Project No. OR GRANT 73(1) Project SILVIES‐HOPPER LANE RECONSTRUCTION

# General Technical Question Answer Date 1 X Can you tell me what this line item is for? 140

31402‐0000 STOCKPILED AGGREGATE Chip Seal Aggregate 1600 CY

Please see Section 314.‐STOCKPILED AGGREGATES In both the FP‐14 and SCR's.

This work consists of furnishing and placing material in a stockpile for future use by the Government.

10/29/18

2 X

Is the Roadway agg method 1 and roadway agg method 2 in the mandatory sources (105.02) already crushed or will it need to be crushed by the contractor at the Gabe creek pit?

Roadway agg method 1 and method 2 is not currently crushed. it will need to be mined from and processed at the Gabe Creek Pit.

11/8/18

3 X

Is there an approved water source for use in crushing operations and or dust control on the project at the Gave creek pit.

There is not an approved water source for use in crushing operations at the Gabe Creek Pit. Contractor is responsible for obtaining their water source.

11/8/18

4 X

Can the Gabe Creek pit be used as an approved disposal site for excess material.

Gabe Creek pit cannot be used as an approved disposal site for excess material.

11/8/18

5 X

No horizontal alignment is shown on the plans.

Is this information available for the contractor’s surveyor?

There is no horizontal alignment information available. Refer to 152.05 of the SCRs. 11/9/2018

6 X

No survey control is shown on the plans. Is this information available for the contractor’s surveyor?

There is no survey control information available. 11/9/2018

7 X Any additional information available for the contractor’s surveyor would be appreciated.

There is no additional survey information available. 11/9/2018

Check General or Technical

8 X

Section 418 SCR’s Type 3 patch. Patch area 1,2,3 directs to “make the minimum Transverse dimension of the patch half of the travel lane width”. The type 3 detail shows the measurement and payment width at 3.5’. Will this section include an additional width of 2.5 lf for a total of 6’ to account for half the lane width. If so, will this additional section need the 6” of agg. Method 2 and geotextile or just the open graded emulsified asphalt?

Measure the actual quantities of asphalt patch completed according to Subsection

109.01. Construct all patches according to

the details in the plans. 11/14/2018

9 x

There is no bid item for 153 QC, however I can’t find that as incidental to any items and the payment section for it says “paid at the contract price per unit of measurement for the section 153 pay items”. How is 153 paid if it is not a bid item?

Work that is specified in Division 150 is required for all projects according to Subsection 101.02. It may be paid directly, or indirectly according to Section 109.05.