This document contains a solicitation amendment for project number 539-22-209 to improve trailers at a Department of Veterans Affairs medical center. The amendment provides responses to contractor questions about composite decking materials, concrete pier sizes, floor leveling, and spray foam insulation thickness. Contractors must acknowledge receipt of the amendment by the specified date and time. The selected contractor will be responsible for completing all construction services necessary to repair and upgrade existing trailers, including labor, materials, and equipment. This will ensure the trailers remain in a safe and usable condition for patients and staff.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 539-22-209 Pre-Bid Site Visit Sign-in Sheet (5-30-23).pdf | ||
| 539-22-209 Bid Drawings 2023-02-23.pdf | ||
| WD OH20230082.pdf | ||
| VHA_Directive_1192.pdf | ||
| Attachment 3 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting (JAN 2023).pdf | ||
| 36C25023B0041_2.pdf | ||
| 539-22-209 Bid Specifications 2023-02-23.pdf | ||
| RFI Form-36C25023B0041.docx | DOCX document | |
| EMR.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
539-22-209
Department of Veterans Affairs Columbus Chalmers P. Wylie Ambulatory Care Center 420 North James Road Columbus OH 43219-1834
Department of Veterans Affairs Columbus Chalmers P. Wylie Outpatient Clinic 420 North James Road Columbus OH 43219-1834 To all Offerors/Bidders
36C25023B0041 06-12-2023
X
The purpose of this amendment is to provide RFI responses and a copy of the Site Visit sign-in sheet.
All other Terms & Conditions remain unchanged.
Q&A RFI’s for Project# 539-22-209 Improve Trailers Q: 1. On drawing AE501 for the deck stair cutout it calls for 2x8 decking runners and 2x12 deck treads - traditionally speaking with composite decking the 2x8 is a 1x8 tread riser board and the deck treads are the same 1x6 composite decking so it would require 2 boards to equal nominally to 11" in width. Please confirm using these materials in this manner would be sufficient for design.
Answer: Guidon Design Responses: Question 1 - 1x8 fro a riser is acceptable. and 2 boards to make up the tread is acceptable.
1a. Is there a specification or basis of design for the composite decking the VA would like to be used? There is a VAST price difference in MFG and lines of decking available.
Answer: Trex Product Composite Decking shall be the basis of design..
1b. Would the VA like the new composite decking face screwed to the new substructure or would they prefer a hidden fastener system? Face screwed is generally cheaper, but hidden fasteners offer no screws tops to be seen.
Answer: Face-screwed is acceptable.
1c. Does the VA have a preferred lumber to be used on the new wood railing? Choices can change prices drastically from pressure treated to cedar...etc Answer: Pressure treated southern pine is preferred.
1d. Drawing SF101 states 8" / 10" / and 12" concrete piers for foundation of new wood deck walkway, please confirm which size is correct.
Answer: 12" is correct.
2. PART 2 – PRODUCTS
2.1 PRODUCTS Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES
Answer: There is no schedule of finishes in section 09.
3. Drawing AE100 note 10 calls to use self leveling on the floor after installing new plywood. What is the pitch of the floor to estimate the proper amount of self leveling material?
There is no note to tell us how to handle the two exterior doors after the floors are self leveled. What does the VA want to do with these doors?
Answer: Guidon Design Response. Self-leveling is to address the sagging of the existing sub-floor between structural elements…approximately 4’ apart. Before the new subfloor is installed. We need a flat surface to start from.
The 2 exterior doors swing out. The contractor shall provide a threshold to account for the added thickness. The door are not planned to be replaced or modified.
4. Drawings do not show a thickness or R value for the spray foam. Please Advise.
Answer: “The answer is R-5 per inch of thickness.”
See attached document: 539-22-209 Pre-Bid Site Visit Sign-in Sheet (5-30-23).
File details come from the government source that posted it. Updated .