This document is a detailed labor rates and cost proposal for a Safety Oversight (Rail Transit) contract involving Vital Assurance Ltd., prepared for the Ohio Department of Transportation (ODOT) and involving two primary transit agencies: Greater Cleveland Regional Transit Authority (GCRTA) and Cincinnati's transit system. The proposal is dated May 19, 2025, and includes a comprehensive breakdown of labor rates, staff positions, and projected work hours across eight primary task categories.

The contract encompasses safety monitoring, risk-based inspections, reporting, and oversight services for rail transit systems, with a total proposed cost of $1,372,984 and 8,600 projected labor hours. The pricing structure includes direct labor rates ranging from $39.50 to $89.12 per hour, with a consultant overhead rate of 93.50% and a net fee percentage of 8%. The tasks are divided into specific areas such as data analysis, safety and security monitoring, planning and oversight, on-site reviews, reporting, and risk-based inspections for both Cleveland and Cincinnati transit systems. The proposal allows for known tasks and potential future task expansions, with detailed hour allocations and cost breakdowns for each task category.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Rates_Cost Proposal

RFP: Safety Oversight (Rail Transit)PROPOSAL LABOR SUMMARYVersion:
Feb 2021RFP: Safety Oversight (Rail Transit)PROPOSAL COST SUMMARYVersion:
Feb 2021RFP: Safety Oversight (Rail Transit)DIRECT COSTSVersion:

Feb 2021

Consultant:Vital Assurance Ltd.Consultant:Vital Assurance Ltd.Consultant:Vital Assurance Ltd.
Agreement No.Agreement No.0State Average Overhead Rate159.98%Agreement No.0Travel Cleveland per trip per person

tc={E92F1BAE-17FA-4BBC-AC43-CE0423209E15}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Insert direct cost category (e.g.: mileage, airfare, printing/copies, rental car, etc.)Travel Cincinnati per trip per personTotal
Modification No.Modification No.0Consultant Overhead Rate:93.50%

tc={5F176C5F-5E77-4D5C-8040-05720EA7F21B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Complete as a percentage rateModification No.0
PID No.Assigned Staff Positions & Associated RatesPID No.0Cost of Money:0.00%

tc={953A55F2-FC43-4D27-9524-DAD905EC8290}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Complete as a percentage rate, for example 0.08%PID No.0
Proposal Date5/19/25ExampleProposal Date5/19/25Net Fee Percentage:8%

tc={D90B5E0A-388E-47A3-B38C-07D51FC3F9BE}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Complete as a percentage that goes no higher than 11.0%Proposal Date5/19/25
Staff PositionProgram Manager

tc={375C69B9-5530-4600-9629-661986A5ABA9}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Insert employee category (e.g.: Principal, Senior Associate, Project Manager, Associate, etc.)Deputy Program ManagerProgram AnalystSenior Safety Consultant ISenior Safety Consultant IISenior Safety Consultant IIISafety Analyst ISafety Analyst IIProject AdministratorSafety Analyst IIITotalNo. of UnitsAverage HourlyTotalLaborOverheadCost ofDirectSubconNetTotalDirect Cost Category:
Task DescriptionDirect Labor Rate$89.12

tc={ADC08D57-F31B-447B-91CD-2E0A0644D19B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Insert employee's labor rate excluding overhead rate $71.40 $56.40 $81.69 $75.78 $73.00 $63.97 $58.70 $39.50 $52.71 Hours Cost Task Description Rate Hours Costs Costs Money Costs Costs Fee Cost Task Description Unit Cost: $783.53 tc={4D6A823F-DE15-4A68-80CC-679AC9DC9756}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Insert unit cost related to the direct cost category tc={375C69B9-5530-4600-9629-661986A5ABA9}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Insert employee category (e.g.: Principal, Senior Associate, Project Manager, Associate, etc.)

tc={5F176C5F-5E77-4D5C-8040-05720EA7F21B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Complete as a percentage rate tc={ADC08D57-F31B-447B-91CD-2E0A0644D19B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Insert employee's labor rate excluding overhead rate tc={953A55F2-FC43-4D27-9524-DAD905EC8290}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Complete as a percentage rate, for example 0.08% tc={D90B5E0A-388E-47A3-B38C-07D51FC3F9BE}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Complete as a percentage that goes no higher than 11.0%$483.32
AUTHORIZED TASKS:AUTHORIZED TASKS:AUTHORIZED TASKS:
Known TasksKnown TasksKnown Tasks
Staff HoursUnitsUnitsUnitsUnitsUnitsUnitsUnitsUnitsUnits$
Task 1: Data Analysis (Average 1250 Hours)Task 1: Data Analysis (Average 1250 Hours)Task 1: Data Analysis (Average 1250 Hours)
Agency Safety Plans, Min Safety Stds4040162084812184$12,967Agency Safety Plans, Min Safety Stds0$70.47184$12,967.36$12,124.48$0.00$0.00$0.00$2,697.00$27,788.85Agency Safety Plans, Min Safety Stds$0.00
Preventive/Corrective Maintenance, Data Analysis4040161624164812212$15,162Preventive/Corrective Maintenance, Data Analysis0$71.52212$15,161.52$14,176.02$0.00$0.00$0.00$3,153.35$32,490.89Preventive/Corrective Maintenance, Data Analysis$0.00
Safety Data - Notif, Invest, ISRs, CAPs8896481616023620010854$61,253Safety Data - Notif, Invest, ISRs, CAPs0$71.72854$61,253.00$57,271.56$0.00$0.00$0.00$12,739.64$131,264.20Safety Data - Notif, Invest, ISRs, CAPs$0.00
TOTAL Task 1168176803220426029603401250$89,382TOTAL Task 1$71.511250$89,382$83,572$0.00$0$0$18,590$191,543.94TOTAL Task 1000000000$0.00
Task 2: GCRTA Safety and Security Monitoring (Average 3500 hours)Task 2: GCRTA Safety and Security Monitoring (Average 3500 hours)Task 2: GCRTA Safety and Security Monitoring (Average 3500 hours)
Quarterly and other meetings1445616160288160240241088$81,071Quarterly and other meetings$74.511088$81,070.72$75,801.12$0.00$31,341.20$0.00$16,861.41$205,074.46Quarterly and other meetings40$31,341.20
SRMM process1204816200288196360401268$92,872SRMM process$73.241268$92,871.84$86,835.17$0.00$0.00$0.00$19,315.86$199,022.87SRMM process$0.00
Capital projects1205620160274196288301144$84,147Capital projects$73.561144$84,147.28$78,677.71$0.00$0.00$0.00$17,501.29$180,326.27Capital projects$0.00
TOTAL Task 23841605252085055288894003500$258,090TOTAL Task 2$73.743500$258,089.84$241,314.00$0.00$31,341.20$0.00$53,678.56$584,423.60TOTAL Task 24000000000$31,341.20
Task 3: RWP Planning and Oversight (Average 500 hours)Task 3: RWP Planning and Oversight (Average 500 hours)Task 3: RWP Planning and Oversight (Average 500 hours)
Manual and Track Access4024442060152$11,185Manual and Track Access$73.58152$11,184.56$10,457.56$0.00$0.00$0.00$2,326.21$23,968.33Manual and Track Access$0.00
Reviews and Approvals2416444060148$10,703Reviews and Approvals$72.32148$10,703.04$10,007.34$0.00$0.00$0.00$2,226.06$22,936.44Reviews and Approvals$0.00
Annual Audit4024444850246200$14,313Annual Audit$71.56200$14,312.50$13,382.19$0.00$0.00$0.00$2,976.77$30,671.46Annual Audit$0.00
TOTAL Task 310464121210801702460500$36,200TOTAL Task 3$72.40500$36,200.10$33,847.09$0.00$0.00$0.00$7,529.04$77,576.24TOTAL Task 3000000000$0.00
Task 4: Cincinnati Safety and Security Monitoring (Average 1750 hrs)Task 4: Cincinnati Safety and Security Monitoring (Average 1750 hrs)Task 4: Cincinnati Safety and Security Monitoring (Average 1750 hrs)
Quarterly and other meetings489616601201609618614$44,907Quarterly and other meetings$73.14614$44,907.28$41,988.31$0.00$11,599.68$0.00$9,340.00$107,835.26Quarterly and other meetings24$11,599.68
SRMM process204020601601968824608$44,139SRMM process$72.60608$44,138.76$41,269.74$0.00$0.00$0.00$9,180.16$94,588.66SRMM process$0.00
Capital projects2040164812019688528$38,493Capital projects$72.90528$38,492.88$35,990.84$0.00$0.00$0.00$8,005.90$82,489.63Capital projects$0.00
TOTAL Task 4881765216840055227242001750$127,539TOTAL Task 4$72.881750$127,538.92$119,248.89$0.00$11,599.68$0.00$26,526.05$284,913.54TOTAL Task 40240000000$11,599.68
Task 5: Cincinnati On-site Triennial SSO Review (Average 200 hours)Task 5: Cincinnati On-site Triennial SSO Review (Average 200 hours)Task 5: Cincinnati On-site Triennial SSO Review (Average 200 hours)
Planning8288448$3,490Planning$72.7148$3,490.12$3,263.26$0.00$0.00$0.00$725.89$7,479.27Planning$0.00
Onsite0408452$3,634Onsite$69.8852$3,633.96$3,397.75$0.00$0.00$0.00$755.81$7,787.52Onsite$0.00
Reporting1256844412100$6,915Reporting$69.15100$6,914.92$6,465.45$0.00$0.00$0.00$1,438.19$14,818.56Reporting000000000$0.00
TOTAL Task 52012424124400120200$14,039TOTAL Task 5$70.20200$14,039.00$13,126.47$0.00$0.00$0.00$2,919.89$30,085.35TOTAL Task 5000000000$0.00
Task 6: ODOT Reports/FTA Annual Report/Program Revision/Other Tasks Assigned (Average 800 hours)Task 6: ODOT Reports/FTA Annual Report/Program Revision/Other Tasks Assigned (Average 800 hours)Task 6: ODOT Reports/FTA Annual Report/Program Revision/Other Tasks Assigned (Average 800 hours)
Program Standard and Reference Guide8024161246040236$16,447Program Standard and Reference Guide$69.69236$16,447.20$15,378.13$0.00$0.00$0.00$3,420.75$35,246.09Program Standard and Reference Guide$0.00
Annual Reporting24241624424020352$23,161Annual Reporting$65.80352$23,161.36$21,655.87$0.00$0.00$0.00$4,817.19$49,634.42Annual Reporting$0.00
Other Reporting402420169616212$14,392Other Reporting$67.89212$14,392.00$13,456.52$0.00$0.00$0.00$2,993.31$30,841.83Other Reporting$0.00
TOTAL Task 61447252362403960760800$54,001TOTAL Task 6$67.50800$54,000.56$50,490.52$0.00$0.00$0.00$11,231.25$115,722.34TOTAL Task 6000000000$0.00
Task 7: Risk-Based Inspections: GCRTA (Average 400 hours)Task 7: Risk-Based Inspections: GCRTA (Average 400 hours)Task 7: Risk-Based Inspections: GCRTA (Average 400 hours)
Safety Risk Prioritization24408448124$8,820Safety Risk Prioritization$71.13124$8,819.76$8,246.48$0.00$0.00$0.00$1,834.37$18,900.60Safety Risk Prioritization$0.00
RBI Selection and Completion24528440128$9,165RBI Selection and Completion$71.60128$9,164.80$8,569.09$0.00$0.00$0.00$1,906.13$19,640.02RBI Selection and Completion$0.00
RBI Reporting244084164016148$10,108RBI Reporting$68.30148$10,108.00$9,450.98$0.00$0.00$0.00$2,102.30$21,661.28RBI Reporting$0.00
TOTAL Task 77213224012161280160400$28,093TOTAL Task 7$70.23400$28,092.56$26,266.54$0.00$0.00$0.00$5,842.80$60,201.91TOTAL Task 7000000000$0.00
Task 8: Risk-Based Inspections: Cincinnati (Average 200 hours)Task 8: Risk-Based Inspections: Cincinnati (Average 200 hours)Task 8: Risk-Based Inspections: Cincinnati (Average 200 hours)
Safety Risk Prioritization412842452$3,503Safety Risk Prioritization$67.3652$3,502.88$3,275.19$0.00$0.00$0.00$728.54$7,506.62Safety Risk Prioritization$0.00
RBI Selection and Completion816842460$4,145RBI Selection and Completion$69.0860$4,144.96$3,875.54$0.00$0.00$0.00$862.09$8,882.58RBI Selection and Completion$0.00
RBI Reporting8128416241688$5,659RBI Reporting$64.3188$5,659.36$5,291.50$0.00$0.00$0.00$1,177.06$12,127.92RBI Reporting$0.00
TOTAL Task 820402401216720160200$13,307TOTAL Task 8$66.54200$13,307.20$12,442.23$0.00$0.00$0.00$2,767.68$28,517.12TOTAL Task 8000000000$0.00

TOTAL Known Tasks 1000 944 320 780 1614 1400 2222 160 160 0 8600 $620,650.06 TOTAL Known Tasks $72.17 8600 $620,650.06 $580,307.81 $0.00 $42,940.88 $0.00 $129,085.28 $1,372,984.03 TOTAL Known Tasks 40 24 0 0 0 0 0 0 0 $42,940.88

Unknown TasksUnknown TasksUnknown Tasks
Task 1:Task 1:Task 1:
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL Task 100000000000$0TOTAL Task 1ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL Task 1000000000$0.00
Task 2:Task 2:Task 2:
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL Task 200000000000$0TOTAL Task 2ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL Task 2000000000$0.00
Task 3:Task 3:Task 3:
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL Task 300000000000$0TOTAL Task 3ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL Task 3000000000$0.00
Task 4:Task 4:Task 4:
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL Task 400000000000$0TOTAL Task 4ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL Task 4000000000$0.00
Task 5:Task 5:Task 5:
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL Task 50000000000TOTAL Task 5ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL Task 5000000000$0.00

Total - Unknown Tasks 0 0 0 0 0 0 0 0 0 0 0 $0.00 Total - Unknown Tasks ERROR:#DIV/0! 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total - Unknown Tasks 0 0 0 0 0 0 0 0 0 $0.00

Future Tasks SectionFuture Tasks SectionFuture Tasks Section
Task NameTask NameTask Name
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL00000000000$0TOTALERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL000000000$0.00
Task NameTask NameTask Name
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL00000000000$0TOTALERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL000000000$0.00
Task NameTask NameTask Name
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL00000000000$0TOTALERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL000000000$0.00
Task NameTask NameTask Name
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL00000000000$0TOTALERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL000000000$0.00
Task NameTask NameTask Name
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL00000000000$0TOTALERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL000000000$0.00
Task NameTask NameTask Name
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL00000000000$0TOTALERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL000000000$0.00

Total - Future Tasks 0 0 0 0 0 0 0 0 0 0 0 $0.00 Total - Future Tasks ERROR:#DIV/0! 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total - Future Tasks 0 0 0 0 0 0 0 0 0 $0.00

Future Tasks SectionFuture Tasks SectionFuture Tasks Section
Task NameTask NameTask Name
Subtask 1:0$0Subtask 1:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 1:$0.00
Subtask 2:0$0Subtask 2:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 2:$0.00
Subtask 3:0$0Subtask 3:ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00Subtask 3:$0.00
TOTAL00000000000$0TOTALERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00TOTAL000000000$0.00

Total - Future Tasks 0 0 0 0 0 0 0 0 0 0 0 $0.00 Total - Future Tasks ERROR:#DIV/0! 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total - Future Tasks 0 0 0 0 0 0 0 0 0 $0.00

TOTAL AUTHORIZED PARTS TOTAL AUTHORIZED PARTS $72.17 8600 $620,650.06 $580,307.81 $0.00 $42,940.88 $0.00 $129,085.28 $1,372,984.03

IF-AUTHORIZED TASKS: IF-AUTHORIZED TASKS: IF-AUTHORIZED TASKS:

TOTAL IF-AUTHORIZED PARTS TOTAL IF-AUTHORIZED PARTS

GRAND TOTAL GRAND TOTAL

&9&P of &N

Instructions for Completion Instructions for Completing the Cost Proposal Summary

StepsDescriptionNotes
Step 1:Input prime consultant firm's name in the highlighted B2 cell - Consultant
Step 2:In the highlighted cells D7 through M7, input the prime consultant's staff position names who would be participating in the contract should the consultant be selected. Any important subconsultant staff positions may be included. Additional columns may be added as necessary.
Step 3:In the highlighted cells D8 through M8, input the prime consultant's staff position direct labor rate associated with the position name directly above. Any important subconsultant staff position's direct labor rate may be included and additional columns may be added as necessary.IMPORTANT: The direct labor rates proposed will be binding with the selected consultant.
Step 4:Complete the Known Tasks with proposed task hours per staff position from the prime consultant's firm or team of firms. Use the amount of average hours ODOT has provided for these known tasks using the past three years historical data. The subtask lines are provided for the proposer to subdivide the task and hours if desired.The Known Tasks are comprised of the typical tasks ODOT conducts each year with this contract. The task amounts proposed by the consultant will be used for comparison purposes only and will not be final task orders with the selected contractor.
Step 5:In the highlighted X4 cell, input the prime consultant's overhead rate expressed as a percentage.
Step 6:In the highlighted X5 cell, input the prime consultant's cost of money rate expressed as a percentage.
Step 7:In the highlighted X6 cell, input the prime consultant's net fee (profit) rate expressed as a percentage.The net fee has been set as a maximum of 11% for this contract.
Step 8:In the highlighted cells AF3 through AN3, input the prime consultant's direct cost category name (ex: airfare, mileage, printing/copies, rental car, etc.)
Step 9:In the highlighted cells AF8 through AN8, input the prime consultant's unit cost rate associated with the direct cost category directly above.
Step 10:Complete the Direct Costs with proposed amounts per category from the prime consultant's firm or team of firms.

Information for use Version: Sept. 2016

SUMMARY OF STEPS

SUMMARY OF STEPS
$0.00RFP: Safety Oversight (Rail Transit)
Consultant:Vital Assurance Ltd.
Agreement No.0
Modification No.0
PID No.0
Proposal Date5/19/25
Average HourlyTotalLaborOverheadCost ofDirectSubconNetTotal
RateHoursCostsCostsMoneyCostsCostsFeeCost
AUTHORIZED TASKS:
Known Tasks
$72.178600$620,650$580,308$0$42,941$0$129,085$1,372,984
Unknown Tasks
ERROR:#DIV/0!0$0$0$0$0$0$0$0
Future Tasks
ERROR:#DIV/0!0$0$0$0$0$0$0$0
Future Tasks
ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL AUTHORIZED TASKS
$72.178600$620,650$580,308$0$42,941$0$129,085$1,372,984
IF-AUTHORIZED TASKS:
Planning Phase

Preliminary Engineering Phase

Environmental Engineering Phase

Final Engineering Phase

Construction Engineering Phase

TOTAL IF-AUTHORIZED TASKS

GRAND TOTAL

&"Arial,Bold"&18SUMMARY OF STEPS

&F &9&P of &N &D

Narratives

0RFP: Safety Oversight (Rail Transit)ConsultantODOTLPAIf-Authorized
Consultant:Vital Assurance Ltd.
Agreement No.0
Modification No.0
PID No.0
Proposal Date5/19/25
Task DescriptionNarrative
Copy task in scope from the Labor Rates_Cost Proposal TabXXXXAdd Narratives as needed here

Microsoft_Word_97_-_2003_Document.doc Information for Use of Spreadsheet

The intent of the spreadsheet(s) is to help guide ODOT and a Consultant in the development of a fair and reasonable fee for a specific project Scope of Services. The generic list was generated from items as outlined in the PDP process (may not be all inclusive). The list can be altered by adding additional activities as needed to comply with the Scope, but do not re-numbered tasks from this list.

Comments have been provided for most tasks in the Labor Rates_Cost Proposal tab describing the work typically required for that task. View the comments by hovering on the name of the task in column A/B. For further information on the work to be included in the proposed hours, also see the ODOT “Consultant Fee Estimation Guidance”.

The Narratives tab is to be used to provide additional detail on the work to be included in each task specific to the project such as number of sheets, plan scales, number of meetings, etc. An “X” should be placed in the ODOT/Consultant/LPA column based on who is responsible, and if the task is if-authorized. The intent of this tab is for it to be included as an attachment to the Scope of Services document.

Sample formulas have been provided in Section 1.1 of the Labor Rates_Cost Proposal tab for information only. ODOT does not warrant the formulas of the spreadsheet. It is the Consultant’s responsibility to check and verify all cells for accuracy (both in content and formula).

The costs submitted to ODOT through this Cost Proposal Summary will serve as the final cost for the awarded contract.

image1.emf

File details come from the government source that posted it. Updated .