This is a Notice of Intent to Award a Contract Without Engaging in a Standard Procurement Process issued by the Utah Department of Government Operations, Division of Purchasing, on behalf of the Department of Health and Human Services. The procurement seeks interoperability technical assistance services from the Utah Health Information Network (UHIN) to conduct a comprehensive healthcare interoperability needs assessment across rural and frontier Utah providers. The scope of work encompasses identifying and diagnosing technical gaps, clinical workflow barriers, system readiness, and data quality limitations regarding electronic health information sharing. The contractor will administer and manage non-competitive sub-grant funding, provide technical assistance and EHR optimization training to onboard rural sites, migrate rural providers to recognized data exchange networks utilizing native HL7 FHIR APIs, and monitor mandatory clinical utilization metrics to improve point-of-care care coordination. The contract term is anticipated to be two years with renewal options up to a total of five years.
The estimated contract value is $3,000,000 with no freight costs. The procurement unit is pursuing award without standard competitive bidding based on the determination that standard procurement would be impractical and not in the best interest of the State under the circumstances outlined in R33-108-101c. UHIN, established by the state legislature in 1993 and designated as the state's Health Information Exchange and Regional Health Information Organization, uniquely owns the infrastructure required to fulfill the contract mandate. As a neutral, non-profit community utility with over 30 years of established local trust, UHIN possesses pre-existing legal frameworks, multi-state reach, and native HL7 FHIR API capabilities necessary to immediately execute the rural needs assessment, administer sub-grant funding, and track clinical metrics required by Utah's DHHS Rural Health Transformation Program funding. The Division of Purchasing will accept challenges to this sole-source determination during the public notice period from interested vendors that can demonstrate comparable capabilities and qualifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Government Operations Division of Purchasing and General Services 4315 S 2700 W, FL 3, Taylorsville, UT 84129-2128 Phone: 801-957-7160 www.purchasing.utah.gov
Issuing Procurement Unit: Division of Purchasing
Conducting Procurement Unit: The Department of Health and Human Services
NOTICE OF INTENT TO AWARD A CONTRACT WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS
The Division of Purchasing is publishing this notice pursuant to the Utah Procurement Code. The Conducting Procurement Unit submitted this form to the Division of Purchasing claiming that it intends to award a contract without competition if it is determined by the Division of Purchasing, in writing, that:
• there is only one source for the procurement item;
• transitional costs are a significant consideration in selecting a procurement item; or
• the award of a contract is under circumstances, described in rules adopted by the applicable rulemaking authority, that make awarding the contract through a standard procurement process impractical and not in the best interest of the procurement unit.
In the subsequent pages the Conducting Procurement Unit has identified its justification for wanting to award a contract without engaging in standard procurement process.
Determination of Other Interested Vendors
If the procurement item identified in this notice is to be awarded as a sole source (only one source for the procurement item), then this notice will help determine if there are any other interested and qualified vendors that meet the specifications of this notice. Any such vendors must submit the following information:
• The name of the contesting person; and
• A detailed explanation of the contest, including documentation showing that there are other competing sources for the procurement item.
In addition, a vendor should include:
• Documentation that your firm can provide a comparable or better procurement item that meets or exceeds the specifications;
• Documentation that your firm can also provide the same proprietary procurement item or an equivalent procurement item; and
• If transitional costs are identified as the justification for this notice, submit a cost comparison of the identified transitional costs with your firm’s anticipated transitional costs.
Regardless of any prior communications with the Division of Purchasing or the State, all vendors interested in responding to this notice must submit a response to this posting containing complete responses to all of the information requested above.
DO NOT CONTACT THE CONDUCTING PROCUREMENT UNIT. Any questions regarding this notice, including obtaining additional information, can be obtained through the Division of Purchasing during the publication period. No action is required if you agree with this notice.
If the purpose of this notice is an intent to award a sole source, after the public notice period has passed, and the Division of Purchasing determines that there are other interested and qualified vendors that meet the specifications of this notice, then the Division of Purchasing will not award a contract pursuant to this notice. An award without competition may still be made even if there are other interested vendors when the basis for the award is due to transitional costs or impracticality as stated above.
If, after the public notice period has passed, no valid contests have been received, then the Division of Purchasing may award a contract to the identified vendor without engaging in a standard procurement process.
Read the entire form very carefully before responding to this notice.
It is anticipated that this procurement will result in a:
RESULT ACTION
Agency Contract
The term of this contract (or extension) will be: 2 years and renewal options: up to a total of 5 years.
The agency may not make the procurement until the solicitation process is completed and a contract is written and signed by the agency, the vendor, and the Division of Purchasing.
Purchase Order The agency may not make the procurement until the solicitation process is completed, the purchase order is signed by the Division of Purchasing and delivered to the agency and the vendor.
Description of procurement item to be purchased: Interoperability technical assistance services
Estimated value of the contract/purchase order/increase: 3,000,000.00
Freight Cost (F.O.B. Destination, Freight Prepaid): $0.00
Vendor Name: UHIN
Explain in detail the service or product to be procured (additional information included in attached Scope of Work):
Procurement of specialized professional services from the Utah Health Information Network (UHIN) to conduct a comprehensive healthcare interoperability needs assessment across rural and frontier Utah providers. The scope encompasses identifying and diagnosing technical gaps, clinical workflow barriers, system readiness, and data quality limitations regarding electronic health information sharing. Additionally, the contractor will administer and manage non-competitive sub-grant funding, technical assistance, and EHR optimization training to onboard rural sites. Deliverables include migrating rural providers to recognized data exchange networks utilizing native HL7® FHIR® APIs and monitoring mandatory clinical utilization metrics to improve point-of-care care coordination.
CHECK THE BOX THAT IDENTIFIES WHY A CONTRACT SHOULD BE AWARDED WITHOUT ENGAGING IN A STANDARD
PROCUREMENT PROCESS:
Sole Source - There is only one source for the procurement item. Complete Section A
Transitional Costs - Transitional costs are a significant consideration in selecting a procurement item and the results of a cost-benefit analysis demonstrate that transitional costs are unreasonable or cost-prohibitive, and that the award of a contract without engaging in a standard procurement process is in the best interest of the procurement unit.
Complete Section B
Impracticality - The award of a contract is under circumstances, described in rules adopted by the applicable rulemaking authority, that make awarding the contract through a standard procurement process impractical and not in the best interest of the procurement unit.
Complete Section C
Trial use contract for a new or innovative procurement item, or for a procurement item with a novel or unproven use or application. Complete Section D
Extension of a contract without engaging in a standard procurement process. If extension will result in a request to increase the contract total, then also complete Section F below. Complete Section E
Request to increase total contract amount. Complete Section F
SECTION A: ONLY ONE SOURCE
1. What is unique about this procurement item to justify an award of contract without engaging in a standard procurement process? (Explain in detail why the service, product, etc. is only available from a single supplier.)
2. Could the procurement item be reasonably modified to allow for competition?
3. Explain the market research performed.
4. What research have you conducted to ensure the requested procurement item is not available on an existing state cooperative contract?
5. If there is only one source for the procurement item, list the names of other similar vendors contacted, contact person, and a summary of their response.
SECTION B: TRANSITIONAL COSTS
1. Describe the existing procurement item; include the original purchase price and date of purchase for the existing procurement item.
2. Supply the following:
a. Procurement method used to purchase the existing procurement item: (e.g. IFB, RFP, Sole Source):
b. Solicitation number or RQS/RQM number for the existing procurement item:
c. Contract number for the existing procurement item:
3. Attach the cost-benefit analysis, as required by Utah Code Section 63G-6a-802, that demonstrates that transitional costs are unreasonable or cost-prohibitive.
SECTION C: STANDARD PROCUREMENT PROCESS IMPRACTICAL
1.
Review R33-108-101c and provide supporting justification why awarding the contract through a standard procurement process is impractical and not in the best interest of the procurement unit under the circumstances; including any supporting documentation.
This focuses on the compatability piece with the UHIN tech system and UHINS expertise help and make changes to their own system if the barriers turn out to be about their system. UHIN established by the state legislature in 1993 UHIN is our RHIO (1 of 6- it is the one for our region) it would be impractical to go with something outside of UHIN.
UHIN is the state’s designated Health Information Exchange (HIE) and uniquely owns the infrastructure (the CHIE) required to fulfill this contract's mandate of increasing rural provider connectivity. As a neutral, non-profit community utility with over 30 years of established local trust, UHIN possesses the pre-existing legal frameworks, multi-state reach, and native HL7® FHIR® API capabilities necessary to immediately execute the rural needs assessment, administer the sub-grant funding, and track the point-of-care clinical metrics required by Utah’s DHHS RHTP funding.
2. Supply the following, if applicable:
a. Procurement method used to purchase existing procurement item (e.g. IFB, RFP, Sole Source): Sole source
b. Solicitation number or RQS/RQM number for the existing procurement item: KT21-48, MK23-149, AA24-16
c. Contract number for existing procurement item: contract #'s: 226330 & 226335
SECTION D: TRIAL USE CONTRACT
1. Describe how this trial use contract for the new or novel procurement item will benefit your agency.
2. Describe how the procurement item is new or innovative, or how the procurement item has a proposed use/application that is novel or unproven.
3. Describe why a trial use contract exception is necessary for this procurement item at this time as opposed to conducting a standard procurement process to procure the procurement item.
4. What research have you conducted to ensure the requested procurement item is not available on an existing state cooperative contract?
5.
How long does the agency need to test the procurement item and what quantities of the procurement item (if applicable) will be necessary to test this procurement item? Note trial use contracts generally cannot exceed a period of 24 months.
SECTION E: EXTENSION OF CONTRACT WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS The procurement official may extend a contract up to 120 days. For extensions beyond 120 days from the original contract end date, the procurement official may extend the contract after consulting with legal counsel.
Original End Date: Enter date. Current End Date: Enter date.
Proposed End Date: Enter date. Contract Number: Enter text.
1.
Is this request for a contract extension the result of a protest, appeal or court action? If yes, agency does not need to complete items 2-5 below. Provide the solicitation number that resulted in a protest and date of the protest, appeal or court action.
2.
Describe why extending this contract without engaging in a standard procurement process is necessary to avoid a lapse in a critical government service, OR to mitigate a circumstance that is likely to have a negative impact on public health, safety, welfare, or property.
3.
Confirm the procurement unit is currently engaged in a standard procurement process for the procurement item that is subject to the contract extension request and that the standard procurement process is delayed due to an unintentional error.
4.
Justification for Extension: check all that apply:
☐ The standard procurement process is delayed due to an unintentional error.
☐ A change in an industry standard requires one or more significant changes to specifications for the procurement item.
☐ To prevent the loss of federal funds.
☐ To mitigate the effects of a delay of a state or federal appropriation.
☐ To enable the procurement unit to continue to receive a procurement item during a delay in the implementation of a contract awarded pursuant to a procurement that has already been conducted.
☐ To enable the procurement unit to continue to receive a procurement item during a period of time during which negotiations with a vendor under a new contract for the procurement item are being conducted.
5. For the selection(s) above, provide any additional details regarding the circumstances justifying a contract extension.
SECTION F: REQUEST TO INCREASE TOTAL CONTRACT AMOUNT
If the original solicitation type was an ACWESPP (e.g. sole source) and the proposed contract total will exceed $50,000, then public notice is required to increase the contract total. Public notice is not necessary if the procurement official waives the public notice requirement in accordance with R33-108-101e.
Contractor Name: Enter text. Contract Number: Enter text.
Original Contract Total: Enter text. Current Contract Total: Enter text.
Proposed Contract Total: Enter text. % Increase from Original: Enter text.
Solicitation Number: Enter text. Solicitation Type: Enter text.
Product or Service Description: Click to enter text.
Why is the contract total being increased? Check all that apply.
☐ The term of the contract is being extended (also complete Section E above if extending).
☐ The quantity of products or services needed has increased.
☐ The price, rate, or fee for a product or service has increased.
☐ A new or upgraded product or service is needed.
Provide details for the answer that was selected in the previous question. Provide any reasons for the increase.
Click to enter text.
| SECTION A: ONLY ONE SOURCE |
| SECTION B: TRANSITIONAL COSTS |
| SECTION D: TRIAL USE CONTRACT |
| SECTION E: EXTENSION OF CONTRACT WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS |
| SECTION F: REQUEST TO INCREASE TOTAL CONTRACT AMOUNT |
File details come from the government source that posted it. Updated .