This is Addendum No. 1 to an Invitation to Bid issued by Southern University at New Orleans for the removal and replacement of a 225-ton Carrier chiller at the School of Social Work Building in New Orleans, Louisiana. The addendum, dated July 20, 2026, addresses critical clarifications regarding Building Automation System (BAS) integration for the chiller replacement project. The bid opening is scheduled for August 25, 2026, at 10:00 a.m. The addendum clarifies that Synergy Building Solutions, providing Alerton Controls, is the campus-wide controls contractor. The new chiller must be connected to the campus-wide BAS System via a new BACnet control panel connected to a new Alerton BACnet Panel, located inside the Social Work mechanical room where the existing controller is located. All BACnet points from the chiller controller must be provided for monitoring and control, with coordination with SUNO facilities to ensure critical alarms are properly integrated.

The addendum serves to resolve technical concerns prior to bid submission and requires all bidders to acknowledge receipt. Bidders must comply with evidence of authority requirements per Louisiana Revised Statutes 38:2212(a)(1)(c) and/or 39:1594(c)(2)(d). The document is signed by Marilyn Manuel, Director of Purchasing, and includes standard provisions for acknowledgment of addenda with corresponding dates. No pricing modifications, set-asides, incumbent contractor information, or funding source details are specified in this addendum, which functions solely as a technical clarification to the original bid specifications.

View the file

Other files

File Type Posted
50014-0004-2.doc DOC document
50014-0004.pdf PDF
50014-0004.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

July 20, 2026 “Chiller Replacement”

Bid No. 0004 10:00 A.M.

August 25, 2026 The following modifications to the referenced project shall be incorporated into the original specifications and/or plans. Unless addenda specifically make a change, the specifications and/or plans as issued shall govern. Bidders are requested to acknowledge receipt of this addendum.

Invitation to Bid #0004

· Question: Who is the controls contractor for the campus?

Answer: Synergy Building Solutions providing Alerton Controls.

· Question: How should the chiller be connected to the campus-wide BAS System?

Answer: Connect the new Chiller BACnet control panel to a new Alerton BACnet Panel, located inside the Social Work mechanical room where the existing controller is. Provide all BACnet points from the Chiller controller for monitoring and control. Coordinate with SUNO facility to provide critical alarms.

BID #0004

Please resolve these concerns before bids are received under cover of the addendum.

We acknowledge receipt of the following addenda: No. Date ____________

No. Date No. Date

COMPANY_____________________________________________________________

NAME__________________________________________________________________

DATE__________________________________________________________________

Evidence of Authority to submit the bid shall be in accordance with R.S. 38:2212(a)(1)(c) and/or R.S. 39:1594(c)(2)(d)

END OF ADDENDUM