Damage_Survey_Report_FS231-W33-C.pdf

PDF 486 KB Posted

Attached to
Chequamegon-Nicolet National Forest - 2016-1(4) Federal contract opportunity
Solicitation number
693C73-18-B-000021
Issued by
Department of Transportation Federal Highway Administration

About this file

Damage Survey Report_FS231-W33-C

View the file

Other files for this federal contract opportunity

Other files attached to Chequamegon-Nicolet National Forest - 2016-1(4), newest first.
File Type Posted
ROBO_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS384-C1C.pdf PDF
Damage_Survey_Report_FS604-W8B.pdf PDF
Damage_Survey_Report_FS1730-C37-D.pdf PDF
Damage_Survey_Report_FS378-W11A.pdf PDF
Damage_Survey_Report_FS396-W48_W49-D.pdf PDF
Damage_Survey_Report_FS379-C30_C31_W37-E.pdf PDF
Damage_Survey_Report_FS390-C33.pdf PDF
Damage_Survey_Report_FS204-C24-D.pdf PDF
IFB_Solicitation_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS373-W96-D.pdf PDF
Damage_Survey_Report_FS387-W40-B.pdf PDF
NEPA_CE.pdf PDF
WI_ERFO_2016-1(4)_-_Design_Scoping_Report_-_Signed_Redacted.pdf PDF
Damage_Survey_Report_FS194-W11_W13_C15_C16-C.pdf PDF
Damage_Survey_Report_FS185-W103-D.pdf PDF
Damage_Survey_Report_W2_W60_W61-C.pdf PDF
Damage_Survey_Report_FS188-W4-B.pdf PDF
Damage_Survey_Report_FS1383-W53-D.pdf PDF
CNNF_ERFO_Closure_Order.pdf PDF
Damage_Survey_Report_FS392-W44-C.pdf PDF
Damage_Survey_Report_FS228-W31-D.pdf PDF
Damage_Survey_Report_FS371-W95-D.pdf PDF
Damage_Survey_Report_FS383-W39-D.pdf PDF
Damage_Survey_Report_FS192-S5_W9_W10-H.pdf PDF
Damage_Survey_Report_T1T2-Trail-D.pdf PDF
Damage_Survey_Report_FS184-W1-B.pdf PDF
Damage_Survey_Report_FS213-C25.pdf PDF
Damage_Survey_Report_FS377-W36.pdf PDF
Damage_Survey_Report_FS253-C42_W34-C.pdf PDF
VETS-4212_-_Form_-_2018.pdf PDF
Damage_Survey_Report_FS202-S8_W22_S9_C23A-H.pdf PDF
Plans_-_WI_ERFO_FS_2016-1(4).pdf PDF
Damage_Survey_Report_FS207-W25_W26-B.pdf PDF
Norvado_Fiber_Optic_Line_Approxe_Loc_in_Bayfield_County.pdf PDF
Damage_Survey_Report_FS196-C41_C19-C.pdf PDF
Damage_Survey_Report_FS376-W1A.pdf PDF
FP14_Eng.pdf PDF
Synopsis_-_WI_ERFO_FS_2016-1(4).doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet No: 1 of 4

DSR No:

Surface Type: Aggregate Thickness: 6"

Surface Type:

Unit Unit Price

Unit Unit Price Lpsm $ Cuyd $ Ton $

Eligible Ineligible

Eligible Ineligible

Disaster No:

Bridge Data:

Type:

ID#:

County: Bayfield / Ashland / Sawyer

Applicant: Chequamegon-Nicolet National Forest

Photograph #:

Road Data: Classification:

Right-of-Way

TOTAL ESTIMATED COST

(Emergency and Permanent Repairs)

Other

DAMAGE SURVEY REPORT

(Title 23, Federal-Aid System/Federal Domain)

Inspection Date: August 22-26, 2016

Location of Damage (Route No., Name of Road and Mile Post) Rte. 231, from MP 0 to MP 3.7 (Beginning at Lat 46°26'39.08", Long 91°21'15.27")

ADT: <200

W33-FS231-C

State:

Wisconsin

Recommended By: (Name and Title)

Date:

*Attach Supplemental Sheets if necessary

Date:

Signature:

Signature:

Signature:

Date:

Submitted By: (Name and Title)

Reviewed By: (Name and Title)

Item Description

MOBILIZATION

AGGREGATE SURFACE COURSE

$0Subtotal Permanent Repairs (continuation sheet)

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

Proposed: Force Account Contract Total Emergency Repairs

EMBANKMENT CONSTRUCTION

Cost

$0 $0

Cost

$0

$0 $0 $0

COST ESTIMATE for EMERGENCY REPAIRS* Item Description

Traveled Way Width:

Shoulder Width:

Description and Cause of Damage:

Extremely heavy rainfall (8'-11") in less than 24 hours on July 11, 2016, led to extensive flooding and damages to over 1,000 miles of Forest Service Roads, over 3 county area of the Forest.

Scope/Description of Repair:

1. Repair shoulder washouts

COST ESTIMATE for PERMANENT REPAIRS* Quantity

Quantity

$0 $0 $0

$0 $0 $0 $0

$0 $0

$0

$0 $0

$0 $0 $0

Construction Engineering

Proposed: Force Account Contract Total Permanent Repairs Preliminary EngineeringIdentify Betterment, if any, and provide justification*

KATERINA ROMAN GONZALEZ

Digitally signed by KATERINA ROMAN GONZALEZ DN: c=US, o=U.S. Government, ou=DOT FHWASterlingVA, ou=FHWA FHWASterlingVA, cn=KATERINA ROMAN GONZALEZ Date: 2016.10.11 12:51:07 -04'00'

Sheet No: 2 of 4

Disaster No:

Applicant: County: 0 State:

Facility Name: Mile Post:

Picture 1. Water ponding at Site W33, roadway was temporarely.

Picture 2. Left shoulder washout along Rte. 231.

0 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) 0

(Title 23, Federal-Aid System/Federal Domain) 0

0 0

Sheet No: 3 of 4

Disaster No:

Applicant: County: 0 State:

Facility Name: Mile Post:0 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway

DAMAGE SURVEY REPORT (Supplemental Sheet) 0

(Title 23, Federal-Aid System/Federal Domain) 0

0 0

Rte. 231

Sheet No: 4 of 4

Roadway Roadbed

Reconditioning Embankment Aggregate Surface

Rte. MP. DSR Length (ft) Width (ft) Depth (ft) Area (sqyd) Volume (cuyd) Depth Tons Remark Betterment

231 3.40 W33 50 10 0 0 0 Waterponding/

TEMPORARY REPAIR N

231 3.70 400 0.5 0.5 4 6 8 Shoulder washout (MINOR) N

Totals 0 4 8

#REF!

Drainage

Rte. MP. DSR Existing Size Pipe

Cleaning (ft) Removal of

Pipe Culvert (ft) 24" Pipe Culvert

36" Pipe Culvert

46" Pipe Culvert

Riprap, Class 3 (cuyd)

Totals 0 0 0 0 0 0

FEDERAL HIGHWAY ADMINISTRATION, Federal Lands Highway DAMAGE SURVEY REPORT (Supplemental Sheet)

(Title 23, Federal-Aid System/Federal Domain) Disaster No:

Applicant: County: State: Inspection Date:

Location of Damage (Route No., Name of Road and Mile Post) ADT:

QUANTITY COMPUTATIONS

Remark

File details come from the government source that posted it.