This document package includes construction drawings and specifications for a federal contract opportunity to install a new water-cooled chiller and relocate an existing chiller at a VA medical facility in Rome, New York. The scope of work involves demolishing existing structures, installing a new government-furnished chiller, and moving an existing chiller to new locations as shown on the plans. Mechanical drawings depict demolition plans, new equipment layouts, piping schematics and details. Electrical drawings show demolition requirements, new power plans and details. Specifications cover general project notes, abbreviations and symbols. The opportunity is issued by the Department of Veterans Affairs for the Veterans Health Administration network in that region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222B0076 0003.docx | DOCX document | |
| split shipped chiller dimensions.pdf | ||
| 36C24222B0076 0002.docx | DOCX document | |
| york chilller selection.pdf | ||
| 36C24222B0076 0001.docx | DOCX document | |
| Wage Detrmination NY20220013 8-5-22.pdf | ||
| Combined Specifications 528A723102.pdf | ||
| 36C24222B0076_1.docx | DOCX document | |
| CONTINUATION OF SF 1442 BLOCK 17 ROME CHILLER.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWINGS INDEX
SHEET NO. DRAWING TITLE
GENERAL
1. GI-001 COVER SHEET
MECHANICAL
2. MG-001 MECHANICAL ABBREVIATIONS, SYMBOLS & NOTES
3. MD-101 MECHANICAL DEMOLITION PLAN
4. M-101 MECHANICAL PLAN
5. MG-501 MECHANICAL DETAILS
6. MG-601 MECHANICAL SCHEDULES
7. MI-701 CONTROLS DIAGRAMS
8. MI-702 SEQUENCE OF OPERATIONS & CONTROL POINTS
ELECTRICAL
9. EG-001 ELECTRICAL ABBREVIATIONS, SYMBOLS & NOTES
10. ED-101 ELECTRICAL DEMOLITION
11. EP-101 ELECTRICAL POWER PLAN
12. EG-501 ELECTRICAL DETAILS
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A7-23-102
VA ROME OUTPATIENT CLINIC
BUILDING 510
125 BROOKLEY ROAD
ROME, NEW YORK 13441
ADD CHILLER AT ROME CBOC
AREA OF WORK
GROUND FLOOR
MECHANICAL ROOM
KEY PLAN
SCALE: NONE
o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e i c h e s e f o o t o a d o n e h a l f i n c h e e f o o t o c f o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A
A d
C i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
GI-001
JDMA
COVER SHEET
N
VA ROME CBOC
GENERAL PIPING SYMBOLS
@ AT
℄ CENTERLINE
° DEGREES
Δ DELTA
ɸ ELECTRICAL PHASE
∅ ROUND / DIAMETER
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
AW AIR WASHER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CO CLEAN OUT
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONDENSATE PUMP
CR CEILING REGISTER
CRAC COMPUTER ROOM AIR CONDITIONING
UNIT
CU CONDENSING UNIT
CW COLD WATER (POTABLE)
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DOM DOMESTIC
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DSS DUCTLESS SPLIT-SYSTEM (EVAPORATOR)
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
EJ EXPANSION JOINT
ENT ENTERING
ER EXHAUST REGISTER
(ER) EXISTING TO REMAIN
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
(E) EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLON(S)
GF/CI GOVERNMENT FURNISHED/CONTRACTOR
INSTALLED
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRR GLYCOL-WATER RUN AROUND RETURN
GRS GLYCOL-WATER RUN AROUND SUPPLY
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J (INTENTIONALLY LEFT BLANK)
KPA KILOPASCAL
KW KILOWATT
L/S LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MIN MINIMUM
MM MILLIMETER
MOD MOTOR OPERATED DAMPER
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
(N) NEW
NA NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSV PRESSURE SAFETY VALVE
REL RELOCATE / RELOCATED
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RCP RADIANT CEILING PANEL
REA RELIEF AIR
RF RETURN FAN
RG RETURN AIR GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATOR DEVICE
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
SVS STEAM VENT SILENCER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP TYPICAL
UC or U/C UNDER CUT
UL UNDERWRITERS LABORATORY
V VALVE
VAMC SYRACUSE VA MEDICAL CENTER
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
W WATTS
WB WET-BULB (TEMPERATURE)
WC WATER COOLED
WCACU WATER-COOLED COMP RM A/C
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOW METER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WHA WATER HAMMER ARRESTOR
GENERAL NOTES AND CONDITIONS
1. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE AVAILABLE
BUILDING DRAWINGS, ARCHITECTURAL BACKGROUNDS PROVIDED AND FIELD SURVEY
INFORMATION COMPILED BY THE VA ENGINEERING DESIGN TEAM FOR THE PURPOSE OF
ENGINEERING DESIGN. EXISTING CONDITIONS ARE SHOWN AS ACCURATELY AS
POSSIBLE. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS
EXISTING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS,
SIZES AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE
ENGINEER PRIOR TO BEGINNING INSTALLATION OR FABRICATION WORK.
1.1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE PLANS AND
SPECIFICATIONS, AS WELL AS ALL RELATED PROJECT PLANS AND SPECIFICATIONS
FROM OTHER DISCIPLINES, TO BECOME FAMILIAR WITH THE FULL PROJECT SCOPE
AND COORDINATED RESPONSIBILITIES.
1.2. SHOULD IT APPEAR THAT THE WORK INTENDED TO BE DESCRIBED OR RELATED
WORK ARE NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THE DRAWINGS, OR IN
THE SPECIFICATIONS, CONSULT THE COR FOR NECESSARY CLARIFICATIONS, AND
CONFORM TO THOSE CLARIFICATIONS INSOFAR AS THEY ARE CONSISTENT WITH
THE ORIGINAL DRAWINGS AND SPECIFICATIONS. IN NO CASE SHALL WORK
PROCEED IN UNCERTAINTY.
1.3. EQUIPMENT ARRANGEMENTS ARE DESIGNED TO SHOW PREFERRED
CONFIGURATIONS TO SUIT KNOWN CONDITIONS. ACTUAL INSTALLATION BY
CONTRACTOR MAY BE ALTERED AS REQUIRED TO SUIT FIELD CONDITIONS
ENCOUNTERED DURING CONSTRUCTION WITHOUT COMPROMISING THE INTENT OF
THE ORIGINAL DESIGN. COORDINATE ANY MODIFICATIONS WITH THE COR PRIOR
TO STARTING WORK IN AREAS AFFECTED.
1.4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
AT SITE PRIOR TO STARTING WORK.
1.5. DO NOT SCALE DRAWINGS.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND
REGULATIONS, INCLUDING THOSE WHICH MAY BE ISSUED BY THE OWNER, ARE BEING
OBSERVED, PARTICULARLY WORKPLACE SAFETY AND THE CONDUCT OF ALL THOSE
EMPLOYED DIRECTLY AND INDIRECTLY ON THE PREMISES, AND THE OWNER'S
EMPLOYEES WHO MAY BE IMPACTED OR AFFECTED BY CONSTRUCTION ACTIVITIES. THE
CONTRACTOR WILL INSTALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE
WARNING AND PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE
COORDINATED WITH THE OWNER AND HIS ONGOING OPERATIONS AND WILL PROMPTLY
BE REVISED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.
2.1. DURING PERFORMANCE OF WORK, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVISION AND MAINTENANCE OF WARNING SIGNS, LIGHT SIGNAL DEVICES,
GUARD LIGHTS, BARRICADES, GUARD RAILS, FENCES AND OTHER DEVICES,
APPROPRIATELY LOCATED ON AND AROUND THE JOB SITE WHICH GIVE PROPER
AND UNDERSTANDABLE WARNING TO PERSONS WITH REGARD TO HAZARDOUS
CONDITIONS, EQUIPMENT AND OPERATIONS BEING PERFORMED IN CONJUNCTION
WITH THE WORK.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH OTHER TRADES FOR
ITEMS IN THEIR SCOPE OF WORK WHICH COULD REQUIRE ADDITIONAL
MECHANICAL/PLUMBING WORK, AND ITEMS THAT ARE NOT INDICATED ON THE
DRAWINGS.
4. THIS INSTALLATION WILL CONFORM TO ALL CODES AND THE REQUIREMENTS OF
FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES HAVING JURISDICTION. IN
PARTICULAR, THE WORK WILL BE IN ACCORDANCE WITH THE CURRENT ADOPTED
EDITION OF THE NEW YORK STATE UNIFORM FIRE PROTECTION AND BUILDING CODE
AND ALL OF ITS APPLICABLE SUBCODES AND AMENDMENTS.
5. ALL WORK WILL BE LAWFULLY EXECUTED IN A NEAT AND WORKMANLIKE MANNER AND
WILL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING CODES (ABOVE),
INDUSTRY STANDARDS, AND IN CONFORMANCE WITH THE MANUFACTURERS
RECOMMENDATIONS AND REQUIREMENTS.
6. WORK UNDER THIS CONTRACT SHALL CONSIST OF THE CONTRACTOR PROVIDING ALL
LABOR, MATERIALS, AND SERVICES, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT
REASONABLY IMPLIED. THIS SHALL INCLUDE CUTTING, PATCHING AND RESTORATION OF
EXISTING SURFACES DAMAGED DURING THE CONSTRUCTION. CONTRACTOR SHALL
ALSO PROVIDE ALL EQUIPMENT SHOWN OR SPECIFIED OR AN APPROVED EQUIVALENT.
SUBSTITUTED EQUIPMENT OR MATERIALS SHALL NOT BE INSTALLED UNTIL GIVEN
WRITTEN APPROVAL BY THE OWNER.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS INCURRED FOR NONCOMPLIANCE
WITH THESE CONTRACT DOCUMENTS. CONTRACTOR WILL NOT BE ALLOWED CHANGE
ORDERS FOR PROBLEMS ARISING FROM NEGLECT OF PROVISIONS INCLUDED IN THESE
CONDITIONS.
8. MAINTAIN ORDERLY HOUSEKEEPING DURING CONSTRUCTION, AND UPON SUBSTANTIAL
COMPLETION PERFORM FINAL CLEANUP. REMOVE CONSTRUCTION RUBBISH,
SCAFFOLDING, EQUIPMENT, TEMPORARY PROTECTION, TEMPORARY FIELD
STRUCTURES, AND OTHER MATERIALS OR EQUIPMENT THAT WAS REQUIRED IN
CONNECTION WITH THE CONSTRUCTION, BUT NOT A PERMANENT PART THEREOF.
9. THOSE PERFORMING WORK AS A CONTRACTOR MUST EXAMINE SUBSTRATES AND
CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY THE
CONTRACTOR IN WRITING, OF CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY
COMPLETION OF THE WORK. COMMENCEMENT OF WORK BY A TRADE ON A SURFACE OR
CONSTRUCTION SHALL IMPLY ACCEPTANCE OF SUCH SURFACE OR CONSTRUCTION. DO
NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED.
10. THE CONTRACTOR SHALL SECURE ALL PERMITS AND APPLICATIONS AND PAY ANY AND
ALL FEES AS REQUIRED. THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES AND
CERTIFICATES OF INSPECTION REQUIRED BY THE AUTHORITIES HAVING JURISDICTION.
DELIVER ALL PERMITS, CERTIFICATES AND APPROVALS TO THE OWNER AGENT PRIOR
TO FINAL ACCEPTANCE OF THE WORK. THE CONTRACTOR MUST FILE NECESSARY
DRAWINGS, PREPARE DOCUMENTS AND MAKE APPLICATIONS FOR EACH REQUIRED
PERMIT AND INSPECTION, PRIOR TO COMMENCING WORK TO AVOID DELAYS DURING
CONSTRUCTION.
11. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND MANUFACTURERS DATA SHEETS ON
ALL EQUIPMENT AND MATERIALS SPECIFIED ON DRAWINGS FOR APPROVAL BY OWNER.
THESE DRAWINGS OR SHEETS SHALL CONTAIN ALL NECESSARY DATA, I.E.,
MANUFACTURER, CATALOG NUMBER, SIZE, DIMENSIONS, CAPACITY, WIRING DETAILS
AND ALL OTHER ENGINEERING DATA AND DETAILS NECESSARY FOR COMPLETE CLARITY
AND INSTALLATION.
12. THE CONTRACTOR SHALL KEEP ONE SET OF THE LATEST ISSUE OF DRAWINGS WHICH
SHALL REFLECT THE ACTUAL INSTALLED CONDITIONS AND CONNECTIONS OF ALL
EQUIPMENT AND DEVICES. THE CONTRACTOR SHALL PROVIDE COPIES OF ALL
MAINTENANCE INFORMATION AND INSTRUCTIONS RECEIVED WITH EQUIPMENT AND
SYSTEMS. ALL "AS-BUILT" DRAWINGS AND MISCELLANEOUS INFORMATION SHALL BE
GIVEN TO THE OWNER AND ENGINEER AT COMPLETION OF WORK. THE CONTRACTOR
SHALL GUARANTEE ALL MATERIAL AND LABOR TO BE FREE FROM DEFECTS FOR A ONE
YEAR PERIOD FROM THE TIME OF OWNER ACCEPTANCE. ANY DEFECTS OCCURRING
DURING THIS PERIOD SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL
COST TO THE OWNER.
13. AS DIRECTED BY THE OWNER, ALL EXISTING EQUIPMENT AND MATERIAL IN USABLE
CONDITION THAT IS REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER, OR
HANDLED AS INSTRUCTED BY THE OWNER, BE DISPOSED OF BY THE CONTRACTOR. ALL
MATERIALS DEEMED FOR REMOVAL SHALL BE RECYCLED WHENEVER POSSIBLE, IN
ACCORDANCE WITH THE REQUIREMENTS SET FORTH WITHIN SPECIFICATION SECTION 01
74 19 (CONSTRUCTION WASTE MANAGEMENT).
14. CONTRACTOR IS TO PROVIDE ALL REQUIRED SCAFFOLDING, LADDERS, RIGGING,
HOISTING AND ALL OTHER EQUIPMENT REQUIRED FOR THE INSTALLATION OF THEIR
WORK.
15. ESTABLISH PASSAGE CLEARANCES REQUIRED TO DELIVER, INSTALL AND ERECT ALL
REQUIRE EQUIPMENT. IF STRUCTURES, EQUIPMENT AND SYSTEMS MUST BE ALTERED
TO PROVIDE PASSAGE OF EQUIPMENT, THE CONTRACTOR SHALL RESTORE
STRUCTURES, EQUIPMENT AND SYSTEMS TO THEIR ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE; INCLUDING REMOVING AND REPLACEMENT OF ALL CEILING
AS REQUIRED TO COMPLETE THE WORK.
16. ALL INTERIOR AND EXTERIOR WALL, CEILING AND ROOF OPENINGS AND DUCT AND PIPE
THROUGH WALL PENETRATIONS, FRAMING, SLEEVES, WEATHERPROOFING AND FIRE
SEALING SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED
OTHERWISE.
17. INSULATE PER SPECIFICATION SECTION 23 07 11.
18. CONTRACTOR SHALL TEST ADJUST & BALANCE THE COMPLETED SYSTEM. ALL
BALANCING WORK SHALL BE DONE UNDER THE DIRECT SUPERVISION OF AN AABC OR
NEBB-QUALIFIED SUPERVISOR WHO SHALL CERTIFY THE RESULTS.
19. TEST, ADJUST AND BALANCE WORK WILL DEMONSTRATE THAT ALL SYSTEMS OPERATE
AS THEY WERE INTENDED TO. UPON COMPLETION OF THE WORK A WRITTEN TEST AND
BALANCE REPORT WILL BE SUBMITTED TO THE OWNER. FORMS AND PROCEDURES
UTILIZED FOR THIS WORK WILL BE AS PROPOSED BY THE AABC OR OTHER NATIONALLY
RECOGNIZED ORGANIZATION ACCEPTABLE TO THE OWNER.
20. ALL DUCTWORK, PIPING AND EQUIPMENT SHOWN ON NEW WORK PLANS AND DETAILS
SHALL BE CONSIDERED AS NEW UNLESS IDENTIFIED AS EXISTING TO REMAIN.
PIPING NOTES
1. ALL PIPING MATERIALS AND COMPONENTS INCLUDING FITTINGS, PIPE, FLANGES,
VALVES, ETC. SHALL BE DESIGNED, FABRICATED AND INSTALLED PER
APPROPRIATE SECTIONS OF THE LATEST ANSI AND ASTM CODES AND STANDARDS
AND THE MATERIAL SPECIFICATIONS FOUND IN THE PROJECT DOCUMENTS.
2. CONTRACTOR TO INSTALL HIGH POINT VENTS AT ALL SYSTEM HIGH POINTS AND
LOW POINT DRAINS AT SYSTEM LOW POINTS. VENTS AND DRAINS ARE REQUIRED
TO FACILITATE SYSTEM DRAINING AND VENTING DURING TESTING AND START-UP.
3. SURFACES TO BE SOLDERED SHALL BE CLEANED BRIGHT. THE JOINTS SHALL BE
PROPERLY FLUXED AND MADE WITH APPROVED SOLDER. SOLDER JOINTS FOR
POTABLE WATER SHALL BE MADE WITH A SOLDER CONTAINING NOT MORE THAN
0.2 PERCENT LEAD.
4. UNIONS SHALL BE INSTALLED AT ALL EQUIPMENT. THE USE OF DIELECTRIC
UNIONS MUST BE INSTALLED IN AREAS WHERE JOINING OF DISSIMILAR METALS (ie
CARBON STEEL TO COPPER OR BRONZE, ETC.). THIS IS TO FACILITATE PIPING
REMOVAL AND REASSEMBLY FOR FUTURE MAINTENANCE WORK AND/OR PREVENT
GALVANIC CORROSION.
5. CONTRACTOR SHALL PROPERLY BRACE, ANCHOR, AND SUPPORT ALL PIPING,
VALVES ETC. UNLESS SHOWN OTHERWISE, ALL PIPE HANGERS AND SUPPORTS
SHALL BE DESIGNED, MANUFACTURED AND INSTALLED PER MSS SP-58, MSS SP-69
AND MSS SP-89.
6. ALL ABOVEGROUND PIPING SHALL BE INSULATED AND JACKETED AS NOTED IN THE
SPECIFICATIONS.
7. ALL PIPES THAT PASS THROUGH EXTERIOR WALLS SHALL BE SLEEVED AND MADE
WEATHER TIGHT.
8. ALL PIPING AND VALVES MUST BE PROPERLY IDENTIFIED AND LABELED PER ANSI
13.1, ENTITLED "SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS". ALL
VALVES MUST BE IDENTIFIED AND TAGGED WITH WEATHERPROOF TAGS.
9. ALL PIPES OR TUBING WHICH PASS THROUGH RATED AND NON-RATED WALLS,
FLOORS AND FOUNDATION WALLS, SHALL PASS THROUGH A SCHEDULE 40
CARBON STEEL PIPE SLEEVE. SLEEVES WHICH PASS THROUGH MASONRY SHALL
BE GALVANIZED COATED. ALL SLEEVES SHALL BE INSTALLED FLUSH ON BOTH
SIDES OF WALL PENETRATION.
NON-RATED WALL: THE SLEEVE SHALL BE SIZED TO ALLOW FREE PASSAGE OF
INSULATED AND NON-INSULATED PIPES AND TUBING.
RATED WALL: PIPES WHICH PASS THROUGH FIRE-RATED WALLS & FLOOR SHALL
USE THE APPROPRIATE CODE APPROVED, TESTED AND INSTALLATION METHOD
OF SEALING WHILE MAINTAINING THE INTEGRITY OF THE WALL'S FIRE RATING(S).
EXTENSION WALLS & FOUNDATION WALLS: PIPES WHICH PASS THROUGH
EXTENSION WALLS OR FOUNDATION WALLS SHALL BE SEALED AND MADE
WEATHER TIGHT.
10. INSULATE COLD AND HOT WATER PIPING WITH FIRE RETARDANT VAPOR BARRIER
JACKET. PIPE INSULATION SHALL BE SEALED WITH A FIRE RESISTIVE ADHESIVE.
SEE SPECIFICATIONS.
MECHANICAL ABBREVIATIONS
SYMBOL LIST SHOWN IS FOR GENERAL REFERENCE ONLY. THE
PRESENCE OF A SYMBOL DOES NOT IMPLY ITS USE ON THIS PROJECT.
REFER TO THE DRAWINGS FOR SPECIFIC SYMBOLS USED.
(NOTE: NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS)
DRAWING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN);
" PER FOOT
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING PIPING
ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAGE
FLOW ELEMENT
SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
CHILLED WATER SUPPLY
MAKE-UP WATER
DRAIN LINE
VENT LINE
CHILLED WATER RETURN
GLYCOL-WATER RUN AROUND SUPPLY
TUBE CLEANER WATER SUPPLY
CHEMICAL FEED
OVERFLOW
COMPRESSED AIR
COLD WATER (CITY WATER)
GLYCOL-WATER RUN AROUND RETURN
SOFTENED WATER
HOT WATER
REVERSE OSMOSIS
EXISTING PIPE OR EQUIPMENT TO BE REMOVED
GATE VALVE - THREADED / FLANGED
GLOBE VALVE - THREADED / FLANGED
GATE VALVE WITH
" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE &
HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND
QUICK COUPLE HOSE CONNECTION
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
PRESSURE REDUCING VALVE (PRV)
CONTROL VALVE (CV) - FLOAT-OPERATED
PLUG VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
CIRCUIT SETTER VALVE
WATER BALANCE DEVICE
KEY NOTE SYMBOL
MULTIPLE KEY NOTES APPLYING TO THE SAME ITEM
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION NUMBER
DRAWING NUMBER WHERE DRAWN
AHU THAT SERVES THE EQUIPMENT
EQUIPMENT ABBREVIATION (SUPPLY FAN)
EQUIPMENT NUMBER
PIPING SYMBOLS
VALVE SYMBOLS
AUTOMATIC BALANCING CONTROL VALVE
M-103
M-103
TYPICAL DRAWING
BLOCK OR DETAIL TITLE
FLOW SWITCH HIGH
FLOW SWITCH LOW
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE) / TRANSMITTER - WALL MOUNT
TEMPERATURE TRANSMITTER
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
VARIABLE SPEED MOTOR CONTROLLER
HVAC CONTROL PANEL
LOCAL TEMPERATURE CONTROL PANEL
OCCUPANCY SENSOR
CARBON MONOXIDE TRANSMITTER
CARBON DIOXIDE TRANSMITTER
PRESSURE SWITCH LOW
PRESSURE SWITCH HIGH
TEMPERATURE SENSING ELEMENT FOR TRANSMITTING
TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER / OR VALVE
CONTROLS SYMBOLS
FIRE AND SMOKE DETECTOR
PIPE CAP OR PLUG
HEATING / COOLING VALVE BOX ASSEMBLY
DRAWING TITLE
SCALE: NONE
NOTE:
SYMBOL LIST SHOWN IS FOR GENERAL
REFERENCE ONLY. THE PRESENCE OF A
SYMBOL DOES NOT IMPLY THAT IT IS USED
ON THIS PROJECT. REFER TO THE
DRAWINGS FOR SPECIFIC SYMBOLS USED.
o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r c h e e f o o t o d o n e h a l f i n c h e e f o o t o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
MG-001
JDMA
MECHANICAL ABBREVIATIONS,
SYMBOLS & NOTES
1 2
1-SF-1
CONNECT NEW TO EXISTING
LIMIT OF DEMOTION
AutoCAD SHX Text
AT
AutoCAD SHX Text
OC
AutoCAD SHX Text
FE
AutoCAD SHX Text
AV
AutoCAD SHX Text
MV
AutoCAD SHX Text
SD
AutoCAD SHX Text
FSD
AutoCAD SHX Text
AT
AutoCAD SHX Text
CO2
AutoCAD SHX Text
AT
AutoCAD SHX Text
CO
AutoCAD SHX Text
HS
AutoCAD SHX Text Rh
AutoCAD SHX Text
FT
AutoCAD SHX Text
MT
AutoCAD SHX Text M
AutoCAD SHX Text
LT
AutoCAD SHX Text
LC
AutoCAD SHX Text
PT
AutoCAD SHX Text
PSH
AutoCAD SHX Text
TT
AutoCAD SHX Text T
AutoCAD SHX Text
SPS
AutoCAD SHX Text
PDT
AutoCAD SHX Text
PDS
AutoCAD SHX Text
TSL
AutoCAD SHX Text
TSH
AutoCAD SHX Text
PSL
AutoCAD SHX Text
FSH
AutoCAD SHX Text
FSL
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
LTCP
AutoCAD SHX Text M
AutoCAD SHX Text
VSMC
D
G127
FMS
G124
WAREHOUSE STORAGE
G134
MECHANICAL ROOM
G128
CLOSET
G129
ROOM
GS2
STAIR #2
G130
FMS
G131
ELECTRICAL ROOM
G134A
GENERATOR ROOM
HE-SP
EXISTING AHU-5 EXISTING AHU-6
EXISTING AHU-8
EXISTING AHU-7
3"
3"
1"
VENT
TO & FROM STEAM MANHOLE
WALL SLEEVE
(BELOW GRADE)
2" VENT
WALL SLEEVE
3"
" PC (CAPPED
FOR FUTURE)
CONCRETE PAD
CRS-SP
3" HPS
3" HPS
5"
LPC FROM FLASH TANK
PRESSURE REDUCING
STATION PRS-SP
COMPLETE WITH METER
5" VENT FROM
SAFETY RELIEF
VALVE DISCHARGE
5"
4"
3"
5" 3"
CV-SP-2
CV-SP-1
3"
3"
5"
4"
5"
2"
4"
3"
ABANDONED STEAM
SERVICE ENTRANCE
EXIST. CONC. PAD
EXIST. DOMESTIC
WATER HEATER
CHILLER
WC-2
2"
2"
AS
EXIST. CONC. PAD
4"
4"
3"
4"
5"
5"
5"
5"
5"
8"
AS
" TO EXPANSION
TANKS
NC
NO
5"
5"
5"
5"
3"
5"
5" 5"
5"
EXISTING
BOILER B-1
(GAS ONLY)
EXISTING
BOILER B-2
(GAS / OIL)
8"
EXIST. CONC.
PAD
EXIST. 8" CWS &
CWR TO & FROM
COOLING TOWER
(BELOW GRADE)
5"
5"
5"
8"
PUMP P-HWG-1 PUMP P-HWG-2
5"
6"
5"
DN TO EXIST.
2" DRAIN
EXIST. 8" VENT
UP THRU ROOF
HHW PUMPS
P-HW-1 &
P-HW-2
8"
CHW PUMP
P-1
CHW PUMP
P-2
6"
8"
6"
EXIST.
EMERGENCY
GENERATOR
EXIST. OIL
150 GAL.
DAY TANK
2'-0"
4"
CW PUMP
P-3
CW PUMP
P-4
EXIST. TRENCH
15'-0"
2 APPROX. NEW
LOCATION OF
CHILLER WC-2,
SEE M-101
APPROX. NEW
LOCATION OF
PUMPS P-1 & P-2,
SEE M-101
5"
4"
5"
CV-CO
EXIST.
EXHAUST FAN
EF-14, EF-13
BELOW
EXIST.
EXHAUST
FAN EF-17
MECHANICAL DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
MECHANICAL DEMOLITION GENERAL NOTES:
1. REMOVE EVERYTHING WITHIN WORK AREA AS SHOWN AND INDICATED; TO
INCLUDE BUT NOT LIMITED TO: ELECTRICAL CONDUITS, PIPING, VALVES,
CONTROLS, AND INSULATION.
2. ALL ABANDONED PIPING & CONDUITS IN THE WORK AREA SHALL BE REMOVED.
COORDINATE WITH VAMC COR PRIOR TO REMOVAL.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN
ADVANCE. SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS.
WORK SHALL BE SCHEDULED DURING THE MONTHS OF NOVEMBER THROUGH
MARCH.
MECHANICAL DEMOLITION KEYED NOTES:
DISCONNECT EXISTING CHILLED WATER PUMPS P-1, P-2 AND AIR SEPARATOR.
DEMO PIPING, VALVES AND ACCESSORIES, SAVE FOR RE-USE TO EXTENT
POSSIBLE. REMOVE CONCRETE HOUSEKEEPING PAD AS SHOWN. PUMPS TO BE
RE-INSTALLED AT NEW LOCATION SHOWN, SEE M-101. COORDINATE WITH
ELECTRICAL CONTRACTOR AND VAMC COR.
DISCONNECT EXISTING CHILLER WC-2. DEMO PIPING, VALVES AND
ACCESSORIES AS SHOWN. CHILLER TO BE RE-INSTALLED AT NEW LOCATION
SHOWN, SEE M-101. COORDINATE WITH ELECTRICAL CONTRACTOR, HVAC
CONTROLS CONTRACTOR AND VAMC COR.
REMOVE EXISTING 3" PVC REFRIGERANT VENT PIPING. DISCONNECT AND
DEMOLISH HALOGUARD II REFRIGERANT MONITOR AFTER NEW REFRIGERANT
MONITOR IS INSTALLED AND OPERATIONAL.
o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
MD-101
JDMA
MECHANICAL DEMOLITION PLAN
N
AutoCAD SHX Text P
P
D
G127
FMS
G124
WAREHOUSE STORAGE
G134
MECHANICAL ROOM
G128
CLOSET
G129
ROOM
GS2
STAIR #2
G130
FMS
G131
ELECTRICAL ROOM
G134A
GENERATOR ROOM
HE-SP
EXISTING AHU-5 EXISTING AHU-6
EXISTING AHU-8
EXISTING AHU-7
3"
3"
1"
VENT
TO & FROM STEAM MANHOLE
WALL SLEEVE
(BELOW GRADE)
2" VENT
WALL SLEEVE
3"
" PC (CAPPED
FOR FUTURE)
CONCRETE PAD
CRS-SP
3" HPS
3" HPS
5"
LPC FROM FLASH TANK
PRESSURE REDUCING
STATION PRS-SP
COMPLETE WITH METER
5" VENT FROM
SAFETY RELIEF
VALVE DISCHARGE
5"
4"
3"
5" 3"
CV-SP-2
CV-SP-1
3"
3"
5"
4"
5"
2"
4"
3"
ABANDONED STEAM
SERVICE ENTRANCE
EXIST. CONC. PAD
EXIST. DOMESTIC
WATER HEATER
2"
2"
EXIST. CONC. PAD
4"
4"
3"
4"
5"
5"
5"
5"
5"
8"
AS
" TO EXPANSION
TANKS
NC
NO
5"
5"
5"
5"
3"
5"
5" 5"
5"
EXISTING
BOILER B-1
(GAS ONLY)
EXISTING
BOILER B-2
(GAS / OIL)
8"
EXIST. CONC.
PAD
EXIST. 8" CWS &
CWR TO & FROM
COOLING TOWER
(BELOW GRADE)
5"
5"
5"
8"
PUMP P-HWG-1 PUMP P-HWG-2
5"
6"
5"
DN TO EXIST.
2" DRAIN
EXIST. 8" VENT
UP THRU ROOF
HHW PUMPS
P-HW-1 &
P-HW-2
8"
AS
CHW PUMP
P-1
CHW PUMP
P-2
6"
8"
6"
15'-6"
RELOCATED
CHILLER WC-2
EXIST.
EMERGENCY
GENERATOR
EXIST. OIL
150 GAL.
DAY TANK
15'-0"
RELOCATED PUMPS
& NEW CONC. PAD
6"
6"
5"
5"
6"
6"
4"
NEW
CHILLER
WC-1
CW PUMP
P-3
CW PUMP
P-4
EXIST. TRENCH
5"
4"
5"
COND.
EVAPORATOR
CV-CO
3"
3"
CONNECT TO
(6) EXIST.
VENT RISERS
CONNECT TO
(3) 1-1/2"
VENT RISERS
M-101
CORE THRU WALL;
REUSE (1) EXIST.
OPNG IF POSSIBLE
FT4
FT3
FT1
FT2
CHW-ISO-1
CHW-ISO-2
CW-ISO-2
CW-ISO-1
EXIST.
EXHAUST FAN
EF-14, EF-13
BELOW
EXIST.
EXHAUST
FAN EF-17
EXISTING AHU-1A
EXISTING AHU-1B
EXISTING AHU-2
EXISTING AHU-4
3"
MECH. PENTHOUSE
3S1
STAIR #1
ROOM
CHASE CHASE
ROOF
ROOF
1"
1" CAP
4"
TO COOLING COIL
TO HUMIDIFIER
TO HEATING COIL
2"
3"
4"
2"
1" DN
" DN
" DN
3" DN
2" DN
2"
4"
4" DN
2"
EXISTING
CSG-1A
EXISTING
CSG-1B
DP
CHW-DP
MECHANICAL DRAWING GENERAL NOTES:
1. PROVIDE ALL CONTROL COMPONENTS, CONTROL WIRING, AND CONNECTIONS
TO PROPERLY INTERFACE WITH THE EXISTING DELTA TEMPERATURE CONTROL
SYSTEM AND CONTROL OPERATING SYSTEMS. ALL NEW CONTROL
COMPONENTS, CONTROL VALVES, THERMOSTATS, SENSORS, ETC. SHALL BE
ELECTRIC TYPE. COORDINATE WITH VAMC COR.
2. MAINTAIN THE INTEGRITY OF ALL EXISTING EQUIPMENT AND SYSTEMS
LOCATED OUTSIDE THE WORK AREA AND INTERRUPTED BY THE RENOVATION
WORK. PROVIDE ALL ADDITIONAL PIPING, FITTINGS, DUCTWORK, ACCESSORIES,
ETC. REQUIRED TO EXTEND AND RECONNECT REMAINING EQUIPMENT AND
SYSTEMS.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN
ADVANCE. SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY
OPERATIONS. PROVIDE TEMPORARY SYSTEMS DURING SHUTDOWNS AS
REQUIRED.
4. SYSTEMS INDICATED ON DRAWINGS SHALL BE INSTALLED AS SHOWN.
ADJUSTMENT TO LOCATIONS OF VARIOUS ITEMS MAY BE REQUIRED BY FIELD
CONDITIONS. VERIFY AND COORDINATE WITH COR PRIOR TO INSTALLATION.
5. PROVIDE SERVICE CLEARANCE FOR ALL HVAC EQUIPMENT AS RECOMMENDED
BY MANUFACTURER.
6. INSULATE ALL CHILLED WATER SUPPLY AND RETURN LINES PER SPECIFICATION
230711.
o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
M-101
JDMA
MECHANICAL PLAN
MECHANICAL DRAWING KEYED NOTES:
INSTALL NEW CHILLER WC-1 AT LOCATION SHOWN, SEE DETAIL ON MG-501.
RE-INSTALL EXISTING CHILLER WC-2 AT NEW LOCATION AS SHOWN. SEE
DEMOLITION PLAN ON MP-101 AND DETAILS ON MG-501.
RELOCATE EXISTING CHILLED WATER PUMP ASSEMBLY (PUMPS P-1, P-2 AND
AIR SEPARATOR) APPROXIMATELY 30" WEST AND 24" SOUTH. REUSE EXISTING
VALVES, GAUGES, ETC. TO EXTENT POSSIBLE. DEMO EXISTING CONCRETE
PAD AND PROVIDE A NEW CONCRETE PAD. SEE DEMOLITION PLAN MD-101
AND DETAILS ON MG-501.
NEW VFD'S FOR EXISTING CHW PUMPS P-3 AND P-4 TO BE PROVIDED AND
INSTALLED BY ELECTRICAL CONTRACTOR. PUMP VFD'S TO BE CONTROLLED
BY CHILLER CONDENSER BARREL DIFFERENTIAL PRESSURE OR FLOW
METERS BY MECHANICAL CONTRACTOR. COORDINATE ALL WORK WITH
ELECTRICAL CONTRACTOR AND HVAC CONTROLS CONTRACTOR.
EXISTING VARIABLE FREQUENCY DRIVES (VFD'S) SHALL CONTROL CHILLED
WATER TO NEW DIFFERENTIAL PRESSURE SENSOR IN PENTHOUSE, SEE
PENTHOUSE PLAN 2/M-101.
MOUNT NEW REFRIGERANT GAS DETECTOR; SHERLOCK 202 BY GENESIS
INTERNATIONAL (OR EQUAL). INCLUDE REFRIGERANT SENSORS FOR R-1233ZD
AND R-134A AND HORN/STROBE. COORDINATE WITH HVAC CONTROLS
CONTRACTOR FOR INTEGRATION TO THE DELTA BAS CONTROL SYSTEM TO
START THE MECHANICAL ROOM EXHAUST FAN, OPEN MAKE-UP AIR DAMPERS
AND INITIATE A CRITICAL ALARM.
CONNECT NEW 3" COPPER REFRIGERANT VENT LINE TO CHILLER REFRIGERANT
VENTS. PROVIDE A STAINLESS STEEL FLEXIBLE CONNECTOR WITH DIELECTRIC
FLANGES/UNIONS ON THE 3" VENT LINE FOR EACH CHILLER.
PROVIDE VIBRATION ISOLATION PADS AND CONCRETE ANCHORS ON EACH
CHILLER. PROVIDE STAINLESS STEEL SHIMS UNDER ISOLATORS TO LEVEL
ISOLATION PADS PRIOR TO SETTING THE CHILLER IN PLACE, IF NECESSARY.
PROVIDE NEW 6" THICK CONCRETE HOUSEKEEPING PAD, REFER TO DETAIL 5 ON
DRAWING MG-501.
MECHANICAL PLAN
SCALE: 1/4" = 1'-0"
N
PENTHOUSE MECHANICAL PLAN
SCALE: 1/4" = 1'-0"
N
M-101
RUPTURE DISC RELIEF PIPING DETAIL
SCALE: NONE
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
VSMC
AutoCAD SHX Text
VSMC
AutoCAD SHX Text
INTERIOR
AutoCAD SHX Text
EXTERIOR
AutoCAD SHX Text
SEAL PENETRATION W/NON-SHRINK GROUT
AutoCAD SHX Text
GALV. STEEL PIPE SLEEVE
AutoCAD SHX Text
MODULAR-TYPE WALL PENETRATION SEAL AT CORE-THRU OPENINGS
AutoCAD SHX Text
EXIST. MASONRY WALL
AutoCAD SHX Text
FLEXIBLE SST CONN. W/DIELECTRIC SEPARATION
AutoCAD SHX Text
RUPTURE DISC ASSEMBLY
AutoCAD SHX Text
SCREENED OUTLET
AutoCAD SHX Text
14" DRAIN VALVE
AutoCAD SHX Text
3" DRIP LEG (LENGTH AS REQ'D FOR ACCESS)
AutoCAD SHX Text
3" COPPER REFRIGERANT VENT FROM CHILLER (TYP 2 PLCS)
DETAIL NOTES: 1. ALL REFRIGERANT VENT PIPING SHALL BE COPPER UNLESS NOTED OTHERWISE. ALL REFRIGERANT VENT PIPING SHALL BE COPPER UNLESS NOTED OTHERWISE. 2. SUPPORT ALL PIPE AND FITTINGS WITH HANGERS AS REQUIRED.SUPPORT ALL PIPE AND FITTINGS WITH HANGERS AS REQUIRED.
SCALE: NONE
RATED BARRIER PENETRATION-INSULATED PIPE
o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
MG-501
JDMA
MECHANICAL DETAILS
WATER-COOLED CHILLER PIPING DETAIL
SCALE: NONE
PIPE HANGERS
SCALE: NONE
INTERIOR CONCRETE
EQUIPMENT PAD DETAIL
SCALE: NONE
SECURING PIPE OR DUCTWORK HANGER
RODS FROM CONCRETE DECK DETAILS
SCALE: NONE
TYPICAL PIPE OR DUCTWORK HANGER ROD
CLAMP TO BUILDING STEEL DETAILS
SCALE: NONE
TYPICAL PUMP PIPING CONNECTIONS DETAIL
SCALE: NONE
CHILLED WATER PIPING SCHEMATIC
SCALE: NONE
CONDENSER WATER PIPING SCHEMATIC
SCALE: NONE
FLOW METER INSTALLATION DETAIL
SCALE: NONE
AutoCAD SHX Text
PIPE INSULATION (2" THICK MAX.)
AutoCAD SHX Text
THROUGH-PENETRANT STEEL PIPE OR COPPER TUBE
AutoCAD SHX Text SEALANT: MIN. " THICK 12" THICK UL-LISTED, FIRE-RATED CAULK APPLIED WITHIN ANNULUS FLUSH WITH FINISHED SURFACE OF WALL ASSEMBLY
AutoCAD SHX Text
2-HR. RATED SHAFT WALL ASSEMBLY
AutoCAD SHX Text
GYPSUM BOARD OR MASONRY WALL
AutoCAD SHX Text
STEEL SLEEVE FLUSH WITH FACE OF WALL (BOTH SIDES)
AutoCAD SHX Text
PACKING MATERIAL - MIN. 3 " 14" WIDE OF MIN. 4 PCF MINERAL WOOL BATT INSULATION
AutoCAD SHX Text WALL STRIP - " TH'K x 1 " WIDE 316" TH'K x 1 " WIDE 34" WIDE INTUMESCENT STRIP WRAPPED TIGHTLY AROUND PIPE COVERING
AutoCAD SHX Text
NOTE: UL SYSTEM W-J-5048
AutoCAD SHX Text
NOTE: SEE SPECIFICATIONS FOR DETAILED HANGER REQUIREMENTS.
AutoCAD SHX Text
5 FT
AutoCAD SHX Text
AutoCAD SHX Text
THRU [20]
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text [32]
AutoCAD SHX Text [25]
AutoCAD SHX Text [40]
AutoCAD SHX Text
AutoCAD SHX Text [65]
AutoCAD SHX Text
AutoCAD SHX Text [50]
AutoCAD SHX Text
AutoCAD SHX Text [75]
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text [125]
AutoCAD SHX Text [100]
AutoCAD SHX Text
AutoCAD SHX Text [150]
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2 12
AutoCAD SHX Text 1 12
AutoCAD SHX Text
AutoCAD SHX Text 1 14
AutoCAD SHX Text [5200]
AutoCAD SHX Text [4100]
AutoCAD SHX Text [4900]
AutoCAD SHX Text [3700]
AutoCAD SHX Text [3000]
AutoCAD SHX Text [3400]
AutoCAD SHX Text [2700]
AutoCAD SHX Text [2100]
AutoCAD SHX Text [4100]
AutoCAD SHX Text [3700]
AutoCAD SHX Text [4000]
AutoCAD SHX Text [3000]
AutoCAD SHX Text [2400]
AutoCAD SHX Text [1800]
AutoCAD SHX Text [1500]
AutoCAD SHX Text
THRU 34
AutoCAD SHX Text
AutoCAD SHX Text [2100]
AutoCAD SHX Text [2100]
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text [2100]
AutoCAD SHX Text
AutoCAD SHX Text [2700]
AutoCAD SHX Text
AutoCAD SHX Text [2400]
AutoCAD SHX Text
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. [453KG] UNIFORM LOAD
AutoCAD SHX Text
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS
AutoCAD SHX Text
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
AutoCAD SHX Text
MAXIMUM PIPE/TUBING SUPPORT SPACING
AutoCAD SHX Text
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
AutoCAD SHX Text
NOM. SIZE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
TUBING
AutoCAD SHX Text
IN.
AutoCAD SHX Text [mm]
AutoCAD SHX Text
FT.
AutoCAD SHX Text [mm]
AutoCAD SHX Text
FT.
AutoCAD SHX Text [mm]
AutoCAD SHX Text
HANGER ROD
AutoCAD SHX Text
INSULATION (VAPOR BARRIER TYPE IS REQUIRED FOR LOW TEMPERATURE PIPE)
AutoCAD SHX Text PROVIDE HIGH COMPRESSIVE STRENGTH INSULATION (9 PSF MIN. DENSITY) UNDER INSULATION SHIELD
AutoCAD SHX Text
INSULATION SHIELD AT HANGER
AutoCAD SHX Text
WELD
AutoCAD SHX Text
SADDLE
AutoCAD SHX Text 12" [15mm] DIA. HANGER RODS W/36" [900mm] MAX. SPACING ON EACH CHANNEL
AutoCAD SHX Text
BAND
AutoCAD SHX Text 1 " [43mm] 12 GA. 58" [43mm] 12 GA. CHANNEL OR 2"x2"x " 14" [50x50x6.4mm] ANGLE
AutoCAD SHX Text PROVIDE INSULATION SHIELD & INSERT FOR ALL PIPING (8" [200mm] MIN.)
AutoCAD SHX Text
1" MAX.
AutoCAD SHX Text
1" MAX.
AutoCAD SHX Text
FIN. FLOOR
AutoCAD SHX Text NOTE: LENGTH AND WIDTH DIMENSIONS OF THE CONCRETE PAD SHALL BE 6" GREATER THAN THE BASE OF THE EQUIPMENT.
AutoCAD SHX Text
EDGE OF EQUIPMENT
AutoCAD SHX Text
CONCRETE PAD: 3000 PSI @ 28 DAYS
AutoCAD SHX Text #4 @ 12" O.C. E.W., T&B
AutoCAD SHX Text
1" CHAMFER ENTIRE PAD PERIMETER (TYP)
AutoCAD SHX Text
PROVIDE #3 BARS 12" O.C. EACH WAY IN CONCRETE PAD, DOWEL PAD TO FLOOR
AutoCAD SHX Text NOTE: REFER TO PIPE HANGER OR DUCTWORK SUPPORT DETAILS FOR HANGER ROD SIZE. FOR CEILING SUSPENDED EQUIPMENT REFER TO PIPE HANGER OR DUCTWORK SUPPORT DETAILS FOR HANGER ROD SIZE. FOR CEILING SUSPENDED EQUIPMENT PROVIDE MIN. " DIA. HANGER ROD (REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS).38" DIA. HANGER ROD (REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS).
AutoCAD SHX Text
CONCRETE SLAB OR BEAM
AutoCAD SHX Text STEEL EXPANSION SHIELD ANCHOR IN (E) CONCRETE & INSERTS FOR NEW CONCRETE; THIS TYPE SHALL ONLY BE USED IN SLABS OR BEAMS OF 4" MIN. DEPTH
AutoCAD SHX Text
38" MIN. DIA. EXPANSION BOLTS FOR (E) CONCRETE & INSERTS FOR NEW CONCRETE (TYP)
AutoCAD SHX Text FOR PIPES UNDER 2" USE 1 "x1 "x " ANGLE, 12"x1 "x " ANGLE, 12"x " ANGLE, 14" ANGLE, FOR PIPES LARGER THAN 2" USE 3"x3"x " ANGLE14" ANGLE
AutoCAD SHX Text
NUTS & WASHERS (TYP)
AutoCAD SHX Text
38" MIN. DIA. HANGER RODS (TYP)
AutoCAD SHX Text
TURNBUCKLE
AutoCAD SHX Text
STRUCTURAL STEEL OR WEB STEEL JOISTS (TYP)
AutoCAD SHX Text
CONCRETE FLOOR OR ROOF SLAB
AutoCAD SHX Text
METAL DECKING (IF APPLICABLE)
AutoCAD SHX Text
METAL CHANNEL STRUT
AutoCAD SHX Text
NUT & WASHER (TYP)
AutoCAD SHX Text
BEAM CLAMP (TYP)
AutoCAD SHX Text
DOUBLE-SIDED BEAM CLAMP
AutoCAD SHX Text
HANGER ROD (TYP-SEE NOTE)
AutoCAD SHX Text
SIDE BEAM CLAMP
AutoCAD SHX Text
TOP BEAM C-CLAMP FOR PIPING 3" & LARGER
AutoCAD SHX Text
C-CLAMP FOR PIPING 2 " & SMALLER14" & SMALLER
AutoCAD SHX Text
VIBRATION ISOLATOR (TYP)
AutoCAD SHX Text
CONTROL & VSD PANELS
AutoCAD SHX Text
RELIEF VENT (SEE PLAN)
AutoCAD SHX Text
CONDENSER WATER SUPPLY
AutoCAD SHX Text
CONDENSER WATER RETURN
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
COMPRESSOR
AutoCAD SHX Text
MOTOR
AutoCAD SHX Text
BUTTERFLY VALVE (TYP)
AutoCAD SHX Text
THERMOMETER (TYP)
AutoCAD SHX Text
PRESSURE GAUGE (TYP)
AutoCAD SHX Text
FLEXIBLE CONNECTION (TYP)
AutoCAD SHX Text
EVAPORATOR
AutoCAD SHX Text
CONDENSER
AutoCAD SHX Text
FIN. FLR
AutoCAD SHX Text
SUCTION
AutoCAD SHX Text
DISCHARGE
AutoCAD SHX Text
UNIVERSAL TEST STATION PLUG (TYP)
AutoCAD SHX Text
SILENT CHECK VALVE (TYP)
AutoCAD SHX Text
THERMOMETER (TYP)
AutoCAD SHX Text
INCREASER
AutoCAD SHX Text
PUMP MOUNTING
AutoCAD SHX Text
COUPLING
AutoCAD SHX Text
PRESSURE GAUGE (TYP)
AutoCAD SHX Text
BUTTERFLY VALVE (TYP)
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
LONG RADIUS ELBOW
AutoCAD SHX Text
PIPE SUPPORT; SEE DETAIL
AutoCAD SHX Text
FLEX CONN. (TYP)
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
SPRING VIBRATION ISOLATOR
AutoCAD SHX Text
1 " CW14" CW
AutoCAD SHX Text
5" CHWR
AutoCAD SHX Text
5" CHWR
AutoCAD SHX Text
5" CHWS
AutoCAD SHX Text
ROTARY SCREW CHILLER WC-2 EVAPORATOR
AutoCAD SHX Text
ROTARY SCREW CHILLER WC-2 CONDENSER
AutoCAD SHX Text
CENTRIFUGAL CHILLER WC-1 EVAPORATOR
AutoCAD SHX Text
AS-3
AutoCAD SHX Text P-2
AutoCAD SHX Text P-1
AutoCAD SHX Text
5" CHWS
AutoCAD SHX Text
5" CHWS
AutoCAD SHX Text
5" CHWS
AutoCAD SHX Text
5" CHWS
AutoCAD SHX Text
5" CHWR
AutoCAD SHX Text
5" CHWR
AutoCAD SHX Text
5" CHWR
AutoCAD SHX Text
EXPANSION TANK
AutoCAD SHX Text
CENTRIFUGAL CHILLER WC-1 CONDENSER
AutoCAD SHX Text
TRIPLE DUTY VALVE (TYP)
AutoCAD SHX Text
BUTTERFLY VALVE (TYP)
AutoCAD SHX Text
SUCTION DIFFUSER (TYP)
AutoCAD SHX Text
2" DRAIN VALVE (TYP)
AutoCAD SHX Text S
AutoCAD SHX Text
FLOW SWITCH
AutoCAD SHX Text
5" CHWS
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text
FS
AutoCAD SHX Text
EXISTING COOLING TOWER SUMP
AutoCAD SHX Text
ROTARY SCREW CHILLER WC-2 EVAPORATOR
AutoCAD SHX Text
ROTARY SCREW CHILLER WC-2 CONDENSER
AutoCAD SHX Text
CENTRIFUGAL CHILLER WC-1 EVAPORATOR
AutoCAD SHX Text
CENTRIFUGAL CHILLER WC-1 CONDENSER
AutoCAD SHX Text
2" DRAIN VALVE (TYP)
AutoCAD SHX Text P-4
AutoCAD SHX Text P-3
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
FT
AutoCAD SHX Text
FT
AutoCAD SHX Text P
AutoCAD SHX Text
6" CWS
AutoCAD SHX Text
6" CWS
AutoCAD SHX Text
6" CWS
AutoCAD SHX Text
6" CWS
AutoCAD SHX Text
8" CWR
AutoCAD SHX Text
2" CW
AutoCAD SHX Text
8" CWS
AutoCAD SHX Text
10" CWR
AutoCAD SHX Text
8" CWR
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text
CONTROL/MODULATING VALVE
AutoCAD SHX Text
REFER TO TABLE FOR
AutoCAD SHX Text
REFER TO TABLE FOR
AutoCAD SHX Text
MINIMUM UPSTREAM STRAIGHT RUN REQUIRED
AutoCAD SHX Text
UPSTREAM
AutoCAD SHX Text
10 DIA
AutoCAD SHX Text
10 DIA
AutoCAD SHX Text
15 DIA
AutoCAD SHX Text
30 DIA
AutoCAD SHX Text
20 DIA
AutoCAD SHX Text
30 DIA
AutoCAD SHX Text
30 DIA
AutoCAD SHX Text
IN-FLOWING TEE
AutoCAD SHX Text
MULTIPLE BENDS OUT OF PLANE
AutoCAD SHX Text
OUT-FLOWING TEE/PUMP OUTFLOW
AutoCAD SHX Text
SINGLE BEND PRECEDED BY <9 DIAMETERS OF STRAIGHT PIPE RUN
AutoCAD SHX Text
PIPE SIZE REDUCTION/EXPANSION IN STRAIGHT RUN
AutoCAD SHX Text
SINGLE BEND PRECEDED BY >9 DIAMETERS OF STRAIGHT PIPE RUN
AutoCAD SHX Text
OBSTRUCTION
AutoCAD SHX Text
FLOW METER; BASIS OF DESIGN: ONICON F-3500
AutoCAD SHX Text
FULL PORT BALL VALVE
AutoCAD SHX Text
NOTE: PIPING CONFIGURATION VARIES BETWEEN NEW AND EXISTING CHILLERS.
AutoCAD SHX Text
MOTORIZED BUTTERFLY VALVE W/HAND WHEEL OPERATOR IN BYPASS MODE (TYP)
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
TEMPERATURE SENSOR (TYP)
AutoCAD SHX Text
FT
AutoCAD SHX Text
FT
AutoCAD SHX Text
FLEX CONN (TYP)
AutoCAD SHX Text
TRIPLE DUTY VALVE (TYP)
AutoCAD SHX Text
BUTTERFLY VALVE (TYP)
FLEX CONN (TYP)
e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
MG-601
JDMA
MECHANICAL SCHEDULES
ABBREVIATIONS
AHU AIR HANDLING UNIT
AFMS AIR FLOW MEASURING STATION, "PIEZOMETER RINGS" ARE PROVIDED & INSTALLED BY
AHU VENDOR. TRANSDUCERS AND CONTROL WIRING BY CONTROLS CONTRACTOR.
ATU AIR TERMINAL UNIT
CC COOLING COIL
CCLT COOLING COIL LEAVING TEMPERATURE
CCET COOLING COIL ENTERING TEMPERATURE
CCV COOLING COIL CONTROL VALVE
DAT DISCHARGE AIR TEMPERATURE
DASP DISCHARGE AIR STATIC PRESSURE
DWH DOMESTIC WATER HEATER
EAD EXHAUST AIR DAMPER
EF EXHAUST FAN
EASP EXHAUST AIR STATIC PRESSURE
EAT EXHAUST AIR TEMPERATURE
EAF EXHAUST AIR FLOW
ERW ENERGY RECOVERY WHEEL
FA FAULT ALARM
FSD FIRE-SMOKE DAMPER
FE FLOW ELEMENT
GF/CI GOVERNMENT FURNISHED / CONTRACTOR INSTALLED
HC HEATING COIL
HCLT HEATING COIL LEAVING TEMPERATURE
HCET HEATING COIL ENTERING TEMPERATURE
HHWV HEATING HOT WATER CONTROL VALVE
HSCV HEATING STEAM CONTROL VALVE
HSV HUMIDIFIER STEAM VALVE
HUM-ISO HUMIDIFIER ENABLE VALVE
MPS MEDIUM PRESSURE STEAM FOR HUMIDIFIER
MPC MEDIUM PRESSURE CONDENSATE RETURN
OAT OUTDOOR AIR TEMPERATURE
OAD OUTDOOR AIR DAMPER
PF-EA PREFILTER (EXHAUST AIR)
PF-OA PREFILTER (OUTDOOR AIR)
PHT PRE-HEAT TEMPERATURE
RAT RETURN AIR TEMPERATURE
RI RUN INDICATOR
RM-A REFRIGERANT MONITOR ALARM
SAT SUPPLY AIR TEMPERATURE
SAF SUPPLY AIR FLOW
SF SUPPLY FAN
SDS SMOKE DETECTOR SUPPLY
SHP STATIC PRESSURE HIGH LIMIT
S/S START / STOP
TE TEMPERATURE ELEMENT
TU TERMINAL UNIT
VFD VARIABLE FREQUENCY DRIVE
o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
MI-701
JDMA
CONTROLS DIAGRAMS
WC-2 EVAPORATOR
WC-2 CONDENSER
COOLING TOWER CT-1 COOLING TOWER CT-2
WC-1 EVAPORATOR
WC-1 CONDENSER
CHWP-1
CHWP-2
CWP-3
CWP-4
CHW-IS0-1
CW-IS0-1
CHW-IS0-2
CW-IS0-2
CT-IS0-1
CT-IS0-2
FROM COOLING TOWER SUMP
RETURN CHW
FROM AHU'S
CHW TO AHU'S
T P
T P
T P
T
P
FT2
FT1
FT3
FT4
CHILLED WATER & CONDENSER WATER CONTROLS DIAGRAM
SCALE: NONE
CHWS
C H
W S
CHWR
CWR CWR
CHWR
C W
S
CWS CWS
CWR
C W
R
C W
R
C H
W R
NOTE: WC-1 SHALL HAVE BACNET INTERFACE.
ENTHALPY SENSORS 1 & 2:
G.E. MODEL HUMI-EN-XR-0 (OR EQUAL),
12-30 VDC POWER, 4-20 mA SIGNAL, ± 2
BTU/LB. MOUNT ON NORTH FACE OF
PENTHOUSE MECHANICAL ROOM OR
OTHER LOCATION APPROVED BY
VAMC COR.
C W
R
T
P
FE
TE
FT
CONTROLS SYMBOLS
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE) / TRANSMITTER - WALL MOUNT
TEMPERATURE TRANSMITTER
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
SMOKE DETECTOR
FIRE AND SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
PRESSURE SWITCH HIGH
PRESSURE SWITCH LOW
CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VARIABLE SPEED MOTOR CONTROLLER
FLOW SWITCH HIGH
FLOW SWITCH LOW
TEMPERATURE SENSING ELEMENT FOR TRANSMITTING
TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER / OR VALVE
TEMPERATURE SENSOR
PRESSURE SENSOR
PUMP
ISOLATION VALVE
FLOW METER
TEMPERATURE ELEMENT
FLOW ELEMENT
RI
CHILLER
WC-1
CONTROLS
FA
ENABLE
CHW TEMP SETPOINT
KW, % LOAD, TONS
CHW TO AHU'S
CHW-DP
IN PENTHOUSE
MECH. ROOM
PUMP VFD S/S
VFD-0
RI
CT-1 & CT-2
FANS VFD
FA
S/S
VFD-0
TYPICAL FOR ALL FOUR PUMPS
(CWP-1, CWP-2, CHWP-3, CHWP-4)
RM-A
S/S
MER-EF-17
REFRIGERANT MONITOR
EXHAUST FAN CONTROL
SCALE: NONE
KW
TONS
RI
CHILLER
WC-2
CONTROLS
FA
ENABLE
CHW TEMP SETPOINT
RI
FA
KW
%LOAD
KW
AutoCAD SHX Text
AT
AutoCAD SHX Text
OC
AutoCAD SHX Text
SD
AutoCAD SHX Text
FSD
AutoCAD SHX Text
AT
AutoCAD SHX Text
CO2
AutoCAD SHX Text
AT
AutoCAD SHX Text
CO
AutoCAD SHX Text
HS
AutoCAD SHX Text Rh
AutoCAD SHX Text
FT
AutoCAD SHX Text
MT
AutoCAD SHX Text M
AutoCAD SHX Text
LT
AutoCAD SHX Text
LC
AutoCAD SHX Text
PT
AutoCAD SHX Text
PSH
AutoCAD SHX Text
TT
AutoCAD SHX Text T
AutoCAD SHX Text
SPS
AutoCAD SHX Text
PDT
AutoCAD SHX Text
PDS
AutoCAD SHX Text
TSL
AutoCAD SHX Text
TSH
AutoCAD SHX Text
PSL
AutoCAD SHX Text
FSH
AutoCAD SHX Text
FSL
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
LTCP
AutoCAD SHX Text M
VSMC
e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
VA ROME OUTPATIENT CLINIC, ROME, NY
06/28/2022
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-102
ADD CHILLER AT ROME CBOC
S S
Y R
M
S M
S E n g i n e e r i n g P
R O
J E
C T
S A
C T
I V
E
P
R O
J E
C T
S
A i l l e r a t
R o m e
C
B O
C D e s i g n
P h a s e
D r a w i n g s C
A D
M e c h a n i c a l
A
M
M
E C
H d w g
OF 12
MI-702
JDMA
SEQUENCE OF OPERATIONS &
CONTROL POINTS
CHILLED WATER PLANT SEQUENCE OF OPERATIONS
CHILLED WATER PLANT MODE: The Operating Engineer shall select “WINTER” or “SUMMER” mode of operation.
Selecting “WINTER” mode shall close cooling tower isolation valves CT-ISO-1 and CT-ISO-2 and allow tower makeup water to be manually isolated and towers to be drained. Selecting “SUMMER” mode shall initiate a dialogue box stating, “Ensure Tower Make-Up Water is Active and Towers are Filled”. Upon acknowledging, CT-ISO-1 and CT-ISO-2 shall be commanded to open.
SYSTEM ENABLE: If the Chilled Water Plant Mode is in “SUMMER” mode, the DELTA Control System (aka BAS) shall enable a Water-Cooled Chiller when the Outside Air Temperature is >60F (adj) and there is a request for chilled water from an Air Handling Unit. Otherwise the system shall be disabled.
CHILLER CONTROL: The chilled water system consists of two chillers, WC-1 and WC-2. Only one chiller shall operate at any time. The active chiller shall be controlled by its own internal controls to maintain the chilled water setpoint as determined by the BAS. When the system is enabled, WC-1 shall normally be the active chiller and WC-2 shall operate only if WC-1 has failed.