/����������
| � | %(�� |
| �) | �� |
| �� | ����� |
| � | �� |
| ����� ���������� | ���� | ����� |
| � | �� |
�����./�0::/303�#73//5�20�:B3185.�#1@�3/AB83/>�9/3:03;#14/�#1>�9#@;/12�$01>5�
0��#������ ��2�
| ����� | ������ | � |
| H���� | �� |
������� �)4��
3�2���%����
| �����" | ��� � ����� | ��� |
| ����������� | �� |
| ��" ���� | ���������� | |
| �������� | ����� | "��� |
����������3 4��� '5 '6 �--����7��
3�2���%���
| �� | ������ | �� | ������ | ������ | � |
| H���� | �� |
������� )4������ �$���� �� �4������
����2�� #��0 ��2�����
�)��������� )�&4'��������������� ������������ &4'���������������
�"������&��*���G��'����, Block 26
Federal Highway Administration Eastern Federal Lands Highway Division ATTN: Construction Office 21400 Ridgetop Circle Sterling, VA 20166-6511
Federal Highway Administration Eastern Federal Lands Highway Division A/P Branch, AMZ-150 P.O. Box 25710 or E-MAIL
9-AMC-AMZ-EFLINVOICES@FAA.GOV
Oklahoma City, OK 73125
EFLHD-CO
peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text
CONTINUATION OF SF 1442
Block 2:
This project is RESTRICTED - Bids will be accepted from all eligible Small Business concerns.
This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)
Facsimile and electronic bids will not be accepted.
PHYSICAL DATA AVAILABLE FOR REVIEW
1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2009 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.
2. National Park Service Sign Manual, revised - January 1988, United States Department of the Interior. http://flh.fhwa.dot.gov/resources/design/library.
3. Categorical Exclusion Form (NEPA)
4. Pavement Report
Block 9:
In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.
∗Block 11:
If the Government Awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 278 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 278 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 30 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 238 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
See Completion of Work section of the B-Pages – Bid Schedule Instructions for further information. The completion time for the contract is not to exceed the maximum time above.
Work restrictions can be found in SCR Sections 108 and 156.
http://flh.fhwa.dot.gov/resources/design/library
CONTINUATION OF SF 1442
Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)
Block 12A:
Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.
Block 13:
A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.
Block 17:
Amounts should be completed as follows:
Schedule A - $ Schedule B (Option 1) - $ Schedule C (Option 2) - $ Other:
The estimated price is expected to fall within the price range of $1,000,000 to $5,000,000.
Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-14 versions can be downloaded at the FHWA web site. FHWA web site is http://flh.fhwa.dot.gov/resources/specs/ then click on “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects”.
http://flh.fhwa.dot.gov/resources/specs/
BID SCHEDULE INSTRUCTIONS
PROJECT: NP-MACA 15(3)
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total for each specific individual Schedule of Work by adding the amounts of the listed items, and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.
The amount in Block 17 of the SF 1442 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
Schedule C - $ .
SCHEDULES OF WORK
The Bid Schedule is comprised of the following separate schedules and options of work:
Schedule A (Base Contract) - Pages B-1 thru B- 4 Schedule B (Government Option 1) - Pages B- 5 Schedule C (Government Option 2) - Pages B- 6 thru B-7
The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B and C (Government Options 1 and 2); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of programmed funds and upon receipt of any additional funds required to award the contract. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedules B or C (Government Options 1 or 2) at that time. If additional funding is required for the award of Schedules B or C (Government Options 1 or 2), and is received after the award of Schedule A (Base Contract), the Government has the right to exercise Schedules B and C (Government Options 1 and 2) at the unit prices bid according to the following schedule:
Schedule B (Government Option 1): No later than the contract completion date for Schedule A (Base Contract).
Schedule C (Government Option 2): No later than the contract completion date for Schedule B (Government Option 1).
COMPLETION OF WORK
The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice to Proceed to contract completion for the various contract award scenarios. The maximum number of calendar days allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.
If the Government awards the contract as Schedules A+B+C, the performance period to complete all contract work will be 278 calendar days.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 278 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 30 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 238 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc.); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc.); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc.). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).
Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be no earlier than October 2020. See Subsection 108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total.
B - 1
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0060 15705-0100 SOIL EROSION CONTROL, SILT FENCE
395 LNFT $____________ $____________
A0080 20302-0500 REMOVAL OF CURB, CONCRETE
210 LNFT $____________ $____________
A0100 20302-1400 REMOVAL OF GUARDRAIL, TIMBER
3,700 LNFT $____________ $____________
A0120 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
425 SQYD $____________ $____________
A0140 20315-0000 SAWCUTTING PAVEMENT AT SHOULDER HARDENING LOCATIONS ONLY
5,100 LNFT $____________ $____________
A0160 20431-1000 SHOULDER, EXCAVATION
575 CUYD $____________ $____________
A0180 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A
1,475 SQYD $____________ $____________
A0200 30101-4000 AGGREGATE BASE GRADING C OR D
360 TON $____________ $____________
A0220 30301-2000 SHOULDER RECONDITIONING
11 MILE $____________ $____________
A0240 31302-0200 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH
13,100 SQYD $____________ $____________
A0260 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL Type I-A Roughness Coeff.
PG-64-22
6,000 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP-MACA 15(3)
Project Name:REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S CROSSING TO PARK'S WESTERN BOUNDARY
B - 2
A0300 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
140 TON $____________ $____________
A0340 41202-0000 TACK COAT
7,100 GAL $____________ $____________
A0360 41301-0400 ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
1,310 SQYD $____________ $____________
A0380 41401-2000 CRACKS, CLEANING AND SEALING
1,200 LNFT $____________ $____________
A0400 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
44 SQYD $____________ $____________
A0420 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
42 SQYD $____________ $____________
A0440 60901-1700 CURB, CONCRETE, 18-INCH DEPTH
230 LNFT $____________ $____________
A0460 61701-3900 GUARDRAIL SYSTEM SBTA
3,200 LNFT $____________ $____________
A0480 61702-0100 TERMINAL SECTION, TYPE SBT-BAT
8 EACH $____________ $____________
A0500 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
820 SQYD $____________ $____________
A0520 62502-0000 TURF ESTABLISHMENT
820 SQYD $____________ $____________
A0540 62901-0200 ROLLED EROSION CONTROL PRODUCT, TYPE 1.B
55 SQYD $____________ $____________
A0560 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
55 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S CROSSING TO PARK'S WESTERN BOUNDARY
B - 3
A0580 63313-1000 RUMBLE STRIP, SHOULDER
2,500 LNFT $____________ $____________
A0600 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID Includes 352 SF of crosswalk pavement marking
103,500 LNFT $____________ $____________
A0620 63401-1600 PAVEMENT MARKINGS, TYPE H, BROKEN
6,700 LNFT $____________ $____________
A0640 63405-0050 PAVEMENT MARKINGS, SYMBOLS "XING" Marking
1 EACH $____________ $____________
A0660 63405-0050 PAVEMENT MARKINGS, SYMBOLS "Bicycle" symbol
1 EACH $____________ $____________
A0680 63405-2900 PAVEMENT MARKINGS, TYPE H, TURN ARROW
7 EACH $____________ $____________
A0700 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW
1 EACH $____________ $____________
A0720 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
60 EACH $____________ $____________
A0740 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
20 EACH $____________ $____________
A0760 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
57,000 LNFT $____________ $____________
A0780 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
470 SQFT $____________ $____________
A0800 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
315 HOUR $____________ $____________
A0820 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S CROSSING TO PARK'S WESTERN BOUNDARY
B - 4
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S CROSSING TO PARK'S WESTERN BOUNDARY
B - 5
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 20301-2400 REMOVAL OF SIGN
20 EACH $____________ $____________
B0060 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
100 SQFT $____________ $____________
B0080 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
60 EACH $____________ $____________
B0100 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
20 EACH $____________ $____________
B0120 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
470 SQFT $____________ $____________
B0140 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
90 HOUR $____________ $____________
B0160 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S CROSSING TO PARK'S WESTERN BOUNDARY
B - 6
C0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0060 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
390 LNFT $____________ $____________
C0080 20303-1200 REMOVAL OF PAVED WATERWAY, ASPHALT
3,600 SQYD $____________ $____________
C0100 30302-1000 DITCH RECONDITIONING
220 LNFT $____________ $____________
C0120 60201-0600 18-INCH PIPE CULVERT
10 LNFT $____________ $____________
C0140 60704-0000 CLEANING CULVERT IN PLACE
15 EACH $____________ $____________
C0160 60801-0400 PAVED WATERWAY, TYPE 4
3,600 SQYD $____________ $____________
C0180 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
2 EACH $____________ $____________
C0200 62027-0000 REMOVE AND RESET STONE MASONRY
90 LNFT $____________ $____________
C0220 62030-0000 REPOINT STONE MASONRY
240 LNFT $____________ $____________
C0240 62901-0200 ROLLED EROSION CONTROL PRODUCT, TYPE 1.B
305 SQYD $____________ $____________
C0260 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
60 EACH $____________ $____________
C0280 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
20 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
Project Name:REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S CROSSING TO PARK'S WESTERN BOUNDARY
B - 7
C0300 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
470 SQFT $____________ $____________
C0320 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
470 HOUR $____________ $____________
C0340 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type:Options
Project Name:REHABILITATION OF BROWNSVILLE ROAD ROUTE 015 FROM SLOAN'S CROSSING TO PARK'S WESTERN BOUNDARY
B - 8
BID SUMMARY
Project NP-MACA 15(3)
(1) Schedule A (Base Contract) Bid Total (from Page B-4) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-5) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-7) = (3) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $____________________
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If the Government awards the contract as Schedules A+B+C, the performance period to complete all contract work will be 278 calendar days.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 278 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 30 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 238 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
BID BOND
(See instructions on reverse)
OMB Control Number: 9000-0045 Expiration Date: 8/31/2022
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PERCENT
OF BID
PRICE
PENAL SUM OF BOND
AMOUNT NOT TO EXCEED
MILLION(S) THOUSAND(S) HUNDRED(S) CENTS
BID IDENTIFICATION
BID DATE INVITATION NUMBER
PRINCIPAL
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1. 2.
2.
3.
3.
(Seal) (Seal) (Seal) Corporate Seal
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
NAME(S)
(Typed)
1.
1.
2.
2.
(Seal) (Seal)
CORPORATE SURETY(IES)
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is NOT usable
STANDARD FORM 24 (REV. 8/2016)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
FOR (Construction, Supplies or Services)
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.
Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
DATE BOND EXECUTED (Must not be later than bid opening date)
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
JOINT VENTURE
OTHER (Specify)
PARTNERSHIPINDIVIDUAL
CORPORATION
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.
The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
Corporate Seal
LIABILITY LIMIT ($)STATE OF INCORPORATION
2.
2.
1.
1.NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
STANDARD FORM 24 (REV. 8/2016) BACK
D-1
FEDERAL ACQUISITION REGULATION AND TRANSPORTATION
ACQUISITION PROVISIONS
(Updated through FAC 2020-06)
REPRESENTATIONS AND CERTIFICATIONS
Annual Representations and Certifications. Prospective contractors shall complete electronic annual representations and certifications on-line at this web address:
http://www.sam.gov (See Far 4.1201) the System for Award Management (SAM) database (see FAR 4.1102).
Vets4212 Form must also be filled-in online at http://www.dol.gov/vets/vets4212.htm in accordance with FAR Clause 52.222-37.
CONTRACTORS ARE NOT ELIGIBLE FOR AWARD
WITHOUT COMPLETING THESE REQUIREMENTS.
52.204-8 -- Annual Representations and Certifications (MAR 2020)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is 39.5.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
(i) □ Paragraph (d) applies.
(ii) □ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–
(A) The acquisition is to be made under the simplified acquisition procedures in part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal
Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic & Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
http://www.sam.gov/ http://www.dol.gov/vets/vets4212.htm
D-2
(xv) 52.222-25, Affirmative Action Compliance.
This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvii) 52.223-1, Biobased Product Certification.
This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification.
This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.
(D) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate.
This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
__ (i) 52.204-17, Ownership or Control of Offeror.
__ (ii) 52.204-20, Predecessor of Offeror.
__ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
__ (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Certification.
__ (v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Certification.
__ (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA– Designated Products (Alternate I only).
__ (vii) 52.227-6, Royalty Information.
____ (A) Basic.
____ (B) Alternate I.
__ (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically in SAM website…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .