6923G217B00001-000001_AMEND_1.pdf
PDF 102 KB Posted
- Attached to
- Installation of New Windows
- Solicitation number
- 6923G217B00001
About this file
Amendment I
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6923G217B00001_AMEND_2.pdf | ||
| 6923G217B00001_APPENDIX_A.pdf | ||
| SPECS-DRAWINGS_1-5.pdf | ||
| 6923G217B00001_-_SITE_VISIT_LOG.pdf | ||
| 6923G217B00001_-_SOLICITATION.pdf | ||
| 6923G217B00001_-_WAGE_DETERMINATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
6923G217B00001 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
KINGS POINT NY 11024-1699
MARAD-00095
300 STEAMBOAT ROAD
USMMA-5206
DIVISION OF PROCUREMENT
USMERCHANT MARINE ACADEMY PROCURE
06/29/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purposes of this amendment are to (a) post specifications sheet/drawings, (b) Extend the response due date, (c) post the site visit log and (d) post answers to questions received.
(a) Specifications sheets/Drawings are attached (Pages 1 thru 5).
(b) The Response Due Date is hereby extended as follows:
RESPONSE DUE DATE: 21 AUG 2017 AT 10:30 AM EST
(c) Site visit log is posted as part of this amendment and is attached (1 Page).
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
BRUCE MARKMAN
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6923G217B00001/000001
(d) Questions received and answers are as follows:
Will the cut sheets for the windows be available?
THE CUT SHEETS ARE INCLUDED AS PART OF THIS
AMENDMENT
Are there more than one measurements, will the
Floor Plan be available?
THE FLOOR PLANS ARE ATTACHED TO THIS AMENDMENT
How many actual windows vs openings vs actual locations?
THE FLOOR PLANS ARE ATTACHED TO THIS AMENDMENT TO
ASSIST WITH LOCATIONS
Are all the windows twins or some singles?
PLEASE SEE FLOOR PLANS
Do the replacements have to meet any specifications (Single vs. Twin)?
PLEASE SEE SPECIFICATIONS, STATEMENT OF WORK
(SOW) AND CUT SHEETS
Can all windows be (single) fixed? Or do they all have to open?
PLEASE SEE SOW FOR RESPONSE
How many windows will need to be DEMOed?
ALL WINDOWS WILL NEED TO BE DEMOLISHED TO MEET
THE REQUIREMENTS OF THIS PROJECT (PLEASE SEE SOW)
What are they allowed to re-purpose?
NO REPURPOSING IS EXPECTED FOR THIS PROJECT
Do they have to fix any damages to the walls?
SEE SOW FOR RESPONSE. NOTE: DAMAGE CAUSED BY
THE CONTRACTOR SHALL BE REPAIRED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE
GOVERNMENT.
Do they have to replace moldings, what kind, painted?
MOLDINGS WILL NEED TO BE REPLACED.
MOLDING WILL NEED TO BE PAINTED TO MATCH EXISTING
WALLS.
GOVERNMENT WILL PROVIDE COLOR OF THE PAINT THAT
CONTRACTOR WILL NEED TO PROVIDE FOR THIS PROJECT
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6923G217B00001/000001
Will they have the space available to work when needed?
THE SPACE WILL BE AVILABLE FOR THE PROJECT TO
PROCEED. ANY OCCUPIED SPACES WILL BE MADE
ACCESSIBLE TO THE CONTRACTOR.
Can they restrict the area from others?
THE SPACE WILL NOT BE RESTRICTED FROM USE.
REASONABLE ACCOMODATION WILL BE MADE TO ENSURE
THAT THE WORK IS PERFORMED SAFELY AND WITHOUT
INTERFERENCE.
Is there a limit on the amount of workers they can use?
THERE IS NO LIMIT ON THE NUMBER OF WORKERS A
CONTARCTOR MAY UTILIZE
What is the extent of the insulation needed?
INSULATION IS REQUIRED IN ACCORDANCE WITH THE
MANUFACTURER'S SPECIFICATIONS. AT A MINIMUM,
INSULATION IS REQUIRED ON EACH WINDOW PERIMETER
AND BETWEEN WINDOW UNITS AS APPROVED BY THE
CONTRACTING OFFICER OR THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
Will the drainage issue be address prior to their work?
NO, THE DRAINIAGE FROM OUTSIDE WILL BE ADDRESSED
AT A LATER TIME. INSTALLED WINDOWS SHALL BE
WATERPROOF AND WEATHER STRIPPED IN ACCORDANCE
WITH THE MANUFACTURER'S SPECIFICATIONS, PROJECT
SPECIFICATIONS AND AS APPROVED BY THE PROJECT
ENGINEER/COR.
Are there any HAZMAT issues that they need be aware of?
THERE ARE NO KNOWN HAZMAT ISSUES AT THIS TIME
What safety guidelines or protocols must they follow (OSHA)?
SEE SOW FOR GUIDELINES. NOTE: OSHA STANDARDS
APPLY TO ALL WORK PERFORMED AT THE UNITED STATES
MERCHANT MARINE ACADEMY.
Is the 45-days timeline a hard date? Is it flexible?
THE PERIOD OF PERFORMANCE (TIMELINE) HAS BEEN
UPDATED AS PART OF THIS AMENDMENT. PERFORMANCE
MUST BE COMPLETED WITHIN 90 DAYS.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6923G217B00001/000001
Will this project be prevailing wages?
FEDERAL ACQUISIITON REGULATION (FAR) FAR CLAUSE
52.222-6 APPLIES TO THIS PROJECT. PLEASE SEE
SOLICITATION DOCUMENT (SF1442)
Will the U.S. MMA Project Manager's (Rob) info be posted?
THE PROJECT MANAGER/OR FOR THIS PROJECT IS ROBERT
DITROIA
TELEPHONE: 516-726-5620
EMAIL: ditroiar@usmma.edu
The Contractor Officer's (Max) info may be incorrect?
INFORMATION IS CORRECT AND LISTED AS PART OF THE
SOLICITATION AT WWW.FBO.GOV
When will the Solicitation Amendment be posted
(on FBO)?
27 JULY 2017
How will they receive notification of any or all updates? A
AS STATED IN THE PRESOLICITATION AND
SOLICITATION, ALL UPDATES WILL BE POSTED AND
AVAILABLE ONLY AT WWW.FBO.GOV
Is there a storage area available or will we need a container?
CONTRACTOR MAY UTILIZE EXISTING SPACE AT THEIR ON
RISK FOR STORAGE OR THE CONTRACTOR MAY UTILIZE
THEIR OWN CONTAINER
Is there any excavation work in the scope.
NO EXCAVATION WORK IS ANTICIPATED. BELOW GRADE
WINDOWS ARE LOCATED IN WINDOW WELLS.
What is the requirements for bid bond with percentage.
SEE PRESOLICIATION/SOLICITATION NOTICE
THE MILLER ACT IS APPLICABLE AND PAYMENT AND
PERFORMANCE BONDS IN A PENAL AMOUNT EQUAL TO 100%
OF THE CONTRACT PRICE AND ANY INCREASES ARE
REQUIRED. A BID BOND IS REQUIRED IN AN AMOUNT OF
20% OF THE BID PRICE.
Delivery: 90 Days After Notice to Proceed
Delivery Location Code: MARAD-00095
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6923G217B00001/000001
USMERCHANT MARINE ACADEMY PROCURE
US DOTMARITIME ADMINISTRATION
300 STEAMBOAT ROAD
KINGS POINT NY 11024-1699 USA
FOB: Destination
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .