5__02826_Fence_Drainage_Crossings_mvo.doc
DOC document 41 KB Posted
- Attached to
- SEVEN LAKES FENCE Federal contract opportunity
- Solicitation number
- 140L6221R0048
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140L6221R0048_AMD_0001_QUESTION_AND_ANSWERS_0001.docx | DOCX document | |
| Sol_140L6221R0048_Amd_0001.pdf | ||
| 8_Work_Data_Sheet_wire_mvo.docx | DOCX document | |
| 6__02827_fence_removal_mvo.docx | DOCX document | |
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| 1_SOW_mvo_KJP.docx | DOCX document | |
| Seven_Lakes_Fence_2021_Drawings.pdf | ||
| 4__02824_Wire_Fence_and_Gates_mvo.docx | DOCX document | |
| 2__01009_general_mvo.docx | DOCX document | |
| 3_01505__Mobilization_mvo.doc | DOC document | |
| Sol_140L6221R0048.pdf | ||
| Seven_Lakes_Fence_Map__pipeline_and_rain_gauge.pdf | ||
| 7__Material_Specifications_mvo.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE
SECTION 02826
FENCE-DRAINAGE CROSSINGS
PART 1: GENERAL
1.1
SUMMARY
A. Section Includes: Furnishing and installing drainage crossings at the locations shown on the drawings, or as staked in the field.
1.1
PROJECT/SITE CONDITIONS
A. Requirements: Access roads shall not be constructed along fence lines and to the construction site unless written approval is granted by the Contracting Officer. Cross country travel with wheeled or tracked vehicles shall be only to and along fence lines.
PART 2: PRODUCTS
2.1
MATERIALS
A. Wire Fence Materials: Shall be according to Section 02824 - Wire Fences and Gates and as shown on the drawings.
PART 3: EXECUTION
3.1
PREPARATION
A. Clearing: Clearing shall be limited to hand clearing. Only vegetation that interferes with the fence shall be removed. All debris shall be disposed of in the immediate vicinity.
3.2
INSTALLATION
A. Type A: Construct Type A drainage crossings as shown on the drawings, with an auxiliary fence of wire, rock weights, and posts constructed under and independent of the main fence, so that when the crossing washes out, the main fence will not be damaged.
PART 4: MEASUREMENT AND PAYMENT
4.1
METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for as part of the fence and not a separate unit.
4.2
BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item
Pay Unit
Fence Construction
Linear Foot
END OF SECTION
Seven Lakes Fence 2021
FENCE-DRAINAGE CROSSINGS
02826 -
File details come from the government source that posted it. Updated .