Amendment A002

View the file

Other files

File Type Posted
BidSum_OR_Galice.pdf PDF
Q&A_10-24-18.pdf PDF
10-24-18(2)Q&A.pdf PDF
Q&A_10-24-18.pdf PDF
A001.pdf PDF
Q&A_10-18-18.pdf PDF
Plan_Request_Form_Galice_Rd.pdf PDF
Galice_Rd_Plan_Set_Sign_Off.pdf PDF
IFB_Galice.pdf PDF
PROJECT_DESCRIPTION_Galice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 10/24/2018 N/A OR JOSEPH 2401(2), Galice Road Improvements

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056718B000022

9B. DATED (SEE ITEM 11)

09/21/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 10/24/2018 OR JOSEPH 2401(2), Solicitation No. 69056718B000022 Galice Road Improvements

REVISIONS ARE AS FOLLOWS:

BID SCHEDULE

Page A-8. Revises Item No. A0110 Description (post dimension) Page A-9 Revises Item No. A0190 Quantity

CONTRACT CLAUSES

SPECIAL CONTRACT REQUIREMENTS

Page F-4, Subsection 622.01(a) under Description, Revises the anticipated work under this section.

PLANS

Plan sheet B.1 Revises, Pay Item Description Item 61701-4500 and Quantity of Item 61707-1000

ENCLOSURES

Pages:

A-7 through A-9 F-4

Plan Sheets:

B.1 C.1 through C.2

Notice to Bidders: Please submit revised pages A-7 through A-9 with your bid.

Page A - 7

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule

Project No:OR JOSEPH 2401(2)

Project Name:Galice Road Improvements

Revised by Amendment A002

Page A - 8

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0010 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0020 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

A0030 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

10,700 LNFT $____________ $____________

A0050 20120-1000 REMOVAL, INDIVIDUAL TREE

2 EACH $____________ $____________

A0060 20302-1200 REMOVAL OF GUARDRAIL

13,470 LNFT $____________ $____________

A0070 30302-2000 SHOULDER RECONDITIONING

10,700 LNFT $____________ $____________

A0080 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

16,000 LNFT $____________ $____________

A0090 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS (8' POSTS)

4,500 LNFT $____________ $____________

A0100 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS (NATINA)

3,625 LNFT $____________ $____________

A0110 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS (8' POSTS)

(NATINA)

875 LNFT $____________ $____________

A0120 61702-0000 TERMINAL SECTION (ANCHOR)

1 EACH $____________ $____________

A0130 61702-0300 TERMINAL SECTION, TYPE G4-BAT

3 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR JOSEPH 2401(2)

Project Name:Galice Road Improvements

A002

Page A - 9

A0140 61702-0300 TERMINAL SECTION, TYPE G4-BAT (NATINA)

1 EACH $____________ $____________

A0150 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

21 EACH $____________ $____________

A0160 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (NATINA)

1 EACH $____________ $____________

A0170 61702-1600 TERMINAL SECTION, TYPE MGS FLARED

11 EACH $____________ $____________

A0180 61702-1600 TERMINAL SECTION, TYPE MGS FLARED (NATINA)

3 EACH $____________ $____________

A0190 61707-1000 STRUCTURE TRANSITION RAILING, G4 SYSTEM

20 LNFT $____________ $____________

A0200 61709-4000 REMOVE AND RESET, TERMINAL SECTION

1 EACH $____________ $____________

A0210 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY

20 HOUR $____________ $____________

A0220 62201-2100 COMPACTOR (JUMPING JACK)

40 HOUR $____________ $____________

A0230 62201-2750 MOTOR GRADER

20 HOUR $____________ $____________

A0240 62301-0000 GENERAL LABOR

40 HOUR $____________ $____________

A0250 63501-0000 TEMPORARY TRAFFIC CONTROL

ALL LPSM $___LPSM_____ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:OR JOSEPH 2401(2)

Project Name:Galice Road Improvements

F-4 DIVISION 600

Special Contract Requirements Project: OR JOSEPH 2401(2), Galice Road Improvements

Section 622. — RENTAL EQUIPMENT

01/01/14–FP14

Description

622.01 Delete the text of this Subsection and substitute the following:

This work consists of furnishing and operating equipment for the construction work as ordered by the CO and listed below. Work under this Section does not include equipment time used to perform work provided for under any other pay item shown in the bid schedule. The work anticipated under this Section includes:

(a) Shoulder reconditioning.Terminal Section Grading.

Construction Requirements

622.02 Rental Equipment. Delete the text of the first paragraph and substitute the following:

Furnish and operate the following equipment:

Number of Units Type of Equipment 1 Wheel Loader, 1 Cubic Yard Minimum Rated Capacity

1 Motor Grader 1 Compactor (Jumping Jack)

Submit the model number and serial number for each piece of equipment before use. Make equipment available for inspection and approval before use.

Sheet and Description

Section C Section D

GUARDRAIL AND EROSION CONTROL TEMPORARY TRAFFIC CONTROL ALLOWANCE Bid Schedule

A0010 15101-0000 MOBILIZATION LPSM ALL

A0020 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0030 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0040 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 10,338 362 10,700

A0050 20120-1000 REMOVAL, INDIVIDUAL TREE EACH 2 2

A0060 20302-1200 REMOVAL OF GUARDRAIL LNFT 13,470 13,470

A0070 30302-2000 SHOULDER RECONDITIONING LNFT 10,338 362 10,700

A0080 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A STEEL POSTS LNFT 15,378 622 16,000

A0090 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A STEEL POSTS (8' POSTS) LNFT 4,328 172 4,500

A0100 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A STEEL POSTS (NATINA) LNFT 3,515 110 3,625

A0110 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A STEEL POSTS (8'

POSTS) (NATINA) LNFT 840 35 875

A0120 61702-0000 TERMINAL SECTION (ANCHOR) EACH 1 1

A0130 61702-0300 TERMINAL SECTION, TYPE G4-BAT EACH 3 3

A0140 61702-0300 TERMINAL SECTION, TYPE G4-BAT

(NATINA) EACH 1 1

A0150 61702-1500 TERMINAL SECTION, TYPE MGS

TANGENT EACH 21 21

A0160 61702-1500 TERMINAL SECTION, TYPE MGS

TANGENT (NATINA) EACH 1 1

A0170 61702-1600 TERMINAL SECTION, TYPE MGS

FLARED EACH 11 11

A0180 61702-1600 TERMINAL SECTION, TYPE MGS

FLARED (NATINA) EACH 3 3

A0190 61707-1000 STRUCTURE TRANSITION RAILING,

G4 SYSTEM LNFT 20 20

A0200 61709-4000 REMOVE AND RESET, TERMINAL

SECTION EACH 1 1

A0210 62201-0850 WHEEL LOADER, 1 CUBIC YARD

MINIMUM RATED CAPACITY HOUR 20 20

A0220 62201-2100 COMPACTOR (JUMPING JACK) HOUR 40 40

A0230 62201-2750 MOTOR GRADER HOUR 20 20

A0240 62301-0000 GENERAL LABOR HOUR 40 40

A0250 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL

MileStone: Final Date Completed: In Progress Report Date: 10/23/18

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-O ct

-2

:3

A M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities

C

U se rs \l ot se

.t ow ns en d\ D es kt op

B 1_

JO

S

EP

H

.x ls m ]S he et

STATE PROJECT

B.1JOSEPH 2401(2)OR

SHEET

NUMBER

Revised By Amendment A002

QUANTITIES (1 of 2)

TABULATION OF C-SHEET

C.1

STATE PROJECT

NUMBER

SHEET

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d o r a c a .d g n

OR JOSEPH 2401(2)

P

M

O c to b e r

A

G u ti e r r e z

G

K r u m b in

C h e c k e d b y

D e s ig n e d b y

QUANTITIES (2 of 2)

TABULATION OF C-SHEET

Revised by Amendment A002

C.2

STATE PROJECT

NUMBER

SHEET

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d o r a c b .d g n

OR JOSEPH 2401(2)

P

M

O c to b e r

A

G u ti e r r z

G

K r u m b in

C h e c k e d b y

D e s ig n e d b y : 2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A002
Amd_Page_2_Master.pdf
BID SCHEDULE
CONTRACT CLAUSES

File details come from the government source that posted it.