Bridge_Insp_Report_Ravine_Viaduct_5140-003P.pdf
PDF 4 MB Posted
- Attached to
- Blue Ridge Parkway, Project NP-BLRI 1E10
- Solicitation number
- 693C7318B000016
About this file
Bridge_Inspection_Report_Ravine_Viaduct_5140-003P
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE NO. 5140 003P
RAVINE VIADUCT INSPECTION DATE: 11/3/16
STRUCTURE SUMMARY
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... NO. OF MAIN SPANS:
STEEL
MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER
# OF BEAMS, MAIN SPAN: .. STRUCT. TOTAL LENGTH: .. 5
DECK TYPE: ......................... MAX. SPAN LENGTH: .......... CONCRETE CAST-IN-PLACE
WEARING SURFACE: .......... DECK WIDTH: ......................BITUMINOUS
ABUT. FOUNDATIONS: ........ CURB TO CURB WIDTH: ..... SPREAD FTG ON BEARING MAT'L
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: ..
PROJ./PLAN REF. NO: ......... SKEW ANGLE:
NPS ROAD CLASS:
1E8 / 1000
FRACTURE CRITICAL:
STRUCTURE HISTORY: ...... 1985-NEW DECK, PAINT SUPERSTRUCTURE.
1 - PRINCIPAL PARK ROAD
LOCATION
196.0 FT (59.7 M)
67.2 FT (20.5 M)
33.9 FT (10.3 M)
29.9 FT (9.1 M)
0 °
NO
BLUE RIDGE PARKWAY MILE POINT: ..................... 35.67 (KM PT 57.37)
STA VIRGINIA LOCA TO VATE: ................................. TION: 86.0 MILES ROUTE 603
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. RAVINE
STRUCTURE EVALUATION SUMMARY
This steel multi-beam bridge is in good condition overall. The main problem with this structure is rusting of the steel superstructure and bearing devices, a condition that continues to progress. Additional problems include debris accumulation in the deck expansion joints, curblines, bearing areas, and beam ends; several cracked stones on the east column at the north pier, a displaced stone at the northeast cheekwall; deterioration of the northwest vertical expansion joint; and open core holes in the deck. It should be noted that two cracked tack welds were observed on the Beam #5 bottom flange near the south abutment.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: R. SILVESTRY, L. ELLIS
CONDITION ASSESSMENT:
REINALDO SILVESTRY, FIELD TEAM LEADER 703-404-6251
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/31/17
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140 003P
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
60.12 RESET DISPLACED STONE AT NORTHEAST CHEEKWALL. 1 LS
58.1 SEAL CORE HOLES IN DECK AND CRACKS ON DECK UNDERSIDE. 1 LS $ $
58.2,7, 59.2, 60.3
REMOVE DEBRIS FROM DECK EXPANSION JOINTS, CURB LINES, BEARING SEATS,
AND BEAM ENDS.
1 LS $
60.8 CLEAN AND RESEAL NORTHWEST VERTICAL EXPANSION JOINT. 1 LS $ $
PRELIM. MAINTENANCE TOTAL : $
ITEM
REHABILITATION/RECONSTRUCTION
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
NO (TYPICALLY NEEDED WITHIN 5 YEARS)
REHAB. RECONSTR.
59.1,2,6 CLEAN AND SPOT PAINT STRUCTURAL STEEL AS NEEDED. 1 LS $ $0
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)
PLUS PARK LOCATION FACTOR.
1 LS $ $ $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $ $0
PRELIMINARY ESTIMATE TOTAL* : ........................................... $
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140 003P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7
DECK SLAB1. G
EXPANSION JOINTS2. G
WEARING SURFACE3. G
RIDEABILITY4. G
CURBS, SIDEWALKS, AND MEDIAN5. N
PARAPETS AND/OR RAILINGS6. G
DRAINS AND DRAINAGE7. F
UTILITIES8. N
DEFLECTION AND/OR VIBRATION9. G
OTHER10. (STRIPING) G
59. SUPERSTRUCTURE 7
BEARING DEVICES1. F
GIRDERS OR BEAMS2. G
ARCH(ES) OR SLAB(S)3. N
FLOOR BEAMS AND STRINGERS4. N
TRUSSES5. N
DIAPHRAGMS AND BRACING6. G
7. PAINT G
FASCIA(E)8. N
DEFLECTION AND/OR VIBRATION9. G
ALIGNMENT10. G
OTHER11. N
60. SUBSTRUCTURE 7
ITEM REFERENCE AND REMARKS
ABUTMENTS
58.1,3 DECK SLAB HAS BEEN CORED IN SEVERAL LOCATIONS; SOME
CORE HOLES HAVE NOT BEEN SEALED COMPLETELY IN CENTER
SPAN AND ARE FILLED WITH DEBRIS, WATER, AND VEGETATION
GROWTH. MINOR TRANSVERSE CRACKS EXTEND FROM CORE
HOLES ON DECK UNDERSIDE; MINOR DETERIORATION OF
CONCRETE IN VICINITY OF CORE HOLES, BETWEEN BEAMS #2 AND
#3, CENTER SPAN. MINOR EFFLORESCENCE AT CORE HOLES AND
ALONG LONGITUDINAL CONSTRUCTION JOINTS ON DECK
UNDERSIDE.
MINOR TRANSVERSE AND VERTICAL CRACKING WITH
EFFLORESCENCE ON UNDERSIDE AND EXTERIOR FACE OF DECK
OVERHANGS, WIDESPREAD ON WEST OVERHANG.
58.2,7 MINOR DEBRIS ACCUMULATION IN DECK EXPANSION JOINTS. MINOR
TO MODERATE DEBRIS ACCUMULATION AND MOSS GROWTH ALONG
PARAPETS.
58.6 MINOR CRACKING AND DETERIORATION OF PARAPET MASONRY
MORTAR JOINTS; MINOR EFFLORESCENCE AND MINOR MOSS
GROWTH IN JOINTS. DISPLACED CAPSTONE AT NORTH END OF
WEST MASONRY PARAPET
59.1 MINOR RUSTING OF BEARING DEVICES; MODERATE AT EXTERIOR
BEARINGS.
59.2,6 MINOR RUSTING OF BEAMS AND DIAPHRAGMS, TYPICALLY ALONG
FLANGES. MINOR PACK RUST BETWEEN VERTICAL STIFFENERS
AND WEBS OF EXTERIOR BEAMS.
MINOR DEBRIS ACCUMULATION ON ENDS OF EXTERIOR BEAMS.
MINOR DAMAGE TO SEVERAL WEB STIFFENERS ON EAST SIDE.
BENT STIFFENER ON WEST FACE OF BEAM #5 IN NORTH SPAN.
INDENTATIONS ON FLANGE AND STIFFENER ON EAST FACE OF
BEAM #1 IN SOUTH AND NORTH SPANS. TWO CRACKED TACK
WELDS ON TOP OF BEAM #5 BOTTOM FLANGE NEAR SOUTH
ABUTMENT.
60.1 MODERATE DETERIORATION OF MASONRY MORTAR JOINTS AT
WEST END OF SOUTH ABUTMENT BREASTWALL AT TOP.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS G
6. WINGWALLS G
7. WEEP HOLES G
8. EXPANSION JOINTS F
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER F
PIER(S)
(CHEEKWALL)
G13. WALLS AND/OR COLUMNS
N14. PILE BENTS
G15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
G17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
FIELD INSPECTION REPORT STRUCTURE NO. 5140 003P
ITEM REFERENCE AND REMARKS
61. CHANNEL N
1. ALIGNMENT
2. EROSION AND/OR SCOUR
3. CHANNEL PROTECTION
4. WATERWAY OBSTRUCTIONS
5. OTHER
6. ADEQUACY OF OPENING
7. NORMAL VELOCITY
8. AVERAGE CLEAR OPENING
9. STREAM BED COMPOSITION :
60.3 MINOR SOIL AND DEBRIS ACCUMULATION ON BEARING SEATS.
MINOR DETERIORATION OF GROUT PAD AT NORTH ABUTMENT,
WEST BEARING (UNABLE TO VERIFY DURING THIS INSPECTION).
60.4 MINOR CRACKING AND SPALLING OF SOUTH ABUTMENT BACKWALL
BEHIND BEAM #5 (WEST EXTERIOR BEAM).
60.6 MINOR CRACKING OF WINGWALL MASONRY MORTAR JOINTS;
MODERATE IN SOME LOCATIONS. LEAKAGE STAINS AND
EFFLORESCENCE ON NORTHWEST WINGWALL.
60.8, 223.1,5 MODERATE DETERIORATION OF NORTHWEST VERTICAL MORTAR
JOINT; MINOR SETTLEMENT AND ROTATION (1-1/4") OF RETAINING
WALL AT JOINT.
60.9 NORTH ABUTMENT FOOTING EXPOSED, 36" H X 11'-8" L ON EAST
SIDE; 11" H X 3'-4" L ON WEST SIDE.
60.12 DISPLACED STONE AT NORTHEAST CHEEKWALL RESTS AGAINST
BOTTOM FLANGE OF BEAM #1 (EAST EXTERIOR BEAM).
60.13,15 MINOR CRACKING OF MASONRY MORTAR JOINTS WITH
EFFLORESCENCE THROUGHOUT UNDERSIDE OF PIER ARCHES AND
ON COLUMNS. RANDOM STONES CRACKED ON EAST COLUMN AT
NORTH PIER.
222.4,6 MINOR SETTLEMENT AND MODERATE TRANSVERSE CRACKING
(1/4"W) OF PAVEMENT AT SOUTH APPROACH. MINOR TRANSVERSE
CRACK IN PAVEMENT OVER NORTH ABUTMENT BACKWALL.
222.7 NO OBJECT MARKERS PRESENT.
222.8 BRIDGE IS ON HORIZONTAL CURVE WITH LIMITED SIGHT DISTANCE.
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
APPROACH SLABS 1. N
N
G
F
G
G
N
F
G
223. RETAINING WALL
(STRIPING)
OTHER6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
WALL1. G
G
N
G
F
N
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 1
N N N
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE NO. 5140 003P
INSPECTION DATE: 11/3/16
TRUCK TYPE
TONS
INVENTORY RATING (NORMAL TRAFFIC)
METRIC TONS METRIC TONSTONS
OPERATING RATING (MAXIMUM LOAD)
H
HS
TYPE 3
TYPE 3S2
TYPE 3-3
DESIGN LOADING:
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS:
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
INTERIOR GIRDER IN SPANS #2 AND #3
6/15
X
STRUCTURE LOAD RATING
RAVINE VIADUCT
H15 (M13.5)
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 003P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 513 - VIRGINIA (VA)
(202) STRUCTURE NAME: .......... RAVINE VIADUCT (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 163 - ROCKBRIDGE
(4) CITY/PLACE CODE:
(204) STRUCTURE NUMBER: ..... 5140-003P
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... RAVINE
(207) ROAD SECTION NO: ..........003P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140003P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 86.0 MILES TO VA ROUTE 60
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 1E8 (11) MILE POINT: ............................. 35.67 (KM PT 57.37)
(212) DRAWING NUMBERS: ....... 1000 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
02 - STRINGER/MULTI-BEAM or GIRDER
67.2 FT (20.5 M)
196.0 FT (59.7 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION:
0 - NONE
YES(218) IS SALT USED?:
LOAD RATING AND POSTING
(31) DESIGN LOAD:
2 - H15 (M13.5) (41) LOAD RESTRICTION:
R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 24.0 TONS (21.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 40.0 TONS (36.3 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 11/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE:
INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 003P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 37°48'02.80" (51) CURB TO CURB WIDTH: ........... 29.9 FT (9.1 M)
(17) LONGITUDE: ......................... 79°11'47.40" (52) DECK WIDTH: ............................ 33.9 FT (10.3 M)
(19) DETOUR LENGTH: ............... 35 MI (56 KM) (32) APPR. ROADWAY WIDTH: ........ 38.0 FT (11.6 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 8.0 FT (2.4 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 8.0 FT (2.4 M)
(42B) SERVICE UNDER: .............. 0 - OTHER (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 400 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2012 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 440 (47) TOTAL HORIZ. CLEARANCE: .... 29.9 FT (9.1 M)
(115) YEAR OF FUTURE ADT: ..... 2032 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... N RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 3 - PARAPET ONLY
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 9 - OTHER
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.67 FT (0.81 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: ..........................N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-NEW DECK, PAINT SUPERSTRUCTURE.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:79�11'47.40 http:37�48'02.80
APPENDIX STRUCTURE NO. 5140 003P
PHOTOGRAPHS STRUCTURE NO. 5140 003P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD ROANOKE
PHOTO #2 - EAST SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW
LOOKING SOUTH
PHOTO #4 - GENERAL VIEW OF EXPANSION
JOINT OVER SOUTH ABUTMENT, NOTE
TYPICAL DEBRIS AND MOSS GROWTH IN
EXPANSION JOINT
PHOTO #5 - TYPICAL DEBRIS ACCUMULATION
AND MOSS GROWTH ALONG PARAPETS;
WEST PARAPET LOOKING SOUTH
RAVINE VIADUCT INSPECTION DATE: 11/3/16
STRUCTURE NO. 5140 003P
PHOTO #6 - TYPICAL DEBRIS AND MOSS
ACCUMULATION AT DECK DRAIN ON EAST
SIDE OF DECK
PHOTOGRAPHS
STRUCTURE NO. 5140 003P
PHOTO #7 - TYPICAL CORE HOLES HAVE NOT
BEEN SEALED COMPLETELY IN CENTER SPAN
AND ARE FILLED WITH DEBRIS AND
VEGETATION GROWTH; NORTHBOUND LANE
SHOWN
PHOTO #8 - SETTLEMENT AND FULL WIDTH
TRANSVERSE CRACKING OF PAVEMENT AT
SOUTH APPROACH
STRUCTURE NO. 5140 003P
PHOTO #9 - DISPLACED CAP STONE AT NORTH
END OF WINGWALL
PHOTO #10 - GENERAL UNDERSIDE VIEW OF
CENTER SPAN LOOKING SOUTH; NOTE
TYPICAL RUSTING OF BEAM FLANGES AND
DIAPHRAGM FLANGES
PHOTO #11 - DETERIORATION OF CONCRETE IN VICINITY OF CORE
HOLES, BETWEEN BEAMS #2 AND #3 AT CENTER SPAN
PHOTO #12 - TYPICAL RUSTING OF BEARING DEVICES AND
T;ACCUMULATION OF DEBRIS ON BEARING SEA BEARING AT EAST END
OF NORTH ABUTMENT SHOWN
PHOTO #13 - DISPLACED STONE AT NORTHEAST CHEEKWALL RESTS
AGAINST BOTTOM FLANGE OF BEAM #1
PHOTO #14 - TYPICAL DAMAGE TO WEB STIFFENERS ON EAST SIDE;
NORTH SPAN SHOWN (PHOTO FROM 10/29/2014 INSPECTION REPORT)
STRUCTURE NO. 5140 003PPHOTOGRAPHS
PHOTO #15 - ONE OF TWO CRACKED TACK WELDS ON TOP OF BEAM
#5 BOTTOM FLANGE NEAR SOUTH ABUTMENT (PHOTO FROM
10/29/2014 INSPECTION REPORT)
PHOTO #16 - TYPICAL INDENTATIONS ON FLANGE AND STIFFENER ON
EAST FACE OF BEAM #1; SOUTH SPAN SHOWN (PHOTO FROM
10/29/2014 INSPECTION REPORT)
PHOTO #17 - GENERAL VIEW OF NORTH ABUTMENT; NOTE EXPOSED
FOOTING
PHOTO #18 - DETERIORATION OF NORTHWEST MORTAR JOINT WITH
EFFLORESCENCE BUILD-UP
STRUCTURE NO. 5140 003PPHOTOGRAPHS
PHOTO #19 - GENERAL VIEW OF NORTH PIER,
NORTH SIDE
PHOTO #20 - TYPICAL BUILD-UP OF
EFFLORESCENCE AND CRACKING ALONG
MASONRY MORTAR JOINTS AND FRACTURED
STONES, EAST COLUMN OF NORTH PIER
SHOWN
PHOTO #21 - CLOSE-UP VIEW OF RANDOM
FRACTURED STONE IN NORTH PIER COLUMN,
EAST SIDE
File details come from the government source that posted it.