520757_8-05-2025 Transmission Mains Rehabilitation_90_ Design Drawings.pdf
PDF 60 MB Posted
- Solicitation number
- 6075A
- Issued by
- Arapahoe County, Colorado
About this file
The file 520757_8-05-2025 Transmission Mains Rehabilitation_90_ Design Drawings.pdf appears to be a design drawing document related to a transmission mains rehabilitation project for a municipal water infrastructure initiative in Colorado. The project involves two specific sites: Site 1 at Airport Blvd and E Hughes Dr, and Site 2 at E Alameda Ave and Moline St. The scope includes installing Hydra Stop valves, line stops, and replacing pipe sections to facilitate condition assessment of water transmission infrastructure. The project requires the contractor to provide all necessary equipment, parts, and materials to complete the specified work, which involves valve installations, pipeline modifications, and site restoration.
The design drawings likely provide technical specifications for the proposed infrastructure improvements, including detailed schematics of valve placement, pipeline modifications, and site restoration requirements. While specific pricing details are not evident in the provided documentation, the project appears to be part of a broader municipal infrastructure improvement program focusing on transmission main condition assessment and valve management. The project seems to be funded through local municipal infrastructure budgets, with a targeted completion date of August 5, 2025, as suggested by the filename. The technical drawings will serve as a critical reference for contractors bidding on the implementation of these transmission main rehabilitation efforts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .