539-22-209 Bid Drawings 2023-02-23.pdf
PDF 11 MB Posted
- Attached to
- Z1DA--Improve Trailers 539-22-209 Federal contract opportunity
- Solicitation number
- 36C25023B0041
About this file
This document provides details for a federal solicitation to improve trailers for the Cincinnati Veterans Affairs Medical Center. The solicitation number 36C25023B0041 seeks a contractor to provide all construction services including labor, materials, equipment, and supervision to complete Project #539-22-209. The project aims to repair and upgrade existing trailers at the main campus to ensure they remain safe and operational for daily use by patients and employees. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 539-22-209 Pre-Bid Site Visit Sign-in Sheet (5-30-23).pdf | ||
| 36C25023B0041 0001.docx | DOCX document | |
| WD OH20230082.pdf | ||
| VHA_Directive_1192.pdf | ||
| Attachment 3 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting (JAN 2023).pdf | ||
| 36C25023B0041_2.pdf | ||
| 539-22-209 Bid Specifications 2023-02-23.pdf | ||
| RFI Form-36C25023B0041.docx | DOCX document | |
| EMR.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:2
P
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG KJW
539-22-209
IMPROVE TRAILERS
VAMC CINCINNATI
3200 VINE ST, CINCINNATI, OH 45220
CONSTRUCTION DOCUMENTS
CONSTRUCTION
DOCUMENTS
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GC101 INFECTION CONTROL/PHASING PLAN
STRUCTURAL
SF101 STRUCTURAL PLANS AND DETAILS
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD100 ARCHITECTURAL DEMO SITE PLAN
AE100 ARCHITECTURAL SITE PLAN
AE201A TRAILER ELEVATIONS
AE201B TRAILER ELEVATIONS
AE201C TRAILER ELEVATIONS
AE201D TRAILER ELEVATIONS
AE501 BUILDING DETAILS
PLUMBING
P000 PLUMBING SYMBOLS AND ABBREVIATIONS
PP101 FIRST FLOOR PLUMBING PLAN
MECHANICAL
M000 MECHANICAL SYMBOLS, ABBREVIATIONS, & DETAILS
MH101 FIRST FLOOR HVAC PLAN & SCHEDULES
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EP101 FIRST FLOOR POWER PLAN
EP600 ELECTRICAL SCHEDULES
Contact:Contact:Contact: Contact:
Christopher Hawk
Senior Mechanical Engineer
MECHANICAL,
ELECTRICAL &
PLUMBING
Lauren Lai
Structural Engineer / Project Manager
STRUCTURAL
ENGINEER
VAMC CINCINNATI
Justin Beaudoin
COR
3200 Vine St Cincinnati, OH 45220 p: 513-609-2338 e: justin.beaudoin@va.gov
OWNER
GUIDON DESIGN INC. MES II JV LLC
Mark Jones
Senior Project Architect + Director
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 153 e: mjones@guidondesign.com
ARCHITECT
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 117 e: llai@guidondesign.com
AREA MAP
VICINITY MAP
CAMPUS MAP
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 167 e: chawk@guidondesign.com
N N
N
PROJECT LOCATION
GUIDON DESIGN INC. MES II JV LLC GUIDON DESIGN INC. MES II JV LLC
Revisions: Date:
kwilliams Rectangle kwilliams M:\Registrations\Individual Licenses\Leising, Luke\LJLSTAMP Model (1)
DN
UP
M
M
M
M
MMMM
SSS S
S
S
S
S
J
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C
PATIENT RISK GROUP: MEDIUM
CLASS OF PRECAUTION MATRIX: II
A. FOR ADDITIONAL INFORMATION, REFER TO LIST OF REQUIRED INFECTION
CONTROL PRECAUTIONS OUTLINED BY CLASS IN SPECIFICATION SECTION
01 35 26.
B. PROJECT SHALL BE COMPLETED IN 2 PHASES.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
G. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
H. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
I. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
J. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
K. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
L. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION EXCEPT FOR TRAILER #1.
B. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
PHASE 1.A
RENOVATE EXTERIOR OF TRAILERS.
PHASING LEGEND
PHASE 2A
TO BE COMPLETED FIRST. PROVIDE SAFETY RAIL DURING
CONSTRUCTION.
PHASE 2B
TO BE COMPLETED SECOND. PROVIDE SAFETY RAIL DURING
CONSTRUCTION.
PHASE 1.B
RENOVATE INTERIOR AND EXTERIOR OF TRAILERS.
EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
TOILET
CORRIDOR
EXAM
EXAM
CONFERENCE
CONFERENCE
ELEC
203A
WAITING
RECEPTION
212A
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
CORRIDOR
OFFICE
OEF/OIF
OFFICE
OEF/OIF
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
CORRIDOR
STORAGE
CLOSET
EDUCATION
CLOSET
TOILET
CLOSET
PHASE 1.A
PHASE 1.A
PHASE 1.A
PHASE 2B
PHASE 2A
LAYDOWN AREA
SF101
SF101
SF1015
SF101
TRAILER #1
TRAILER #2
TRAILER #3TRAILER #4
REFERENCE ONLY
REFERENCE ONLY
REFERENCE ONLYREFERENCE ONLY
PHASE 1.B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:2
P
M
GC101
INFECTION CONTROL/PHASING
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG KJW
CONSTRUCTION
DOCUMENTS
SCALE: 3/16" = 1'-0"GC101
1 PHASING PLAN
N
Revisions: Date:
kwilliams Rectangle
AE
1B
B
A
1 2 3 4 5 6 7 8 9 10 11
D
C
82' - 0"
3' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 3' - 2" 5' - 10"
9'
6'
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
" F
D N
E1
E2
E3
E4
1E
2E
SF101
SF101
SF1015
SF101
TRAILER #1
TRAILER #2
REFERENCE ONLY
REFERENCE ONLY
B
A
1 2 3 4 5 6 7 8 9 10 11
D
C
(3) PRESSURE-TREATED 2x12 BOARDS AT PERIMETER
2x
P R
E S
S U
R E
T
R E
A T
E D
J O
IS
T
S
O
.C
2x8 PRESSURE-TREATED JOISTS @ 16" O.C.
1" x 6" COMPOSITE DECK
BOARDS W/ 1/4" GAP
1"x6" COMPOSITE
DECK BOARDS W/
1/4" GAP
4x
4x
4x
4x
4x
4x 6 4x
4x
4x
4x
4x
4x
4x 64x
4x 64x
4x 64x
4x
4x
4x
4x
4x
SF101
SF101
SF101
6'-6" (VIF)
6'
7" 7"
3' - 0" 6"6"
0' - 6"8 1/4"
3' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 3' - 2" 5' - 10"
82' - 0"
4x
SF101
DOUBLE LINES INDICATE EXTENT OF 2x2 RAILS
CONTRACTOR SHALL MAKE THE
TRANSITION TO THE RXISTING
SIDEWALK LEVEL (1/2 DIFFERENCE
MAXIMUM).
TRAILER #1
TRAILER #2
REFERENCE ONLY
REFERENCE ONLY
SF101
10" ROUND CONCRETE PIER FOUNDATION
2'
(2) 2x12 AT STAIR
2x8 JOIST AT MAX.
16" SPACING W/
JOIST HANGER
4x6 POST AND STEEL BASE
(3) 2x12 W/ COLUMN CAP
2x2 RAIL @ 4" O.C. SCREWED TO TRIM BOARD
2x2 RAIL @ 4" O.C. SCREWED TO TRIM BOARD
1' - 4" TYP.
2x8 JOISTS W/ JOIST HANGER
CONNECTION TO PERIMETER BEAM
EXTEND DECK TO
MEET EXISTING
SIDEWALK
STEEL POST BASE FOR (3)
2x12s W/ EMBED INTO
CONCRETE
2' -6
M
IN
1' - 0" ROUND CONCRETE PIER FDN
4x6 POST W/ STEEL
POST BASE INTO
CONCRETE
(3) 2x12s W/ COLUMN CAP
2x8 JOIST BEYOND
1'
/2
2'
0"
10"
5/
8"
3/ 8"
3'
/4
2x6 CONT.
2x6 TOP RAIL
2x2 BALUSTER @ 4" O.C.
PROVIDE (2) 1/2" DIA. x 3" LONG
LAG SCREWS AT EACH BALUSTER
COMPOSITE DECKING
(3) 2x12
2x12 JOIST @ 16" O.C.
2x12 RIM JOIST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:3
P
M
SF101
STRUCTURAL PLANS AND
DETAILSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG LL
CONSTRUCTION
DOCUMENTS
SCALE: 3/16" = 1'-0"SF101
1 DECK FOUNDATION PLAN
SCALE: 3/16" = 1'-0"SF101
2 DECK FRAMING PLAN
NOTES:
1. TOP OF DECK TO MEET EXISTING DOOR OPENINGS
2. IN ADDITION TO PRESSURE TREATMENT, PROVIDE 2 COATS
OF OIL-BASED SEALER ON DIMENSIONAL LUMBER.
NOTES:
1. 8" PIERS TO BE MADE OF MIN 2500 PSI CONCRETE
2. TOP OF PIER AT GRADE
3. IN ADDITION TO PRESSURE TREATMENT, PROVIDE 2 COATS OF OIL-BASED SEALER
ON DIMENSIONAL LUMBER.
GENERAL
THE STRUCTURE HAS BEEN DESIGNED FOR THE IN-SERVICE LOADS ONLY. THE METHODS, MEANS, PROCEDURES, AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE BUILDING IS COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE ERECTION PROCEDURES AND SEQUENCE TO INSURE SAFETY OF THE BUILDING AND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION OF
NECESSARY SHORING, SHEETING, TEMPORARY BRACING, GUYS, TIEDOWNS, ETC.
THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE DRAWINGS OF ALL OTHER DISCIPLINES AND THE
SPECIFICATIONS.
THE GENERAL NOTES ON THE DRAWINGS ARE TO BE USED IN CONJUNCTION WITH THE FULL WRITTEN MATERIAL SPECIFICATIONS (IF ANY) FOR THE PROJECT. IF A DISCREPANCY OCCURS BETWEEN THE NOTES AND THE FULL SPECIFICATIONS, THE MORE STRINGENT
RESTRICTIONS AND REQUIREMENTS SHALL APPLY.
NO VERTICAL OR HORIZONTAL SLEEVES SET, OR HOLES CUT OR DRILLED IN ANY BEAM OR COLUMN, OTHER THAN THOSE SHOWN ON THE DRAWINGS, SHALL BE MADE WITHOUT THE APPROVAL OF THE STRUCTURAL ENGINEER. PROVIDE ONE SINGLE PENETRATION SUBMITTAL INCLUDING DIMENSIONED LOCATIONS OF ALL SLEEVES AND PENETRATIONS FOR PLUMBING, ELECTRICAL, DATA, AND
SPRINKERS.
CONTRACTOR TO COORDINATE AND CHECK ALL DIMENSIONS RELATING TO ARCHITECTURAL FINISHES BEFORE PROCEEDING WITH
WORK IN THE AREA UNDER QUESTION.
SHOP DRAWING SUBMITTALS
THE CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS TO ENABLE HIM TO FABRICATE, ERECT AND CONSTRUCT ALL PARTS OF THE WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. THESE SHOP DRAWINGS WILL BE REVIEWED FOR GENERAL COMPLIANCE WITH THE DESIGN INTENT ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS, ACCURACY AND FIT OF WORK.
ALL SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE STRUCTURAL ENGINEER. DRAWINGS
SUBMITTED WITHOUT CONTRACTOR'S REVIEW WILL BE RETURNED UNCHECKED.
SUBMIT ELECTRONIC VERSIONS OF SHOP DRAWINGS. SUBMIT SHOP DRAWINGS IN PDF FORMAT.
SUBMIT SHOP DRAWINGS FOR EACH OF THE FOLLOWING ITEMS:
1. FOUNDATION LAYOUT
2. WOOD STAIRS
FOUNDATIONS
FOUNDATIONS HAVE BEEN DESIGNED BASED ON ASSUMED ALLOWABLE CAPACITIES OF 2500 PSF
EXCAVATIONS FOR FOUNDATIONS SHALL BE CLEANED TO UNIFORM SURFACE AND SHALL BE PROTECTED AND MAINTAINED UNIFORM
UNTIL CONCRETE IS PLACED.
WHERE FOUNDATION SUBGRADE IS OVEREXCAVATED, OR WHERE UNSUITABLE SOILS ARE ENCOUNTERED FOR FOUNDATION OR SLAB SUPPORT, REMOVE ALL UNSUITABLE SOILS AND REPLACE TO PROPER GRADE WITH LEAN CONCRETE OR GRANULAR FILL.
CONCRETE
REINFORCED CONCRETE HAS BEEN DESIGNED IN ACCORDANCE WITH THE BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE (ACI 318) AND COMMENTARY (ACI 318R).
MIXING, TRANSPORTING, AND PLACING OF CONCRETE SHALL CONFORM TO THE LATEST EDITION OF THE SPECIFICATIONS FOR STRUCTURAL CONCRETE (ACI 301). READY-MIXED CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF ASTM C94. IN CASE OF A
DISCREPANCY, THE PLANS AND SPECIFICATIONS SHALL GOVERN.
CEMENT SHALL CONFORM TO ASTM C150, TYPE I, UNO.
FLY ASH SHALL CONFORM TO ASTM C618, CLASS C OR F. THE RATIO OF THE AMOUNT (BY WEIGHT) OF FLY ASH TO TOTAL
CEMENTITIOUS MATERIALS IN THE MIX SHALL NOT EXCEED 25 PERCENT.
NORMAL WEIGHT AGGREGATES SHALL CONFORM TO ASTM C33.
WATER-REDUCING ADMIXTURES SHALL CONFORM TO ASTM C494.
AIR-ENTRAINING ADMIXTURES SHALL CONFORM TO ASTM C260 AND SHALL BE CERTIFIED BY THE MANUFACTURER TO BE COMPATIBLE
WITH OTHER ADMIXTURES.
CALCIUM CHLORIDE ADMIXTURES OR ADMIXTURES CONTAINING MORE THAN 0.1 PERCENT CHLORIDE IONS SHALL NOT BE USED.
IN COLD WEATHER CONDITIONS, MIXING, PLACING, FINISHING, CURING AND PROTECTION OF CONCRETE SHALL BE PERFORMED IN
ACCORDANCE WITH THE LATEST EDITION OF ACI 306R, COLD WEATHER CONCRETING.
IN HOT WEATHER CONDITIONS, MIXING, PLACING, FINISHING, CURING AND PROTECTION OF CONCRETE SHALL BE PERFORMED IN
ACCORDANCE WITH THE LATEST EDITION OF ACI 305R, HOT WEATHER CONCRETING.
USE OF CONSTRUCTION JOINTS AT LOCATIONS OTHER THAN THOSE INDICATED ON THE DRAWINGS SHALL BE SUBMITTED TO THE
STRUCTURAL ENGINEER FOR REVIEW.
SLUMP FOR PUMPED CONCRETE SHALL BE MEASURED AT POINT OF DISCHARGE.
NORMAL WEIGHT CONCRETE SHALL BE USED IN THE FOLLOWING AREAS AND SHALL HAVE THE PROPERTIES AS SHOWN BELOW:
FOUNDATIONS
1. COMPRESSIVE STRENGTH (28 DAYS): 4000 PSI
2. MAXIMUM SLUMP: 4 INCHES
3. MINIMUM CEMENTITIOUS MATERIALS CONTENT: 470 LB./CU. YD. (USE TYPE II SULFATE RESISTANT CEMENT)
4. MAXIMUM SLUMP BEFORE WATER-REDUCING ADMIXTURE: 4 TO 6 INCH**
5. MAXIMUM WATER/CEMENTITIOUS MATERIALS RATIO: 0.50
6. MAXIMUM COARSE AGGREGATE SIZE: 1 1/2 INCHES
7. AIR CONTENT: 0 - 3%
8. WATER REDUCING ADMIXTURE REQUIRED
SLABS ON GRADE
1. COMPRESSIVE STRENGTH (28 DAYS): 4000 PSI
2. MAXIMUM SLUMP: 4 INCHES
3. MINIMUM CEMENTITIOUS MATERIALS CONTENT: 564 LB./CU. YD. (USE TYPE II SULFATE RESISTANT CEMENT)
4. MAXIMUM SLUMP BEFORE WATER-REDUCING ADMIXTURE: 4 TO 6 INCH**
5. MAXIMUM WATER/CEMENTITIOUS MATERIALS RATIO: 0.50
6. MAXIMUM COARSE AGGREGATE SIZE: 1 INCH
7. AIR CONTENT: 0 - 3%
8. WATER REDUCING ADMIXTURE AND FIBER REINFORCING REQUIRED
** MAXIMUM SLUMP FOR CONCRETE CONTAINING HIGH-RANGE WATER-REDUCING ADMIXTURE: 8 INCHES MAXIMUM SLUMP FOR CONCRETE CONTAINING MID-RANGE WATER-REDUCING ADMIXTURE: 6 1/2 INCHES
PRODUCT DATA SUBMITTALS
THE CONTRACTOR SHALL SUBMIT FOR APPROVAL PRODUCT DATA FOR THE SPECIFIC ITEMS LISTED BELOW. CONTRACTOR SHALL NOT USE PRODUCTS OTHER THAN THOSE SUBMITTED WITHOUT THE APPROVAL OF THE STRUCTURAL ENGINEER.
MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES, AND PATTERNS AS A BASIS OF DESIGN. PRODUCTS OF AUTHORIZED EQUAL MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES, AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL
SAMPLES, AND UPON APPROVAL IN WRITING BY CONTRACTING OFFICER.
SUBMIT ELECTRONIC VERSIONS OF PRODUCT DATA IN PDF FORMAT TO THE STRUCTURAL ENGINEER AND COR FOR REVIEW.
1. CONCRETE CURING COMPOUND
2. WOOD CONNECTORS
3. LUMBER DATA SHEETS
N
N
SCALE: 3/4" = 1'-0"SF101
6 DECK FRAMING DETAIL
SCALE: 3/4" = 1'-0"SF101
4 DECK FRAMING DETAIL
SCALE: 3/4" = 1'-0"SF101
3 DECK FRAMING DETAIL
SCALE: 3/4" = 1'-0"SF101
5 DECK FRAMING DETAIL
WOOD FRAMING NOTES
FOR WOOD CONNECTIONS NOT SPECIFICALLY NOTED OR DETAILED, FOLLOW THE REQUIREMENTS OF IBC 2012 CHAPTER 23
FASTENING SCHEDULE OR ESR 1539.
ALL SCREWS ARE STAINLESS STEEL UNLESS NOTED OTHERWISE. ALL SCREWS SHALL BE CAREFULLY DRIVEN AND NOT OVERDRIVEN. SUBMIT ALL PROPOSED FASTENERS FOR APPROVAL PRIOR TO CONSTRUCTION. INSTALLATION OF ALL FASTENERS SHALL MEET THE REQUIREMENTS OF NDS AND ISANTA GUIDELINES, INCLUDING THOSE IN ESR 1539, AND IBC CHAPTER 23 NAILS AND
STAPLES SECTION.
FASTEN DOUBLE (DBL) STUDS TOGETHER WITH 0.131" X 3" NAILS AT 6" O.C. UNLESS NOTED OTHERWISE. FOR MORE THAN TWO
STUDS, FASTEN IN THE SAME WAY, NAILING AS EACH STUD IS ADDED.
COORDINATE FINAL FLOOR AND ROOF FRAMING INCLUDING JOIST OR TRUSS LAYOUT & TRUSS MEMBER CONFIGURATION WITH MECHANICAL, ELECTRICAL, & PLUMBING (MEP) DRAWINGS. OBTAIN ADDITIONAL MEP INFORMATION AS NEEDED FOR COMPLETE COORDINATION. KEEP ALL MECHANICAL CHASES FREE OF FRAMING. DO NOT LOCATE JOISTS OR TRUSSES AT PARALLEL PLUMBING
WALLS.
WHERE FRAMING SUPPORTED BY A JOIST OR TRUSS CAN CAUSE UPLIFT ON THAT JOIST OR TRUSS (SUCH AS AT CANTILEVERED BALCONY FRAMING) THE DESIGNER SHALL CONSIDER A LOAD CASE THAT MAXIMIZES THE UPLIFT LOAD IN COMBINATION WITH NO
LIVE LOAD APPLIED TO THE JOIST OR TRUSS SUPPORTING THE UPLIFT.
ALL EXPOSED FRAMING TO BE PRESSURE PRESERVATIVE TREATED WOOD (PPT) AS DESCRIBED IN THE SPECIFICATIONS. ALL PPT WOOD TO BE KILN DRIED AFTER TREATMENT (KDAT). HARDWARE USED WITH PPT WOOD TO BE HOT-DIP GALVANIZED OR STAINLESS
STEEL. ALL MEMBERS TO RECEIVE TWO (2) COATS OF OIL-BASED PRESERVATIVE.
ALL HARDWARE TO MEET VA STANDARD OR AN APPROVED EQUAL. WHERE HARDWARE IS NOT SPECIFICALLY DESIGNATED, SUBMIT PROPOSED HARDWARE FOR APPROVAL. WHERE MORE THAN ONE TYPE OF FASTENER OR FASTENER PATTERN IS ALLOWED BY THE HARDWARE MANUFACTURER, HARDWARE FASTENERS ARE TO BE OF THE TYPE, SIZE, AND QUANTITY TO MAXIMIZE THE LOAD CAPACITY OF THE HARDWARE IN THE SPECIFIC APPLICATION SHOWN ON THESE PLANS, UNLESS NOTED OTHERWISE.
REFERENCE THE ARCHITECTURAL PLANS FOR LAYOUT OF ALL WALLS, OPENINGS, WALL TYPES, ETC. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION & IMMEDIATELY NOTIFY THE ARCHITECT AND ENGINEER OF ANY DISCREPANCIES.
WHERE DECKS OR BALCONIES ARE WOOD-FRAMED, IF THE RAILING RELIES ON A CONNECTION TO THE WOOD BALCONY BEAMS OR RIM JOISTS FOR STABILITY AND LOAD RESISTANCE, THEN THE RAILING DESIGNER SHALL CHECK TORSION AND OTHER EFFECTS ON
THE EDGE BEAMS OR JOISTS AND THEIR CONNECTIONS.
Revisions: Date:
NEW STAIR TO MATCH EXISTING
STAIRS FOR CONSTRUCTION.
PRESSURE TREATED STRINGERS AND
COMPOSITE DECKING FOR TREADS.
SCALE: 3/4" = 1'-0"SF101
7 DECK FRAMING DETAIL - HANDRAIL
kwilliams Rectangle
N NORTH ARROW
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A
DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS
TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING AND ELECTRICAL
EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND STRUCTURAL DETAILING
OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. FLOOR ELEVATION 100’-0” IS EQUAL TO THE FINISH FLOOR OF THE EXISTING FLOOR
CONSTRUCTION UNLESS OTHERWISE NOTED.
16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.
27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,
ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE
AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR
HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR
SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOZ DOZEN
DN DOWN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
ETS EXPOSE TO STRUCTURE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIP FILLER PANEL
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR FIBERGLASS
REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER OR HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LEFT HAND REVERSE
LATENT HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM OR MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE OR MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
NEW WALL
EXISTING WALL TO
REMAIN
ROOM
ROOM TAG
NEW DOOR
EXISTING DOOR
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP
DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
S SOUTH
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL LNTL STEEL LINTEL
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TA TOILET ACCESSORY
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL OR TEMPERATURE
CONTROL PANEL OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
WALLS
DOOR TAG
KEY NOTE TAGS
DOORS
101 EQUIPMENT/FURNITURE TAG
1 PLAN NOTE
1 DEMOLITION NOTE
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLSARCHITECTURAL ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:1
P
M
AE001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG KJW
CONSTRUCTION
DOCUMENTS
Revisions: Date:
kwilliams Rectangle
UP
EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
TOILET
CORRIDOR
EXAM
EXAM
CONFERENCE
CONFERENCE
ELEC
203A
WAITING
RECEPTION
212A
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
CORRIDOR
OFFICE
OEF/OIF
OFFICE
OEF/OIF
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
CORRIDOR
STORAGE
CLOSET
EDUCATION
CLOSET
TOILET
CLOSET
6 7
8 8 8 8
8 8
8 8 8 8
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE DIMENSION
FLOOR PLAN AE100, AND ENGINEERING DRAWINGS FOR ADDITIONAL
INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
1. REMOVE UNDERFLOOR BATT INSULATION AND SUSPENSION MESH AND
CLEAN ALL LOOSE DEBRIS FOR NEW SPRAY-ON INSTALLATION.
2. REMOVE EXISTING METAL OR VINYL SKIRT MATERIAL AND TOP CAP
FLASHING.
3. REMOVE WOOD WALKWAY AND COMPLETE SUB STRUCTURE TO GRADE. SEE
STRUCTURAL DRAWINGS SF101 FOR ADDITIONAL INFORMATION.
4. REMOVE UNDER TRAILER PVC COLD WATER PIPE INSULATION. SEE MEP
DRAWINGS FOR ADDITIONAL INFORMATION.
5. REMOVE ALL FLOOR MOUNTED TOILET FIXTURES. RETAIN FOR RE-
INSTALLATION.
6. REMOVE RESILIENT TILE FLOORING AND WALL BASE
7. REMOVE CARPET FLOORING AND WALL BASE.
8. EXISTING DOOR TO BE REMOVED AND CUT DOWN AS REQUIRED. FOR
ADDITIONAL NEW SUB-FLOOR, SEE NEW WORK PLAN FOR ADDITIONAL
DETAILS/INFORMATION.
DEMOLITION GENERAL NOTES
DEMOLITION PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:1
P
M
AD100
ARCHITECTURAL DEMO SITE PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG KJW
CONSTRUCTION
DOCUMENTS
SCALE: 3/16" = 1'-0"AD100
1 DEMO SITE PLAN
N
Revisions: Date:
kwilliams Rectangle
UP
M
M
M
M
MMMM
SSS S
S
S
S
S
J
EXAM
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
TOILET
CORRIDOR
EXAM
EXAM
CONFERENCE
CONFERENCE
ELEC
203A
WAITING
RECEPTION
212A
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
CORRIDOR
OFFICE
OEF/OIF
OFFICE
OEF/OIF
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
CORRIDOR
STORAGE
CLOSET
EDUCATION
CLOSET
TOILET
CLOSET
2 4
AE501
10 13
11 11 11
11 11
11 11
AE100
SF101
SF101
SF1015
SF101
A. REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL FOR
COORDINATION ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY
FRAMING, BLOCKING, ETC.
B. ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR
"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF
FINISH.
C. VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
D. CONTRACTOR TO MAINTAIN/REPAIR RATING OF EXISTING PARTITIONS AS
AFFECTED BY DEMOLITION/NEW CONSTRUCTION, TYPICAL THROUGHOUT.
E. COLUMN DIMENSIONS ARE FOR REFERENCE AND SHALL BE VERIFIED IN THE
FIELD.
F. DIMENSIONS INDICATED AS 'VIF' MAY INCREASE OR DECREASE TO MATCH
FIELD CONDITIONS. ALL OTHER DIMENSIONS WITHIN THE DIMENSION
STRING MUST BE MAINTAINED.
ARCHITECTURAL GENERAL NOTES
1. APPLY CLOSED CELL SPRAY ON INSULATION TO UNDERSIDE OF TRAILERS.
PROVIDE FULL COVERAGE.
2. PROVIDE NEW VINYL SKIRTING AROUND ENTIRE PERIMETER. PROVIDE NEW
CAP FLASHING.
3. PROVIDE PLASTIC CURBING ALONG BACKSIDE OF TRAILERS TO DIVERT
WATER AWAY FROM AND AROUND TRAILERS TO KEEP WATER FROM
GETTING BENEATH TRAILERS.
4. HEAT TAPE ALL HOT AND COLD PVC WATER LINES AND INSULATE.
5. SEE STRUCTURAL DRAWINGS FOR NEW WALKWAY CONSTRUCTION.
6. PROVIDE NEW EXHAUST FAN FOR VENTILATION OF UNDERSIDE OF TRAILER.
SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
7. PROVIDE 10 MIL VAPOR BARRIER WITH STRING REINFORCEMENT OVER
ENTIRE AREA UNDER TRAILER.
8. EXISTING WOOD STAIR AND LANDING TO REMAIN.
9. EXISTING WOOD RAMP TO REMAIN.
10. LEVEL FLOOR WITH SELF LEVELING COMPOUND AND INSTALL 3/4"
STRUCTURAL PLYWOOD SUBFLOORING OVER ENTIRE FLOOR, EXCEPT
AROUND WALLS.
11. RE-INSTALL DOORS IN ORIGINAL LOCATIONS AFTER UNDER CUTTING THEM
FOR NEW FLOORING.
12. RESET FLOOR MOUNTED TOILET/PLUMBING FIXTURES IN ORIGINAL
LOCATIONS.
13. INSTALL NEW LVT FLOORING AND RUBBER BASE THROUGHOUT.
14. EXHAUST LOUVER, SEE MECHANICAL DRAWINGS FOR SIZE AND EXACT
LOCATION.
ARCHITECTURAL PLAN NOTES
10"
2'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:2
P
M
AE100
ARCHITECTURAL SITE PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG KJW
CONSTRUCTION
DOCUMENTS
SCALE: 3/16" = 1'-0"AE100
1 SITE PLAN
N
SCALE: 1/2" = 1'-0"AE100
2 TYPICAL CUT DETAIL
Revisions: Date:
kwilliams Rectangle
1 2
TYP
TYP 72' - 0"
FINISHED FLOOR
100'-0"
AABBCCDDEEFFGG
72' - 1"
2'
2'
0"
72' - 0"
FINISHED FLOOR
100'-0"
AA BB CC DD EE FF GG
4'
3'
72' - 1"
FINISHED FLOOR
100'-0"
1E 2E 3E 4E 5E 6E
36' - 2"
4'
2'
0"
AE501
1 2
FINISHED FLOOR
100'-0"
36' - 0"
1E2E3E4E5E6E
36' - 2"
3'
2'
1. PROVIDE NEW PERFORATED VINYL SKIRTING AROUND ENTIRE PERIMETER.
PROVIDE NEW CAP FLASHING.
2. NEW PRESSURE TREATED WOOD AND COMPOSITE BOARD WALKWAY. SEE
STRUCTURAL DRAWING SF101 FOR ADDITIONAL DETAILS.
3. NEW VENTILATION FANS FOR UNDER TRAILER VENTILATION.
4. EXISTING WOOD STAIR / LANDING TO REMAIN.
ELEVATION NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:2
P
M
AE201A
TRAILER ELEVATIONS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG KJW
CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"AE201A
0000 NVS TRAILER A - EAST
SCALE: 1/4" = 1'-0"AE201A
2 NVS TRAILER A - WEST
SCALE: 1/4" = 1'-0"AE201A
3 NVS TRAILER A - NORTH
SCALE: 1/4" = 1'-0"AE201A
1 NVS TRAILER A - SOUTH
Revisions: Date:
kwilliams Rectangle
FINISHED FLOOR
100'-0"
AABBCCDDEEFFGG
72' - 2"
2'
FINISHED FLOOR
100'-0"
TYP
TYP
72' - 0"
AA BB CC DD EE FF GG
SF101
SF101
72' - 2" 2'
2'
FINISHED FLOOR
100'-0"
24' - 0"
EQ EQ
E1 E2 E3 E4
SF101
24' - 1"
2'
2'
FINISHED FLOOR
100'-0"
E1E2E3E4
3 3
2'
2'
24' - 1"
1. PROVIDE NEW PERFORATED VINYL SKIRTING AROUND ENTIRE PERIMETER.
PROVIDE NEW CAP FLASHING.
2. NEW PRESSURE TREATED WOOD AND COMPOSITE BOARD WALKWAY. SEE
STRUCTURAL DRAWING SF101 FOR ADDITIONAL DETAILS.
3. NEW VENTILATION FANS FOR UNDER TRAILER VENTILATION.
4. EXISTING WOOD STAIR / LANDING TO REMAIN.
ELEVATION NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/09/2022
85% DESIGN DEVELOPMENT 01/06/2023
100% DESIGN DEVELOPMENT 02/01/2023
CONSTRUCTION DOCUMENTS 02/23/2023
A u to d e s k D o c s
/2
.8
.0
V
A C in c y I m p ro v e
T ra ile rs
/2
.8
.0
A v
.r v t
/2
/2
:3
:2
P
M
AE201B
TRAILER ELEVATIONS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
IMPROVE TRAILERS
3200 VINE ST, CINCINNATI, OH 45220
539-22-209
TRAILERS
Kristina Amin, Chief Engineer
03/29/2023 JG KJW
CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"AE201B
1 NVS TRAILER B - EAST
SCALE: 1/4" = 1'-0"AE201B
2 NVS TRAILER B - WEST
SCALE: 1/4" = 1'-0"AE201B
3 NVS TRAILER B - NORTH
SCALE: 1/4" = 1'-0"AE201B
4 NVS TRIALER B - SOUTH
Revisions: Date:
kwilliams Rectangle
FINISHED FLOOR
100'-0"
23' - 4 1/8"
23' - 5"
2'
2'
FINISHED FLOOR
100'-0"
23' - 4 1/8"
5'
5'
23' - 5"
FINISHED FLOOR
100'-0"
72' - 0"
2'
5'
72' - 1"
FINISHED FLOOR
100'-0"
72' - 0"
E1E2E3E41E2E3E4E5E6E
SF101
2'
72' - 1"
AE501
1. PROVIDE NEW PERFORATED VINYL SKIRTING AROUND ENTIRE PERIMETER.
PROVIDE NEW CAP FLASHING.
2. NEW PRESSURE TREATED WOOD AND COMPOSITE BOARD WALKWAY. SEE
STRUCTURAL DRAWING SF101 FOR ADDITIONAL DETAILS.
3. NEW VENTILATION FANS FOR UNDER TRAILER VENTILATION.
4. EXISTING WOOD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .