Q&A_6-19-18.pdf
PDF 71 KB Posted
- Solicitation number
- 69056718B000016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Q&A_7-09-18.pdf | ||
| Amendment_A002.pdf | ||
| Q&A_7-05-18.pdf | ||
| Amendment_A001.pdf | ||
| Q&A_6-27-18.pdf | ||
| or-22401_Plans_Final.pdf | ||
| Plan_Request_Form_Clackamas.pdf | ||
| IFB_OR_Clackamas.pdf | ||
| PROJECT_DESCRIPTION_Clackamas.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT 224(1)
Clackamus Highway Pavement Restoration
# General Technical Question Answer Date
1 X
The bid item 61701‐4550 is calling for type 2 class A wood post guardrail, but sheet F.1 in the plans there is a safety features quantity box that refers you to ODOT Type 3 guardrail. Just looking for some clarification on to which type of guardrail you are expecting.
The Type 2, Class A designation shown in the bid item provides material requirements specified under Section 617, and the reference to Type 3 in the Plans is a reference to the type of installation required.
6/19/18
Check General or Technical
File details come from the government source that posted it.