6923G217B00001_-_SOLICITATION.pdf

PDF 153 KB Posted

Attached to
Installation of New Windows Federal contract opportunity
Solicitation number
6923G217B00001
Issued by
Department of Transportation Maritime Administration

About this file

SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to Installation of New Windows, newest first.
File Type Posted
6923G217B00001_APPENDIX_A.pdf PDF
6923G217B00001_AMEND_2.pdf PDF
SPECS-DRAWINGS_1-5.pdf PDF
6923G217B00001-000001_AMEND_1.pdf PDF
6923G217B00001_-_SITE_VISIT_LOG.pdf PDF
6923G217B00001_-_WAGE_DETERMINATION.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

MMAPR5CIP170009

USMERCHANT MARINE ACADEMY PROCURE

DIVISION OF PROCUREMENT

USMMA-5206

300 STEAMBOAT ROAD

MARAD-00095

KINGS POINT NY 11024-1699

UNITED STATES MERCHANT MARINE ACADEMY

PROCUREMENT DEPARTMENT (IFB: 6923G217B00001)

300 STEAMBOAT ROAD

KINGS POINTS NY 11024-1699

Maxmillian Diah 516-726-6152 x

06/29/2017

6923G217B00001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 45 calendar days and complete it within ________________ ________________ calendar days after receiving

FAR 52.211-10

08/01/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USMERCHANT MARINE ACADEMY PROCURE

DIVISION OF PROCUREMENT

USMMA-5206

300 STEAMBOAT ROAD

MARAD-00095

KINGS POINT NY 11024-1699

BRUCE MARKMAN

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

Delivery: 45 Days After Notice to Proceed

Delivery Location Code: MARAD-00095

USMERCHANT MARINE ACADEMY PROCURE

US DOTMARITIME ADMINISTRATION

300 STEAMBOAT ROAD

KINGS POINT NY 11024-1699 USA

FOB: Destination

00001 INSTALLATION OF NEW WINDOWS AT ZERO DECK

STATEMENT-OF-WORK

INSTALLATION OF NEW WINDOWS AT ZERO DECK

LOCATED AT THE

U.S. MERCHANT MARINE ACADEMY

300 STEAMBOAT RD

KINGS POINT, NEW YORK

U.S. DEPARTMENT OF TRANSPORTATION

MARITIME ADMINISTRATION

U.S. MERCHANT MARINE ACADEMY

DEPARTMENT OF CAPITAL IMPROVEMENTS

KINGS POINT, NEW YORK 11024-1699

Contents

SECTION 1 - INTRODUCTION

SECTION 2 - PURPOSE

SECTION 3 - SCOPE

SECTION 4 - CONSULTATIONS, REPORTS, DRAWINGS,

DATA, ETC.

SECTION 5 - DELIVERY SCHEDULE

SECTION 6 - CONTRACT PRICE AND PAYMENT SCHEDULE

SECTION 7 - ADDITIONAL SITE VISITS

SECTION 8 - ADDITIONAL SERVICES

SECTION 9 - NORMAL WORKING HOURS

SECTION 10 - CLEAN UP

SECTION 11 - PROJECT ACCESS

SECTION 12 - UTILITIES

SECTION 13 - OSHA

SECTION 14 - CONTRACTOR¿S REPRESENTATIVE

SECTION 15 - SUBMITTALS

SECTION 16 - FIRE PREVENTION

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

STATEMENT-OF-WORK

INSTALLATION OF NEW WINDOWS AT ZERO DECK

LOCATED AT THE

U.S. MERCHANT MARINE ACADEMY

SECTION 1 - INTRODUCTION

1.1 This statement of work describes the services

of the contractor for the installation of new replacement windows at the zero deck of the dormitories.

1.2 The Academy is in operation 365 days a year, 24 hours a day, and must continue to be in operation during all phases of the design and construction.

1.3 The contractor is responsible to field verify

all measurements and locations.

1.4 All new work must be coordinated and approved

if required by authorities having jurisdiction.

1.5 Construction shall be in accordance with all

current local, state and federal regulations, building codes as applicable and authorities having jurisdiction. The New York State Building

Code will primarily govern and all OSHA regulations will apply.

1.6 All work shall be done in accordance with

Specifications provided in Appendix A.

SECTION 2 - PURPOSE

2.1 The primary purpose of this statement of work

is to install new replacement windows at the zero deck (basement) of the dormitories.

2.2 All work shall be in accordance with all

current local, state and federal regulations, building codes as applicable and authorities having jurisdiction.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

5 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

2.3 A proposal and schedule shall be submitted to

the Academy for approval before any work shall commence.

SECTION 3 - SCOPE

3.1 The project shall consider the following but

not be necessarily limited to:

3.1.1 Investigate and review the window locations

at the zero deck.

3.1.2 The contractor shall demolish and dispose

of the existing windows, plywood, frames, molding, and associated material at 94 locations throughout zero deck of the dormitories. The zero deck of the dormitories in this project includes Barry, Jones, Rogers, Cleveland and

Delano halls. The basements of all the buildings are connected.

3.1.3 The contractor shall replace any existing

blocking that is deteriorated and not usable for new window installation. Wood is deteriorated at a majority of the locations. Molding will be replaced with approved submissions.

3.1.4 The contractor shall furnish and install 88

YKK YES 45FI Storefront Framing System at

Exterior Windows or approved equal. These are the non-opening style window. See attached cut sheet for specifications of window.

3.1.5 The contractor shall furnish and install 6

YKK SSG Vent Windows in YES 45FI Storefront

Framing System at Exterior Windows or approved equal. Locations of the operable windows will be given by the Contracting Officer Representative

(COR). See attached cut sheet for specifications of window.

3.1.6 All windows shall be in Dark Bronze

Anodized Finish.

3.1.7 The contractor shall install waterproofing

at all exterior perimeter window locations ensuring a waterproof connection between window

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

6 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001 and structure.

3.1.8 The contractor shall install all windows to

manufacturer specifications.

3.1.9 The contractor shall ensure all windows are

caulked on both exterior and interior for moisture, air, insect, and aesthetic purposes.

3.1.10 The contractor shall patch, repair and

paint any areas damaged during construction.

3.1.11 The contractor shall provide a shop

drawing submittal prior to any work being completed for approval by the COR. All material to be used will be submitted to the COR for approval.

3.1.12 The contractor will furnish all labor, materials, tools, transportation, supervision, testing, and equipment required to install all new windows at zero deck.

3.1.13 The contractor shall be responsible for

presenting his best efforts for phasing of the project in order to obtain maximum efficiency, cohesive design, and minimum adverse impact on the Academy.

3.1.14 At the conclusion of the project the

Contractor shall furnish three (3) sets of any operating, maintenance, parts, and warranty manuals.

SECTION 4 - CONSULTATIONS, REPORTS, DRAWINGS,

DATA, ETC.

4.1 During the life of the project the contractor

shall periodically formally consult with the

Academy. The consultations/meetings may be requested by the contractor or established by the

Contracting Officer (CO) or COR.

4.1.1 The Academy shall establish an official

committee with one individual designated as

Chairman to provide authoritative decisions. The committee members may be rotated from time to

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

7 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001 time. Permanent members of the Committee are:

4.1.1.1 Director of CIP, Committee Chairman.

4.1.1.2 Contracting Officer, USMMA.

4.1.1.3 Capital Improvement Plan Officer, USMMA, Delegated authority of the Contracting Officer¿s

Representative.

4.1.1.4 Department Head(s) as may be specified.

4.1.1.5 Mechanical Engineer, CIP.

4.1.1.6 Civil Engineer, CIP.

SECTION 5 - DELIVERY SCHEDULE

5.1 The contractor shall prepare and submit a

milestone Schedule for the Academy review within one (1) week after receipt of authorized

Notice-to-Proceed.

5.2 The contractor shall complete the window

installations no later than forty five (45) days after the notice to proceed.

SECTION 6 - CONTRACT PRICE AND PAYMENT SCHEDULE

6.1 The Government shall pay the contractor on a

percentage complete basis the total sum to be negotiated which shall constitute full compensation for all services, materials, expenses, indirect costs, and profit for the program detailed herein except as herein after identified.

6.2 Invoices from the contractor shall be

submitted to the following:

6.2.1 1 original - Director of CIP, USMMA

6.2.2 1 copy - Contracting Officer

6.2.3 1 copy - Department of Budgets and Accounts

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

8 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

6.3 The processing of the invoice for payment

shall only commence after the COR or his designee has certified, in writing, that the invoice is correct and proper for payment.

SECTION 7 - ADDITIONAL SITE VISITS

7.1 Only when authorized by the CO shall

additional site visits be subject to reimbursement at a rate to be negotiated per day, including all expenses based on an approximated 8 hour day or equivalent segments adding up to a full day (i.e. - ½ day units).

SECTION 8 - ADDITIONAL SERVICES

8.1 If the Government requires additional

services beyond this Statement of Work, the compensation shall be negotiated and, in any event, shall not exceed the following:

8.1.1 Time for employee will be based on direct

labor costs multiplied by an overhead rate to be negotiated, and profit on direct labor costs and overhead.

8.1.2 Time for principals will be based on a

maximum total cost of an hourly rate to be negotiated.

SECTION 9 - NORMAL WORKING HOURS

9.1 Normal working hours are 0800 to 1700 hours

Monday through Friday excluding Federal holidays.

All work shall be performed during these hours, unless otherwise approved by the CO. The contractor may be required to reimburse the

Government for the cost of inspecting work performed outside of normal working hours. No work shall be performed during graduation and homecoming.

SECTION 10 - CLEAN UP

10.1 The contractor shall clean up all debris and

discard materials resulting from his operations at the end of each workday. Materials shall be

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

9 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001 disposed of off campus in accordance with local, state and federal laws and regulations. In case of conflict among these laws and regulations, the most stringent law or regulation will apply.

Open burning of scrap or unsalvageable materials are forbidden.

SECTION 11 - PROJECT ACCESS

11.1 The contractor shall be responsible to

maintain access to the job site at all times under all normal seasonal weather conditions, at no additional cost to the government.

SECTION 12 - UTILITIES

12.1 Existing utilities will be available to the

Contractor for his use. Any extension of or connections to the above utilities and their restoration to original condition and removal of extension and connections will be at the expense of the Contractor. The above utilities will be provided at no cost, as needed to perform this contract. All connections to existing utilities shall be coordinated with the COR.

12.2 Contractor shall obtain digging permits

prior to start of excavation by contacting the CO

15 calendar days in advance. Contractor shall scan the construction site with electronic equipment and mark the surface of the ground where existing underground utilities are discovered. Contractor shall notify the CO at least 48 hours prior to starting excavating work.

SECTION 13 - OSHA

13.1 All work and materials called for in the

specifications and drawings will conform to the applicable OSHA standards.

SECTION 14 - CONTRACTOR'S REPRESENTATIVE

14.1 A competent foreman or superintendent with

authority to act on behalf of the contractor must be present at the job site all times that work is

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

10 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001 going on. The name of the foreman or superintendent will be furnished in writing to the CO.

SECTION 15 - SUBMITTALS

15.1 Submittals shall be provided as required by

the specification and contract. Failure to furnish submittals could result in a work stoppage and in addition, materials furnished and/or installed may not meet the specifications and may be rejected by the CO or COR.

15.2 Manufacturer¿s catalog cuts of all materials

and supplies used shall be submitted for approval.

SECTION 16 - FIRE PREVENTION

16.1 The contractor shall comply with the most

current editions of the National Fire Codes, Installation fire prevention standards, USMMA

Safety regulations and all OSHA Standards. All open flame/hot work or disconnection of fire protection alarms or suppression systems require prior approval of the COR, CIP department (516)

726-5907. Dormitories above the work area will remain occupied during all phases of this project.

CONTRACT CLAUSES APPLICABLE TO CONSTRUCTION (FULL

TEXT)

52.211-10 Commencement, Prosecution, and

Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within five (5) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 1 DAYS after commencement. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.236-1 Performance of Work by the Contractor.

(APR 1984)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

11 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen (15) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the

Government.

(End of clause)

52.222-8 Payrolls and Basic Records. (May 2014)

a) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of

3 years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40

U.S.C. 3141(2)(B) (Construction Wage Rate

Requirement statute)), daily and weekly number of hours worked, deductions made, and actual wages paid. Whenever the Secretary of Labor has found, under paragraph (d) of the clause entitled

Construction Wage Rate Requirements, that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B), the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

12 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001 the ratios and wage rates prescribed in the applicable programs.

(b)

(1) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Contracting Officer.

The payrolls submitted shall set out accurately and completely all of the information required to be maintained under paragraph (a) of this clause, except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee¿s social security number).

The required weekly payroll information may be submitted in any form desired. Optional Form

WH-347 is available for this purpose and may be obtained from the U.S. Department of Labor Wage and Hour Division website at http://www.dol.gov/whd/forms/wh347.pdf . The

Prime Contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the

Contracting Officer, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a Prime

Contractor to require a subcontractor to provide addresses and social security numbers to the

Prime Contractor for its own records, without weekly submission to the Contracting Officer.

(2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the

Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify --

(i) That the payroll for the payroll period contains the information required to be maintained under paragraph (a) of this clause and that such information is correct and complete;

(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

13 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001 the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in the

Regulations, 29 CFR Part 3; and

(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.

(3) The weekly submission of a properly executed certification set forth on the reverse side of

Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of

Compliance" required by subparagraph (b)(2) of this clause.

(4) The falsification of any of the certifications in this clause may subject the

Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and

Section 3729 of Title 31 of the United States

Code.

(c) The Contractor or subcontractor shall make the records required under paragraph (a) of this clause available for inspection, copying, or transcription by the Contracting Officer or authorized representatives of the Contracting

Officer or the Department of Labor. The

Contractor or subcontractor shall permit the

Contracting Officer or representatives of the

Contracting Officer or the Department of Labor to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit required records or to make them available, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR

5.12.

(End of clause)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

14 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

52.228-5, Insurance -- Work on a Government

Installation (Jan 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the

Schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting

Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the

Government¿s interest shall not be effective --

(1) For such period as the laws of the State in which this contract is to be performed prescribe;

or

(2) Until 30 days after the insurer or the

Contractor gives written notice to the

Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors¿ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

(End of Clause)

52.228-13 Alternative Payment Protections. (JUL

2000)

(a) The Contractor shall submit one of the following payment protections:

(b) The amount of the payment protection shall be

100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

15 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001 procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

52.252-2 Clauses Incorporated by Reference. (FEB

1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the

Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil

(End of clause)

Contract Clauses Incorporated by Reference:

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (APR

1984)

52.203-7 Anti-Kickback Procedures. (MAY 2014)

52.203-13 Contractor Code of Business Ethics and

Conduct. (APR 2010)

52.204-7 System for Award Management. (JUL 2013)

52.204-9 Personal Identity Verification of

Contractor Personnel. (JAN 2011)

52.209-6 Protecting the Government's Interest

When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)

52.211-13 Time Extensions. (SEP 2000)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

16 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

52.215-8 Order of Precedence - Uniform Contract

Format. (OCT 1997)

52.222-6 Construction Wage Rate Requirements.

(MAY 2014)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (MAY 2014)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10, Compliance with Copeland Act

Requirements. (FEB 1988)

52.222-11, Subcontracts (Labor Standards). (MAY

2014)

52.222-12 -- Contract Termination ¿ Debarment.

(MAY 2014)

52.222-13 Compliance with Construction Wage Rate

Requirements and Related Regulations. (May 2014)

52.222-14 -- Disputes Concerning Labor Standards.

(FEB 1988)

52.222-15 Certification of Eligibility. (MAY

2014)

52.222-26 Equal Opportunity. (MAR 2007)

52.222-27 Affirmative Action Compliance

Requirements for Construction. (FEB 1999)

52.222-36 Affirmative Action for Workers with

Disabilities. (JUL 2014)

52.222-54 Employment Eligibility Verification.

(AUG 2013)

52.223-3 Hazardous Material Identification and

Material Safety Data. (JAN 1997)

52.223-5 Pollution Prevention and Right-to-Know

Information. (MAY 2011)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

17 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-18 Contractor Policy to Ban Text Messaging

While Driving. (AUG 2011)

52.225-13 Restrictions on Certain Foreign

Purchases. (JUN 2008)

52.225-25 Prohibition on Engaging in Sanctioned

Activities Relating to Iran-Certification. (SEP

2010)

52.228-5 Insurance-Work on a Government

Installation (JAN 1997)

52.228-14 Irrevocable Letter of Credit. (NOV

2014)

52.228-15 Performance and Payment Bonds -

Construction. (OCT 2010)

52.229-3 Federal, State, and Local Taxes. (FEB

2013)

52.229-6 Taxes - Foreign Fixed-Price Contracts.

(JUN 2003)

52.232-5 Payments under Fixed-Price Construction

Contracts. (MAY 2014)

52.232-27 Prompt Payment For Construction

Contracts. (MAY 2014)

52.232-33 Payment by Electronic Funds Transfer ¿

System for Award Management. (JUL 2013)

52.233-1 Disputes. (MAY 2014)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract

Claim. (OCT 2004)

52.234-4 Earned Value Management System. (MAY

2014)

52.236-2 Differing Site Conditions. (APR 1984)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

18 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

52.236-3 Site Investigation and Conditions

Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR

1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-14 Availability and Use of Utility

Services. (APR 1984)

52.236-15 Schedules for Construction Contracts.

(APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for

Construction. (FEB 1997)

52.242-14 Suspension of Work. (APR 1984)

52.243-4 Changes. (JUN 2007)

52.243-5 Changes and Changed Conditions. (APR

1984)

52.244-6 Subcontracts for Commercial Items. (DEC

2010)

52.246-12 Inspection of Construction. (APR 1996)

52.246-21 Warranty of Construction. (MAR 1994)

52.248-3 Value Engineering - Construction. (OCT

2010)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

19 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6923G217B00001

52.249-10 Default (Fixed-Price Construction).

(APR 1984)

52.249-2 Termination for Convenience of the

Government (Fixed-Price). (MAY 2004) - Alternate

I (SEP 1996)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)