STRUCTURE NO. 5140 003P

RAVINE VIADUCT INSPECTION DATE: 11/3/16

STRUCTURE SUMMARY

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... NO. OF MAIN SPANS:

STEEL

MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER

# OF BEAMS, MAIN SPAN: .. STRUCT. TOTAL LENGTH: .. 5

DECK TYPE: ......................... MAX. SPAN LENGTH: .......... CONCRETE CAST-IN-PLACE

WEARING SURFACE: .......... DECK WIDTH: ......................BITUMINOUS

ABUT. FOUNDATIONS: ........ CURB TO CURB WIDTH: ..... SPREAD FTG ON BEARING MAT'L

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: ..

PROJ./PLAN REF. NO: ......... SKEW ANGLE:

NPS ROAD CLASS:

1E8 / 1000

FRACTURE CRITICAL:

STRUCTURE HISTORY: ...... 1985-NEW DECK, PAINT SUPERSTRUCTURE.

1 - PRINCIPAL PARK ROAD

LOCATION

196.0 FT (59.7 M)

67.2 FT (20.5 M)

33.9 FT (10.3 M)

29.9 FT (9.1 M)

0 °

NO

BLUE RIDGE PARKWAY MILE POINT: ..................... 35.67 (KM PT 57.37)

STA VIRGINIA LOCA TO VATE: ................................. TION: 86.0 MILES ROUTE 603

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. RAVINE

STRUCTURE EVALUATION SUMMARY

This steel multi-beam bridge is in good condition overall. The main problem with this structure is rusting of the steel superstructure and bearing devices, a condition that continues to progress. Additional problems include debris accumulation in the deck expansion joints, curblines, bearing areas, and beam ends; several cracked stones on the east column at the north pier, a displaced stone at the northeast cheekwall; deterioration of the northwest vertical expansion joint; and open core holes in the deck. It should be noted that two cracked tack welds were observed on the Beam #5 bottom flange near the south abutment.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: R. SILVESTRY, L. ELLIS

CONDITION ASSESSMENT:

REINALDO SILVESTRY, FIELD TEAM LEADER 703-404-6251

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140 003P

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

60.12 RESET DISPLACED STONE AT NORTHEAST CHEEKWALL. 1 LS

58.1 SEAL CORE HOLES IN DECK AND CRACKS ON DECK UNDERSIDE. 1 LS $ $

58.2,7, 59.2, 60.3

REMOVE DEBRIS FROM DECK EXPANSION JOINTS, CURB LINES, BEARING SEATS,

AND BEAM ENDS.

1 LS $

60.8 CLEAN AND RESEAL NORTHWEST VERTICAL EXPANSION JOINT. 1 LS $ $

PRELIM. MAINTENANCE TOTAL : $

ITEM

REHABILITATION/RECONSTRUCTION

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

NO (TYPICALLY NEEDED WITHIN 5 YEARS)

REHAB. RECONSTR.

59.1,2,6 CLEAN AND SPOT PAINT STRUCTURAL STEEL AS NEEDED. 1 LS $ $0

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

1 LS $ $ $0

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $ $0

PRELIMINARY ESTIMATE TOTAL* : ........................................... $

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140 003P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 7

DECK SLAB1. G

EXPANSION JOINTS2. G

WEARING SURFACE3. G

RIDEABILITY4. G

CURBS, SIDEWALKS, AND MEDIAN5. N

PARAPETS AND/OR RAILINGS6. G

DRAINS AND DRAINAGE7. F

UTILITIES8. N

DEFLECTION AND/OR VIBRATION9. G

OTHER10. (STRIPING) G

59. SUPERSTRUCTURE 7

BEARING DEVICES1. F

GIRDERS OR BEAMS2. G

ARCH(ES) OR SLAB(S)3. N

FLOOR BEAMS AND STRINGERS4. N

TRUSSES5. N

DIAPHRAGMS AND BRACING6. G

7. PAINT G

FASCIA(E)8. N

DEFLECTION AND/OR VIBRATION9. G

ALIGNMENT10. G

OTHER11. N

60. SUBSTRUCTURE 7

ITEM REFERENCE AND REMARKS

ABUTMENTS

58.1,3 DECK SLAB HAS BEEN CORED IN SEVERAL LOCATIONS; SOME

CORE HOLES HAVE NOT BEEN SEALED COMPLETELY IN CENTER

SPAN AND ARE FILLED WITH DEBRIS, WATER, AND VEGETATION

GROWTH. MINOR TRANSVERSE CRACKS EXTEND FROM CORE

HOLES ON DECK UNDERSIDE; MINOR DETERIORATION OF

CONCRETE IN VICINITY OF CORE HOLES, BETWEEN BEAMS #2 AND

#3, CENTER SPAN. MINOR EFFLORESCENCE AT CORE HOLES AND

ALONG LONGITUDINAL CONSTRUCTION JOINTS ON DECK

UNDERSIDE.

MINOR TRANSVERSE AND VERTICAL CRACKING WITH

EFFLORESCENCE ON UNDERSIDE AND EXTERIOR FACE OF DECK

OVERHANGS, WIDESPREAD ON WEST OVERHANG.

58.2,7 MINOR DEBRIS ACCUMULATION IN DECK EXPANSION JOINTS. MINOR

TO MODERATE DEBRIS ACCUMULATION AND MOSS GROWTH ALONG

PARAPETS.

58.6 MINOR CRACKING AND DETERIORATION OF PARAPET MASONRY

MORTAR JOINTS; MINOR EFFLORESCENCE AND MINOR MOSS

GROWTH IN JOINTS. DISPLACED CAPSTONE AT NORTH END OF

WEST MASONRY PARAPET

59.1 MINOR RUSTING OF BEARING DEVICES; MODERATE AT EXTERIOR

BEARINGS.

59.2,6 MINOR RUSTING OF BEAMS AND DIAPHRAGMS, TYPICALLY ALONG

FLANGES. MINOR PACK RUST BETWEEN VERTICAL STIFFENERS

AND WEBS OF EXTERIOR BEAMS.

MINOR DEBRIS ACCUMULATION ON ENDS OF EXTERIOR BEAMS.

MINOR DAMAGE TO SEVERAL WEB STIFFENERS ON EAST SIDE.

BENT STIFFENER ON WEST FACE OF BEAM #5 IN NORTH SPAN.

INDENTATIONS ON FLANGE AND STIFFENER ON EAST FACE OF

BEAM #1 IN SOUTH AND NORTH SPANS. TWO CRACKED TACK

WELDS ON TOP OF BEAM #5 BOTTOM FLANGE NEAR SOUTH

ABUTMENT.

60.1 MODERATE DETERIORATION OF MASONRY MORTAR JOINTS AT

WEST END OF SOUTH ABUTMENT BREASTWALL AT TOP.

1. BREASTWALLS OR COLUMNS G

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS G

4. BACKWALLS AND/OR BULKHEADS G

5. FOUNDATIONS G

6. WINGWALLS G

7. WEEP HOLES G

8. EXPANSION JOINTS F

9. EROSION AND/OR SCOUR G

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER F

PIER(S)

(CHEEKWALL)

G13. WALLS AND/OR COLUMNS

N14. PILE BENTS

G15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS

G17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

FIELD INSPECTION REPORT STRUCTURE NO. 5140 003P

ITEM REFERENCE AND REMARKS

61. CHANNEL N

1. ALIGNMENT

2. EROSION AND/OR SCOUR

3. CHANNEL PROTECTION

4. WATERWAY OBSTRUCTIONS

5. OTHER

6. ADEQUACY OF OPENING

7. NORMAL VELOCITY

8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

60.3 MINOR SOIL AND DEBRIS ACCUMULATION ON BEARING SEATS.

MINOR DETERIORATION OF GROUT PAD AT NORTH ABUTMENT,

WEST BEARING (UNABLE TO VERIFY DURING THIS INSPECTION).

60.4 MINOR CRACKING AND SPALLING OF SOUTH ABUTMENT BACKWALL

BEHIND BEAM #5 (WEST EXTERIOR BEAM).

60.6 MINOR CRACKING OF WINGWALL MASONRY MORTAR JOINTS;

MODERATE IN SOME LOCATIONS. LEAKAGE STAINS AND

EFFLORESCENCE ON NORTHWEST WINGWALL.

60.8, 223.1,5 MODERATE DETERIORATION OF NORTHWEST VERTICAL MORTAR

JOINT; MINOR SETTLEMENT AND ROTATION (1-1/4") OF RETAINING

WALL AT JOINT.

60.9 NORTH ABUTMENT FOOTING EXPOSED, 36" H X 11'-8" L ON EAST

SIDE; 11" H X 3'-4" L ON WEST SIDE.

60.12 DISPLACED STONE AT NORTHEAST CHEEKWALL RESTS AGAINST

BOTTOM FLANGE OF BEAM #1 (EAST EXTERIOR BEAM).

60.13,15 MINOR CRACKING OF MASONRY MORTAR JOINTS WITH

EFFLORESCENCE THROUGHOUT UNDERSIDE OF PIER ARCHES AND

ON COLUMNS. RANDOM STONES CRACKED ON EAST COLUMN AT

NORTH PIER.

222.4,6 MINOR SETTLEMENT AND MODERATE TRANSVERSE CRACKING

(1/4"W) OF PAVEMENT AT SOUTH APPROACH. MINOR TRANSVERSE

CRACK IN PAVEMENT OVER NORTH ABUTMENT BACKWALL.

222.7 NO OBJECT MARKERS PRESENT.

222.8 BRIDGE IS ON HORIZONTAL CURVE WITH LIMITED SIGHT DISTANCE.

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

APPROACH SLABS 1. N

N

G

F

G

G

N

F

G

223. RETAINING WALL

(STRIPING)

OTHER6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

WALL1. G

G

N

G

F

N

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

N N N

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE NO. 5140 003P

INSPECTION DATE: 11/3/16

TRUCK TYPE

TONS

INVENTORY RATING (NORMAL TRAFFIC)

METRIC TONS METRIC TONSTONS

OPERATING RATING (MAXIMUM LOAD)

H

HS

TYPE 3

TYPE 3S2

TYPE 3-3

DESIGN LOADING:

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS:

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

INTERIOR GIRDER IN SPANS #2 AND #3

6/15

X

STRUCTURE LOAD RATING

RAVINE VIADUCT

H15 (M13.5)

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 003P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 513 - VIRGINIA (VA)

(202) STRUCTURE NAME: .......... RAVINE VIADUCT (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 163 - ROCKBRIDGE

(4) CITY/PLACE CODE:

(204) STRUCTURE NUMBER: ..... 5140-003P

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... RAVINE

(207) ROAD SECTION NO: ..........003P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140003P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 86.0 MILES TO VA ROUTE 60

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 1E8 (11) MILE POINT: ............................. 35.67 (KM PT 57.37)

(212) DRAWING NUMBERS: ....... 1000 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

67.2 FT (20.5 M)

196.0 FT (59.7 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION:

0 - NONE

YES(218) IS SALT USED?:

LOAD RATING AND POSTING

(31) DESIGN LOAD:

2 - H15 (M13.5) (41) LOAD RESTRICTION:

R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 24.0 TONS (21.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 40.0 TONS (36.3 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 11/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE:

INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 003P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 37°48'02.80" (51) CURB TO CURB WIDTH: ........... 29.9 FT (9.1 M)

(17) LONGITUDE: ......................... 79°11'47.40" (52) DECK WIDTH: ............................ 33.9 FT (10.3 M)

(19) DETOUR LENGTH: ............... 35 MI (56 KM) (32) APPR. ROADWAY WIDTH: ........ 38.0 FT (11.6 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 8.0 FT (2.4 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 8.0 FT (2.4 M)

(42B) SERVICE UNDER: .............. 0 - OTHER (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 400 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2012 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 440 (47) TOTAL HORIZ. CLEARANCE: .... 29.9 FT (9.1 M)

(115) YEAR OF FUTURE ADT: ..... 2032 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... N RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 3 - PARAPET ONLY

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 9 - OTHER

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.67 FT (0.81 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: ..........................N

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL:

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N

N - Not over waterway.

2 - REHAB/RECONSTRUCTION

D - MINOR

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1985-NEW DECK, PAINT SUPERSTRUCTURE.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:79�11'47.40 http:37�48'02.80

APPENDIX STRUCTURE NO. 5140 003P

PHOTOGRAPHS STRUCTURE NO. 5140 003P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD ROANOKE

PHOTO #2 - EAST SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW

LOOKING SOUTH

PHOTO #4 - GENERAL VIEW OF EXPANSION

JOINT OVER SOUTH ABUTMENT, NOTE

TYPICAL DEBRIS AND MOSS GROWTH IN

EXPANSION JOINT

PHOTO #5 - TYPICAL DEBRIS ACCUMULATION

AND MOSS GROWTH ALONG PARAPETS;

WEST PARAPET LOOKING SOUTH

RAVINE VIADUCT INSPECTION DATE: 11/3/16

STRUCTURE NO. 5140 003P

PHOTO #6 - TYPICAL DEBRIS AND MOSS

ACCUMULATION AT DECK DRAIN ON EAST

SIDE OF DECK

PHOTOGRAPHS

STRUCTURE NO. 5140 003P

PHOTO #7 - TYPICAL CORE HOLES HAVE NOT

BEEN SEALED COMPLETELY IN CENTER SPAN

AND ARE FILLED WITH DEBRIS AND

VEGETATION GROWTH; NORTHBOUND LANE

SHOWN

PHOTO #8 - SETTLEMENT AND FULL WIDTH

TRANSVERSE CRACKING OF PAVEMENT AT

SOUTH APPROACH

STRUCTURE NO. 5140 003P

PHOTO #9 - DISPLACED CAP STONE AT NORTH

END OF WINGWALL

PHOTO #10 - GENERAL UNDERSIDE VIEW OF

CENTER SPAN LOOKING SOUTH; NOTE

TYPICAL RUSTING OF BEAM FLANGES AND

DIAPHRAGM FLANGES

PHOTO #11 - DETERIORATION OF CONCRETE IN VICINITY OF CORE

HOLES, BETWEEN BEAMS #2 AND #3 AT CENTER SPAN

PHOTO #12 - TYPICAL RUSTING OF BEARING DEVICES AND

T;ACCUMULATION OF DEBRIS ON BEARING SEA BEARING AT EAST END

OF NORTH ABUTMENT SHOWN

PHOTO #13 - DISPLACED STONE AT NORTHEAST CHEEKWALL RESTS

AGAINST BOTTOM FLANGE OF BEAM #1

PHOTO #14 - TYPICAL DAMAGE TO WEB STIFFENERS ON EAST SIDE;

NORTH SPAN SHOWN (PHOTO FROM 10/29/2014 INSPECTION REPORT)

STRUCTURE NO. 5140 003PPHOTOGRAPHS

PHOTO #15 - ONE OF TWO CRACKED TACK WELDS ON TOP OF BEAM

#5 BOTTOM FLANGE NEAR SOUTH ABUTMENT (PHOTO FROM

10/29/2014 INSPECTION REPORT)

PHOTO #16 - TYPICAL INDENTATIONS ON FLANGE AND STIFFENER ON

EAST FACE OF BEAM #1; SOUTH SPAN SHOWN (PHOTO FROM

10/29/2014 INSPECTION REPORT)

PHOTO #17 - GENERAL VIEW OF NORTH ABUTMENT; NOTE EXPOSED

FOOTING

PHOTO #18 - DETERIORATION OF NORTHWEST MORTAR JOINT WITH

EFFLORESCENCE BUILD-UP

STRUCTURE NO. 5140 003PPHOTOGRAPHS

PHOTO #19 - GENERAL VIEW OF NORTH PIER,

NORTH SIDE

PHOTO #20 - TYPICAL BUILD-UP OF

EFFLORESCENCE AND CRACKING ALONG

MASONRY MORTAR JOINTS AND FRACTURED

STONES, EAST COLUMN OF NORTH PIER

SHOWN

PHOTO #21 - CLOSE-UP VIEW OF RANDOM

FRACTURED STONE IN NORTH PIER COLUMN,

EAST SIDE