6__02827_fence_removal_mvo.docx

DOCX document 21 KB Posted

Attached to
SEVEN LAKES FENCE Federal contract opportunity
Solicitation number
140L6221R0048
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

View the file

Other files for this federal contract opportunity

Other files attached to SEVEN LAKES FENCE, newest first.
File Type Posted
Sol_140L6221R0048_Amd_0001.pdf PDF
140L6221R0048_AMD_0001_QUESTION_AND_ANSWERS_0001.docx DOCX document
Bid_Schedule.xlsx XLSX spreadsheet
1_SOW_mvo_KJP.docx DOCX document
Seven_Lakes_Fence_2021_Drawings.pdf PDF
4__02824_Wire_Fence_and_Gates_mvo.docx DOCX document
2__01009_general_mvo.docx DOCX document
3_01505__Mobilization_mvo.doc DOC document
Sol_140L6221R0048.pdf PDF
Seven_Lakes_Fence_Map__pipeline_and_rain_gauge.pdf PDF
7__Material_Specifications_mvo.doc DOC document
5__02826_Fence_Drainage_Crossings_mvo.doc DOC document
8_Work_Data_Sheet_wire_mvo.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02827

FENCE REMOVAL

PART 1: GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removing fences: 3-wire lay down fence with cedar posts.

B. Requirements: Access roads shall not be constructed along fence lines or to the jobsite unless written approval is granted by the Contracting Officer. Cross-country travel with wheeled or tracked vehicles shall be only to and along fence lines.

PART 2: PRODUCTS

2.1 MATERIALS

A. Requirements: Furnish labor and materials required to remove existing barbed wire/woven wire fence, and gates.

PART 3: EXECUTION

3.1 REMOVAL

A. Removal of Fence: Remove existing fence as directed by the contractors authorized representative on the project. All materials removed from the fence shall become property of the contractor. Disposal of debris shall be according to Section 01009 – General Information and Requirements.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: Fence removal will be measured and paid for by the linear foot removed as measured along the ground surface next to the fence prior to removal, including distance across gate openings, end, stress, and corner panels and drainage crossings.

4.2 BASIS OF PAYMENT

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item Pay Unit

02827(1) Fence Removal Linear Foot

END OF SECTION 02827

Seven Lakes Fence 2021 FENCE REMOVAL

02827 -