Damage_Survey_Report_FS383-W39-D.pdf

PDF 437 KB Posted

Attached to
Chequamegon-Nicolet National Forest - 2016-1(4) Federal contract opportunity
Solicitation number
693C73-18-B-000021
Issued by
Department of Transportation Federal Highway Administration

About this file

Damage Survey Report_FS383-W39-D

View the file

Other files for this federal contract opportunity

Other files attached to Chequamegon-Nicolet National Forest - 2016-1(4), newest first.
File Type Posted
ROBO_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS384-C1C.pdf PDF
Damage_Survey_Report_FS604-W8B.pdf PDF
Damage_Survey_Report_FS1730-C37-D.pdf PDF
Damage_Survey_Report_FS378-W11A.pdf PDF
Damage_Survey_Report_FS396-W48_W49-D.pdf PDF
Damage_Survey_Report_FS231-W33-C.pdf PDF
Damage_Survey_Report_FS379-C30_C31_W37-E.pdf PDF
Damage_Survey_Report_FS390-C33.pdf PDF
Damage_Survey_Report_FS204-C24-D.pdf PDF
IFB_Solicitation_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS373-W96-D.pdf PDF
Damage_Survey_Report_FS387-W40-B.pdf PDF
NEPA_CE.pdf PDF
WI_ERFO_2016-1(4)_-_Design_Scoping_Report_-_Signed_Redacted.pdf PDF
Damage_Survey_Report_FS194-W11_W13_C15_C16-C.pdf PDF
Damage_Survey_Report_FS185-W103-D.pdf PDF
Damage_Survey_Report_W2_W60_W61-C.pdf PDF
Damage_Survey_Report_FS188-W4-B.pdf PDF
Damage_Survey_Report_FS1383-W53-D.pdf PDF
CNNF_ERFO_Closure_Order.pdf PDF
Damage_Survey_Report_FS392-W44-C.pdf PDF
Damage_Survey_Report_FS228-W31-D.pdf PDF
Damage_Survey_Report_FS371-W95-D.pdf PDF
Damage_Survey_Report_FS192-S5_W9_W10-H.pdf PDF
Damage_Survey_Report_T1T2-Trail-D.pdf PDF
Damage_Survey_Report_FS184-W1-B.pdf PDF
Damage_Survey_Report_FS213-C25.pdf PDF
Damage_Survey_Report_FS377-W36.pdf PDF
Damage_Survey_Report_FS253-C42_W34-C.pdf PDF
VETS-4212_-_Form_-_2018.pdf PDF
Damage_Survey_Report_FS202-S8_W22_S9_C23A-H.pdf PDF
Plans_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS207-W25_W26-B.pdf PDF
Norvado_Fiber_Optic_Line_Approxe_Loc_in_Bayfield_County.pdf PDF
Damage_Survey_Report_FS196-C41_C19-C.pdf PDF
Damage_Survey_Report_FS376-W1A.pdf PDF
FP14_Eng.pdf PDF
Synopsis_-_WI_ERFO_FS_2016-1(4).doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet No: 1 of

DSR No:

Surface Type: Aggregate Thickness: 6"

Surface Type:

Unit Unit Price

Unit Unit Price Lpsm $ Lpsm $ Lnft $

Cuyd $ Cuyd $ Ton $ Sqyd $ Lnft $ Lnft $ Lnft $ Lnft $

Eligible Ineligible

Eligible Ineligible

8,300

Disaster No:

Bridge Data:

Type:

ID#:

County: Bayfield / Ashland / Sawyer

Applicant: Chequamegon-Nicolet National Forest

Photograph #:

Road Data: Classification:

Right-of-Way

TOTAL ESTIMATED COST

(Emergency and Permanent Repairs)

Other

DAMAGE SURVEY REPORT

(Title 23, Federal-Aid System/Federal Domain)

Inspection Date: August 22-26, 2016

Location of Damage (Route No., Name of Road and Mile Post) Forest Service Route 383 MP 0.0 to 1.2

ADT: <200

W39-FS383-D

State:

Wisconsin

Recommended By: (Name and Title)

Date:

*Attach Supplemental Sheets if necessary

Date:

Signature:

Signature:

Signature:

Date:

Submitted By: (Name and Title)

Reviewed By: (Name and Title)

EMBANKMENT CONSTRUCTION

Item Description

MOBILIZATION

REMOVAL OF PIPE CULVERT

$0Subtotal Permanent Repairs (continuation sheet)

CLEANING CULVERTS IN PLACE 110

7,300

2,800 AGGREGATE SURFACE COURSE

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

ROADBED RECONDITIONING

Proposed: Force Account Contract Total Emergency Repairs

SOIL EROSION CONTROL

PLACED RIPRAP, METHOD A, CLASS 3

36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

68-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Cost

$0 $0

Cost

24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

$0 $0 $0

COST ESTIMATE for EMERGENCY REPAIRS* Item Description

Traveled Way Width:

Shoulder Width:

Description and Cause of Damage:

Extremely heavy rainfall (8'-11") in less than 24 hours on July 11, 2016, led to extensive flooding and damages to over 1,000 miles of Forest Service Roads, over 3 county area of the Forest.

Scope/Description of Repair:

1. Repair roadway and shoulder washouts

2. Resurface roadway with 3"-6" of Aggregate Surface Course

3. Clean up clogged corrugated metal pipe culverts

4. Replace damaged culverts and place riprap at the outlets

COST ESTIMATE for PERMANENT REPAIRS* Quantity

Quantity

$0 $0 $0

$0 $0 $0 $0 $0

Construction Engineering

Proposed: Force Account Contract Total Permanent Repairs Preliminary EngineeringIdentify Betterment, if any, and provide justification* S15 culvert identified as 68-inch equivalent replacement can be replaced by culvert meeting Aquatic Organism Passage (AOP) and meeting 100-year event based on USFS design guidelines.

BENJAMIN D DIXON

Digitally signed by BENJAMIN D DIXON DN: c=US, o=U.S. Government, ou=DOT FHWASterlingVA, ou=FHWA FHWASterlingVA, cn=BENJAMIN D DIXON Date: 2016.10.12 10:27:47 -04'00'

Sheet No: 2 of

Disaster No:

Applicant: County: 0 State:

Facility Name: Mile Post:0 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) 0

(Title 23, Federal-Aid System/Federal Domain) 0

0 0

Sheet No: 3 of

Disaster No:

Applicant: County: 0 State:

Facility Name: Mile Post:0 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) 0

Sheet No: 4 of

Disaster No:

Applicant: County: 0 State:

Facility Name: Mile Post:0 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) 0

Volume Roadbed Reconditioning Embankment Aggregate Surface

Rte. MP. DSR Length Width Depth Area (sqyd) Volume (cuft) Volume (cuyd) Depth Tons Remark 383 0.00 550 20 1 1222 11000 407 6 413 Roadway Washout Full Width South to No 383 0.00 550 10 2 611 11000 407 6 206 Roadway Washout Lt 383 0.50 550 3 183 6 62 383 0.60 W39 250 16 5 444 20000 741 6 150 Add Culvert and C&G --------------- 383 0.10 300 5 2 167 3000 111 6 56 Culvert Replace North to So 383 0.20 100 2 1 22 200 7 6 8 Culvert Replace 383 0.30 10 20 3 22 600 22 6 8 Culvert Erosion 383 0.35 Clean Culvert 383 0.40 Culvert Washout 383 0.60 2500 20 3 5556 150000 5556 6 1875 Roadway Washout Full Width

Totals 8228 195,800 7,252 2,777

Culverts

Rte. MP. DSR Existing Size Pipe Cleaning (ft) Removal of

Pipe Culvert (ft) 24" Pipe Culvert 36" Pipe Culvert 46" Pipe Culvert Riprap, Class 3 (cuyd) 383 W39 36"x24" 55 55 5

383 0.1 24 50 50 5 CMP

383 0.2 18" 50 50 5 CMP

383 0.3 18" 50 50 5 383 0.35 45 383 0.4 S15 68" 80 80 10 383 0.6 21" x 15" 65 390 390 30

Totals 110 675 540 0 80 60

CMP

Remark

CMP

CMP

CMP

CMP

File details come from the government source that posted it.