Damage_Survey_Report_FS188-W4-B.pdf

PDF 1 MB Posted

Attached to
Chequamegon-Nicolet National Forest - 2016-1(4) Federal contract opportunity
Solicitation number
693C73-18-B-000021
Issued by
Department of Transportation Federal Highway Administration

About this file

Damage Survey Report_FS188-W4-B

View the file

Other files for this federal contract opportunity

Other files attached to Chequamegon-Nicolet National Forest - 2016-1(4), newest first.
File Type Posted
ROBO_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS384-C1C.pdf PDF
Damage_Survey_Report_FS604-W8B.pdf PDF
Damage_Survey_Report_FS1730-C37-D.pdf PDF
Damage_Survey_Report_FS378-W11A.pdf PDF
Damage_Survey_Report_FS396-W48_W49-D.pdf PDF
Damage_Survey_Report_FS231-W33-C.pdf PDF
Damage_Survey_Report_FS379-C30_C31_W37-E.pdf PDF
Damage_Survey_Report_FS390-C33.pdf PDF
Damage_Survey_Report_FS204-C24-D.pdf PDF
IFB_Solicitation_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS373-W96-D.pdf PDF
Damage_Survey_Report_FS387-W40-B.pdf PDF
NEPA_CE.pdf PDF
WI_ERFO_2016-1(4)_-_Design_Scoping_Report_-_Signed_Redacted.pdf PDF
Damage_Survey_Report_FS194-W11_W13_C15_C16-C.pdf PDF
Damage_Survey_Report_FS185-W103-D.pdf PDF
Damage_Survey_Report_W2_W60_W61-C.pdf PDF
Damage_Survey_Report_FS1383-W53-D.pdf PDF
CNNF_ERFO_Closure_Order.pdf PDF
Damage_Survey_Report_FS392-W44-C.pdf PDF
Damage_Survey_Report_FS228-W31-D.pdf PDF
Damage_Survey_Report_FS371-W95-D.pdf PDF
Damage_Survey_Report_FS383-W39-D.pdf PDF
Damage_Survey_Report_FS192-S5_W9_W10-H.pdf PDF
Damage_Survey_Report_T1T2-Trail-D.pdf PDF
Damage_Survey_Report_FS184-W1-B.pdf PDF
Damage_Survey_Report_FS213-C25.pdf PDF
Damage_Survey_Report_FS377-W36.pdf PDF
Damage_Survey_Report_FS253-C42_W34-C.pdf PDF
VETS-4212_-_Form_-_2018.pdf PDF
Damage_Survey_Report_FS202-S8_W22_S9_C23A-H.pdf PDF
Plans_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS207-W25_W26-B.pdf PDF
Norvado_Fiber_Optic_Line_Approxe_Loc_in_Bayfield_County.pdf PDF
Damage_Survey_Report_FS196-C41_C19-C.pdf PDF
Damage_Survey_Report_FS376-W1A.pdf PDF
FP14_Eng.pdf PDF
Synopsis_-_WI_ERFO_FS_2016-1(4).doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet No: 1 of 5

DSR No:

Disaster No:

County: Latitude:

State: Longitude:

Facility Number: Mile Post:

Maint. Level:

Type: Traveled Way Width: 22 Surface Type: Gravel Thickness: 6" ADT:

ID#: Shoulder Width: 4 Surface Type: N/A Thickness: N/A Inspection Date:

Unit Unit Price

Proposed:

Unit Unit Price Lpsm Lpsm Lnft Ton Sqyd

Proposed:

20%

10%

100.00%

Eligible Ineligible

Eligible Ineligible

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT W4-FS188-B

(Title 23, Federal-Aid System/Federal Domain)

COST ESTIMATE for EMERGENCY REPAIRS Quantity Item Description Cost

<200

8/26/2016

Classification:Road Data:Bridge Data:

Site: 00 00' 00" W

Ashland County

Wisconsin

Applicant:

Agency:

WI2016-1-FS

$0 $0

Facility Name:

Chequamegon Nicolet National Forest

Forest Service

FR-188

$0

Description and Cause of Damage:

Severe storm on July 11, 2016 with heavy rains receiving about 8- 12 inches of precipitation during a 24-hour period, resulting in flash flooding and causing damages to the roads, bridges, and other road structures in the Forest Service.

Scope/Description of Repair:

1. Repair roadway and shoulder washouts

2. Resurface roadway with Aggregate Surface Course

FR-188

$0

$0

Total Estimated Emergency Repairs

$0 $0

MOBILIZATION

SOIL EROSION CONTROL

$0

COST ESTIMATE for PERMANENT REPAIRS Quantity Item Description Cost

ROADBED RECONDITIONING

$0

EMBANKMENT CONSTRUCTION

AGGREGATE SURFACE COURSE

$0

$0 $0

* Tribal transportation facilities and federal lands transportation facilities are at 100%. Other federally owned roads are at the sliding scale. See attached table.

Site: 00 00' 00" N

Signature: Date:

Reviewed By: (Name and Title) Signature: Date:

Submitted By: (Name and Title)

(amount from continuation sheet) $0

$0 $0

$0

Preliminary Engineering (percent of permanent repair construction)

Construction Engineering (percent of permanent repair construction)

ERFO share of Permanent Repairs (Sliding Scale) * TOTAL EMERGENCY REPAIRS and ERFO SHARE of PERMANENT

REPAIRS

$0 $0

Recommended By: FLH ERFO Coordinator Signature: Date:

$0 $0

Total Estimated Permanent Repairs - Construction Identify Betterment and provide supporting documentation and economic justification on attached sheets.

Force Account Contract

Force Account Contract

NTTFI/NFLTFI

WENDY HICIANO

Digitally signed by WENDY HICIANO DN: c=US, o=U.S. Government, ou=DOT FHWASanJuanPR, ou=FHWA FHWASanJuanPR, cn=WENDY HICIANO Date: 2016.10.28 14:07:55 -04'00'

Sheet No: 2 of 5

Disaster No:

Applicant: County: Ashland County State:

Facility Name: Mile Post:

Figure 1: Washout shoulder

Figure 2: Washout shoulder

Wisconsin

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) W4-FS188-B

(Title 23, Federal-Aid System/Federal Domain) WI2016-1-FS

FR-188

Chequamegon Nicolet National Forest

Sheet No: 2 of 5

Disaster No:

Applicant: County: Ashland County State:

Facility Name: Mile Post:

Figure 3: Washout road section

Figure 4: Washout road section

FR-188 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) W4-FS188-B

(Title 23, Federal-Aid System/Federal Domain) WI2016-1-FS

National Forest Wisconsin

Sheet No: 4 of 5

Disaster No:

Applica nt: County: Ashland County State:

Facility Name: Mile Post:

Permanent Repair

VOLUME

Roadbed

Reconditioning Embankment Aggregate Surface Rte. Latitude Longitud e Length (ft) Width (ft) Depth (ft) Area (sqyd) Volume (cuft) Volume (cuyd) Depth (in) Tons Remark

FR-188 46.324 90.77735 120 3.5 0.66 47 277.2 10 3 8 Minor gully formed on both sides of the road FR-188 46.3221 90.77753 525 8 3.5 467 14700 544 0 0 Ditch on right side of the road needed FR-188 46.3215 90.7783 575 5 1 319 2875 106 6 108 Shoulder washout RT FR-188 46.3212 90.77897 10 22 3 24 660 24 6 8 Culvert damage FR-188 46.3206 90.78089 300 3 1 100 900 33 6 34 Gully on both side of the road FR-188 46.3205 90.78197 75 3 1 25 225 8 6 8 Erosion RT side FR-188 46.3206 90.78738 50 3 0.83 17 124.5 5 3 3 Gully RT side FR-188 46.3218 90.79198 250 4 1 111 1000 37 6 38 Washout RT side FR-188 46.3214 90.7934 350 3.5 0.75 136 918.75 34 6 46 RT side FR-188 46.3197 90.79914 250 2.5 1 69 625 23 6 23 Gully both sides of the road FR-188 46.3173 90.80342 200 6 1 133 1200 44 6 45 LT Side FR-188 46.3165 90.80576 75 1.5 0 13 0 0 6 4 Gully both sides of the road FR-188 46.3148 90.8074 300 3 0 100 0 0 6 34 Gully both sides of the road FR-188 46.3108 90.80878 50 2.5 0 14 0 0 6 5 RT side FR-188 46.3093 90.80891 100 3 0.58 33 175 6 6 11 RT side FR-188 46.308 90.80804 300 3 3.5 100 3150 117 6 34 RT side FR-188 46.3059 90.80903 75 2 17 0 0 3 3 LT Side

Totals 1725 994 411

*Quantities are round up or down to the nearest 5

FR-188 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway DAMAGE SURVEY REPORT (Supplemental Sheet) W4-FS188-B

(Title 23, Federal-Aid System/Federal Domain) WI2016-1-FS

Chequamegon Nicolet National Forest Wisconsin

Sheet No: 5 of 5

Disaster No:

Applicant: County: Ashland County State:

Facility Name: Mile Post: 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) W4-FS188-B

(Title 23, Federal-Aid System/Federal Domain) WI2016-1-FS

Wisconsin

FR-188

National Forest

File details come from the government source that posted it.