6-RFQ 2025037 - Eng Design CTH NN - Amendment 1 Traffic Info.pdf

PDF 1 MB Posted

Attached to
RFQ - Engineering/Design Services - CTH NN Signalized Intersections
Solicitation number
2025037
Issued by
Waukesha County, Minocqua CDP, Wisconsin

About this file

The documents detail a traffic signal synchronization project for County Highway NN (CTH NN) involving a 0.81-mile urban corridor with three signalized intersections. The project focuses on fiber optic connections between intersections at CTH NN & CTH EE and CTH NN & Fairwinds Boulevard, with proposed signal upgrades and coordination to improve traffic flow. The project is planned for implementation in 2024, with a posted speed limit of 35 miles per hour and an annual average daily traffic volume of 13,600 vehicles.

The project includes a comprehensive environmental impact analysis using the USDOT Equitable Transportation Community (ETC) Explorer tool, which assesses the corridor's environmental burden. The CMAQ Emission Calculator Tool estimates potential emission reductions from signal synchronization, projecting benefits such as increased average speeds (from 24 to 28 mph during peak hours), reduced travel times, and decreased emissions of pollutants like carbon monoxide, particulate matter, and nitrogen oxide. The environmental assessment for Census Tract 55133203901 shows a total population of 5,200 in the project area, with no disadvantaged census tracts identified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

= Proposed Signal Upgrade Location

= Existing Signal No Proposed Improvements but Intersection to be Connected with Fiber Optics)

* Fiber optics connection project to include retiming and coordination with current project signals.

= Proposed Fiber Optics Installation Limits

0.39mi 0.42mi

CTH NN & CTH EE CTH NN & Fairwinds Blvd

SPEED

LIMIT

WHEN

CHILDREN

ARE

PRESENT

SCHOOL

SPEED

LIMIT

SPEED

LIMIT

NN

EE

Evaluation Year 2024 Area Type Urban

Corridor Length 0.81 miles Number of Signalized Intersections 3

Number of Lanes (one direction) 1 Posted Speed Limit 35 miles per hour (1 - 75 MPH)

Average Cycle Length 90 seconds Truck Percentage 7%

Annual Average Daily Traffic (AADT) (both directions) 13,600 veh/day Peak-hour Volume (both directions) 1,210 veh/hr

Existing Corridor Travel Time 2 minutes Total peak hours per day (AM+PM) 4

PERFORMANCE

PEAK-HOUR OFF-PEAK

Volume (both directions) 1,210 438 veh/hr Existing Average Speed 24 24 mph

Travel Time Savings 16 13 min Proposed Average Speed 28 26 mph

Peak-hour Kilograms/day

Off-Peak Kilograms/day

Total Kilograms/day

0.975 1.169 2.144

0.012 0.011 0.022

0.056 0.048 0.104

0.204 0.192 0.396

0.059 0.054 0.113

138.027 125.797 263.824

139.018 126.733 265.751

1.815 1.653 3.469

Atmospheric Carbon Dioxide (CO2)

Total Energy Consumption (MMBTU)

Volatile Organic Compounds (VOC)

Carbon Dioxide Equivalent (CO2e)

Pollutant

Carbon Monoxide (CO) Particulate Matter <2.5 μm (PM2.5) Particulate Matter <10 μm (PM10)

Nitrogen Oxide (NOx)

Traffic Signal Synchronization This calculator will estimate the emission reductions resulting from synchronizing the traffic signals along a previously unsynchronized corridor.

INPUT

EMISSION REDUCTIONS

OUTPUT

CMAQ Emission Calculator Tool - CTH NN Corridor Signal Sync

CTH NN Corridor Project Census Tract 55133203901 Environmental Burden as of 06/25/2024

CTH NN Supporting Documents
CTH NN Corridor Map and Photos
CTH NN Signal Sync CMAQ Emissions Reductions

CTH NN-Mukwonago Environemental Burden

File details come from the government source that posted it. Updated .