About this file

This is Addendum No. 1 to Invitation to Bid #0004 issued by Southern University at New Orleans for the removal and replacement of a 225-ton Carrier chiller at the School of Social Work Building in New Orleans, Louisiana. The addendum, dated July 20, 2026, addresses critical clarifications regarding building automation system integration prior to bid submission, with a bid due date of July 22, 2026, at 10:00 a.m. The project requires complete chiller removal and installation to be performed within 15 consecutive calendar days during normal working hours in compliance with national, state, and local codes. The addendum clarifies that Synergy Building Solutions provides Alerton Controls as the campus-wide Building Automation System (BAS) controls contractor and specifies that the new chiller's BACnet control panel must connect to a new Alerton BACnet Panel located in the Social Work mechanical room, with all BACnet points from the chiller controller provided for monitoring and control, and coordination with SUNO facilities to enable critical alarms.

The addendum requires bidders to acknowledge receipt and resolve the specified concerns before submitting bids. Bidders must comply with evidence of authority requirements per R.S. 38:2212(a)(1)(c) and/or R.S. 39:1594(c)(2)(d). The contract is federally funded and subject to Davis-Bacon Act compliance, Fair Labor Standards Act provisions, EEOC and ADA mandates, with qualified contractors required to hold valid Louisiana contractor licenses for building construction classification. Bidders must submit a 5 percent bid bond, with performance and payment bonds equal to 100 percent of the contract amount if selected, along with workers' compensation insurance with minimum employer's liability of $1,000,000, commercial general liability of $1,000,000 per occurrence, and automobile liability of $1,000,000 per occurrence. Liquidated damages are assessed at $100.00 per consecutive calendar day for project delays, and payment is due within 30 days of invoice receipt or delivery and acceptance, whichever is later.

View the file

Other files

File Type Posted
50014-0004-1.doc DOC document
50014-0004.pdf PDF
50014-0004.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

July 20, 2026 “Chiller Replacement”

Bid No. 0004 10:00 A.M.

July 22, 2026 The following modifications to the referenced project shall be incorporated into the original specifications and/or plans. Unless addenda specifically make a change, the specifications and/or plans as issued shall govern. Bidders are requested to acknowledge receipt of this addendum.

Invitation to Bid #0004

· Question: Who is the controls contractor for the campus?

Answer: Synergy Building Solutions providing Alerton Controls.

· Question: How should the chiller be connected to the campus-wide BAS System?

Answer: Connect the new Chiller BACnet control panel to a new Alerton BACnet Panel, located inside the Social Work mechanical room where the existing controller is. Provide all BACnet points from the Chiller controller for monitoring and control. Coordinate with SUNO facility to provide critical alarms.

BID #0004

Please resolve these concerns before bids are received under cover of the addendum.

We acknowledge receipt of the following addenda: No. Date ____________

No. Date No. Date

COMPANY_____________________________________________________________

NAME__________________________________________________________________

DATE__________________________________________________________________

Evidence of Authority to submit the bid shall be in accordance with R.S. 38:2212(a)(1)(c) and/or R.S. 39:1594(c)(2)(d)

END OF ADDENDUM

Marilyn Manuel - Director of Purchasing

File details come from the government source that posted it. Updated .