69056721Q000009_A0002.pdf
PDF 268 KB Posted
- Attached to
- WFLHD Facility 2nd Floor Remodel Federal contract opportunity
- Solicitation number
- 69056721Q000009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q-and-A_2021-01-25.pdf | ||
| Q-and-A_2021-01-19.pdf | ||
| 69056721Q000009_A0001.pdf | ||
| Q-and-A_2021-01-08.pdf | ||
| Q-and-A_2021-01-06.pdf | ||
| G.004_Past Performance Reference Questionnaire.pdf | ||
| G.003_RCP Environmental Limited Pre-Renovation Flooring Survey.pdf | ||
| Q-and-A_2021-01-04.pdf | ||
| 69056721Q000009.pdf | ||
| G.001_WFLHD 2nd Floor Room Dimensions Drawing.pdf | ||
| G.002_WFLHD 2nd Floor Cubicle Layout Drawing.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
69056721Q000009 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
690567
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIV.
610 E FIFTH STREET
VANCOUVER WA 98661
1/19/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/16/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA WFLHD Facility 2nd Floor Remodel
Amendment A0002 is issued to revise the Statement of Work, Page E-4, and the Unified Facilities Guide Specifications, page F-21. It updates both sections to remove references to "Corner Guards" as indicated on the attached page by red and/or lined-through text.
ENCLOSURES: Page E-4 and Page F-21
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ONE(1)
E-4
WA WFLHD Facility 2nd Floor Remodel Amendment 0002
5 SAMPLES AND SUBMITTALS
5.1 Samples. Provide samples to the COR as indicated below. Concurrent with providing sample provide submittal. COR will approve sample and submittal within two working days. Disapproved samples and submittals shall be resubmitted within two working days following disapproval.
a. Rubber Wall Base: Provide a minimum 6” long sample of the proposed rubber wall base. Rubber wall base style, texture and color to closely match rubber wall base currently installed adjacent to the work area.
b. Corner Guards:
5.2 Submittals. Provide submittals to the COR as indicated below. Submittals shall describe the design, features, materials, and warranty for fixtures, appliances, materials, and equipment the Contractor intends to use and install. Submittals shall identify sustainability features when required by section The finished second floor work area are intended to look similar to the existing second floor finished areas.
Submittals shall be provided for the following:
a. Floor leveling materials or compounds
b. Adhesives, glues, and caulk.
c. Resilient Base and Accessories.
d. Paint
e. Partition, furniture, and government document storage plan
6 PROJECT TASKS
There will be 4 distinct phases of work required to complete this project and are described in greater detail later in this section. The first phase will be Preparation and Existing Partition and Furniture removal. It will be the Contractors choice in performing this work as a whole or breaking the work area into sections. The second phase will be Carpet Removal and Asbestos Abatement.
The third phase will be Wall/Floor Preparation, Painting, and Carpet Installation. The fourth and last phase will be Restoration, Existing Partition and Furniture installation.
6.1 Preparation and Existing Partition And Furniture Removal
6.1.1 PREPARATION
F-21
WFLHD Facility Amendment 0002 2nd Floor Remodel Project
2.3 CORNER GUARD
A. Corner Guard: Burke Standard Corner Guard, or approved equal.
B. Length: Approximately 54”
C. Return Legs: 1-1/2” long return legs, unless otherwise approved.
D. Thickness: Legs are 1/8” thick unless otherwise approved.
2.34 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, Portland cement or blended hydraulic cement-based formulation provided or approved by flooring manufacturer for applications indicated.
B. Adhesives: Water-resistant type recommended by manufacturer to suit floor covering and substrate conditions indicated.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Prepare horizontal surfaces according to ASTM F 710. Verify that substrates are dry and free of curing compounds, sealers, and hardeners.
B. Adhesively install resilient wall base and accessories according to manufacturer’s recommendations. Remove excess adhesive immediately after installation.
C. Base joints shall be tight and base shall be even with adjacent flooring.
D. Install wall base in continuous lengths or 4 foot sections. Apply to walls, columns, pilasters, casework, and other permanent fixtures in rooms or areas where base is required.
E. Install reducer strips at edges of floor coverings that would otherwise be exposed.
F. Resilient Corner Guard shall be rolled, with a J-hand roller, after installation, to ensure proper bonding.
END OF SECTION 096513
File details come from the government source that posted it. Updated .