Hazardous Material Study - Hillsboro School District Block 56 South Demolition Project
This document is a Hazardous Material Abatement Plan prepared by Apex Companies, LLC for the Hillsboro School District 1J, detailing environmental remediation requirements for four residential and commercial structures located in Hillsboro, Oregon (222 SE 5th Avenue, 233 SE 6th Avenue, and 527 Gumleal Lane). The plan comprises six floor and roof plan drawings that identify the locations and types of hazardous materials requiring abatement prior to demolition, including asbestos-containing materials, lead-based paint, and mercury-containing light tubes. The drawings indicate specific areas where asbestos-containing vinyl sheet flooring, drywall with joint compound, ceiling textures, and black woven insulated wire are present and must be removed. The abatement contractor is responsible for coordinating all soft demolition activities with the general contractor, field-verifying material locations and quantities, and complying with all applicable federal, state, and local regulations including OAR 437-Division 3, 29 CFR 1926.1101, and 40 CFR Part 763.
The specification section outlines comprehensive air monitoring requirements to be conducted by both the contractor's independent testing laboratory and the owner's retained environmental consultant throughout abatement activities. Air samples must be collected using 25-millimeter filters and analyzed within 12 hours using NIOSH Analytical Method No. 7400 with phase contrast microscopy at 400-500x magnification. The contractor must document all sampling activities with chain-of-custody records, equipment calibration data, and worker exposure information, with verbal notification to the environmental consultant within 18 hours and written reports within two weeks. The owner's industrial hygienist will collect additional area and exhaust samples with maximum allowable fiber counts of 0.01 f/cc, and the contractor must notify the Department of Environmental Quality of clearance results within 30 days of monitoring completion. Temporary utilities will be provided by the owner, and all contractors and subcontractors must comply with specifications referenced in Section 02 82 21 for asbestos, Section 02 83 19 for lead paint, and Section 02 84 16 for mercury-containing materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GARAGE
LIVING ROOM
KITCHEN
RESTROOM
ROOM
ROOM
ROOM
SHED
RESTROOM
Fi le na m e:
L :\P ro je ct s\
_D
VP
\H \H
IL
8\
\IH
\A ba te m en t D es ig n\ D
W G
\2
S E
5t h\
C
AD
\2
3_
_0
_H
A1 .d w g
La yo ut T ab : 1
1X
U se r:
Ja m es
B la nc o
C
AD
P lo t D at e/ Ti m e:
/1
8/
:5 8:
P
M
NOT TO SCALE
N O
R
EV
IS
IO
N D
A
TE
B Y
A
PP
D
FIRST FLOOR
H A
ZA
R
D O
U S
M A
TE
R
IA
L
A B
A
TE
M
EN
T
PL
A N
HIL
LS
BO
RO
SC
HO
OL
DI
ST
RIC
T -
BL
OC
K 5
6 S
OU
TH
SE
TH
A
VE
N U
E, H
IL
LS
B O
R O
, O R
EG
O
N
HA1
1 6
JAB
ED
JUNE 2026
26007393_0003_003
PREPARED FOR: HILLSBORO SCHOOL DISTRICT 1J
SHEET DRAWING NO:
SHEET OF
DRAWN BY
DATE:
CHECKED:
PROJECT NUMBER:
FULL SIZE SHEET FORMAT IS 24X36; IF PRINTED SIZE IS NOT 24X36, THEN THIS SHEET FORMAT HAS BEEN MODIFIED & INDICATED DRAWING SCALE IS NOT ACCURATE.
S C or be tt Av en ue
Po rtl an d, O R
3.
8.
A pe x Co m pa ni es
, L
LC
ap ex co s.
co m
1. THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED FOR
GENERAL MATERIAL AND ABATEMENT INFORMATION ONLY. REFER
TO THE ASSOCIATED PRE-DEMOLITION HAZARDOUS BUILDING
MATERIAL REPORT FOR ADDITIONAL ASBESTOS-CONTAINING
MATERIAL INFORMATION. CONTRACTOR TO PERFORM
ABATEMENT ACTIVITIES ACCORDING TO SPECIFICATIONS AND ALL
APPLICABLE REGULATIONS AS NECESSARY TO COMPLETE THE
WORK.
2. ABATEMENT CONTRACTOR SHALL COORDINATE THEIR WORK
WITH THE GENERAL CONTRACTOR INCLUDING, BUT NOT LIMITED
TO, SCHEDULING, PHASING, ACCESS, SECURITY, STAGING,
PROTECT AND SAVE ITEMS, SALVAGE, LOCKOUT/TAGOUT OF
UTILITIES AND DEMOLITION ACTIVITIES.
3. TEMPORARY UTILITIES WILL BE PROVIDED BY THE OWNER.
COORDINATE POWER AND WATER CONNECTIONS WITH THE
GENERAL CONTRACTOR.
4. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL LOCATIONS AND
QUANTITIES.
5. IF SUSPECT MATERIALS ARE ENCOUNTERED THAT ARE NOT
IDENTIFIED ON THIS DRAWING, TESTING IS RECOMMENDED PRIOR
TO IMPACT.
6. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON LESS THAN 1%
ASBESTOS MATERIALS ARE TO COMPLY WITH ALL APPLICABLE
REGULATIONS, AS SPECIFIED IN 02 82 21.
7. ALL PAINT, VARNISHES, AND SIMILAR COATINGS ARE CONSIDERED
TO BE LEAD-BASED PAINT.
8. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON PAINTED SURFACES
ARE TO COMPLY WITH ALL APPLICABLE LEAD PAINT REGULATION
IN OAR-437-DIVISION 3 1926.62 LEAD IN CONSTRUCTION INDUSTRY
STANDARDS, AND SPECIFIED IN 02 83 19.
9. MERCURY VAPOR TUBES SHOULD BE HANDLED, PACKAGED, AND
RECYCLED IN APPROPRIATE MANNER. HANDLE AND DISPOSAL OF
MERCURY CONTAINING FLUORESCENT LIGHT TUBES IN
ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL
REGULATIONS, AS SPECIFIED IN 02 84 16.
GENERAL NOTES
LEGEND
NON-ASBESTOS VINYL SHEET FLOOR ON
ASBESTOS-CONTAINING VINYL SHEET FLOORING ON
WOOD SUBFLOOR TO BE REMOVED.
1. LESS THAN 1% ASBESTOS DRYWALL AND ASSOCIATED JOINT
COMPOUND IS PRESENT THROUGHOUT.
2. ABATEMENT CONTRACTOR RESPONSIBLE FOR ALL SOFT
DEMOLITION REQUIRED TO ACCESS ASBESTOS MATERIALS TO BE
REMOVED.
3. PRESUMED ASBESTOS-CONTAINING BLACK WOVEN INSULATED
WIRE IS PRESENT THROUGHOUT CEILING AND WALL CAVITIES.
4. MERCURY-CONTAINING LIGHT TUBES ARE PRESENT
THROUGHOUT BOTH MAIN RESIDENCE AND ACCESSORY
STRUCTURES.
ABATEMENT NOTES
LO
SE
T
ROOM
ATTIC
STORAGE
C
LO
SE
T
ROOM
GARAGE LOFT
RESTROOM
na m e:
L :\P ro je ct s\
_D
VP
\H \H
IL
8\
\IH
\A ba te m en t D es ig n\ D
W G
\2
S E
5t h\
C
AD
\2
3_
_0
_H
A2 .d ut T ab : 1 r:
Ja m es
B la
P lo t D at e/ Ti m e:
/1
9/
:2 7:
A
M
NOT TO SCALE
N O
R
EV
IS
IO
N D
A
TE
B Y
A
PP
D
SECOND FLOOR
H A
ZA
R
D O
U S
M A
TE
R
IA
L
A B
A
TE
M
EN
T
PL
A N
HIL
LS
BO
RO
SC
HO
OL
DI
ST
RIC
T -
BL
OC
K 5
6 S
OU
TH
SE
TH
A
VE
N U
E, H
IL
LS
B O
R O
, O R
EG
O
N
HA2
2 6
JAB
ED
JUNE 2026
26007393_0003_003
PREPARED FOR: HILLSBORO SCHOOL DISTRICT 1J
SHEET DRAWING NO:
SHEET OF
DRAWN BY
DATE:
CHECKED:
PROJECT NUMBER:
FULL SIZE SHEET FORMAT IS 24X36; IF PRINTED SIZE IS NOT 24X36, THEN THIS SHEET FORMAT HAS BEEN MODIFIED & INDICATED DRAWING SCALE IS NOT ACCURATE.
S C or be tt Av en ue
Po rtl an d, O R
3.
8.
A pe x Co m pa ni es
, L
LC
ap ex co s.
co m
ASBESTOS-CONTAINING CEILING TEXTURE TO BE
REMOVED
ASBESTOS-CONTAINING CEILING TEXTURE UNDER
WOOD PANELING TO BE REMOVED
1. THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED FOR
GENERAL MATERIAL AND ABATEMENT INFORMATION ONLY. REFER
TO THE ASSOCIATED PRE-DEMOLITION HAZARDOUS BUILDING
MATERIAL REPORT FOR ADDITIONAL ASBESTOS-CONTAINING
MATERIAL INFORMATION.CONTRACTOR TO PERFORM ABATEMENT
ACTIVITIES ACCORDING TO SPECIFICATIONS AND ALL APPLICABLE
REGULATIONS AS NECESSARY TO COMPLETE THE WORK.
2. ABATEMENT CONTRACTOR SHALL COORDINATE THEIR WORK
WITH THE GENERAL CONTRACTOR INCLUDING, BUT NOT LIMITED
TO, SCHEDULING, PHASING, ACCESS, SECURITY, STAGING,
PROTECT AND SAVE ITEMS, SALVAGE, LOCKOUT/TAGOUT OF
UTILITIES AND DEMOLITION ACTIVITIES.
3. TEMPORARY UTILITIES WILL BE PROVIDED BY THE OWNER.
COORDINATE POWER AND WATER CONNECTIONS WITH THE
GENERAL CONTRACTOR.
4. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL LOCATIONS AND
QUANTITIES.
5. IF SUSPECT MATERIALS ARE ENCOUNTERED THAT ARE NOT
IDENTIFIED ON THIS DRAWING, TESTING IS RECOMMENDED PRIOR
TO IMPACT.
6. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON LESS THAN 1%
ASBESTOS MATERIALS ARE TO COMPLY WITH ALL APPLICABLE
REGULATIONS, AS SPECIFIED IN 02 82 21.
7. ALL PAINT, VARNISHES, AND SIMILAR COATINGS ARE CONSIDERED
TO BE LEAD-BASED PAINT.
8. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON PAINTED SURFACES
ARE TO COMPLY WITH ALL APPLICABLE LEAD PAINT REGULATION
IN OAR-437-DIVISION 3 1926.62 LEAD IN CONSTRUCTION INDUSTRY
STANDARDS, AND SPECIFIED IN 02 83 19.
9. MERCURY VAPOR TUBES SHOULD BE HANDLED, PACKAGED, AND
RECYCLED IN APPROPRIATE MANNER. HANDLE AND DISPOSAL OF
MERCURY CONTAINING FLUORESCENT LIGHT TUBES IN
ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL
REGULATIONS, AS SPECIFIED IN 02 84 16.
GENERAL NOTES
LEGEND
1. LESS THAN 1% ASBESTOS DRYWALL AND ASSOCIATED JOINT
COMPOUND IS PRESENT THROUGHOUT.
2. ABATEMENT CONTRACTOR RESPONSIBLE FOR ALL SOFT
DEMOLITION REQUIRED TO ACCESS ASBESTOS MATERIALS TO BE
REMOVED.
3. PRESUMED ASBESTOS-CONTAINING BLACK WOVEN INSULATED
WIRE IS PRESENT THROUGHOUT CEILING AND WALL CAVITIES.
4. MERCURY-CONTAINING LIGHT TUBES ARE PRESENT
THROUGHOUT BOTH MAIN RESIDENCE AND ACCESSORY
STRUCTURES.
ABATEMENT NOTES
NON-ASBESTOS VINYL SHEET FLOOR ON
ASBESTOS-CONTAINING VINYL SHEET FLOORING ON
WOOD SUBFLOOR TO BE REMOVED.
ROOM
GARAGE
RESTROOM
C
LO
SE
T
ROOM
ROOMROOM PORCH
FIREPLACE
na m e:
Eg ny te
D riv e\
PB
S_ L\
Pr oj ec ts
D
VP
\H
\H
IL
8\
\IH
\A ba te m en t D es ig n\
D W
G \2
S
E 6t h\ C
AD
\2
3_
_0
_H A3
.d ut
T ab
: 1 r:
Ja m es B la
P lo t D at e/
Ti m e:
/1 8/
:5
9:
P M
NOT TO SCALE
N O
R
EV
IS
IO
N D
A
TE
B Y
A
PP
DFIRST FLOOR
H A
ZA
R
D O
U S
M A
TE
R
IA
L
A B
A
TE
M
EN
T
PL
A N
HIL
LS
BO
RO
SC
HO
OL
DI
ST
RIC
T -
BL
OC
K 5
6 S
OU
TH
SE
TH
A
VE
N U
E, H
IL
LS
B O
R O
, O R
EG
O
N
HA3
3 6
JAB
ED
JUNE 2026
26007393_0003_002
PREPARED FOR: HILLSBORO SCHOOL DISTRICT 1J
SHEET DRAWING NO:
SHEET OF
DRAWN BY
DATE:
CHECKED:
PROJECT NUMBER:
FULL SIZE SHEET FORMAT IS 24X36; IF PRINTED SIZE IS NOT 24X36, THEN THIS SHEET FORMAT HAS BEEN MODIFIED & INDICATED DRAWING SCALE IS NOT ACCURATE.
S C or be tt Av en ue
Po rtl an d, O R
3.
8.
A pe x Co m pa ni es
, L
LC
ap ex co s.
co m
LEGEND
CARPET AND MASTIC ON ASBESTOS-CONTAINING VINYL
SHEET FLOOR ON WOOD SUBFLOOR TO BE REMOVED
ASBESTOS-CONTAINING CEILING TEXTURE ON PLASTER
TO BE REMOVED
1. THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED FOR
GENERAL MATERIAL AND ABATEMENT INFORMATION ONLY. REFER
TO THE ASSOCIATED PRE-DEMOLITION HAZARDOUS BUILDING
MATERIAL REPORT FOR ADDITIONAL ASBESTOS-CONTAINING
MATERIAL INFORMATION. CONTRACTOR TO PERFORM
ABATEMENT ACTIVITIES ACCORDING TO SPECIFICATIONS AND ALL
APPLICABLE REGULATIONS AS NECESSARY TO COMPLETE THE
WORK.
2. ABATEMENT CONTRACTOR SHALL COORDINATE THEIR WORK
WITH THE GENERAL CONTRACTOR INCLUDING, BUT NOT LIMITED
TO, SCHEDULING, PHASING, ACCESS, SECURITY, STAGING,
PROTECT AND SAVE ITEMS, SALVAGE, LOCKOUT/TAGOUT OF
UTILITIES AND DEMOLITION ACTIVITIES.
3. TEMPORARY UTILITIES WILL BE PROVIDED BY THE OWNER.
COORDINATE POWER AND WATER CONNECTIONS WITH THE
GENERAL CONTRACTOR.
4. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL LOCATIONS AND
QUANTITIES.
5. IF SUSPECT MATERIALS ARE ENCOUNTERED THAT ARE NOT
IDENTIFIED ON THIS DRAWING, TESTING IS RECOMMENDED PRIOR
TO IMPACT.
6. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON LESS THAN 1%
ASBESTOS MATERIALS ARE TO COMPLY WITH ALL APPLICABLE
REGULATIONS, AS SPECIFIED IN 02 82 21.
7. ALL PAINT, VARNISHES, AND SIMILAR COATINGS ARE CONSIDERED
TO BE LEAD-BASED PAINT.
8. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON PAINTED SURFACES
ARE TO COMPLY WITH ALL APPLICABLE LEAD PAINT REGULATION
IN OAR-437-DIVISION 3 1926.62 LEAD IN CONSTRUCTION INDUSTRY
STANDARDS, AND SPECIFIED IN 02 83 19.
GENERAL NOTES
1. ABATEMENT CONTRACTOR RESPONSIBLE FOR ALL SOFT
DEMOLITION REQUIRED TO ACCESS ASBESTOS MATERIALS TO BE
REMOVED.
2. PRESUMED ASBESTOS-CONTAINING BLACK WOVEN INSULATED
WIRE IS PRESENT THROUGHOUT CEILING AND WALL CAVITIES.
ABATEMENT NOTES
KEY NOTES
LESS THAN 1% ASBESTOS WALL TEXTURE ON NORTH WALL TO BE
REMOVED.
CLOSET
ST
O
R
AG
E
FIREPLACE
STORAGE
na m e:
Eg ny te
D riv e\
PB
S_ L\
Pr oj ec ts
D
VP
\H
\H
IL
8\
\IH
\A ba te m en t D es ig n\
D W
G \2
S
E 6t h\ C
AD
\2
3_
_0
_H A4
.d ut
T ab
: 1 r:
Ja m es B la
P lo t D at e/
Ti m e:
/1 8/
:0
0:
P M
NOT TO SCALE
N O
R
EV
IS
IO
N D
A
TE
B Y
A
PP
DSECOND FLOOR
H A
ZA
R
D O
U S
M A
TE
R
IA
L
A B
A
TE
M
EN
T
PL
A N
HIL
LS
BO
RO
SC
HO
OL
DI
ST
RIC
T -
BL
OC
K 5
6 S
OU
TH
SE
TH
A
VE
N U
E, H
IL
LS
B O
R O
, O R
EG
O
N
HA4
4 6
JAB
ED
JUNE 2026
26007393_0003_002
PREPARED FOR: HILLSBORO SCHOOL DISTRICT 1J
SHEET DRAWING NO:
SHEET OF
DRAWN BY
DATE:
CHECKED:
PROJECT NUMBER:
FULL SIZE SHEET FORMAT IS 24X36; IF PRINTED SIZE IS NOT 24X36, THEN THIS SHEET FORMAT HAS BEEN MODIFIED & INDICATED DRAWING SCALE IS NOT ACCURATE.
S C or be tt Av en ue
Po rtl an d, O R
3.
8.
A pe x Co m pa ni es
, L
LC
ap ex co s.
co m
1. THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED FOR
GENERAL MATERIAL AND ABATEMENT INFORMATION ONLY. REFER
TO THE ASSOCIATED PRE-DEMOLITION HAZARDOUS BUILDING
MATERIAL REPORT FOR ADDITIONAL ASBESTOS-CONTAINING
MATERIAL INFORMATION. CONTRACTOR TO PERFORM
ABATEMENT ACTIVITIES ACCORDING TO SPECIFICATIONS AND ALL
APPLICABLE REGULATIONS AS NECESSARY TO COMPLETE THE
WORK.
2. ABATEMENT CONTRACTOR SHALL COORDINATE THEIR WORK
WITH THE GENERAL CONTRACTOR INCLUDING, BUT NOT LIMITED
TO, SCHEDULING, PHASING, ACCESS, SECURITY, STAGING,
PROTECT AND SAVE ITEMS, SALVAGE, LOCKOUT/TAGOUT OF
UTILITIES AND DEMOLITION ACTIVITIES.
3. TEMPORARY UTILITIES WILL BE PROVIDED BY THE OWNER.
COORDINATE POWER AND WATER CONNECTIONS WITH THE
GENERAL CONTRACTOR.
4. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL LOCATIONS AND
QUANTITIES.
5. IF SUSPECT MATERIALS ARE ENCOUNTERED THAT ARE NOT
IDENTIFIED ON THIS DRAWING, TESTING IS RECOMMENDED PRIOR
TO IMPACT.
6. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON LESS THAN 1%
ASBESTOS MATERIALS ARE TO COMPLY WITH ALL APPLICABLE
REGULATIONS, AS SPECIFIED IN 02 82 21.
7. ALL PAINT, VARNISHES, AND SIMILAR COATINGS ARE CONSIDERED
TO BE LEAD-BASED PAINT.
8. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON PAINTED SURFACES
ARE TO COMPLY WITH ALL APPLICABLE LEAD PAINT REGULATION
IN OAR-437-DIVISION 3 1926.62 LEAD IN CONSTRUCTION INDUSTRY
STANDARDS, AND SPECIFIED IN 02 83 19.
GENERAL NOTES
1. ABATEMENT CONTRACTOR RESPONSIBLE FOR ALL SOFT
DEMOLITION REQUIRED TO ACCESS ASBESTOS MATERIALS TO BE
REMOVED.
2. PRESUMED ASBESTOS-CONTAINING BLACK WOVEN INSULATED
WIRE IS PRESENT THROUGHOUT CEILING AND WALL CAVITIES.
STAFF
REST
ROOM
STORAGE
WAITING
BUSINESS ROOM
STORAGE
EXAM
STAFF
REST
ROOM
REST
ROOM
ROOM
ROOMWAITING RECEPTION
na m e:
L :\P ro je ct s\
_D
VP
\H \H
IL
8\
\IH
\A ba te m en t D es ig n\ D
W G
\5
G um le af
L an e\ C
AD
\2
3_
_0
_H A5
.d ut
T ab
: 1 r:
Ja m es B la
P lo t D at e/
Ti m e:
/1 8/
:0
5:
P M
NOT TO SCALE
N O
R
EV
IS
IO
N D
A
TE
B Y
A
PP
D
FIRST FLOOR H
A
ZA
R
D O
U S
M A
TE
R
IA
L
A B
A
TE
M
EN
T
PL
A N
HIL
LS
BO
RO
SC
HO
OL
DI
ST
RIC
T -
BL
OC
K 5
6 S
OU
TH
G
U M
LE
A
F
LA
N E, H
IL
LS
B
O R
O , O
R
EG
O N
HA5
5 6
JAB
ED
JUNE 2026
26007393_0003_003
PREPARED FOR: HISSBORO SCHOOL DISTRICT 1J
SHEET DRAWING NO:
SHEET OF
DRAWN BY
DATE:
CHECKED:
PROJECT NUMBER:
FULL SIZE SHEET FORMAT IS 24X36; IF PRINTED SIZE IS NOT 24X36, THEN THIS SHEET FORMAT HAS BEEN MODIFIED & INDICATED DRAWING SCALE IS NOT ACCURATE.
S C or be tt Av en ue
Po rtl an d, O R
3.
8.
A pe x Co m pa ni es
, L
LC
ap ex co s.
co m
1. THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED FOR
GENERAL MATERIAL AND ABATEMENT INFORMATION ONLY. REFER
TO THE ASSOCIATED PRE-DEMOLTION HAZARDOUS BUILDING
MATERIAL REPORT FOR ADDITIONAL ASBESTOS-CONTAINING
MATERIAL INFORMATION. CONTRACTOR TO PERFORM
ABATEMENT ACTIVITIES ACCORDING TO SPECIFICATIONS AND ALL
APPLICABLE REGULATIONS AS NECESSARY TO COMPLETE THE
WORK.
2. ABATEMENT CONTRACTOR SHALL COORDINATE THEIR WORK
WITH THE GENERAL CONTRACTOR, INCLUDING BUT NOT LIMITED,
TO SCHEDULING, PHASING, ACCESS, SECURITY, STAGING,
PROTECT AND SAVE ITEMS, SALVAGE, LOCKOUT/TAGOUT OF
UTILITIES AND DEMOLITION ACTIVITIES.
3. TEMPORARY UTILITIES WILL BE PROVIDED BY THE OWNER.
COORDINATE POWER AND WATER CONNECTIONS WITH THE
GENERAL CONTRACTOR.
4. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL LOCATIONS AND
QUANTITIES.
5. IF SUSPECT MATERIALS ARE ENCOUNTERED THAT ARE NOT
IDENTIFIED ON THIS DRAWING, TESTING IS RECOMMENDED PRIOR
TO IMPACT.
6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON PAINTED SURFACES
ARE TO COMPLY WITH ALL APPLICABLE LEAD PAINT REGULATION
IN OAR-437-DIVISION 3 1926.62 LEAD IN CONSTRUCTION INDUSTRY
STANDARDS, AND SPECIFIED IN 02 83 19.
7. MERCURY VAPOR TUBES SHOULD BE HANDLED, PACKAGED, AND
RECYCLED IN APPROPRIATE MANNER. HANDLE AND DISPOSAL OF
MERCURY CONTAINING FLUORESCENT LIGHT TUBES IN
ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL
REGULATIONS, AS SPECIFIED IN 02 84 16.
GENERAL NOTES
1. ABATEMENT CONTRACTOR RESPONSIBLE FOR ALL SOFT
DEMOLITION REQUIRED TO ACCESS ASBESTOS MATERIALS TO BE
REMOVED.
2. MERCURY-CONTAINING LIGHT TUBES PRESENT THROUGHOUT.
ABATEMENT NOTES
LEGEND
CARPET AND MASTIC ON NON-ASBESTOS VINYL SHEET
FLOOR ON ASBESTOS-CONTAINING VINYL SHEET FLOOR
ON CONCRETE TO BE REMOVED
ASBESTOS-CONTAINING SINK UNDERCOATING
NON-ASBESTOS VINYL SHEET FLOOR ON
ASBESTOS-CONTAINING VINYL SHEET FLOORING ON
CONCRETE TO BE REMOVED
ROOF
na m e:
L :\P ro je ct s\
_D
VP
\H \H
IL
8\
\IH
\A ba te m en t D es ig n\ D
W G
\5
G um le af
L an e\ C
AD
\2
3_
_0
_H A6
.d ut
T ab
: 1 r:
Ja m es B la
P lo t D at e/
Ti m e:
/1 9/
:3
1:
A M
NOT TO SCALE
N O
R
EV
IS
IO
N D
A
TE
B Y
A
PP
D
H A
ZA
R
D O
U S
M A
TE
R
IA
L
A B
A
TE
M
EN
T
PL
A N
HIL
LS
BO
RO
SC
HO
OL
DI
ST
RIC
T -
BL
OC
K 5
6 S
OU
TH
G
U M
LE
A
F
LA
N E, H
IL
LS
B
O R
O , O
R
EG
O N
HA6
6 6
JAB
ED
JUNE 2026
26007393_0003_001
PREPARED FOR: HILLSBOROW SCHOOL DISTRICT 1J
SHEET DRAWING NO:
SHEET OF
DRAWN BY
DATE:
CHECKED:
PROJECT NUMBER:
FULL SIZE SHEET FORMAT IS 24X36; IF PRINTED SIZE IS NOT 24X36, THEN THIS SHEET FORMAT HAS BEEN MODIFIED & INDICATED DRAWING SCALE IS NOT ACCURATE.
S C or be tt Av en ue
Po rtl an d, O R
3.
8.
A pe x Co m pa ni es
, L
LC
ap ex co s.
co m
1. THIS DRAWING IS DIAGRAMMATIC AND SHOULD BE USED FOR
GENERAL MATERIAL AND ABATEMENT INFORMATION ONLY. REFER
TO THE ASSOCIATED PRE-DEMOLITION HAZARDOUS BUILDING
MATERIAL REPORT FOR ADDITIONAL ASBESTOS-CONTAINING
MATERIAL INFORMATION. CONTRACTOR TO PERFORM
ABATEMENT ACTIVITIES ACCORDING TO SPECIFICATIONS AND ALL
APPLICABLE REGULATIONS AS NECESSARY TO COMPLETE THE
WORK.
2. ABATEMENT CONTRACTOR SHALL COORDINATE THEIR WORK
WITH THE GENERAL CONTRACTOR INCLUDING, BUT NOT LIMITED
TO, SCHEDULING, PHASING, ACCESS, SECURITY, STAGING,
PROTECT AND SAVE ITEMS, SALVAGE, LOCKOUT/TAGOUT OF
UTILITIES AND DEMOLITION ACTIVITIES.
3. TEMPORARY UTILITIES WILL BE PROVIDED BY THE OWNER.
COORDINATE POWER AND WATER CONNECTIONS WITH THE
GENERAL CONTRACTOR.
4. CONTRACTOR IS TO FIELD VERIFY ALL MATERIAL LOCATIONS AND
QUANTITIES.
5. IF SUSPECT MATERIALS ARE ENCOUNTERED THAT ARE NOT
IDENTIFIED ON THIS DRAWING, TESTING IS RECOMMENDED PRIOR
TO IMPACT.
6. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING
DEMOLITION OR RENOVATION IMPACTS ON PAINTED SURFACES
ARE TO COMPLY WITH ALL APPLICABLE LEAD PAINT REGULATION
IN OAR-437-DIVISION 3 1926.62 LEAD IN CONSTRUCTION INDUSTRY
STANDARDS, AND SPECIFIED IN 02 83 19.
GENERAL NOTES
LEGEND
ASBESTOS-CONTAINING ROOFING TAR PRESENT UNDER
ROOFING PARAPET PERIMETER
1. ABATEMENT CONTRACTOR RESPONSIBLE FOR ALL SOFT
DEMOLITION REQUIRED TO ACCESS ASBESTOS MATERIALS TO BE
REMOVED.
Block 56 South
Hillsboro School District
ASBESTOS AIR MONITORING REQUREMENTS SECTION 01 45 23
SECTION 01 45 23: ASBESTOS AIR MONITORING REQUIREMENTS
PART 1 GENERAL
1.1. AIR MONITORING BY CONTRACTOR
A. An Independent Testing Laboratory shall be retained by the Contractor. All air-monitoring analysis shall be performed by an Industrial Hygienist. The Hygienist must be experienced and trained in asbestos sampling and analysis. At a minimum, documentation of prior asbestos sampling and analysis experience, plus satisfactory completion of the NIOSH 582 course or equivalent formal asbestos education, will be required. The laboratory must meet the requirements specified in Section 02 82 13. Air sample collection may be performed by an Industrial Hygienist or the Contractor's foreman at the Contractor's option.
B. Documentation shall be kept for each filter sample procured as to worker sampled, work area location, date and time taken, volume of air drawn through filter, pump identification number and calibration. Documentation shall indicate in what areas tests were taken and shall clearly indicate the specified maximum allowable fiber levels for each area tested.
Report all data on copies of "Asbestos Air Sampling Data Form" bound in these
Specifications or similar form. Fill in all information on every form. Submit chain-of-custody records along with all samples.
C. The samples shall be collected on 25 mm filters and analyzed within 12 hours using the membrane filter method at 400-500x magnification with phase contrast illumination - NIOSH
Analytical Method No. 7400 - for laboratory and field analysis. The analyst shall sign and submit permanent records of all samples analyzed directly to the Environmental Consultant.
The Independent Testing Laboratory shall seal the unused portion of all filters in airtight containers so that individual samples can be reanalyzed at a later date if necessary. The containers shall be clearly labeled with Project Name and Sample Number and shall become property of the Owner at work completion at the Owner's request.
D. The Contractor's testing laboratory shall submit sample analysis results to the Environmental
Consultant verbally within 18 hours from the time of collection and written within two weeks including chain-of-custody and equipment calibration records.
E. Contractor's Sampling During Abatement:
1. Air monitoring shall be performed to provide samples during the period of asbestos abatement in each work area. Begin sampling when asbestos removal commences.
Samples are to be taken where Class I or II work is being conducted during each 8-hour work shift until abatement is complete in that work area or until a negative exposure assessment is established per 29 CFR 1926.1101.
2. The Contractor shall determine which worker(s) in each work area is probably experiencing the most severe exposure. This is the "Most Contaminated Worker(s)". 8-hour TWA and 30-minute excursion samples shall be collected on this worker(s). This worker shall wear a personal sampling pump and the sample shall be drawn from the breathing zone of this worker. All other samples are area samples.
3. The number of air samples collected shall be determined by the Contractor, and may be altered during the project based on work activity and results.
4. The maximum allowable fiber levels shall be as determined by the Environmental
Consultant based on the respiratory protection being utilized.
F. Contractor shall notify the Department of Environmental Quality of air monitoring clearance results as supplied by Environmental Consultant. Notification shall be within 30 days after monitoring procedures were performed in accordance to OAR 340-32-465.
1.2. AIR MONITORING BY OWNER
A. The Owner has retained an experienced Industrial Hygienist/Environmental Consultant to collect and analyze asbestos air samples. Documentation of sample results will be forwarded to the Contractor as appropriate to regulatory requirements.
B. Samples analyzed by phase contrast microscopy will use NIOSH Analytical Method No. 7400.
Samples analyzed by transmission electron microscopy will use either the AHERA methodology, 40 CFR Part 763, or Yamate Level Two.
C. Owner's Air Sampling During and After Abatement:
1. Air Sampling Table is to be used as a guide. The Owner's Industrial
Hygienist/Environmental Consultant may modify criteria. Modifications to the
Maximum Allowable Fiber Count shall be made in writing by the Owner.
Type of
Sample
Average Samples per Eight-Hour
Work Shift
Sample
Volume—L
(Liters)
Approximate
Flow Rate
Maximum
Allowable
Fiber Count
(f/cc)
HEPA Fan
Exhaust 0 or selected units 400–2,000 L
2 to
10 LPM
0.01 f/cc
Outside of
Work Area 0–5 400–2,000 L
2 to
10 LPM
0.01 f/cc or
<pre-abatement
Clearance
PCM
5 per work area 800–3,000 L
2 to
10 LPM
0.01 f/cc
Clearance
TEM
5 per work area 1,200–1,800 L
2 to
10 LPM
<70 s/mm2 average
2. Air sampling for post-abatement work in isolated work areas will use the aggressive sampling method. Use of aggressive sampling in other areas shall be as directed by the Environmental Consultant. Aggressive sampling shall be conducted to assure that fibers remain airborne during sample collection.
3. Analysis of clearance samples shall be via both phase contrast microscopy (PCM) and transmission electron microscopy (TEM) as required to meet AHERA regulations.
4. The Owner reserves the right to monitor Contractor's performance via air samples on abatement workers and in the work area in addition to the Contractor's air monitoring.
1.3. QUALITY ASSURANCE
A. If, at any time during the work, analysis of an air sample taken by the Contractor, Owner, or
Owner's representative, indicates a fiber count in excess of the allowable maximums specified, the Industrial Hygienist who analyzed the air sample shall immediately notify:
1. The Contractor's Foreman
2. The Environmental Consultant:
Apex Companies, LLC
(or as designated) 503.248.1939
3. Project Manager and/or Project Superintendent
4. Other workers, employees, occupants, etc. in affected area(s).
B. Immediately upon being notified of fiber count exceeding the specified maximum allowable levels, the Contractor shall perform the following steps in the order presented, at no additional cost to the Owner:
1. Stop abatement work.
2. Identify source of high fiber counts.
3. Immediately correct any containment breaches, pressure differential changes, or other potential cause, and other concerns with the Environmental Consultant, and the
Owner if the Owner is available. The Environmental Consultant will determine the affected area and affected adjacent areas considered to be contaminated. The
Environmental Consultant will determine the actions to be taken by the Contractor at no additional cost to the Owner.
a. Clean the affected area and the affected adjacent areas. Cleaning shall use wet methods and HEPA vacuuming.
b. Resample air until fiber counts are determined to be below one half of the specified maximum levels.
c. Secure and repair containment barriers, repair or add equipment.
d. Modify work procedures, and make other changes determined to be the possible cause of high fiber counts.
4. Complete every part of the “Fiber Count Above Control Limit Data Form” bound into these Specifications.
5. Carefully resume work under close air monitoring.
6. The Contractor shall be responsible for costs of any testing, cleanup, repair, down time loss, etc. that is a result of the Contractor's negligence, poor maintenance of isolated areas or improper procedures.
PART 2 PRODUCTS
2.1. Not applicable.
PART 3 EXECUTION
3.1. Not applicable.
END OF SECTION
ASBESTOS ABATEMENT 1 of 23 SECTION 02 82 13
SECTION 02 82 13: ASBESTOS ABATEMENT
1.1. SCOPE
A. This section covers the removal, patching, encapsulation, repair, or enclosure of materials that contain or are suspected to contain asbestos.
B. Contractor shall provide all labor, materials, equipment, services, permits, and insurance required to complete asbestos abatement procedures as indicated in these Specifications and/or the drawings.
C. The following table lists asbestos-containing materials (ACM) to be abated. Abatement includes soft (non-structural) demolition, exploratory inspections, protect and save items, and disposal of asbestos and non-asbestos materials as shown and/or described in the general notes, abatement notes, or key notes on the hazardous materials abatement drawings.
D. Less than <1% materials are present in some of the structures, handling requirements are noted in specification 02 82 21.
Asbestos-Containing Materials to be Removed
Location Material Approximate
Quantity
527 Gumleaf Lane, Suite F, in Restroom and Storage Room
Gray Pebble Vinyl Sheet Floor Under Carpet and
Non-Asbestos Vinyl Sheet Floor on Concrete 250 sf
527 Gumleaf Lane, Roofing Perimeter Roofing Tar Under Roof Perimeter Flashing 500 sf
527 Gumleaf Lane, Staff Room Black Sink Undercoating 1 ea
233 SE 6th Avenue, First Floor
Southwest Room with Kitchenette and First Floor
Northeast Room on
Wall
Trowelled-On Ceiling Texture 350 sf
233 SE 6th Avenue, Storage Area Next to Restroom
Vinyl Sheet Floor Under Carpet on Wood
Subfloor 100 sf
233 SE 6th Avenue, Throughout
Interstitial Spaces
Woven Black Wire Insulation 200 lf
222 SE 5th Avenue, Throughout all
Second Floor
Asbestos-Containing Trowelled on Ceiling
Texture on Wallboard With <1% Asbestos Joint
Compound
750 sf
ASBESTOS ABATEMENT 2 of 23 SECTION 02 82 13
Location Material Approximate
Quantity
Rooms and
Stairwell
222 SE 5th Avenue, First and Second
Floor Restrooms of
Main House
Vinyl Sheet Floor Under Non-Asbestos
Containing Sheet Floor on Wood Subfloor 150 sf
222 SE 5th Avenue, Woven Black Wire Insulation 200 lf
E. The quantities and locations of ACM indicated above, and in the provided abatement drawings, are only best estimates limited by the physical constraints imposed by occupancy of the building.
Accordingly, minor variations of plus or minus 10% of the estimated quantities of ACM within the limits of containment for each abatement stage are considered as having no impact on contract price and time of this contract. Locations of ACM different than indicated on drawings, but within the limits of the containment, are considered as having no impact on contract price and time of this contract.
1.2. DEFINITIONS
A. Abatement: Procedures to control fiber release from asbestos-containing building materials, which include encapsulation, enclosure, removal, repair, and related activities.
B. Aggressive Sampling: Air sampling method that assures that asbestos fibers remain airborne during sampling. All surfaces inside the work area will be agitated by the liberal use of compressed air. Fans will then be run throughout the sampling period to keep all suspended fibers airborne.
C. AHERA: Asbestos Hazard Emergency Response Act, 40 CFR Part 763.
D. Air Lock: A system for permitting ingress or egress without permitting air movement between a contaminated area and an uncontaminated area, typically consisting of two curtained doorways at least three feet apart.
E. Air Monitoring: The process of measuring the asbestos fiber content of a specific volume of air in a stated period of time.
F. Amended Water: Water containing a surfactant additive.
G. Asbestos-containing Material (ACM): Any material containing more than 1% asbestos as defined under NESHAPS CFR 40, Part 61, OAR Chapter 340, Division 248, OR-OSHA 437, 1926.1101, and
OSHA 29 CFR Part 1926.1101.
ASBESTOS ABATEMENT 3 of 23 SECTION 02 82 13
H. Authorized Visitor: The owner or designated representative, or a representative of any regulatory or other agency having jurisdiction over the project, and having required training, medical, fit test, etc.
I. Certified Industrial Hygienist (CIH): An industrial hygienist certified in comprehensive practice by the American Board of Industrial Hygiene.
J. Construction, Manager/General Contractor (CMGC): A construction delivery method in which the construction manager acts as the general contractor with schedule and cost risk. The CMGC provides design phase assistance in evaluating costs, schedule, and implications of systems and materials during design.
K. Class I Asbestos Work: Activities involving the removal of TSI and surfacing ACM and PACM.
L. Class II Asbestos Work: Activities involving the removal of ACM, which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and mastics.
M. Clean Room: An uncontaminated area or room that is part of the worker decontamination enclosure system, with provisions for storing workers' street clothes and clean protective equipment.
N. Critical Barrier: Solid barrier constructed from minimum of 2- by 4-inch studs, 16-inch o.c.; ½-inch plywood or drywall sealed airtight and covered on both sides (where applicable) with two layers of 6-mil plastic.
O. Curtained Doorway: A device to allow ingress or egress from one room to another while permitting minimal air movement between the rooms, typically constructed by placing three overlapping sheets of plastic over an existing or temporarily-framed doorway, securing each along the top of the doorway in a pleated fashion and securing one vertical side of each sheet on alternating sides of consecutive sheets. Two curtained doorways spaced a minimum of three feet apart to form an air lock.
P. Disposal: Procedures necessary to transport and deposit the asbestos-contaminated material in an approved waste disposal site in compliance with Environmental Protection Agency (EPA) and other applicable regulations.
Q. Enclosure: Procedures necessary to completely seal all asbestos-containing material behind airtight, impermeable, permanent barriers, including PVC jackets.
R. Encapsulant (Sealant): A liquid material that can be applied to asbestos-containing material and that controls the possible release of asbestos fibers from the material either by creating a membrane over the surface (bridging encapsulant), or by penetrating into the material and binding its components together (penetrating encapsulant).
S. Environmental Consultant: Environmental consultant specializing in asbestos abatement—PBS
Engineering and Environmental Inc., 4412 SW Corbett Avenue, Portland, Oregon, 97239, 503.248.1939—or any subcontractor designated by PBS.
ASBESTOS ABATEMENT 4 of 23 SECTION 02 82 13
T. Equipment Room: A contaminated area or room, which is part of the worker decontamination enclosure system, with provisions for storage of contaminated clothing and equipment.
U. Fitting: With regard to pipe insulation, a fitting is any elbow, offset, reducer, tee, etc.
V. Fixed Object: Fixtures that are attached to the building or too heavy or bulky to remove from the work area.
W. Glovebag: A manufactured device consisting of a transparent plastic bag with inward projecting sleeves, an internal tool pouch, provisions for fastening and sealing at the top and sides, and a receptacle in the bottom to hold asbestos waste. The glovebag is installed to surround the material to be removed and contain all fibers released during the process. Glovebags are used to remove insulation from small sections of pipe and fittings.
X. High Efficiency Particulate Air (HEPA) Filter: A HEPA (absolute) filter capable of trapping and retaining 99.97% of asbestos fibers greater than 0.3 microns in length.
Y. HEPA Vacuum Equipment: HEPA (absolute) filtered vacuuming equipment with a filter system capable of collecting and retaining asbestos fibers. Filters of 99.97% efficiency for retaining fibers of 0.3 microns in length or larger shall be installed for filtering discharge air.
Z. Independent Testing Laboratory: A laboratory financially independent from and hired by the owner, architect, or contractor that is either AIHA-accredited for asbestos with demonstrated proficiency via the AIHA PAT program or has analysts proficient in the AIHA AAR program for air sample analysis.
AA. Industrial Hygienist: An employee of the Independent Testing Laboratory who is experienced and trained in asbestos sampling and analysis as specified.
BB. Isolated Work Area: A totally contained area of the facility where abatement activities are performed.
CC. Movable Object: Furnishings not attached to the building structure that can be removed from the work area.
DD. Negative-air Glovebag: A manufactured device consisting of a transparent plastic bag with inward projecting sleeves, an internal tool pouch, provisions for fastening and sealing it at the top and sides, and a receptacle in the bottom to hold asbestos waste. The glovebag is installed to surround the material to be removed and contain all fibers released through the process, with provisions for allowing continuous airflow through the bag while maintaining negative pressure inside.
EE. Owner Representative: Designated by the Owner, and/or designated employee(s) of the Owner
Representative.
FF. PACM: Presumed asbestos-containing materials.
ASBESTOS ABATEMENT 5 of 23 SECTION 02 82 13
GG. Pressure Differential Fan System: An air-purifying fan system located inside or outside the isolated work area that draws air out of the work area through a HEPA filter, keeping static air pressure in the work area lower than in adjacent areas, and preventing escape of contaminated air from work area to adjacent areas.
HH. Public Area: Any area outside the isolated work area. When work area isolation measures are removed, the work area becomes a public area.
II. Removal: All operations where ACM and/or PACM are taken out or stripped from structures or substrates and include demolition activities.
JJ. Shower Room: A room between the clean room and the equipment room in the worker decontamination enclosure system that is equipped with soap, shampoo, and hot and cold running water controllable at the faucet, and suitably arranged for complete showering during decontamination. The shower room must be separated from the clean room and equipment room by air locks.
KK. Special Fitting: With regard to pipe insulation, a special fitting is any valve, union, strainer, thermometer, flange, etc.
LL. Surfactant: A chemical wetting agent added to water to improve penetration, thus reducing the quantity of water required for a given operation or area.
MM. Tack Coat: A coat of penetrating encapsulant applied to all surfaces from which asbestos-containing materials have been removed.
NN. Thermal System Insulation (TSI): ACM applied to pipes, fittings, boilers, breeching, tanks, ducts, or other structural components to prevent heat loss or gain.
OO. Vacuum Loader Removal: Wetting and pneumatic conveying of loose material through a vacuum hose to a sealed collection tank specially equipped to prevent escape of fibers.
PP. Wet Cleaning: The process of eliminating asbestos from building surfaces and objects by using cloths, mops, or other cleaning tools that have been dampened with water.
QQ. Worker Decontamination Enclosure System: A showering facility for workers, typically consisting of a clean room, a shower room, and an equipment room. Each of these rooms is separated from the others by air locks. The equipment room is separated from the work area by a curtained doorway. The clean room is separated from the public area by a curtained doorway.
RR. Worksite Entry Logbook: A logbook kept in the clean room that must be signed by everyone entering or leaving the work area. All pages of the logbook must be the same as the sample page bound into these Specifications.
1.3. DOCUMENTS INCORPORATED BY REFERENCE
A. The current issue of each document shall govern. Where conflict among requirements or with these Specifications exists, the most stringent requirements shall apply.
ASBESTOS ABATEMENT 6 of 23 SECTION 02 82 13
1. US Environmental Protection Agency National Emissions Standards for Hazardous Air
Pollutants (NESHAPS). (Code of Federal Regulations Title 40, Part 61, Subparts A and M.)
2. US Environmental Protection Agency Office of Toxic Substances Guidance Document, "Guidance for Controlling Friable Asbestos-Containing Materials in Buildings." EPA Report
Number 560/5-85-024 ("Purple Book").
3. US Department of Labor Occupational Safety and Health Administration (OSHA):
a. Title 29 Code of Federal Regulations Section 1910.1001—General Industry Standard for Asbestos.
b. Title 29 Code of Federal Regulations Section 1910.134—General Industry Standard for Respiratory Protection.
c. Title 29 Code of Federal Regulations Section 1910 et al.—Occupational Exposure to
Asbestos; Final Rule.
d. Title 29 Code of Federal Regulations 1926.1101—Construction Standard for
Asbestos.
e. Title 29 Code of Federal Regulations Section 1910.1020—Access to Employee
Exposure and Medical Records.
f. Title 29 Code of Federal Regulations Section 1910.1200—Hazard Communication.
4. National Institute for Occupational Safety and Health (NIOSH), 42 CFR, Part 84, Respiratory
Protective Devices.
5. American National Standards Institute (ANSI) NY; ANSI Standard Z 88.2-1980 "American
National Standards Practice for Respiratory Protection," latest edition.
6. Oregon Administrative Rules Chapter 340, Division 248, Department of Environmental
Quality; Chapter 340, Division 33, Licensing and Certification Requirements.
7. Oregon Administrative Rules Chapter 437, Divisions 2 and 3.
8. Oregon Revised Statutes (ORS), Chapters 279C, Certified Asbestos Contractors and
Prevailing Wage; 656, Workers Compensation; and 701, Construction Contractors and
Contracts.
9. All related electrical work shall be performed in accordance with the National Electrical
Code.
10. All local ordinances, regulations, or rules pertaining to asbestos, including its storage, transportation, and disposal.
1.4. SUBMITTALS AND NOTICES
ASBESTOS ABATEMENT 7 of 23 SECTION 02 82 13
A. Contractors shall submit copies of each submittal package as indicated below.
B. Contractors shall submit to the district and environmental consultant the following information prior to beginning work on the project:
1. CONTRACTOR'S LICENSE. Submit proof that the asbestos abatement contractor is currently and for the duration of the project licensed with the State of Oregon to perform asbestos abatement, per ORS Chapter 701, and OAR Chapter 340, Division 248.
2. ASBESTOS SUPERVISOR. Submit the name and resume of the assigned on-site foreman. At minimum, the foreman shall have successfully completed the Department of
Environmental Quality (DEQ) asbestos supervisor course as approved by the State of
Oregon. Other criteria such as references and similar projects will also be reviewed. At the district’s or environmental consultant’s request, the contractor shall arrange an oral interview with the assigned on-site foreman. The district, and the environmental consultant reserve the right to reject the foreman from the work at any time during the project. The contractor shall then assign another on-site foreman for the district, and environmental consultant’s approval as described above.
3. INSURANCE CERTIFICATE. Submit a copy of the certificate of asbestos-specific liability insurance policy.
4. WORKER CERTIFICATION. Submit written proof indicating that all employees impacting asbestos-containing materials are State of Oregon certified asbestos workers. Proof shall include photocopies of certificates and a signature from the contractor's principal indicating that all employees assigned to this project have completed such a program.
5. RESPIRATOR PROGRAM. Submit written proof indicating respirator program is in compliance with all parts of OSHA Asbestos Regulations CFR Title 29, Part 1910.134 and
1926.1101, OR-OSHA Chapter 437, 1910.134 and 1926.1101.
6. MEDICAL PROGRAM. Submit written proof medical exam program is in compliance with
OSHA Asbestos Regulations CFR Title 29, Section 1926.1101 and OR-OSHA Chapter 437, 1926.1101.
7. EMERGENCY PLANS. Submit a written emergency control and cleanup plan to be followed by the contractor in the event of an accidental breach in containment, power failure, and accidental disturbance of ACMs in non-isolated areas.
8. NOTIFICATION. Submit copy of written notification to DEQ of the proposed asbestos work not fewer than 10 days before work commences on this project.
9. DISPOSAL PLAN. Submit written proof that all required permits and arrangements regarding the transportation and disposal of asbestos-containing or contaminated materials, supplies, etc. have been obtained. The disposal site must be approved by the
EPA and/or DEQ and other responsible agencies.
ASBESTOS ABATEMENT 8 of 23 SECTION 02 82 13
10. WORK PLAN. Submit a written work plan satisfactory to the district and environmental consultant describing the schedule for asbestos abatement, decontamination procedures, and plans for construction and location of decontamination enclosure systems, pressure differential exhaust fans, etc. in compliance with these Specifications and applicable regulations, including calculations for determining required number of negative-air filtration units. The plan shall schedule the systematic flow of work throughout the facility per Specifications on a day-by- day basis, outlining room-by-room, or area-by-area procedures and planned alternative control measures. The contractor shall keep close coordination of his work with the district and environmental consultant.
11. AIR MONITORING. Submit information pertaining to the proposed air monitoring program for this project, if appropriate. This information shall include the name(s) of the certified industrial hygienist appointed, the name of the on-site industrial hygiene technician working under his supervision, types of equipment, and sampling schedule, sampling procedures, calibration recordkeeping, and testing laboratory proposed.
12. PRODUCT INFORMATION. Submit complete product information for any materials and products for which the contractor requests approval for use on this job (other than those specified).
13. EMERGENCY PHONE NUMBER. Submit a local phone number at which the contractor or on-site foreman can be reached on a 24-hour basis during the course of the work.
C. The contractor shall not begin work until submittals are reviewed and accepted by the district and the environmental consultant. Allow a 10-day review period.
D. During the work, the contractor shall submit the following to the district and environmental consultant, on a periodic basis as agreed to by the district, environmental consultant, and the contractor:
1. Waste shipment and disposal documentation.
2. Air monitoring data.
3. Notification updates.
E. Contractor shall submit to the district and environmental consultant, in writing, all information required above regarding any new asbestos workers hired by, or subcontracted to, the contractor before these new asbestos abatement workers begin work.
F. Prior to removal of decontamination systems and isolation barriers, the contractor shall obtain specific written permission from the environmental consultant.
G. Prior to making final application for payment the contractor shall:
1. Complete all work under this contract.
ASBESTOS ABATEMENT 9 of 23 SECTION 02 82 13
2. Submit to the environmental consultant all required submittals, including all waste shipment records completely filled out and signed.
3. Submit to the owner all payroll reports for work on this contract and other information as described elsewhere in the Specifications, if appropriate, under the contract.
4. Submit to the environmental consultant as-abated drawings along with a signed affidavit stating that all ACMs have been removed as indicated on the drawings.
H. See other sections of these Specifications, and EPA, OSHA, and other standards referenced therein, for further information and requirements not included above.
1.5. BUILDING PROTECTION
A. Building Security and Protection
1. The contractor shall post adequate warning signs at all potential entrances to work areas as required by the EPA and OSHA.
2. The contractor shall protect all existing fixed equipment, building finishes that are to remain, and existing systems and functions from damage during the abatement process.
Extra precautions are to be taken in protecting existing electrical panels, light fixtures, etc.
Any damage to existing building, services, and/or equipment shall be remedied by the contractor at their expense.
3. Contractor shall clean external surfaces of contaminated containers and equipment thoroughly by wet sponging and HEPA vacuum.
4. Contractor shall maintain access and use of existing fire lanes.
1.6. PERSONNEL PERSONAL PROTECTION
A. Training
1. Prior to commencement of work, contractor shall ensure that all workers have been trained as specified.
2. The contractor shall provide and post, in the clean room(s) and the equipment room(s), the decontamination, respirator, and work procedures to be followed by the workers.
3. For demolition of non-asbestos containing walls and ceilings in areas containing friable asbestos materials, the contractor has the option to train qualified demolition workers.
Such training shall be the sole responsibility of the contractor and shall consist of a minimum of eight hours, unless applicable regulatory agencies accept a lesser amount of classroom time. Topics shall include the background of asbestos, health effects, personnel protection, use of worker decontamination and other topics. Training shall be acceptable to Oregon OSHA (OR-OSHA), DEQ, and other applicable agencies.
ASBESTOS ABATEMENT 10 of 23 SECTION 02 82 13
B. Personnel Personal Protective Equipment for Asbestos Removal
1. Work clothes shall consist of disposable full-body coveralls and head and foot covers
(Tyvek or approved), boots, or sneakers. Eye, hearing, fall protection, and hard hats should be available as appropriate.
2. At minimum, respiratory protection shall be approved by National Institute for
Occupational Safety and Health/Mine Safety and Health Administration (NIOSH/MSHA);
US Department of Labor; US Department of Health, Education, and Welfare; Centers for
Disease Control; and as listed below. Respiratory protection shall provide workers with a maximum calculated fiber level inside the mask of 0.01 f/cc.
a. Glovebag or modified glovebag: full-face mask, powered air-purifying respirator with disposable HEPA filter cartridges (magenta/purple color code). Protection factor: 100.
b. Demolition of walls and ceilings that may impact friable asbestos-containing material: half-face mask, negative-pressure respirator with disposable HEPA filter cartridges (magenta/purple color code). Protection factor: 10.
c. Pre-abatement work in close proximity to friable asbestos-containing materials:
half-face mask, negative-pressure respirator with disposable HEPA filter cartridges
(magenta/purple color code). Protection factor: 10.
d. Abatement in isolated areas: full-face mask, powered air-purifying respirator with disposable HEPA filter cartridges (magenta/purple color code). Protection factor:
100.
e. HEPA vacuuming and wet cleaning of surfaces: half-face mask, negative-pressure respirator with disposable HEPA filter cartridges (magenta/purple color code).
Protection factor: 10.
f. Vinyl asbestos floor tile removal: half-face mask, negative-pressure respirator with disposable HEPA filter cartridges (magenta/purple color code). Protection factor: 10.
g. Handling of double-bagged asbestos-contaminated waste: half-face mask, negative-pressure respirator with disposable HEPA filter cartridges (magenta/purple color code). Protection factor: 10.
3. Additional respiratory protection shall be as required by CFR 29 1910.134 and 1926.1101, OR-OSHA Chapter 437, 1910.134 and 1926.1101.
4. As part of the contractor's respiratory protection program, all workers shall be provided with a selection of brands and sizes of respirators to choose from. At a minimum, all workers shall be qualitatively fit-tested at the time of respirator selection per OR-OSHA
Worker's Compensation Department Rule 22-069 (4)(e)(5)(i), and semiannually thereafter.
ASBESTOS ABATEMENT 11 of 23 SECTION 02 82 13
5. Contractor shall supply replacement filter cartridges, as required. Cartridges that have become wet or clogged shall be replaced immediately.
C. Worker Decontamination Enclosure System
1. The contractor shall construct a personnel decontamination facility immediately outside of the isolated work area consisting of three chambers and two air locks as follows:
a. The equipment room shall consist of an air lock to the shower room, and a curtained doorway to the work area.
b. The shower room shall have two air locks, one to the equipment room and one to the clean room. All showers shall have hot and cold water controllable at the taps and installed in this room. The contractor shall supply and maintain soap, shampoo, and towels at all times in the shower area. Shower wastewater shall be filtered to remove all fibers larger than five microns, or as required by local regulations, before disposal in the municipal sewer system, or shall be collected and disposed of as asbestos-contaminated material. Permits shall be obtained, and all water discharge regulations complied with, as required by local municipalities. Water filters shall be disposed of as asbestos-contaminated material.
c. The clean room shall consist of an air lock to the shower room and a curtained doorway to the adjacent building area. The clean room shall contain a first aid kit, a place to sit down, the worksite entry logbook, and storage for workers' and visitors' clothing and shoes. Work, respirator, and decontamination procedures; regulations;
and prevailing wage rates shall be conspicuously posted. There shall be a supply of clean, protective clothing, and respirators and cartridges in the clean room at all times.
2. The contractor shall not begin asbestos abatement work unless this system is functional, in good repair, and has been found acceptable for specification compliance by the
Environmental Consultant.
D. Personnel Protection Procedures in Isolated Work Areas
1. Each worker shall, upon entering the job site, remove street clothes in the clean change room, put on and fit-test his respirator, put on clean protective clothing, and sign in on the worksite entry logbook before entering the equipment room or the work area.
2. Workers shall, each time they leave the work area, remove gross contamination from clothing before leaving the work area; proceed to…