Damage_Survey_Report_T1T2-Trail-D.pdf
PDF 541 KB Posted
- Attached to
- Chequamegon-Nicolet National Forest - 2016-1(4) Federal contract opportunity
- Solicitation number
- 693C73-18-B-000021
About this file
Damage Survey Report_T1T2-Trail-D
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet No: 1 of
DSR No:
Surface Type: Aggregate Thickness: 6"
Surface Type:
Unit Unit Price
Unit Unit Price Lpsm $ Lpsm $ Lnft $
Cuyd $ Cuyd $ Ton $ Sqyd $ Lnft $ Lnft $ Lnft $
Eligible Ineligible
Eligible Ineligible
Disaster No:
Bridge Data:
Type:
ID#:
County: Bayfield / Ashland / Sawyer
Applicant: Chequamegon-Nicolet National Forest
Photograph #:
Road Data: Classification:
Right-of-Way
TOTAL ESTIMATED COST
(Emergency and Permanent Repairs)
Other
DAMAGE SURVEY REPORT
(Title 23, Federal-Aid System/Federal Domain)
Inspection Date: August 30-31, 2016
Location of Damage (Route No., Name of Road and Mile Post) Forest Service Trail NorthEast of Drummond West of Forest Service Route 811
ADT: <200
T1T2-Trail-D
State:
Wisconsin
Recommended By: (Name and Title)
Date:
*Attach Supplemental Sheets if necessary
Date:
Signature:
Signature:
Signature:
Date:
Submitted By: (Name and Title)
Reviewed By: (Name and Title)
EMBANKMENT CONSTRUCTION
Item Description
MOBILIZATION
REMOVAL OF PIPE CULVERT
$0Subtotal Permanent Repairs (continuation sheet)
12,000
900 AGGREGATE SURFACE COURSE
FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway
ROADBED RECONDITIONING
Proposed: Force Account Contract Total Emergency Repairs
SOIL EROSION CONTROL
PLACED RIPRAP, METHOD A, CLASS 3
36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
CLEANING CULVERTS IN PLACE
Cost
$0 $0
Cost
24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
$0 $0 $0
COST ESTIMATE for EMERGENCY REPAIRS* Item Description
Traveled Way Width:
Shoulder Width:
Description and Cause of Damage:
Extremely heavy rainfall (8'-11") in less than 24 hours on July 11, 2016, led to extensive flooding and damages to over 1,000 miles of Forest Service Roads, over 3 county area of the Forest.
Scope/Description of Repair:
1. Repair roadway and shoulder washouts
2. Resurface roadway with 3"-6" of Aggregate Surface Course
3. Clean up clogged corrugated metal pipe culverts
4. Replace damaged culverts and place riprap at the outlets
COST ESTIMATE for PERMANENT REPAIRS* Quantity
Quantity
$0 $0 $0
$0 $0 $0 $0 $0 $0 $0
Construction Engineering
Proposed: Force Account Contract Total Permanent Repairs Preliminary EngineeringIdentify Betterment, if any, and provide justification*
BENJAMIN D DIXON
Digitally signed by BENJAMIN D DIXON DN: c=US, o=U.S. Government, ou=DOT FHWASterlingVA, ou=FHWA FHWASterlingVA, cn=BENJAMIN D DIXON Date: 2016.10.12 10:25:48 -04'00'
Sheet No: 2 of
Disaster No:
Applicant: County: 0 State:
Facility Name: Mile Post:0 0
FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway
DAMAGE SURVEY REPORT (Supplemental Sheet) 0
(Title 23, Federal-Aid System/Federal Domain) 0
0 0
Sheet No: of
Disaster No:
Applicant: County: 0 State:
Facility Name: Mile Post:0 0
FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway
DAMAGE SURVEY REPORT (Supplemental Sheet) 0
Sheet No: 4 of
Disaster No:
Applicant: County: 0 State:
Facility Name: Mile Post:0 0
FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway
DAMAGE SURVEY REPORT (Supplemental Sheet) 0
Volume Roadbed Reconditioning Embankment Aggregate Surface
Rte. MP. DSR Length Width Depth Area (sqyd) Volume (cuft) Volume (cuyd) Depth Tons Remark T1 500 12 667 6 225 T1 5 20 2 200 7 T2 1500 12 6 675 T2 12000 Assume 640 sqft x-section for approximately 500 feet (12 foot traveled way at 20-foot
Totals 667 200 12,007 900
Culverts
Rte. MP. DSR Existing Size Pipe Cleaning (ft) Removal of
Pipe Culvert (ft) 24" Pipe Culvert 36" Pipe Culvert 46" Pipe Culvert Riprap, Class 3 (cuyd) Remark T1 24" 20 20 5 T2 Double 36" 140 140 10
Totals 0 160 0 140 0 15
File details come from the government source that posted it.