3_01505__Mobilization_mvo.doc

DOC document 35 KB Posted

Attached to
SEVEN LAKES FENCE Federal contract opportunity
Solicitation number
140L6221R0048
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

View the file

Other files for this federal contract opportunity

Other files attached to SEVEN LAKES FENCE, newest first.
File Type Posted
Sol_140L6221R0048_Amd_0001.pdf PDF
140L6221R0048_AMD_0001_QUESTION_AND_ANSWERS_0001.docx DOCX document
Bid_Schedule.xlsx XLSX spreadsheet
1_SOW_mvo_KJP.docx DOCX document
Seven_Lakes_Fence_2021_Drawings.pdf PDF
4__02824_Wire_Fence_and_Gates_mvo.docx DOCX document
2__01009_general_mvo.docx DOCX document
Sol_140L6221R0048.pdf PDF
Seven_Lakes_Fence_Map__pipeline_and_rain_gauge.pdf PDF
7__Material_Specifications_mvo.doc DOC document
5__02826_Fence_Drainage_Crossings_mvo.doc DOC document
8_Work_Data_Sheet_wire_mvo.docx DOCX document
6__02827_fence_removal_mvo.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01505

MOBILIZATION

PART 1: GENERAL

1.1 SUMMARY:

A.

Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site.

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

(There are no applicable requirements.)

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A.

Units: Progress payments will be made as follows:

1.

When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

2.

When 10% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 10% of the original Contract amount, whichever is lesser, will be paid.

4.2 BASIS OF PAYMENT:

Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item Pay Unit

Mobilization Lump Sum

END OF SECTION 01505

Seven Lakes Fence 2021