Amendment 00005
Supply/Install 30’ Stair Tower Questions and Answers
Request for Quote No. 6913G620Q300072
Question 1. Can the RFQ due date be extended to 8/17/2020 please? Yes, the RFQ due date has been extended multiple times and is currently extended to 09/14/2020 by 10:00 AM, EST.
Question 2. What are the specifications of the existing concrete pad (thickness, rebar, concrete psi, etc.)? The existing concrete pad is 1 Foot thick with no rebar and 3,000 PSI (see attached picture of pad being poured).
Question 3. Are there any details available regarding existing sub‐grade utilities/structures?
No, the only utility is the electrical feed from C‐tower to our breaker panel and then over to the existing pad..
Question 4. Who will be responsible for identifying and marking (Dig‐Safe, GPR, etc.?) The Government
Question 5. Are there any sub‐grade utilities/structures? The only utility is the electrical feed from C‐tower to our breaker panel and then over to the existing pad.
Question 6. The scope of work indicates a working platform at the top level as well as intermediate levels. How many intermediate platforms are required and at what heights?
At least 2 intermediate levels evenly spaced.
Question 7. Who is responsible for grounding the structure? The contractor performing the work under the resulting order.