Q-and-A_2021-01-08.pdf

PDF 110 KB Posted

Attached to
WFLHD Facility 2nd Floor Remodel Federal contract opportunity
Solicitation number
69056721Q000009
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to WFLHD Facility 2nd Floor Remodel, newest first.
File Type Posted
Q-and-A_2021-01-25.pdf PDF
69056721Q000009_A0002.pdf PDF
Q-and-A_2021-01-19.pdf PDF
69056721Q000009_A0001.pdf PDF
Q-and-A_2021-01-06.pdf PDF
G.004_Past Performance Reference Questionnaire.pdf PDF
Q-and-A_2021-01-04.pdf PDF
69056721Q000009.pdf PDF
G.001_WFLHD 2nd Floor Room Dimensions Drawing.pdf PDF
G.002_WFLHD 2nd Floor Cubicle Layout Drawing.pdf PDF
G.003_RCP Environmental Limited Pre-Renovation Flooring Survey.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR QUESTIONS AND ANSWERS

Solicitation No 69056721Q000009 Project No.:

Project Name:

# General Technical Question Answer Date

1 X I can not find information about when the site visit is scheduled…

Refer to FAR 52.236-27 Site Visit (Construction)(Feb 1995) on pg B-10 of the RFQ 4-Jan-2021

2 X May offer be hand-delivered by the contractor instead of being sent by commercial carrier?

Yes… Refer to the Offeror Submittal Checklist (pg 4 of the RFQ pdf document) for driving directions 5-Jan-2021

3 X Is it a requirement to replace electrical outlet covers that are currently missing? No... quote based on current site conditions 6-Jan-2021

4 X Is storage of furniture and items removed to be on-site or off? Quote as stated in 6.1.1 of the SOW. 7-Jan-2021

5 X What items within the project area will be moved and what containers will be required?

All personal/non-Government items will be removed prior to NTP with all remaining items moved in accordance with 6.1.1(b) of the SOW.

7-Jan-2021

6 X Will a "clean air test" by a 3rd party be required?

3rd party not required… but quote in accordance with UFGS Section 024119, paragraph 3.4.E 7-Jan-2021

7 X Are wall-mount book cases to be removed/reinstalled? No 7-Jan-2021

8 X Is there an elevator to move equipment to the 2nd floor Yes, with a 2,500 lb. capacity 7-Jan-2021

9 X Is there 480V electric service available? No 8-Jan-2021

2nd Floor Remodel

WA WFLHD

File details come from the government source that posted it. Updated .