This document is a Statement of Special Inspections for the Patrick County Business Development Center project located at 132/136 Slusher St. in Stuart, VA. It outlines the special inspection requirements and procedures to be followed during construction in accordance with the International Building Code and Virginia Uniform Statewide Building Code. The special inspections will be conducted by approved special inspection agents, including AECOM, to verify compliance with the contract documents. The special inspections cover key areas such as foundation bearing capacity, soil material, controlled fill placement, and concrete reinforcement. The special inspector will maintain detailed records, submit periodic reports, and provide a final report documenting the completion of required special inspections and correction of any discrepancies noted.

The document also specifies the responsibilities of the contractor to cooperate with the special inspections, provide access, and correct any deficiencies identified. The special inspection program does not relieve the contractor of their responsibility to comply with the contract documents or to implement an effective quality control program. The owner will directly employ and pay for the special inspection services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submitted to Patrick County Submitted by AECOM Technical Services, Inc.

Patrick County Business Development Center Final Specifications

JANUARY 17, 2023

Patrick County Business Center 60691532

TABLE OF CONTENTS 000000 - 1

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

000107 SEALS PAGE

00107A SEALS

000115 LIST OF DRAWING SHEETS

000115A LIST OF DRAWINGS

003126 EXISTING HAZARDOUS MATERIAL INFORMATION

DIVISION 01 – GENERAL REQUIREMENTS

011000 SUMMARY

012200 UNIT PRICES

012500 SUSTITUTION PROCEDURES

013100 PROJECT MANAGEMENT AND COORDINATION

013516 ALTERATION PROJECT PROCEDURES

014000 QUALITY REQUIREMENTS

014100 SPECIAL INSPECTIONS

014100A STATEMENT OF SPECIAL INSPECTIONS

014100B SCHEDULE OF SPECIAL INSPECTIONS

017300 EXECUTION

017823 OPERATION AND MAINTENANCE DATA

DIVISION 02 – EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION

DIVISION 03 – CONCRETE

031000 CONCRETE FORMING AND ACCESSORIES

032000 CONCRETE REINFORCING

033000 CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

Patrick County Business Center 60691532

TABLE OF CONTENTS 000000 - 2

040120.64 MASONRY REPOINTING

042200 CONCRETE UNIT MASONRY

DIVISION 05 – METALS

051200 STRUCTURAL STEEL FRAMING

053100 STEEL DECKING

055213 PIPE AND TUBE RAILINGS

055313 BAR GRATINGS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

078400 FIRESTOPPING

DIVISION 09 – FINISHES

099113 EXTERIOR PAINTING

099123 INTERIOR PAINTING

DIVISION 10 – SPECIALTIES

104413 FIRE PROTECTION CABINETS

104416 FIRE EXTINGUISHERS

Patrick County Business Center 60691532

SEALS PAGE 000107 - 1

DOCUMENT 000107 - SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

A. Architect:

1. Daniel DiMarco

2. 401013190

3. Responsible for all Division Sections except where indicated as prepared by other design professionals of record.

B. Structural Engineer:

1. David Reynolds

2. 047908

3. Responsible for Divisions 3, 4 and 5.

END OF DOCUMENT 000107

Patrick County Business Center 60691532

SEALS PAGE 000107 - 1

Architectural Only

All Division Sections except where indicated as prepared by other design professionals of record

Structural Only

Divisions 3, 4 and 5

Patrick County Business Center 60691532

LIST OF DRAWING SHEETS 000115 - 1

DOCUMENT 000115 - LIST OF DRAWING SHEETS

1.1 LIST OF DRAWINGS

A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of Contents page of the separately bound drawing set titled Patrick County Business Development Center Project, dated 17 January 2023, as modified by subsequent Addenda and Contract modifications.

B. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:

1. See attached List of Drawings following this document.

END OF DOCUMENT 000115

SHEET NUMBER SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 ABBREVIATIONS

G-003 GENERAL SYMBOLOGY

LIFE SAFETY

GI001.2 LIFE SAFETY CODE AND BUILDING ANALYSIS

GI101 FIRST FLOOR LIFE SAFETY PLAN

GI102 SECOND FLOOR LIFE SAFETY PLAN

STRUCTURAL

S-001 GENERAL NOTES

S-101 FOUNDATION PLAN - COMPOSITE

S-101A FOUNDATION PLAN AREA A

S-101B FOUNDATION PLAN AREA B

S-102 SECOND FLOOR FRAMING PLAN - COMPOSITE

S-102A SECOND FLOOR FRAMING PLAN AREA A

S-102B SECOND FLOOR FRAMING PLAN AREA B

S-103 ROOF FRAMING PLAN - COMPOSITE

S-103A ROOF FRAMING PLAN - AREA A

S-103B ROOF FRAMING PLAN B

S-301 SECTIONS & DETAILS

S-302 SECTIONS & DETAILS

S-501 TYPICAL DETAILS

ARCHITECTURE

AD001 GENERAL DEMOLITION NOTES AND LEGEND

AD101 DEMOLITION PLANS - COMPOSITE

AD101A LOWER LEVEL - DEMOLITION PLAN - AREA A

AD101B LOWER LEVEL - DEMOLITION PLAN - AREA B

AD102A UPPER LEVEL - DEMOLITION PLAN - AREA A

AD102B UPPER LEVEL - DEMOLITION PLAN - AREA B

AD152 UPPER LEVEL - DEMOLITION CEILING PLAN

A-001 GENERAL NOTES AND LEGENDS

A-101 LOWER LEVEL - NEW WORK PLAN - COMPOSITE

A-101A LOWER LEVEL - NEW WORK PLAN - AREA A

A-101B LOWER LEVEL - NEW WORK PLAN - AREA B

A-102 UPPER LEVEL - NEW WORK PLAN - COMPOSITE

A-102A UPPER LEVEL - NEW WORK PLAN - AREA A

A-102B UPPER LEVEL - NEW WORK PLAN - AREA B

A-103 ROOF PLAN

A-151 LOWER LEVEL - REFLECTED CEILING PLAN

A-152 UPPER LEVEL - REFLECTED CEILING PLAN

A-201 EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS

A-401 ENLARGED PARTIAL PLANS

A-411 LOWER LEVEL INTERIOR ELEVATIONS

A-412 UPPER LEVEL INTERIOR ELEVATIONS

A-511 SECTION DETAILS

A-521 CEILING DETAILS

A-551 STAIR SECTION AND RAMP DETAILS - LOWER LEVEL

A-552 STAIR SECTION AND RAMP DETAILS - UPPER LEVEL

A-553 EXTERIOR STAIRCASE

A-601 PARTITION TYPES

A-611 DOOR SCHEDULE & DETAILS

A-615 DOOR DETAILS

A-621 WINDOW DETAILS

A-701 LOWER LEVEL - CASEWORK DETAILS

A-702 UPPER LEVEL - CASEWORK DETAILS

A-710 ARCHITECTURAL SPECIFICATIONS

LIST OF DRAWINGS

000115 LIST OF DRAWINGS ATTACHMENT

INTERIORS

IN101 INTERIOR FINISH PLAN - COMPOSITE

IN104 UPPER LEVEL - INTERIOR FINISH PLAN - AREA A

IN105 UPPER LEVEL - INTERIOR FINISH PLAN - AREA B

IN601 LOWER LEVEL INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE

IN602 UPPER LEVEL INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE

IF101 FURNITURE PLAN - COMPOSITE

IF102 LOWER LEVEL - FURNITURE PLAN AREA A

IF103 LOWER LEVEL - FURNITURE PLAN AREA B

IF104 UPPER LEVEL - FURNITURE PLAN AREA A

IF105 UPPER LEVEL - FURNITURE PLAN AREA B

IF601 LOWER LEVEL - FURNITURE SCHEDULE

IF602 UPPER LEVEL - FURNITURE SCHEDULE

IF603 UPPER LEVEL - FURNITURE SCHEDULE CONT.

FIRE PROTECTION

FA001.2 FIRE ALARM GENERAL NOTES & LEGEND

FA101 FIRST FLOOR FIRE ALARM PLAN

FA102 SECOND FLOOR FIRE ALARM PLAN

FA501 FIRE ALARM DETAILS

FA701 FIRE ALARM SPECIFICATIONS

PLUMBING

P-001 LEGEND AND GENERAL NOTES

PU100 UNDERGROUND PLAN

P-101 LOWER LEVEL PLAN

P-002 LOWER LEVEL WASTE PLAN

P-102 UPPER LEVEL PLAN

P-501 DETAILS

P-601 SCHEDULES AND SPECIFICATIONS

P-901 SUPPLY RISER DIAGRAM

P-902 WASTE RISER DIAGRAM

MECHANICAL

M-001 MECHANICAL LEGEND AND GENERAL NOTES

MH-101 LOWER LEVEL DUCTWORK PLAN

M-102 UPPER LEVEL HVAC PLAN

M-103 ROOF HVAC PLAN

MP-101 LOWER LEVEL PIPING PLAN

M-301 SECTIONS

M-501 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

M-702 MECHANICAL CONTROLS

M-703 MECHANICAL CONTROLS

ELECTRICAL

E-001 ELECTRICAL ABBREVIATION AND LEGEND

E-002 ELECTRICAL SPECIFICATIONS

EL101A LOWER LEVEL LIGHTING PLAN - AREA A

EL101B LOWER LEVEL LIGHTING PLAN - AREA B

EL102A UPPER LEVEL LIGHTING PLAN - AREA A

EL102B UPPER LEVEL LIGHTING PLAN - AREA B

EP101A LOWER LEVEL POWER PLAN - AREA A

EP101B LOWER LEVEL POWER PLAN - AREA B

EP102A UPPER LEVEL POWER PLAN - AREA A

EP102B UPPER LEVEL POWER PLAN - AREA B

EP103 ROOF POWER PLAN - OVERALL

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-601 ELECTRICAL ONE-LINE DIAGRAMS

E-701 ELECTRICAL PANEL SCHEDULES

E-702 ELECTRICAL PANEL SCHEDULES

000115 LIST OF DRAWINGS ATTACHMENT

Patrick County Business Center 60691532

EXISTING HAZARDOUS MATERIAL INFORMATION 003126 - 1

DOCUMENT 003126 - EXISTING HAZARDOUS MATERIAL INFORMATION

1.1 EXISTING HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. An existing hazardous materials report for Project has been developed and can be obtained from Patrick County representative.

C. Related Requirements:

1. Section 024119 "Selective Structure Demolition" for notification requirements if materials suspected of containing hazardous materials are encountered.

END OF DOCUMENT 003126

Patrick County Business Center 60691532

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Phased construction.

4. Work under Owner's separate contracts.

5. Owner-furnished/Contractor-installed (OFCI) products.

6. Contractor's use of site and premises.

7. Coordination with occupants.

8. Work restrictions.

9. Specification and Drawing conventions.

1.2 PROJECT INFORMATION

A. Project Identification: Patrick County Business Center

1. Project Location:

a. Patrick County Business Development Center

b. 132/ 136 Slusher St.

c. Stuart, VA. 24171

B. Owner: Patrick County

1. Owner's Representative: Sean T. Adkins, MPA, sadkins@co.patrick.va.us, O: (276) 694- 8367, C: (276) 692-4490.

C. Architect: AECOM, 10 S. Jefferson St. Suite 1600, Roanoke, VA 24011: phone (540) 857- 3100.

1. Architect’s Construction Representative: Kyle Dobbins; phone (540) 857-3225.

2. AECOM’s Project Manager: Daniel DiMarco; phone (540) 521-4811

D. Contractor: TBD

E. Retain "Construction Manager" Paragraph below if Owner has engaged a construction manager.

F. Web-Based Project Software: Project software provided by General Contractor will be used for purposes of managing communication and documents during the construction stage.

mailto:sadkins@co.patrick.va.us

Patrick County Business Center 60691532

SUMMARY 011000 - 2

1. See Section 013100 "Project Management and Coordination." for requirements for using web-based Project software.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

The Work of Project is defined by the Contract Documents and consists of the following:

A. Type of Contract:

1. Project will be constructed under a single prime contract.

1.4 OWNER-FURNISHED/CONTRACTOR-INSTALLED (OFCI) PRODUCTS

A. Owner's Responsibilities: Owner will furnish products indicated and perform the following, as applicable:

1. Provide to Contractor Owner-reviewed Product Data, Shop Drawings, and Samples.

2. Provide for delivery of Owner-furnished products to Project site.

3. Upon delivery, inspect, with Contractor present, delivered items.

a. If Owner-furnished products are damaged, defective, or missing, arrange for replacement.

4. Obtain manufacturer's inspections, service, and warranties.

5. Inform Contractor of earliest available delivery date for Owner-furnished products.

B. Contractor's Responsibilities: The Work includes the following, as applicable:

1. Designate delivery dates of Owner-furnished products in Contractor's construction schedule, utilizing Owner-furnished earliest available delivery dates.

2. Review Owner-reviewed Product Data, Shop Drawings, and Samples, noting discrepancies and other issues in providing for Owner-furnished products in the Work.

3. Receive, unload, handle, store, protect, and install Owner-furnished products.

4. Make building services connections for Owner-furnished products.

5. Protect Owner-furnished products from damage during storage, handling, and installation and prior to Substantial Completion.

6. Repair or replace Owner-furnished products damaged following receipt.

C. Owner-Furnished/Contractor-Installed (OFCI) Products:

1. See Medical Equipment Plans for OFCI and all other equipment to be installed in the new Clinic. Coordinate Patrick County’s Material Management equipment list and requirements with utility rough-ins and wall blocking.

1.5 CONTRACTOR'S USE OF SITE AND PREMISES

A. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

Patrick County Business Center 60691532

SUMMARY 011000 - 3

B. Limits on Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits on Use of Site: Confine construction operations to area designated by Mall owner.

2. Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times.

Do not use these areas for parking or for storage of materials.

C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.6 COORDINATION WITH OCCUPANTS

A. Existing hospital operation as: Patrick County will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Patrick County during construction operations to minimize conflicts and facilitate Owner usage.

Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.

1.7 WORK RESTRICTIONS

A. Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

2. Contractor shall provide key locks for the project area for after hours and weekends.

Contractor shall provide Owner’s maintenance and security with three (3) sets of keys for access if required

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Patrick County or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Architect, and Patrick County not less than two days in advance of proposed utility interruptions.

2. Obtain Patrick County’s written permission before proceeding with utility interruptions.

D. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Patrick County’s occupancy with Patrick County.

Patrick County Business Center 60691532

SUMMARY 011000 - 4

1. Notify Patrick County not less than two days in advance of proposed disruptive operations.

2. Obtain Owner's written permission before proceeding with disruptive operations.

E. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances within the existing building, on Project site, or on Patrick County’s property is not permitted.

F. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.

G. Employee Screening: Comply with Patrick County's requirements for drug and background screening of Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Patrick County's representative.

1.8 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.

3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.

4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 00 Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.

C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

D. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations scheduled on drawings.

Patrick County Business Center 60691532

SUMMARY 011000 - 5

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

UNIT PRICES 012200 - 1

SECTION 012200 - UNIT PRICES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1.2 DEFINITIONS

A. Unit price is an amount incorporated into the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.3 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

A. Unit Price No. 1: Masonry Repointing.

1. Description: Repointing of existing brick and concrete masonry joints, as required, in accordance with Section 040120.64 "Masonry Repointing"

UNIT PRICES 012200 - 2

2. Unit of Measurement: 200 square feet of masonry wall to be repointed.

END OF SECTION 012200

Patrick County Business Center 60691532

SUBSTITUTION PROCEDURES 012500 - 1

SECTION 012500 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

1.2 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner.

1.3 ACTION SUBMITTALS

A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. Both AECOM and Patrick County to approve all Substitution Requests.

1. Substitution Request Form: Use CSI form 13.1A.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section.

Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable or requested.

Patrick County Business Center 60691532

SUBSTITUTION PROCEDURES 012500 - 2

g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

i. Research reports evidencing compliance with building code in effect for Project.

j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Architect's/Owner’s Action: If necessary, Architect or Owner will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Owner will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's Supplemental Instructions for minor changes in the Work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.

1.4 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.5 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.6 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

Patrick County Business Center 60691532

SUBSTITUTION PROCEDURES 012500 - 3

1. Conditions: Architect or Owner will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Substitution request is fully documented and properly submitted.

c. Requested substitution will not adversely affect Contractor's construction schedule.

d. Requested substitution has received necessary approvals of authorities having jurisdiction.

e. Requested substitution is compatible with other portions of the Work.

f. Requested substitution has been coordinated with other portions of the Work.

g. Requested substitution provides specified warranty.

h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Not allowed.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 012500

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. General coordination procedures.

2. Coordination drawings.

3. RFIs.

4. Digital project management procedures.

5. Project meetings.

B. Related Requirements:

1. Section 017300 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

1.2 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

1.3 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 2

B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

1.4 COORDINATION DRAWINGS

A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, and additionally where installation is not completely indicated on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements.

Provide alternative sketches to Architect indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.

3. Review: Architect will review coordination drawings to confirm that, in general, the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If Architect determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, Architect will so inform Contractor, who shall make suitable modifications and resubmit.

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 3

1.5 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Architect will return without response those RFIs submitted to Architect by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Owner name.

2. Owner's Project number.

3. Name of Architect.

4. Architect's Project number.

5. Date.

6. Name of Contractor.

7. RFI number, numbered sequentially.

8. RFI subject.

9. Specification Section number and title and related paragraphs, as appropriate.

10. Drawing number and detail references, as appropriate.

11. Field dimensions and conditions, as appropriate.

12. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

13. Contractor's signature.

14. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Architect.

D. Architect's Action: Architect will review each RFI, determine action required, and respond.

Allow three days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 4

2. Architect's action may include a request for additional information, in which case Architect's time for response will date from time of receipt by Architect of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal.

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Architect and Owner in writing within five days of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log weekly. Use software log that is part of web-based Project management software.

Include the following Software log with not less than the following:

1. Project name.

2. Name and address of Contractor.

3. Name and address of Architect.

4. RFI number including RFIs that were returned without action or withdrawn.

5. RFI description.

6. Date the RFI was submitted.

7. Date Architect's response was received.

F. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Architect within three days if Contractor disagrees with response.

1.6 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Use of Architect's Digital Data Files: Digital data files of Architect's CAD drawings will be provided by Architect for Contractor's use during construction.

1. Digital data files may be used by Contractor in preparing coordination drawings, Shop Drawings, and Project record Drawings.

2. Architect makes no representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings.

3. Digital Drawing Software Program: Contract Drawings are available in Autocade 2020.

4. Contractor shall execute a data licensing agreement in the form of Agreement form acceptable to Architect.

a. Subcontractors, and other parties granted access by Contractor to Architect's digital data files shall execute a data licensing agreement in the form of Agreement acceptable to Owner and Architect.

5. The following digital data files will be furnished for each appropriate discipline:

a. Floor plans.

b. Reflected ceiling plans.

B. Web-Based Project Management Software Package: Provide, administer, and use web-based Project management software package for purposes of hosting and managing Project communication and documentation until Final Completion.

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 5

1. Web-based Project management software includes, at a minimum, the following features:

a. Compilation of Project data, including Contractor, subcontractors, Architect, architect's consultants, Owner, and other entities involved in Project. Include names of individuals and contact information.

b. Access control for each entity for each workflow process, to determine entity's digital rights to create, modify, view, and print documents.

c. Document workflow planning, allowing customization of workflow between project entities.

d. Creation, logging, tracking, and notification for Project communications required in other Specification Sections, including, but not limited to, RFIs, submittals, Minor Changes in the Work, Construction Change Directives, and Change Orders.

e. Track status of each Project communication in real time, and log time and date when responses are provided.

f. Procedures for handling PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.

g. Processing and tracking of payment applications.

h. Processing and tracking of contract modifications.

i. Creating and distributing meeting minutes.

j. Document management for Drawings, Specifications, and coordination drawings, including revision control.

k. Management of construction progress photographs.

l. Mobile device compatibility, including smartphones and tablets.

2. Provide up to seven web-based Project management software user licenses for use of Owner Architect, and Architect's consultants. Provide eight hours of software training at Architect's office for web-based Project software users.

3. At completion of Project, provide digital archive in format that is readable by common desktop software applications in format acceptable to Architect. Provide data in locked format to prevent further changes.

C. PDF Document Preparation: Where PDFs are required to be submitted to Architect, prepare as follows:

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

3. Certifications: Where digitally submitted certificates and certifications are required, provide a digital signature with digital certificate on where indicated.

1.7 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences via Web-based teleconferencing, unless otherwise indicated.

B. Preconstruction Conference: Schedule and conduct a preconstruction conference before starting construction via Web-based teleconferencing, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement.

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 6

1. Attendees: Authorized representatives of Owner Architect, and their consultants;

Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Responsibilities and personnel assignments.

b. Tentative construction schedule.

c. Phasing.

d. Critical work sequencing and long lead items.

e. Designation of key personnel and their duties.

f. Lines of communications.

g. Use of web-based Project software.

h. Procedures for processing field decisions and Change Orders.

i. Procedures for RFIs.

j. Procedures for testing and inspecting.

k. Procedures for processing Applications for Payment.

l. Distribution of the Contract Documents.

m. Submittal procedures.

n. Sustainable design requirements.

o. Preparation of Record Documents.

p. Use of the premises and existing building.

q. Work restrictions.

r. Working hours.

s. Owner's occupancy requirements.

t. Responsibility for temporary facilities and controls.

u. Procedures for moisture and mold control.

v. Procedures for disruptions and shutdowns.

w. Construction waste management and recycling.

x. Parking availability.

y. Office, work, and storage areas.

z. Equipment deliveries and priorities.

aa. First aid.

bb. Security.

cc. Progress cleaning.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference via Web-based teleconference before each construction activity when required by other sections and when required for coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Architect and Owner's Commissioning Authority of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 7

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility requirements.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written instructions.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of authorities having jurisdiction.

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

x. Protection of adjacent work.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct progress meetings via Web-based teleconference, at biweekly intervals.

1. Coordinate dates of meetings with preparation of payment requests.

2. Attendees: In addition to representatives of Owner, Owner's Commissioning Authority and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to

Patrick County Business Center 60691532

PROJECT MANAGEMENT AND COORDINATION 013100 - 8

do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Status of submittals.

4) Status of sustainable design documentation.

5) Deliveries.

6) Off-site fabrication.

7) Access.

8) Site use.

9) Temporary facilities and controls.

10) Progress cleaning.

11) Quality and work standards.

12) Status of correction of deficient items.

13) Field observations.

14) Status of RFIs.

15) Status of Proposal Requests.

16) Pending changes.

17) Status of Change Orders.

18) Pending claims and disputes.

19) Documentation of information for payment requests.

4. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013100

Patrick County Business Center 60691532

ALTERATION PROJECT PROCEDURES 013516 - 1

SECTION 013516 - ALTERATION PROJECT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes special procedures for alteration work.

1.2 DEFINITIONS

A. Alteration Work: This term includes remodeling, renovation, repair, and maintenance work performed within existing spaces or on existing surfaces as part of the Project.

B. Consolidate: To strengthen loose or deteriorated materials in place.

C. Design Reference Sample: A sample that represents the Architect's prebid selection of work to be matched; it may be existing work or work specially produced for the Project.

D. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.

E. Match: To blend with adjacent construction and manifest no apparent difference in material type, species, cut, form, detail, color, grain, texture, or finish; as approved by Architect.

F. Refinish: To remove existing finishes to base material and apply new finish to match original, or as otherwise indicated.

G. Repair: To correct damage and defects, retaining existing materials, features, and finishes. This includes patching, piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading materials.

H. Replace: To remove, duplicate, and reinstall entire item with new material. The original item is the pattern for creating duplicates unless otherwise indicated.

I. Replicate: To reproduce in exact detail, materials, and finish unless otherwise indicated.

J. Reproduce: To fabricate a new item, accurate in detail to the original, and from either the same or a similar material as the original, unless otherwise indicated.

K. Retain: To keep existing items that are not to be removed or dismantled.

L. Strip: To remove existing finish down to base material unless otherwise indicated.

1.3 INFORMATIONAL SUBMITTALS

A. Alteration Work Program: Submit 30 days before work begins.

Patrick County Business Center 60691532

ALTERATION PROJECT PROCEDURES 013516 - 2

B. Fire-Prevention Plan: Submit 30 days before work begins.

1.4 QUALITY ASSURANCE

A. Title X Requirement: Each firm conducting activities that disturb painted surfaces shall be a "Lead-Safe Certified Firm" according to 40 CFR 745, Subpart E, and use only workers that are trained in lead-safe work practices.

B. Alteration Work Program: Prepare a written plan for alteration work for whole Project, including each phase or process and protection of surrounding materials during operations.

Show compliance with indicated methods and procedures specified in this and other Sections.

Coordinate this whole-Project alteration work program with specific requirements of programs required in other alteration work Sections.

1. Dust and Noise Control: Include locations of proposed temporary dust- and noise-control partitions and means of egress from occupied areas coordinated with continuing on-site operations and other known work in progress.

2. Debris Hauling: Include plans clearly marked to show debris hauling routes, turning radii, and locations and details of temporary protective barriers.

C. Fire-Prevention Plan: Prepare a written plan for preventing fires during the Work, including placement of fire extinguishers, fire blankets, rag buckets, and other fire-control devices during each phase or process. Coordinate plan with Owner's fire-protection equipment and requirements. Include fire-watch personnel's training, duties, and authority to enforce fire safety.

D. Safety and Health Standard: Comply with ANSI/ASSE A10.6.

1.5 STORAGE AND HANDLING OF SALVAGED MATERIALS

A. Existing Materials to Remain: Protect construction indicated to remain against damage and soiling from construction work. Where permitted by Architect, items may be dismantled and taken to a suitable, protected storage location during construction work and reinstalled in their original locations after alteration and other construction work in the vicinity is complete.

PART 2 - PRODUCTS - (Not Used)

PART 3 - EXECUTION

3.1 PROTECTION

A. Protect persons, motor vehicles, surrounding surfaces of building, building site, plants, and surrounding buildings from harm resulting from alteration work.

1. Use only proven protection methods, appropriate to each area and surface being protected.

Patrick County Business Center 60691532

ALTERATION PROJECT PROCEDURES 013516 - 3

2. Provide temporary barricades, barriers, and directional signage to exclude the public from areas where alteration work is being performed.

3. Erect temporary barriers to form and maintain fire-egress routes.

4. Erect temporary protective covers over walkways and at points of pedestrian and vehicular entrance and exit that must remain in service during alteration work.

5. Contain dust and debris generated by alteration work, and prevent it from reaching the public or adjacent surfaces.

6. Provide shoring, bracing, and supports as necessary. Do not overload structural elements.

7. Protect floors and other surfaces along hauling routes from damage, wear, and staining.

8. Provide supplemental sound-control treatment to isolate demolition work from other areas of the building.

B. Temporary Protection of Materials to Remain:

1. Protect existing materials with temporary protections and construction. Do not remove existing materials unless otherwise indicated.

2. Do not attach temporary protection to existing surfaces except as indicated as part of the alteration work program.

C. Comply with each product manufacturer's written instructions for protections and precautions.

Protect against adverse effects of products and procedures on people and adjacent materials, components, and vegetation.

D. Utility and Communications Services:

1. Notify Owner, Architect, authorities having jurisdiction, and entities owning or controlling wires, conduits, pipes, and other services affected by alteration work before commencing operations.

2. Disconnect and cap pipes and services as required by authorities having jurisdiction, as required for alteration work.

3. Maintain existing services unless otherwise indicated; keep in service, and protect against damage during operations. Provide temporary services during interruptions to existing utilities.

E. Existing Drains: Prior to the start of work in an area, test drainage system to ensure that it is functioning properly. Notify Architect immediately of inadequate drainage or blockage. Do not begin work in an area until the drainage system is functioning properly.

1. Prevent solids such as adhesive or mortar residue or other debris from entering the drainage system. Clean out drains and drain lines that become sluggish or blocked by sand or other materials resulting from alteration work.

2. Protect drains from pollutants. Block drains or filter out sediments, allowing only clean water to pass.

F. Existing Roofing: Prior to the start of work in an area, install roofing protection in areas that will be affected by new work.

3.2 PROTECTION…