Q-and-A_2021-01-25.pdf
PDF 131 KB Posted
- Attached to
- WFLHD Facility 2nd Floor Remodel Federal contract opportunity
- Solicitation number
- 69056721Q000009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 69056721Q000009_A0002.pdf | ||
| Q-and-A_2021-01-19.pdf | ||
| 69056721Q000009_A0001.pdf | ||
| Q-and-A_2021-01-08.pdf | ||
| Q-and-A_2021-01-06.pdf | ||
| G.004_Past Performance Reference Questionnaire.pdf | ||
| G.003_RCP Environmental Limited Pre-Renovation Flooring Survey.pdf | ||
| Q-and-A_2021-01-04.pdf | ||
| 69056721Q000009.pdf | ||
| G.001_WFLHD 2nd Floor Room Dimensions Drawing.pdf | ||
| G.002_WFLHD 2nd Floor Cubicle Layout Drawing.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENDOR QUESTIONS AND ANSWERS
Solicitation No 69056721Q000009 Project No.:
Project Name:
# General Technical Question Answer Date
1 X I can not find information about when the site visit is scheduled…
Refer to FAR 52.236-27 Site Visit (Construction)(Feb 1995) on pg B-10 of the RFQ 4-Jan-2021
2 X May offer be hand-delivered by the contractor instead of being sent by commercial carrier?
Yes… Refer to the Offeror Submittal Checklist (pg 4 of the RFQ pdf document) for driving directions 5-Jan-2021
3 X Is it a requirement to replace electrical outlet covers that are currently missing? No... quote based on current site conditions 6-Jan-2021
4 X Is storage of furniture and items removed to be on-site or off? Quote as stated in 6.1.1 of the SOW. 7-Jan-2021
5 X What items within the project area will be moved and what containers will be required?
All personal/non-Government items will be removed prior to NTP with all remaining items moved in accordance with 6.1.1(b) of the SOW.
7-Jan-2021
6 X Will a "clean air test" by a 3rd party be required?
3rd party not required… but quote in accordance with UFGS Section 024119, paragraph 3.4.E 7-Jan-2021
7 X Are wall-mount book cases to be removed/reinstalled? No 7-Jan-2021
8 X Is there an elevator to move equipment to the 2nd floor Yes, with a 2,500 lb. capacity 7-Jan-2021
9 X Is there 480V electric service available? No 8-Jan-2021
10 X Asbestos survey report shows abatement items on the 1st floor. Are these included in the project?
No 14-Jan-2021
2nd Floor Remodel
WA WFLHD
11 X Does the FHWA have any electrical as-builts for the 2nd Floor that could be shared with us?
No 15-Jan-2021
12 X Does the FHWA have a reflected ceiling plan as-built for the 2nd floor that could be shared with us?
No 15-Jan-2021
13 X
The scope of work description states that the existing data cable shall be replaced with new CAT6 cable but the project task discussion suggests that the existing data cable shall remain. Can the FHWA please confirm that new CAT6 is not required or otherwise?
New CAT6 cable is not included in the project and the scope description will be addressed in amendment 0001 15-Jan-2021
14 X
The scope of work section 5.1.b has a section that is called "Corner Guards" but there is no further description of what is required. The specifications also reference corner guards in section 096513, 2.3. Can the FHWA please confirm that corner guards are not required or otherwise?
Corner guards are not to be included and the scope/specifications are addressed in amendment 0002 15-Jan-2021
15 X
In regards to the change in Amendment 0001 that removed the requirement to upgrade to CAT6 wiring from the PWS;
does this completely eliminate the requirement for the contractor to perform any Network/Date Cabling of any kind?
No, only the requirement for upgrading to CAT6 wiring is being removed 19-Jan-2021
16 X I am looking to find the plan information in regards to painting on this project...
Painting consists of a wall and columns in the Environmental area, a single office area (including door), a wall and columns in the Design area and then touch up. There will also be a door frame for the single office area that will have to be trimmed to match existing color scheme (Government to provide "color codes").
19-Jan-2021
17 X
Is the ProMover Certification (F-4, 1.4 Special Qualifications, B) required for the GC or just for the company doing the inventory and storage of all cubicle items and dismantling/ re-installing of partitions?
It would make sense that the company moving and reinstalling the partitions would have that certification as that is part of their business. However, if the GC has that certification, that is OK also
25-Jan-2021