or-22401_Plans_Final.pdf
PDF 11 MB Posted
- Solicitation number
- 69056718B000016
About this file
Plan Sheets
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Q&A_7-09-18.pdf | ||
| Amendment_A002.pdf | ||
| Q&A_7-05-18.pdf | ||
| Amendment_A001.pdf | ||
| Q&A_6-27-18.pdf | ||
| Q&A_6-19-18.pdf | ||
| Plan_Request_Form_Clackamas.pdf | ||
| IFB_OR_Clackamas.pdf | ||
| PROJECT_DESCRIPTION_Clackamas.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
P
M
D e c e m b e r
U
S C c m y fi le s p w p r o d u c ti o n d o r a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 DOT 224(1) OR
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle y w
H s a m a k c al
C g r e b n eo hc
NO SCALE NO SCALE
kr o
F .N
R d k e erC eeB
R d keerC drofdeB
F N nrubkc olliH
S d
R d
R
SITE 1
MP 31.73
SITE 2
VICINITY MAPS
MP 33.0
MP 44.94
MP 45.82
LENGTH 1.27 MILES LENGTH 0.88 MILES
N
N
F
N d R r e n ni k
S
S
F N5
F N t r o s e R s a m a k c al C reviR
.0 m i to
T h r e e L y n x , O
R
A.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c .d g n
OR DOT 224(1)
F e b r u a r y
K
H A
R R I S
O N
K
S M I T
H
C h e c k e d b y
D e s ig n e d b y
NATIONAL FOREST
MT HOOD
ri o vr es e
R kr oF h tr oN s a m ak c al
C re vi
R
RV Park
Clackamas River
BEGIN SITE 1
NATIONAL FOREST
MT HOOD
END SITE 1
BEGIN SITE 2
END SITE 2
Lake
Small Fry
Park Marina
Promontory
Camp Ground
Park
Promontory
Clackamas River
N. Fork keerC xnyL eerhT
Three Lynx keerC reeD k e er
C t a
C
.d R e ni l e pi
P kee rC e lp pi r
C y w H s a m a k c al C
FN
F N k eerC el a h
W
R iv e r sa m a kc al C
Campground
Indian Henry
River Trailhead
Clackamas
Surprise Lake
5.00 m i to Estacada, O
R
.8 m i to E stacad a, O R
.0 m i to R ip p le b r o o k
O R
Gravel staging area
493+23 to 497+45
Paved staging area
444+12 to 451+52
Gravel staging area
1179+25 to 1183+20
Sheet and Description
Section C Section D Section E Section F Section G Section H
Typical Section Plan & Plan Erosion Control Safety Features Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 740 60 800
A0140 20302-1200 REMOVAL OF GUARDRAIL LNFT 5,875 25 5,900
A0160 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 400 20 420
A0180 30206-0500 ROADWAY AGGREGATE, SHOULDER
FINISHING LNFT 9,330 470 9,800
A0200 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 5,555 175 5,730
A0220 41201-0000 TACK COAT TON 23 23
A0240 41301-1000 ASPHALT PAVEMENT MILLING,
4-INCH DEPTH SQYD 19,316 584 19,900
A0260 41402-2000 CRACKS, CLEANING AND SEALING MILE 0.9 0.9
A0280 41501-0000 PAVING GEOTEXTILE SQYD 97 3 100
A0300 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A WOOD POSTS LNFT 5,912 25 5,937
A0320 61702-0000 TERMINAL SECTION (ENERGY
ABSORBING) EACH 1 1
A0340 61702-0000 TERMINAL SECTION (ANCHOR) EACH 1 1
A0360 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 30 30
A0380 62201-0700 BACKHOE LOADER, 1 CUBIC YARD
MINIMUM CAPACITY FRONTEND
BUCKET, 10 CUBIC FOOT MINIMUM
CAPACITY BACKHOE BUCKET, 90
HP MINIMUM FLYWHEEL HOUR 30 30
A0400 62301-0000 GENERAL LABOR HOUR 30 30
A0420 63309-0000 DELINEATOR EACH 70 6 76
A0440 63313-0000 RUMBLE STRIP LNFT 11,318 182 11,500
A0460 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 45,272 728 46,000
A0480 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 37,988 512 38,500
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
-A pr -2
:3
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 or
-2
_E ng in ee rs
Es tim at e.
xl sx
]S he et
STATE PROJECT
B.1DOT 224(1)OR
SHEET
NUMBER
Sheet and Description
Section C Section D Section E Section F Section G Section H
Typical Section Plan & Plan Erosion Control Safety Features Temporary Traffic Control
Permanent Traffic Control ALLOWANCE Bid
Schedule
A0500 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN (YELLOW) LNFT 6,440 80 6,520
A0520 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 100 100
A0540 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 135 135
A0560 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 300 300
A0580 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 600 600
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
6- A pr
-2
:4
PM
c:
\m yf ile s\ pw _p ro du ct io n\ d0
Su m m ar y of
Q ua nt iti es
TW
xl sx
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2DOT 224(1)OR
SHEET
NUMBER
Variable
Existing Slope Variable
Existing Slope
Match existing Match existing concrete pavement
2" asphalt
TYPICAL SECTION
width varies
M a in li n e s h o u ld a r
Variable
Existing Slope Variable
Existing Slope
Match existing Match existing
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r c a .d g n
A p r il
STATE PROJECT
NUMBER
SHEET
C.1 OR DOT 224(1)
C h e c k e d b y
D e s ig n e d b y
K
S M I T
H K
H A
R R I S
O N
493+23 to 497+45 RT
NOTE:
Existing pavement
Construction Limits
LC
Traveled Way
12'
Traveled Way
12'
434+09 to 500+62
1137+08 to 1183+73
NO SCALE
Tack coat (on existing pavement)
FOOTNOTE:
4-INCH MILL AND ASPHALT OVERLAY
SITE 1
2-INCH ASPHALT OVERLAY
SITE 2
Turnout
TURNOUT SECTION
2'' compacted depth
Roadway aggregate, method 1
See safety edge detail (this sheet)
SAFETY EDGE DETAIL
2'' asphalt overlay
Existing asphalt
Shoulder finishing in accordance with
Section 302
Existing superelevated and widened sections are not shown.1.
10-28" Existing base course
6" Existing pavement
See F Sheets for guardrail details
LC4' Shldr
Traveled Way
12'
Traveled Way
12'
Mill existing pavement 4" Tack coat (on existing pavement and between lifts)
[1]
4" Asphalt concrete pavement placed in two equal lifts
Limits of Milling and Paving
5' Shldr
1'
1'
Mill existing pavement 1' outside of traveled way[1]
1179+25 to 1183+20 LT
CONNECTION DETAILS
TRANSITION AND
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r c b .d g n
OR DOT 224(1)
A p r il
C h e c k e d b y
D e s ig n e d b y
Existing pavement not acceptable
Mill edge Sawcut and seal as shown Nominal depth
EDGE DETAIL
NO SCALE
Asphalt concrete pavement, type 1
2-inch compacted depth 200' Taper
Transitional milling
2-INCH ASPHALT OVERLAY SECTION
PAVEMENT TRANSITION
See Edge Detail (this sheet) pavement
Existing
See edge detail
4-INCH MILL AND ASPHALT OVERLAY
PAVEMENT CONNECTION
Asphalt pavement milling
4-inch compacted depth
Asphalt concrete pavement, type 1
4-inch depth
Seal crack with hot applied crack sealant
CRACK SEALING
SHOULDER STABILIZATION
CRACK SEALING AND
Edge of traveled way
4.
3.
2.
1.
See SCR 714.01(b) for paving geotextile crack width.
See Subsection 414.06 for minimum to ensure adhesion to existing surface.
Force crack repair material into cracks recommendations for sealing cracks.
Section 414. Follow manufacturer's
Prepare cracks for sealing according to
C.3
STATE PROJECT
NUMBER
SHEET
D e fa u lt m y fi le s p w p r o d u c ti o n d o r c c .d g n
OR DOT 224(1)
A p r il
C h e c k e d b y
D e s ig n e d b y
6'' min.6'' min.
NOTES:
flush with the existing surface
Ensure all remaining overband is
NO SCALE
See Note 3
Less than 1" with existing surface
Strike off material flush
FOOTNOTE:
468+32 to 469+47 RT side only
459+36 to 459+96 RT side only
SHOULDER STABILIZATION
Compacted depth placed in two lifts
Asphalt concrete pavement 4-inch
Existing pavement
5'
Paving geotextile
6'' min in all directions or to the edge of pavement construction.
and should be field verified by the CO before
Shoulder stabilization locations are approximate way to edge of pavement.
Paving geotextile measures from traveled
1.
N
LC Clackamas Highway
Begin asphalt concrete pavement, type 1
Begin asphalt pavement milling, 4-inch depth
434+09
NO SCALE
SITE 1 - MP 31.73 TO MP 32.45
PLAN AND PLAN
2.
Boat Ramp
24" CMP - DO NOT DISTURB
440+43
24" CMP - DO NOT DISTURB
438+32
24" CMP - DO NOT DISTURB
443+60
24" CMP - DO NOT DISTURB
447+29
24" CMP - DO NOT DISTURB
466+83
For details see F Sheets
Install terminal section (energy absorbing)
433+46 to 433+96 RT
Remove existing guardrail
433+56 to 493+23 RT
Type 2, class A, wood posts, for details see F Sheets
Install guardrail system MGS, 433+96 to 493+08
Remove existing guardrail
433+56 to 493+23 RT
Type 2, class A, wood posts, for details see F Sheets
Install guardrail system MGS, 433+96 to 493+08
D.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fa .d g n
OR OR DOT 224(1)
A p r il
K
H A
R R I S
O
C h e c k e d b y
D e s ig n e d b y K
S M I T
H
BEGIN PROJECT
NOTE:
Clackamas River
Clackamas River
32.00
M.P.
Adjust as necessary to fit field conditions.
and proposed features are not based on precise survey data.
The horizontal alignment and the location of the existing
LC Clackamas Highway ty p ty p
E=560212
N=5007015
24" CMP - DO NOT DISTURB
450+46
24" CMP - DO NOT DISTURB
454+68
30" CMP - DO NOT DISTURB
457+32
24" CMP - DO NOT DISTURB
464+72
T y p
T y p
Stationing is in reference to ODOT road log and is approximate.
433+46
HIGHWAY 224 MP 31.73
OR DOT 224(1)
UTILITY CONTACT
Michael.Ansbergs@pgn.com
503-736-5715
Portland General Electric
Michael Ansbergs, Manager, T & D Project Engineering
ELECTRIC
DoddT@cuaccess.net
503-630-8923 dba Reliance Connects
Cascade Utilities, Inc.
Tim Dodd, OSP Engineering Manager
TELEPHONE
Paved turnout - DO NOT DISTURB
444+12 to 451+52
NO SCALE
D.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fb .d g n
OR OR DOT 224(1)
p r il
K
H A
R R I S
O N
K
S M I T
H
C h e c k e d b y
D e s ig n e d b y
SITE 1 - MP 32.45 TO MP 33.00
PLAN AND PLAN
Clackamas River
SUSPEND PROJECT
NOTE:
Adjust as necessary to fit field conditions.
and proposed features are not based on precise survey data.
The horizontal alignment and the location of the existing 1.
33.00
M.P.
Clackamas River ty p ty p
Clackamas HighwayLC
(t y p .)1
(t yp .)12
E=560955
N=5005425 gravel pullout
Roadway aggregate, method 1, 493+23 to 497+45
2.Stationing in reference to ODOT road log and is approximate.
24" CMP - DO NOT DISTURB
473+69
18" TMR - DO NOT DISTURB
476+86
30" CMP - DO NOT DISTURB
477+39
24" CMP - DO NOT DISTURB
483+20
24" CMP - DO NOT DISTURB
485+32
24" CMP - DO NOT DISTURB
489+00
24" CMP - DO NOT DISTURB
493+76
24" CMP - DO NOT DISTURB
497+45
Remove existing guardrail
433+56 to 493+23 RT
For details see F Sheets
Type 2, class A, wood posts
Install guardrail system MGS, 433+96 to 493+08 RT
For details see F Sheets
Install terminal section (anchor)
493+08 to 493+21
For details see F Sheets type 2, class A, wood posts
Install guardrail system MGS, 433+96 to 493+08 RT
Remove existing guardrail
433+56 to 493+23 RT
End asphalt concrete pavement, type 1
End asphalt pavement milling, 4-inch depth
500+62
500+62
HIGHWAY 224 MP 33.00
OR DOT 224(1)
SITE 2 - MP 44.94 TO MP 45.39
PLAN AND PLAN
2.
1.
D.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fc .d g n
OR DOT 224(1)
p r il
C h e c k e d b y
D e s ig n e d b y
Clackamas Highway ty p ty p
RESUME PROJECT
E=572517
N=4997285
Clackamas HighwayLC ty p ty p
LC
Adjust as necessary to fit field conditions.
and proposed features are not based on precise survey data.
The horizontal alignment and the location of the existing
NOTE:
45.00
M.P.
Stationing is in reference to ODOT road log and is approximate.
1137+08
HIGHWAY 224 MP 44.94
OR DOT 224(1)
Cl ac ka m as R ive r
C la c k a m a s R iv e r
2-inch depth, type 1
Begin asphalt concrete pavement, 1137+08
N D
S T
O N
E R
D
E=572721
N=4996295
N N
SITE 2 - MP 45.39 TO MP 45.82
PLAN AND PLAN
D.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fd .d g n
OR OR DOT 224(1)
p r il
K
H A
R R I S
O N
K
S M I T
H
C h e c k e d b y
D e s ig n e d b y
2.
1.
Method 1, gravel pullout
Roadway aggregate, 1179+25 to 1183+20
Clackamas Highway
(t y p .)1
(t y p .)1 ty p ty p
Clackamas Highway
End asphalt concrete pavement, type 1
1183+73
See connection to approach road detail
END PROJECT
Clackam as River
LC
LC
Clackamas River
Existing pavement, approach road
Saw cut vertical
E d g e o f
H W
Y
CONNECTION TO APPROACH ROAD
50' Taper
Transitional Milling
Adjust as necessary to fit field conditions.
and proposed features are not based on precise survey data.
The horizontal alignment and the location of the existing
NOTE:
Stationing is in reference to ODOT road log and is approximate.
1183+73
HIGHWAY 224 MP 45.82
OR DOT 224(1)
QUANTITIES
EROSION CONTROL
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r d a .d g n
OR DOT 224(1)
p r il
C h e c k e d b y
D e s ig n e d b
NO SCALE
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 224(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d m s
W .d g n
J u ly
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
SAFETY FEATURES
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r fa .d g n
OR DOT 224(1)
A p r il
C h e c k e d b y
D e s ig n e d b
MEDIAN BARRIER PARTS
GUARDRAIL AND METAL
METAL MEDIAN BARRIER
TYPE 1, 2A, 3 OR
METAL MEDIAN BARRIER
TYPE 2A, 3 OR
WOOD POSTS
" dia. hole 4
" dia. hole 4
(typ.)
Bolt, washer & nut
" dia. holes 4
Post
B lo c k
GUARDRAIL POST TABLE
TYPE
GUARDRAIL
WOOD
POST SIZE
STEEL WOOD
POST LENGTH
STEEL*
a
" 2 may be used. See ODOT's QPL.
5. Wood blocks shown. Blocks of an approved alternate material be on left, right, or both sides of web.
4. Steel posts are shifted to accomodate bolt holes. Holes may
3. Post and block dimensions are nominal.
installation.
2. Posts and blocks to be pre-drilled for the intended guardrail not shown.
1. See appropriate guardrail standard drawing(s) for details
Metal median barrier
2A
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r fb .d g n
OR DOT 224(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
8" x 8"
8" x 8"
6" x 8" or 8" x 8"
6" x 8" or 8" x 8"
W6 x 9 or W6 x 8.5
W6 x 9 or W6 x 8.5
W6 x 9 or W6 x 8.5
6' 6"
6'-0"
6'-0"
6'-0"
6'-6"
6'-6"
6'-6" or 6'-0" through top of block nail ea. side galvanized flat head
Toenail with 1 - 16d
8"
8"
(See Note 5) to match post
8"x 8" or 6"x 8"
Wood block
(Pre-drilled)
" dia. holes4
Alternate
Effective Date: December 1, 2017, May 31,2018 - RD405
Effective Date: June 1, 2018, November 30,2018 - RD415
H HH
f
MEDIAN BARRIER PARTS
GUARDRAIL AND METAL
(INCHES)
L
11 (min.)8
(min.)4
4 (min.)
4 (min.)
4 (min.)
(INCHES)
THREAD LENGTH
nominal (before galvanized)
Base metal thickness 0.135"
OR DOT 224(1) F.3
STATE PROJECT
NUMBER
SHEET
p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fc .d g n
C h e c k e d b y
D e s ig n e d b y
"4
"32
"16
"4
"16 ty p
55° (typ.)
55° (typ.)
Tol. ( -0, +
Splice bolt slots
(8 reqd. each end)
"4
"4
2"
2'-6"
2"
4"
4"
3"
"4
"4
1" dia. holes hole dia.
" 4 element of BeamLC
Post bolt slots
Spacing as required
ELEVATION OF RAIL ELEMENT
galvanized)
0.105" nom. (Before
Base metal thickness.
3" ±
Neutral axis
25.5°
TERMINAL CONNECTOR
RAIL ELEMENT
SECTION THRU
"2 12 "8
SLOT
POST BOLT
SLOT
SPLICE BOLT
"2
Base metal thickness
0.105" nom. (Before galvanized) a p p r o x
C
C
"2
"4
Splice bolt slots
(4 required)
3" min.
24" ± 1"
" R
" R64
(typ " R
(typ.)
" R 8
TYPE B END PIECE
GENERAL NOTES FOR ALL DETAILS:
NOTE:
2.
1.
SECTION C-C
be 12'-6".
Effective length of rail sections shall
Identification Plate", (see detail right).
industry standard. Install "Radius use rail elements pre-curved to
150' or less (5' min. radius)
For guardrail installed on radii of
5.
4.
3.
2.
1.
4"
2"
"8
" Steel plate4
"16
"2
(min.)
plate Steel
3"
1" " hole Slotted
"32
"16
L
45° (typ.)
"16
"4 11 "16
ALTERNATIVE NO. 2
ALTERNATIVE NO. 1
SPLICE BOLT AND NUT
POST OR
"4
1"
10"
5"
"8 m in
1 g r o u t p a d
Height as required to be vertical.
W6 x 9 Steel post etc.
of box culvert, Concrete top
(4 required) and washer
Leveling nut
BASE PLATE DETAILS
post installation)
(Use when depth of cover is less than normal for
(For additional details, see Standard Drg. BR266) bonded anchor
" Bolt or resin4
(place as shown)
Slotted holes
"5 14- 1" x 1
Base plate
"8 510" x 6" x
7"
"4
" (min.)4 31 " (min.)4
Splice bolt slot plate
" Steel4
Rail element
Post
Plate (See detail)
Radius Identification
PLATE
IDENTIFICATION
RADIUS
(See detail) connector
Terminal as required
Trim post
R11"
18" "4
ALTERNATE 1
ALTERNATE 2
slot in rail member
Splice bolt
ELEVATION
element
Rail
R plate
" Steel16
PLATE MOUNTING DETAIL
IDENTIFICATION
RADIUS
TYPE C END PIECE
(For details not shown, See Type B End Piece)
(See General Note 5)(See General Note 4)
Slots as required
SNOW LOAD
(optional)
PLAIN RECTANGULAR
as directed by the Engineer
In area of heavy snow, Use on back of post on Type C End Piece
Use on rail element face
NOTE:
"8
W6 x 9 Steel post
"8
Use rectangular washer under bolt head and nut on Type C End Piece as shown.
Not required if "Snow Load" washer option is used.
of core and install using approved resin bonding system.
6" (min.) penetration into concrete slabs other than bridge decks. Cast-in-place
Furnished & installed by structure contractor when shown on structure plans.
LC
slot bolt
Splice
Post bolt slots
"2 1" x 24 a p p r o x
" R8
S y m m e tr ic a l a b o u t
" Ø hole16
"4
" Ø hole4
Base plate
"8 510" x 6" x
(Traffic side)
RAIL MEMBERS
lowest splice bolt nearest the P.C. of guardrail radius.
The guardrail "Radius Identification Plate" is to be mounted on the back of the rail element with the
" (max.) width. Plate shall be galvanized after placement of digits.4 3" (min.) height and 2
1be 1 bead replacing the letters "HHH", shown on the "Radius Indentification Plate" detail. Digits shall
Radius dimensions, in feet to the nearest 0.5 foot, shall be placed on the plate with a raised weld
All indicated welds shall attain the full strength of the section welded.
as called for on plans.
For details of guardrail connections to structural handrails, see special details or standard drawings
See appropriate guardrail Standard Drawing(s) for details not shown.
APPURTENANCES
WASHERS
both sides recess one or
" deep16 11" X heavy hex bolt
" - 11 mod.8
" slots (typ.)8 1" x 132 use with alternate Type C end piece.
25.5" Bend and hole required only for
OR DOT 224(1) F.4
STATE PROJECT
NUMBER
SHEET
p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fc c .d g n
C h e c k e d b y
D e s ig n e d b y
TRAFFIC DELINEATORS
REFLECTOR PATTERN TABLE
HORIZONTAL CURVES
Type
Color
And Target Or Post
Color Of Reflector
Reflectors
Number Of
On Backside
And Target Or Post
Color Of Reflector
On Backside
Reflectors
Number Of
Pattern
Standard
"W-2B"
"W-1B"
"R-1"
"B-3"
"B-2"
"B-1"
"Y-2"
"Y-1"
"W-2"
"W-1"
White
White
Red
Blue
Blue
Blue
Yellow
Yellow
White
White
White
White
NOT
APP
LI
CABLE
NOT
APP
LI
CABLE
Pattern
Backside
54 & Higher
35 - 53
23 - 34
17 - 22
12 - 16
9 - 11
7 - 8
Lower Than 1
IN ADVANCE OF & BEYOND CURVE
CURVE
ON
CURVE
OF
DEGREE
IN FEET
OF ROADWAY
EACH SIDE
SPACING
MAXIMUM MAXIMUM SPACING EACH SIDE OF ROADWAY IN FEET
SPACE
FIRST
SPACE
SECOND
SPACE
THIRD
TANGENT
Effective Date: June 1, 2018, November 30,2018 - TM570
GENERAL NOTES:
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
Place required number in sequence from top of target.
and 4 posts and Type 5 barrier mounts.
Acrylic prismatic reflectors acceptable on Type 1, 1 U, 2 unless otherwise shown.)
" x 4" reflective sheeting is an acceptable alternate 2 1 ( 3
3" x 4" reflective sheeting unless otherwise shown.
REFLECTORS:
target.
For "B-3" reflector pattern, top target shall overlap bottom
" dia. aluminum blind rivets and washers.16 3 with
Aluminum sheet, nominal thickness .050". Fasten to post
TARGET:
and details.
See Standard Drawing TM571 for steel post dimensions
Type 1 U, 1.12 lb/ft.
Galv. steel, nominal weight Type 1, 2 lb/ft, POST:
channelized intersections, lane reductions, emergency escape ramps and freeway crossovers.)
for spacing, layout, and reflective pattern of delineators at interchange ramps, ( Install "W-1" reflective pattern unless otherwise noted. See Standard Drawings TM575 thru TM577
(Min. spacing 20 feet)
Drg. No. TM571, TM575, TM576, and/or TM577 as specified.
To be accompanied by
Pattern.
Refer to TM 222 for bracket assembly details for Backside Reflector and ramps, or on radius sections.
Backside Delineators on one-way sections of roadway, freeways and "W-2B" respectively, on Type 1 steel posts. Do not install
Delineators are specified, substitute "W-1" and "W-2" with "W-1B" where use of snow poles is not justified. When Backside
Backside Delineators may be used in frequently snow plowed areas operations.
Offset delineators an additional 4' in areas of heavy snow removal traffic.
Install all delineators with reflectors facing adjacent oncoming for Type 4 Delineators.
the rail and shall be located adjacent to guard rail posts as shown
At guard rail locations the delineators are to be installed behind
On horizontal curves place delineators nearly opposite each other.
tend to hamper maintenance operations.
standards where ditches are narrow and where delineators in cut section, particularly on roads constructed to older
Judgement should be exercised in the installation of delineators must be exceeded.
(b) eliminate said post if limit of variation of spacing shown, or;
(a) vary placement of that post up to 25% at ramps and at intersections, either:
To clear driveways, crossroads etc., or for required adjustments etc. exist.
be used except where situations such as sharp horizontal curves, On roads with less than 500 vehicle ADT, delineators are not to
Spacing shall be measured along the shoulder.
2"
4"
4"
1"
2"
4"
4"
1" line
Ground line
Ground detail See installation detail See installation
3"- 4" diameter3"- 4" wide sheeting
Reflective cylindrical post wrapping around sheeting bands
4" Wide reflective
"16 13 "16
12TARGET
TYPE - 2 TYPE - 3
TYPE - 1 TYPE - 1U
FLEXIBLE PLASTIC POSTS
4"
1"
4"
2"
"4
(8 required)
" Ø Holes4
"2
"2
"16
"4
"4
"4
"4
"4 pattern, install 2nd target For "B-3" reflector
STEEL POSTS
INSTALLATION DETAIL
Ground line roadway section dependent on
Variation and anchorage system upon make of post used posts, variable dependent
Metal posts, 2' plastic
8' (max.)
2' (norm.)
as directed o r f a c e o f c u r b
E d g e o f s h ld r
T y p e
U m in T y p e V a r ia b le
TYPE - 5
CONCRETE BARRIER AREAS
unless otherwise noted in plans)
(Install barrier markers at 50' spacing
Concrete barrier color of the adjacent edge line) reflective material shall be the
(color of barrier marker and
Retroreflective Barrier marker
TYPE - 4
GUARDRAIL AREAS (WITH WOOD POSTS)
ALTERNATE 2ALTERNATE 1
as shown for the Type 2 post
Install reflective sheeting as shown for the Type 1 post
Install reflective sheeting plastic post
Flexible
Wood post
Ground line Ground line
Wood post steel post detail)
(see
U-Flange post
NOTE "A":
deform circular section when tightening lag screws).
the diameter of the circular section. Do not compress or delineators. Lag screws shall be at least 2" longer than
(Use 2 lag screws, centered, for circular sectin plastic
" X 2") lag screws 4 1" Ø Holes & fasten with 4 (8
See NOTE "A"
DELINEATOR SPACING TABLE FOR TYPES 1, 1U, 2 AND 4
ASSEMBLY DETAILS
INITIAL INSTALLATION
TYPES 2A & 3
FITTINGS
FUTURE ADJUSTMENT OR FUTURE ADJUSTMENT
INITIAL INSTALLATION
ALTERNATE
(For Type 3 use double thickness (2) rail elements) removal only.
3. All post bolt threads to be set after assembly for wrench modified bolt detail, Std. Drg. RD415.
2. When steel posts are used see ''APPURTENANCES'' for
".2 1" to 4
1 the tightened nuts within limits of
1. When required by the plans, post bolts to extend beyond to top of post
2" top of block
(Pre-drilled)
" holes4 3Alt.
to top of post
2" top of block
(See Note 2)
F.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r fd .d g n
OR DOT 224(1)
p r il
C h e c k e d b y
D e s ig n e d b y
6' post
31'' GUARDRAIL DETAIL
NOTE:
RELATION OF PARTS
Ad ja ce nt tr af fic fl ow
M id-span
Rail element
(W beam shown, Thrie beam similar)
Rail splice at mid-span
Toenail with
1-16d galvanized nail each side through top of block
Block (Used on
Types 2A, 3 & 4)
Post
(Steel or wood)
Post3
Block
Post3
Edge of block or post
Back of post
Washer
Post bolt & nut
(At each post) Rail members 2
(where reqd.)(typ.)
Drainage curb, NO SCALE
Splice bolt & nut
(8 per splice)
(4 per end splice) of rail to top of rail (typ. all types). 1'' +/- tolerance.
3. Rail height measured from final paved surface at face
2. Lap guardrail in direction of adjacent traffic.
not shown.
1. See appropriate guardrail standard drawing(s) for details steeper than fill slope Variable slope but not fill slope
Variable
1:10 or flatter slope groundline at face of rail
Edge of pavement or terminal sections approach and departure
Widening required for
Subgrade shoulder.
Hinge point
8'' block
'' 2'
6' POST, 8'' BLOCK
TYPICAL GUARDRAIL CROSS SECTION
shown on Typical Section Aggregate base or as
GUARDRAIL TERMINALS
GRADING FOR
TEST LEVEL
1 ( ≤ 30 mph)
2 (≤ 45 mph)
3 ( > 45 mph)
X (ft) W (ft)
10 1
22 1
1 or 235
NOTE:
1. E=2', where shown on plans.
PERFERRED GRADING
ALTERNATIVE GRADING
F.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r fe .d g n
OR DOT 224(1)
p r il
C h e c k e d b y
D e s ig n e d b y
NO SCALE
Effective Date: June 1, 2018, November 30, 2018 - RD419
See project plans for details not shown.
See appropriate guardrail standard drawings(s) for details not shown.
Grading for test level 3 terminal shown. See table for test levels 1 and 2.
3.
2.
1.
GENERAL NOTES FOR ALL DETAILS:
m in
E
W
E
Normal edge of paved shoulder repat 1:
01 gnida rg dened iw fo egd
E gnidarg denediw fo egdE gnidarg denediw fo egdE m in
Guardrail Terminal length varies
17'
Widened grading (length varies)
X n e e d p o in t
L e n g th o f w id e n in g
B e g in g r a d e
10'
Adjacent traffic flow
Adjacent traffic flow repat 1:
01 gnida rg dened iw fo egd
E gnidarg denediw fo egdE gnidarg denediw fo egdE n e e d p o in t
L e n g th o f w id e n in g
B e g in g r a d e
Guardrail Terminal length varies
23'
Widened grading (length varies)
X
7'
E m in
E
W
(see project plans)
Depth varies
(Slope varies, 2% normal)
Finish grade
E d g e o f s u b g r a d e
(see project plans)
Shoulder width varies o f s h ld r
N o r m a l e d g e
F a c e o f r a il
(Slope varies, 2% normal)
Finish grade
(see project plans)
Shoulder width varies Face of rail
E d g e o f s u b g r a d e
1:3 max. (See Note 4) plans)
(see project
1:3 max. (See Note 4)
(see project plans)
Depth varies
(See Note 9)
(see tables)
*** See Note 3
TEST LEVEL X (ft) W (ft) grading
Edge of widened
1 to 23 (> 45 mph)
1 (≤ 30 mph)
2 (≤ 45 mph)
"2 125'-9 1 ***
"2 138'-3
"2 150'-9
1 ***
A B
B
A
2.
1.
plans)
(see project
F.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r ff .d g n
OR DOT 224(1)
p r il
C h e c k e d b y
D e s ig n e d b y
(ENERGY ABSORBING)
TERMINAL SECTION
NO SCALE
NOTE:
SECTION A-A
SECTION B-B
face of posts shldr. to match
Edge of paved
(where reqd.)
Drainage curb
VariesE
(where reqd.)
Drainage curb face of posts shldr. to match
Edge of paved
Cross slope
WE
NOTE:
(min.)
2'
Variesguardrail teminals
See grading for
Cross slope paved shldr.
Edge of to match face of posts
Edge of paved shldr.
W
E
Normal edge of paved shldr.
(Shown)
ELEVATION
MSKT END TERMINAL
Terminal pay limit n e e d p o in t
L e n g th o f
50'
(See project plans)
Guardrail type & length
Guardrail pay limit
Ground strut on finish grade
ELEVATION
SOFTSTOP END TERMINAL
Ground strut on finish grade n e e d p o in t
L e n g th o f
(See project plans)
Guardrail type & length
Guardrail pay limit Terminal pay limit
X (TL-3)
X (TL-2)
X (TL-1)
to normal edge of paved shldr.
Extend 10:1 taper
See Note 3
See Note 9
4" (max.)
4" (max.)
Finish grade grade
Finishas shown.
face of posts at terminal ends only, of guardrail. Modify alignment to match
Drainage curb alignment same as face
E=2', where shown on plans.
shop drawings to Engineer.
manufacturer's recommendations (post count varies). Provide
Provide terminal from ODOT's QPL. Install according to
1:4 slope or flatter preferable, 1:3 (max.)
ensuring that the end piece is entirely off normal shldr.
Non-flared terminal shall be installed with a (min.) 1-foot offset is required.
widened shldr. to the face of posts on both ends of guardrail runs shall be provided with a terminal flared or non-flared. Paving of
On two way two lane highways, both ends of guardrail runs shown.
See appropriate guardrail standard drawing(s) for details not
5.
4.
3.
2.
1.
See project plans for details not shown.
If required, maximum grade break at normal edge of shoulder 8%.
If required, maximum shoulder slope 10% for guardrail widening.
Cross slope to match adjacent roadway cross slope (preferred).
See Std. Drg. RD701 for drainage curbs, where required.
exclusive of end piece.
"W" distance is measured to face of guardrail at end post, 4-feet or less.
Install fixed object marker on head of every terminal with "W"
10.
9.
8.
7.
6.
PLAN
MSKT END TERMINAL
Effective Date: June 1, 2017, November 30, 2017 - RD420 thickness
( Where shown on plans )
(For details not shown, see Type 1 Anchor)
Effective Date: June 1, 2017, November 30, 2017 - RD450
(ANCHOR)
TERMINAL SECTION
F.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r fg .d g n
OR DOT 224(1)
A p r il
C h e c k e d b y
D e s ig n e d b y
ELEVATION
PLAN
TYPE 1
6'-3" of run (see plans)
Beginning or end
Type C end piece of bolt on end post only to be used under head
Rectangular washer
Detail ''A''
Steel tubeSoil plate
Detail "B" Detail "B"Soil plate
" dia. hole8 trim to fit steel tube if reqd.
Wood breakaway posts, 6" x 8" S4S
Cable assemblyBracket
Block
Rail element Soil plate
ANCHORS (Steel ) ( Where shown on plans )
ELEVATION
TYPE 1 MODIFIED
PLAN
Soil plate
Cable assembly
Bracket
Block
Rail element
6'-3"
Detail "A"
Detail "B"
Soil plate Steel tube
TOP VIEW
grade
Finish
8"
1" 6"
8"
CABLE ASSEMBLY
6'-6" entire length Threaded
"16 112 "4
"8 3 "8 and studs (Same both ends)
Standard swaged fittings
NOTE:
DETAIL ''A'' DETAIL ''B'' SOIL PLATE
BEARING PLATEEND VIEW END VIEW BACK VIEW
FRONT VIEW SIDE VIEW
BRACKET
Alternate No. 2Alternate No. 1
" Steel plate4
24"
6" 9"9'
"16
"8
"5
4"
8" unless otherwise noted.
" thick steel,4 1All plate for bracket to be
NOTE:
slots (Optional) 8 reqd.
x 1"16 11 Holes or 16
16"
2" 4" 4" 4' 2"
" Plate2 nut (Type 1) 1" Hex.
rail member
Corrugated weld full penetration
Bend to fit or
"2
"4
"2
1"
1" "8
"8
Ground line
6"
" Tube thkn.16
Steel tube post(s) breakaway
Bottom of wood
Soil plate
Steel tube head nail each corner galvanized flat
Toenail with 1 - 16dT
Bearing plate
Steel tube
Finish grade
STEEL TUBE
SIDE VIEW
1" Ø 7" Stud to be swage connected
" Ø (6 x 19) Cable4
"Ø bolts (3)8
" Ø Hole16
Bolts (2)
" Ø8
Bolt
" Ø8 on rail side (8 reqd.)
nut with washer machine bolt and
" hex headed8
" plate8 5welded to
Plate tack
" x 1" x 8"16
" O.D.)8 3only (2 pipe, end post
2" Std. steel tube and post
Hole through
" Ø4
Washer
"8 12" x
3. See Std. Drg. RD451 for wood breakaway posts.
not shown.
2. See appropriate guardrail standard drawing(s) for details as required to be done 30 days following initial installation.
(b.) Final tension check and tightening of cable assembly initial installation.
1. (a.) Cable assembly to be tightened to a taut condition on
" Ø hole8 1with 1
" Plate8 58" x 8" x
" Ø bolts (3)8
" Ø bolts (3)8
" bolts8
Holes for
" Ø4
" Ø Holes4
" Ø16 hole (Type 1)
" Ø16
ELEVATION
ANCHOR (Steel)
31" GUARDRAIL
"2 13'- 1 "2
13'- 1 6'-3"
" Tube16 on plans)
(Where shown
Type B end piece if required trim to fit steel tube, Wood breakaway post, 6" x 8" S4S
DEPTH
EMBEDMENT
Case 1
Case 2
DEPTH (B)
DRILLING
MATERIAL (A)
OVERLYING
TYPE
HOLE
POST EMBEDMENT DIMENSIONS
NO SCALE
IN ROCK
GUARDRAIL INSTALLATION
24'' TO 42''
30'' TO 42''
42'' >30'' 42'' - A
12''
24''
>18'' TO 30''
0 TO 18''
F.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d fh .d g n
OR DOT 224(1)
A p r il
C h e c k e d b y
D e s ig n e d b y
Overlying material Overlying material backfill
Crushed coarse aggregate backfill
Crushed coarse aggregate
PLAN VIEW
ELEVATION
Case 1: Overlying material
ELEVATION
Case 2: Overlying material
PLAN VIEW
Rock material aggregate backfill
Crushed coarse
Rock material aggregate backfill
Crushed coarse
Finished grade
B A
E m b e d m e n t
D e p th
Finished grade
B A
E m b e d m e n t
D e p th
Wood Post Wood Post the base metal with two coats of zinc-oxide paint.
Treat field cut galvanized steel post surfaces that expose requirements in Section 617.
Place crushed coarse aggregate according to the post underdrain pipe with geotextile" in Section 703.
Crushed coarse aggregate backfill conforms to "granular backfill for oblong hole configuration for Case 1 conditions.
Unless otherwise specified use either the circular or the
4.
3.
2.
1.
NOTE:
between drilled holes
Excavate area
TRAFFIC CONTROL
TEMPORARY
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r n a .d g n
OR DOT 224(1)
a r c h
C h e c k e d b y
D e s ig n e d b
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 224(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r g b .d g n
O c to b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
C
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
DO
NOT
PASS
DO
NOT
PASS
DO
NOT
PASS
PASS
WITH
CARE
PASS
WITH
CARE
PASS
WITH
CARE
NO
PASSING
ZONE
NO
PASSING
ZONE
NO
PASSING
ZONE
635-3
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
FOR UNMARKED PAVEMENTS
DELINEATION AND SIGNING
STATE PROJECT
NUMBER
SHEET
G.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 224(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d m s S td
.d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
On curves with radius less than 500', reduce cycle length to 20'.
temporary traffic control zones greater than 3 miles long.
Repeat W8-12 after each major intersection and every 2 miles for
Repeat R4-1 at 1 mile intervals.
500'
500'
500'
500'
500' cycle length
40'
500' cycle length
40' cycle length
40'
NOTE:
Traffic flow
Traffic flow
W8-12
Traffic flow
Traffic flow
Traffic flow
Traffic flow
W8-12
W8-12
W8-12
W8-12
W8-12
Use permanent markings plan to determine no passing zones for each direction of travel.
W14-3
(optional)
W14-3
(optional)
W14-3
(optional) See Note 2
See Note 2
See Note 2
R4-1
R4-1
R4-1R4-2
See Note 6
R4-2
See Note 6
R4-2
See Note 6
1.
2.
3.
4.
5.
6. Use the "PASS WITH CARE" (R4-2) sign at the downstream end of a no-passing zone only if a "DO NOT PASS" (R4-1) sign has been installed at the upstream end of the zone.
vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
Passing AllowedNo Passing ZonePassing Allowed
DETAIL B
No Passing zone one direction
Two-way traffic
DETAIL C
No Passing zone both directions
Two-way traffic
DETAIL A
Passing zone both directions
Two-way traffic
The pavement on two- or three-lane roads may remain unmarked up to 14 days when providing signs according to this standard.
Optionally use the vehicle positioning guides to provide additional delineation.
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
STATE PROJECT
NUMBER
SHEET
G.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 224(1)OR
B o r d e r .U
S c m y fi le s p w p r o d u c ti o n d F L
H C e ll s .d g n li b
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
NOTE:
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
50' - 100' 50' - 100' (optional)
See Note 6
10' min.
limit or 85 percentile speed prior
Shoulder taper formula:
Where:
L =
L =
Minimum length of taper
* Approach speed based on the regulatory posted speed, not the advisory speed.
**Lengthen taper as needed to provide minimum of three channelizing devices in taper at required spacing.
L =
W =
S =
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
WS
WS²
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
MINIMUM TAPER LENGTH**
BUFFER SPACE
LENGTH
Expressway / Freeway
SHOULDER
WORK
xx
MPH
635-10
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
for S ≤ 40 MPH for S ≥ 45 MPH
Width of offset in feet
Numerical value of posted speed to work in miles per hour
FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
SHOULDER CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 224(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r n e .d g n e c e m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
NOTE:
See Note 2
10' min.
W21-5W20-1
See Note 3
G20-2
See Note 3
W20-1
See Note 3
G20-2
See Note 3
(See Length and
Spacing Table)
(optional) TERMINATION AREA
W13-1P
(optional)
1.
2.
3.
4.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For project specific minimum width, refer to Special
Contract Requirements, Section 156.
If shoulder closure is completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-1) and "END
ROAD WORK" (G20-2) signs.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
Channelizing devices
W
A Device spacing
AVARIABLE WORK SPACEBUFFER SPACETAPER AREAAB
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
NO SCALE
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 224(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r n f.
d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 - 1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
TRAFFIC CONTROL
PERMANENT
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r p a .d g n
OR DOT 224(1)
p r il
C h e c k e d b y
D e s ig n e d b
E=560236
N=5007004
434+09
HIGHWAY 224 MP 31.74
BEGIN PAVEMENT MARKINGS
N
NOTE:
1.
N
Adjust as necessary to fit field conditions.
and proposed features are not based on precise survey data.
The horizontal alignment and the location of the existing
NO SCALE
H.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r p b .d g n
OR OR DOT 224(1)
p r il
K
H A
R R I S
O N
K
S M I T
H
C h e c k e d b y
D e s ig n e d b y
2.
Boat Ramp
SITE 1 - MP 31.74 TO MP 32.45
PAVEMENT MARKINGS
4'' width (typ.)
Broken yellow and solid yellow, Pavement Markings, type B, Station 434+09 to 439+37
Solid white, 4" width (typ.)
Pavement Markings, type B, Station 434+09 to 500+62
Double solid yellow, 4'' width (typ.)
Pavement Markings, type B, Station 448+87 to 462+08
Solid white, 4" width (typ.)
Pavement Markings, type B, Station 434+09 to 500+62
Broken yellow and solid yellow, 4'' width (typ.)
Pavement Markings, type B, Station 462+08 to 469+47
Broken yellow, 4'' width (typ.)
Pavement Markings, type B, Station 469+47 to 471+58
Solid yellow, 4'' width (typ.)
Broken yellow and
Pavement Markings, type B, Station 471+58 to 479+50
Rumble strip (typ.)
Rumble strip (typ.)
Clackamas River
Clackamas River
32.00
M.P.
Solid yellow, 4'' width (typ.)
Broken yellow and
Pavement Markings, type B, Station 441+48 to 448+87
Broken yellow, 4'' width (typ.)
Pavement Markings, type B, Station 439+37 to 441+48
Paved turnout
444+12 to 451+52
Stationing is in reference to ODOT road log and is approximate.
NO SCALE
2.
H.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r p c .d g n
OR OR DOT 224(1)
p r il
C h e c k e d b y
D e s ig n e d b y
SITE 1 - MP 32.45 TO MP 33.00
PAVEMENT MARKINGS
4'' width (typ.)
Broken yellow and solid yellow, Pavement Markings, type B, Station 471+58 to 479+50
Solid double yellow, 4''…