69056721Q000009_A0001.pdf
PDF 297 KB Posted
- Attached to
- WFLHD Facility 2nd Floor Remodel Federal contract opportunity
- Solicitation number
- 69056721Q000009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q-and-A_2021-01-25.pdf | ||
| 69056721Q000009_A0002.pdf | ||
| Q-and-A_2021-01-19.pdf | ||
| Q-and-A_2021-01-08.pdf | ||
| Q-and-A_2021-01-06.pdf | ||
| G.004_Past Performance Reference Questionnaire.pdf | ||
| G.003_RCP Environmental Limited Pre-Renovation Flooring Survey.pdf | ||
| Q-and-A_2021-01-04.pdf | ||
| 69056721Q000009.pdf | ||
| G.001_WFLHD 2nd Floor Room Dimensions Drawing.pdf | ||
| G.002_WFLHD 2nd Floor Cubicle Layout Drawing.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
69056721Q000009 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
690567
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIV.
610 E FIFTH STREET
VANCOUVER WA 98661
1/19/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/16/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA WFLHD Facility 2nd Floor Remodel
Amendment A0001 is issued to revise the Statement of Work Page E-1. It updates paragraph 1
(DESCRIPTION OF WORK) as indicated on the attached page by red and/or lined-through text.
ENCLOSURES: Page E-1
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ONE(1)
E-1
WA WFLHD Facility 2nd Floor Remodel Amendment 0001
Statement of Work
1 DESCRIPTION OF WORK
This project is a remodel of second floor areas known as Environmental, Design and one COE office. Remodel activities include removal office cubicles and furniture, removal of existing carpet, asbestos abatement, installation of new carpet, reinstallation of office cubicles and furniture, upgrading network cabling to Cat 6 cabling, and electrical . The work area is located on the second floor of the Western Federal Lands Highway Division (WFLHD) building located at 610 E. 5th Street, Vancouver, WA, 98661.
The purpose of this work is to replace unsafe worn-out carpet and remove known asbestos sources, install new carpeting, and to remove safety hazards from the designated area. Existing furniture, partitions, electrical, data and telephones lines are required to be removed, stored, and reinstalled to same configuration and condition prior to its removal. The Contractor performing the work is responsible for providing all tools, labor, equipment, materials, and services to perform the work as described.
2 SUSTAINABILITY REQUIREMENTS
To the maximum extent possible and consistent with the federal acquisition regulations part 23, the government requires during the performance of the work under this statement of work (sow) that the Contractor provide or use products that are: energy efficient (Energy Star® or Federal Energy Management Program (FEMP)-designated); water-efficient; bio-based; environmentally preferable (e.g., EPEAT-registered, or non-toxic or less toxic alternatives); non-ozone depleting;
or made with recovered materials.
Unless otherwise identified in this SOW, each recovered material or bio-based product provided and delivered must meet, but may exceed, the minimum recovered materials or bio-based content of an EPA- or USDA-designated product.
The sustainable acquisition requirements specified herein apply only to products that are required to be: (1) delivered to the government during contract performance; (2) acquired by the Contractor for use in performing services (including construction) at a federally-controlled facility; (3) furnished by the Contractor for use by the government; or (4) specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.
3 CONTRACT SCHEDULE
3.1 All on-site construction shall be completed in accordance with FAR Clause 52.211-10.
Completed installation is defined as ready to return to service with no outstanding items left to complete.
3.2 High-noise work such as concrete breaking/grinding, cutting or sawing, metal cutting/threading, floor scraping, and sustained hammering (more than 10 minutes) shall be approved daily by the Contracting Officer’s Representative (COR) inside of