This document is a data cage finish-out study for the Tarrant County College District (TCCD) Trinity River Campus Data Center located in Fort Worth, Texas. The study, prepared by Yaggi Engineering, Inc. in August 2022, explores the feasibility of reducing and securely containing the existing data center footprint, with a comprehensive analysis of architectural, electrical, mechanical, plumbing, and fire protection modifications. The proposed project involves reducing the current 18,400 square foot open area to approximately 4,750 square feet, including the installation of new fire-rated demountable partitions, a secure vestibule, LED lighting, updated mechanical systems, and modifications to existing fire protection and detection systems.
The total estimated probable construction cost for the project is $1,098,021.36, which includes architectural demolition and finishes, electrical work, and mechanical/plumbing/fire protection modifications. Key equipment includes two 15-ton Liebert precision cooling systems, new LED lighting fixtures, updated fire protection systems, and significant reconfigurations of existing infrastructure. The study recommends a detailed analysis of the space's heat load changes to ensure proper chiller system performance, and provides detailed technical specifications for equipment replacements and system reconfigurations. The proposed modifications aim to improve the data center's security, efficiency, and functionality while reducing its overall spatial footprint.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA CAGE FINISH-OUT STUDY
FOR
TARRANT COUNTY COLLEGE DISTRICT
TRINITY RIVER CAMPUS – DATA CENTER
FORT WORTH, TEXAS
AUGUST 8, 2022
Exhibit L -Data Cage Finish-out Study RFQ #25-039: Architectural and Engineering Services for Data Center MEP Updates Tarrant County College District
TCC Trinity River Campus – Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 1
TABLE OF CONTENTS
I) PURPOSE OF STUDY
II) EXISTING CONDITIONS
a) Architectural
b) Electrical
c) Mechanical/Plumbing/Fire Protection
III) PROPOSED MODIFICATIONS
a) Architectural
b) Electrical
c) Mechanical
d) Plumbing
e) Fire Protection
IV) OPINION OF PROBABLE CONSTRUCTION COST
a) Architectural
b) Electrical
c) Mechanical/Plumbing/Fire Protection
V) APPENDIX
a) Sheet A1 – Annotated Floor Plan – Architectural
b) Sheet A2 – Annotated Ceiling Plan - Architectural
c) Sheet E1 – First Floor Plan - Electrical
d) Sheet E2 – First Floor Reflected Ceiling Plan
e) Sheet MP1 – Crawl Space - Mechanical
f) Sheet FP1 – First Floor Plan – Fire Protection
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 2
I) PURPOSE OF STUDY:
The purpose of this study is to investigate the feasibility of reducing and securely containing the existing overall footprint of the caged area within the Trinity River Campus Data Center within the TRCF building. This study is intended to outline the scope of work and opinions of probable construction costs associated with these anticipated Architectural, Electrical, Mechanical, Plumbing and Fire Protection modifications.
II) EXISTING CONDITIONS:
Architectural:
• Estimated square footage of 18,400 for the open area.
• Raised computer floor throughout the area.
• 2x2 lay-in acoustical lay-in ceiling.
• Perforate metal partition wall surrounding TCCD server racks.
Electrical:
• 3-Lamp, 2x4 fluorescent lighting fixtures throughout.
o (6) Manual toggle switches control the lights for the entire open area.
• (3) card access doors surrounding TCCD server racks.
• Several Emergency Power Off (EPO) locations.
Mechanical/Plumbing/Fire Protection:
• Server rack area is covered by (3) 20-ton CRAC units.
• Outside-air system
• Water-detection system
• VESDA smoke detection system
• Preaction system
• Wet pipe system
• FM200 system
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 3
III) PROPOSED MODIFICATIONS
Architectural:
The existing perforated metal partition wall will be replaced with a new prefinished 1-hour fire rated demountable partition, approximately 14’-8” in height. A secure fire rated entry vestibule will be provided with 4’x7’ doors equipped with card readers along with three (3) 3 ‘x7’ fire rated exit only doors.
Three (3) 30”x40” fire rated windows will also be provided for vision into the data center. The existing acoustical lay-in ceiling will be replaced with new 2’x2’ acoustical lay-in ceiling through-out the entire current data space.
Refer to Appendix for additional drawings/diagrams.
Electrical:
Existing fluorescent 2x4 fixtures will be replaced with District standard LED fixtures from Lithonia. Fixture replacement could largely be handled with 1-for- 1 replacement in the open area. New server rack room would have fixtures aligned with hot and cold aisles. New LED fixture will be installed in new security vestibule. Lighting controls will be replaced with District standard nLight nPODMA low-voltage wall stations. Locations for lighting controls to be located at each entry door of the space they control. Light fixture control zones in open area will be driven by future open office layout. Remove lighting circuit diagram wall box.
Since new server room walls are to be fire rated demountable partitions, electrical raceways that cross/penetrate this new deck-to-deck barrier will also need to be fire rated. Possibly HILTI or STI EZ Path Cable Tray Retrofit devices.
Emergency Power Off (EPO) stations shall be reconfigured/reduced to only control server rack area. EPOs shall be located within the new server room.
EPOs for Radio Shack area shall be removed.
Fire Alarm pull stations and networked telephone systems shall be reworked to be located at each room entry door. Fire Alarm control panel to remain in current location.
Refer to Appendix for additional drawings/diagrams.
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 4
Mechanical:
The existing three, 20-ton down blown CRAC units will remain to be re-used in a lead, lag, and standby system. Two emergency 15-ton down blown DX units will be added for redundancy. These units will be programed to automatically start if the three existing CRAC units’ malfunction. Two condensing units will be installed at the nearest suitable outdoor location which will require the installation of refrigerant lines connecting the condensing units with the air handling units. One hundred feet of refrigerant piping will be used for the pricing.
The reduced space allocated for the data center will be completely contained within walls, therefore, penetrations will be needed for the existing 6” chilled water supply line and 6” chilled water return line. The new DX system condensate piping and a single existing ½” domestic cold-water pipe for the humidity system. All existing lines are located under the sub-floor and all penetrations will require an additional 1 to 4-inch diameter clearance for pipe insulation.
The existing sub floor will be utilized as a plenum space for the distribution of conditioned air supplied by the existing AHUs (Air Handling Units), AHU B-1-1 & AHU B-1-2, pending a static pressure test and information on the existing units. Fourteen fan driven VAV (Variable Air Volume) boxes equipped with electric heating, ducting, floor diffusers and a thermostat will be used to ensure the proper amount of conditioned air can be distributed to the repurposed room/s.
Lastly, converting a data center into offices may decrease the total heat load of the space. This change in load could drop the amount of chilled water needed to cool the space which could degrease the flow rate at the chiller below the required minimum. The chiller may experience “chiller surge” if this does occur resulting in a system malfunction. A study of space’s change in total heat load is HIGHLY recommended to ensure the chillers minimum flow rate is met.
Plumbing:
The addition of the two, 15-ton units will each require 1-1/4” condensate connection to the existing 1-1/4” condensate drain line. Both will also require a 1/2” domestic cold-water connection to the existing 1/2” domestic cold water supply line for the humidifiers. The existing Liebert Leak Detection System is currently inoperable, and repairs or replacement will be required with the addition of new detectors and cabling for the proposed new piping.
The control box will need to be relocated to the new room. New cabling will be routed from each CRAC unit around the room and below each rack and back to the panel.
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 5
Mechanical and Plumbing
Image 1: Partial first floor mechanical plan
Image 2: Existing CRAC units located underfloor showing attached condensate piping. New unit condensate piping to resemble existing
Note: Refer to the Mechanical piping plan. Sheet. No. MP1.0B for more information.
Location of existing CRAC units
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 6
Image 3: Existing condensate drain runs, refer to image 2.
Image 4: Existing CRAC unit chilled water hookup detail.
Note: Refer to the Mechanical piping plan. Sheet. No. MP1.0B for more information.
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 7
Fire Protection:
Smoke Detection System - VESDA – Vesda LaserPlus - The current system covers approximately 18,400 square feet in the data center. This system will need to be reduced to approximately 4, 750 square feet. The “3 SOUTH ROOM LEVEL” and “4 SOUTHE SUB FLOOR” Vesda system shown below will need to be removed. The piping will be removed above the ceiling and below the raised floor.
The smoke & heat detectors are to be removed from the area that will be repurposed. The “1 NORTH ROOM LEVEL” and “2 NORTH SUB FLOOR” Vesda system will need to be reworked for the reduced area. These two are already located in the area to be the new enclosed data room.
Pre-action System – Potter Intelligent Nitrogen System INS-250 with Intellpurge
INS-PV will also need to be reduced to serve the new area. The INS-250 will possibly need to be relocated to inside the new room. Currently there are four zones. The existing piping in the repurposed area will be utilized for the wet pipe system. Only one zone will remain for the new enclosed data room.
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 8
Wet Pipe System - Three pre-action valves will need to be removed from the pre-action system. A new wet pipe valve will need to be installed in place of one of the removed valves and the piping reworked to serve all the area outside of the new data room. This will tie into the existing wet pipe header and utilize the existing piping.
FM200 System – This system will need to be reduced to serve the new data room only. Currently there are 21 large tanks and 6 small tanks. The pipes and discharge valves will need to be removed from the repurposed room. The tanks will need to be relocated to the data room. The emergency shut-offs will need to be relocated.
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 9
Fire protection
Image 5: Location of main pre-action system control valves
Image 6: Existing INS-PV control valve Image 7: Existing VESDA PLUS smoke sensor
Four Existing pre-action systems:
removing three and replacing them with a single wet pipe system. One to remain
Existing Potter INS – 250 Existing FM200 Fire Agent canisters
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 10
Image 8: fire protection plan showing scope of work. Refer to appendix for a larger view.
YAGGI ENGINEERING, INC. Page 11
NEW M/P/FP EQUIPMENT COMPONENTS
(1) Liebert DS Model DS053ADA1EIP4O0, Liebert DS Precision cooling system Nominal 053kW (15-Ton) Air cooled Downflow system, 460V, 60Hz, 3Phase
65kA SCR Supply air exits from the bottom of units, return air enters top of unit #14-gauge welded frame with Autophoretic coating Front service access Insulated and powder coated exterior panels 4” filters, MERV 8 rating Electronically commutated motors with fans operating inside the unit Infrared humidifier with automatic flush cycle; capacity of 22lbs/hr 3-stage tubular finned; 304/304 stainless steel electric reheat with a capacity of 25kW Dual refrigeration circuits with liquid line filter driers, refrigerant sight glasses, expansion valves, and liquid line solenoid valves Two (2) independent Digital Scroll Compressors provide variable capacity, increased part-load energy efficiency, and reduced compressor cycling A-frame Evaporator coil with stainless steel drain pan R-407C refrigerant. Field supplied and field charged on air-cooled units Liebert iCOM Control with High-Definition Display BMS Communication interface includes one Ethernet port and one RS-485 port on iCOM controller, dedicated to supporting BACnet IP, Modbus TCP/IP, BACnet 485, Modbus 485 and SNMP v1/v2c/v3 Smoke Sensor with unit alarm and shutdown. Includes supervision contacts Factory installed dual float condensate pump with unit alarm indication and unit shutdown upon high water level. Rated for 100GPH at 20 ft head Liebert Liqui-Tect 460 kit Zone Leak Sensor with cable Floor stand: Height TBD
(1) Liebert MC Model MCL110E8AD0ABM, Air-cooled microchannel condenser
Nominal 15 Ton, 460V, 60Hz, 3Phase, 65kA SCR Microchannel Aluminum coil Variable speed electronically commutated fans Premium electronic control board providing communication with iCOM using CANbus
• System requires BOTH 24V control wire and CANbus communication wire to be furnished and installed by the installing contractor and installed between each indoor unit and each outdoor condenser.
Aluminum exterior panels and 18” aluminum legs Dual refrigerant circuit condenser R-407C set points
YAGGI ENGINEERING, INC. Page 12
IV) OPINIONS OF PROBABLE CONSTRUCTION COSTS
This opinion of probable construction cost is not a price quote. Pricing for equipment/materials and labor fluctuates with the market. All indicated prices are subject to change and do not take into consideration managerial efficiency, competitive conditions, restrictive union practices, or unique contractor requirements.
Description Qty Unit Labor Material Unit Cost Extension Achitectural
Demolition Security Mesh 184 lf 3.00$ 3.00$ 552.00$ Lay-in Acoustical Ceiling 18,364 sf 1.00$ 0.89$ 16,343.96$
New Openings -
a. 3' x 7' Fire Rated Metal Door with Vision Panel 3 ls 1,248.00$ 1,248.00$ 3,744.00$
b. 4' x 7' Fire Rated Metal Door with Vision Panel 2 ls 1,425.00$ 1,425.00$ 2,850.00$
c. Door Hardware 5 ls 3,700.00$ 3,700.00$ 18,500.00$
d. 30" x 40" Fire Rated Window 3 ls 1,200.00$ 1,200.00$ 3,600.00$ Finishes -
a. Fire Rated Wall Partition - demountable 198 lf 843.00$ 843.00$ 166,914.00$
b. Lay-In Acoustical Ceiling, 2' x 2' 18,364 sf 8.00$ 7.85$ 144,157.40$ Specialties -
a. Revisions to Raised Flooring 1 ls 20,000.00$ 20,000.00$ 20,000.00$
Subtotal 376,661.36$
Electrical Demolition
Demo Light fixtures and haul off/disposal 240 ea 60.00$ 60.00$ 14,400.00$ Demo Lighting controls and haul off 12 ea 115.00$ 115.00$ 1,380.00$ Demo Lighting circuit diagram wall box 1 ea 250.00$ 250.00$ 250.00$
New New LED 2x4 lighting fixtures 240 ea 80.00$ 150.00$ 230.00$ 55,200.00$ New nLight nPODMA lighting controls 12 ea 300.00$ 300.00$ 600.00$ 7,200.00$ Replace and provide additional Exit lights 10 ea 60.00$ 100.00$ 160.00$ 1,600.00$ Relocate and remove EPOs and controllers 1 ea 2,500.00$ 2,500.00$ 2,500.00$ Relocate Fire Alarm pull stations and networked telephones 1 ea 9,500.00$ 9,500.00$ 9,500.00$ Fire proofing material and sleeves 5 ea 500.00$ 500.00$ 2,500.00$ Receptacles in new walls and associated wiring/conduit 12 ea 250.00$ 250.00$ 500.00$ 6,000.00$ Access Controls rough-in for new doors/entrances 5 ea 150.00$ 200.00$ 350.00$ 1,750.00$ Electrical associated with new M/P/F equipment 3 ea 500.00$ 500.00$ 1,000.00$ 3,000.00$
Subtotal 105,280.00$
Mechanical/Plumbing/Fire Protection Mechanical Equipment
15 Ton – Indoor unit (Liebert/Vertiv DS053ADA1EIP4O0) 2 ea 48,926.00$ 48,926.00$ 97,852.00$ 15 Ton – Outdoor unit (Liebert/Vertiv MCL110E8AD0ABM) 2 ea 14,196.00$ 14,196.00$ 28,392.00$ 14K CFM – Outdoor AHU (Temtrol) 1 ea 98,000.00$ 98,000.00$ 98,000.00$ 10” Terminal units (Enviro-tec CRQ) 14 ea 2,000.00$ 2,000.00$ 28,000.00$ Ground Freight 1 ls 17,749.00$ 17,749.00$ 17,749.00$
Mechanical and Plumbing Outdoor Unit Installation 1 ls -$ 23,440.00$ Indoor Unit Installation 1 ls -$ 57,167.00$ Installation of 14 VAVs, ductwork, insulation and dampers 1 ls -$ 49,000.00$ Refrigerant Piping 1 ls -$ 625.00$ Condensate Piping 1 ls -$ 370.00$ Outdoor Air Handling Unit Installation 1 ls -$ 110,500.00$ Capping 68 chilled water connections to office space Cus 1 ls -$ 260.00$
Fire Protection Preaction system control valve removal and wet pipe install 13,650 sf 3.00$ 3.00$ 40,950.00$ VESDA smoke detection system removal and re-configure 1 ls -$ 18,775.00$ FM200 system removal and relocation 1 ls -$ 45,000.00$
Subtotal 616,080.00$
1,098,021.36$ Grand Total
Exhibit L -Data Cage Finish-out Study
YAGGI ENGINEERING, INC. Page 13
APPENDIX
CRAC CRAC CRAC
PDUPDU
1101C-X
DATA CENTER
1101B-X
DATA CENTER
1100A-X
CORRIDOR
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
FUTURE FUTURE
SECURE VESTIBULE AND
DOORS (2)
- 4'X7' DOORS WITH
VISION PANEL
- 90 MINUTE FIRE RATING
- PANIC HARDWARE
- SECURE ENTRY/CARD
READER
NEW WALL
- 14'-8" HEIGHT
- APPROX. 198 LF
-1 HOUR FIRE RATING
- PREFINISHED
- DEMOUNTABLE
WINDOW (3)
- 1 HOUR FIRE RATING
- 30"X40" WIRE GLASS
NEW DOORS (3)
- 3'X7' DOORS WITH VISION PANEL
- 90 MINUTE FIRE RATING
- PANIC HARDWARE
- NO TRIM ON OUTSIDE FACE
ANNOTATED FLOOR PLAN - ARCHITECTURAL ASPECT LBL 6/17/22
ALTERATIOIN
TO RAISED
FLOORING
ANNOTATED FLOOR PLAN - ARCHITECTURAL ASPECT
NOT TO SCALE
ANNOTATED
FLOOR PLAN -
ARCHITECTURAL
A1
8-9-2022
THE RECORD FOR THIS DRAWING IS ON FILEL
WITH LBL ARCHITECTS, 1106 2. RANDOLL MILL
RD. SUITE 300 ARLINGTON, TEXAS 76012. THIS
ELECTRONIC DOCUMENT IS RELEASED FOR
THE PURPOSE OF REFERENCE,
COORDINATION AND/OR FACILITY MANGEMENT
UNDER THE AUTHORITY OF TOM MCCARTY.
TEXAS ARCHITECT #20587. ANY
MODIFICATION(S) TO THIS DRAWING SHALL BE
IN COMPLIANCE WITH THE TEXAS BOARD OF
ARCHITECTURAL EXAMINERS' RULES. THESE
DOCUMENTS ARE NOT FOR CONSTRUCTION
Exhibit L -Data Cage Finish-out Study
CRAC CRAC CRAC
PDUPDU
1101C-X
DATA CENTER
1101B-X
DATA CENTER
1100A-X
CORRIDOR
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
FUTURE FUTURE
SECURE VESTIBULE AND
DOORS (2)
- 4'X7' DOORS WITH
VISION PANEL
- 90 MINUTE FIRE RATING
- PANIC HARDWARE
- SECURE ENTRY/CARD
READER
NEW WALL
- 14'-8" HEIGHT
- APPROX. 198 LF
-1 HOUR FIRE RATING
- PREFINISHED
- DEMOUNTABLE
WINDOW (3)
- 1 HOUR FIRE RATING
- 30"X40" WIRE GLASS
NEW DOORS (3)
- 3'X7' DOORS WITH VISION PANEL
- 90 MINUTE FIRE RATING
- PANIC HARDWARE
- NO TRIM ON OUTSIDE FACE
ANNOTATED FLOOR PLAN - ARCHITECTURAL ASPECT LBL 6/17/22
ALTERATIOIN
TO RAISED
FLOORING
CRAC CRAC CRAC
PDUPDU
1101C-X
DATA CENTER
1101B-X
DATA CENTER
1100A-X
CORRIDOR
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
PDU
PDU
CD6
FUTURE FUTURE
NEW 2'X2'
LAY-IN CEILING
NEW 2'X2'
LAY-IN CEILING
NEW 2'X2'
LAY-IN CEILING
NEW 2'X2'
LAY-IN CEILING
ANNOTATED CEILING PLAN - ARCHITECTURAL ASPECT LBL 6/17/22
NOT TO SCALE
ANNOTATED
CEILING PLAN -
ARCHITECTURAL
A2
8-9-2022
ANNOTATED FLOOR PLAN - ARCHITECTURAL ASPECTANNOTATED CEILING PLAN - ARCHITECTURAL ASPECT
THE RECORD FOR THIS DRAWING IS ON FILEL
WITH LBL ARCHITECTS, 1106 2. RANDOLL MILL
RD. SUITE 300 ARLINGTON, TEXAS 76012. THIS
ELECTRONIC DOCUMENT IS RELEASED FOR
THE PURPOSE OF REFERENCE,
COORDINATION AND/OR FACILITY MANGEMENT
UNDER THE AUTHORITY OF TOM MCCARTY.
TEXAS ARCHITECT #20587. ANY
MODIFICATION(S) TO THIS DRAWING SHALL BE
IN COMPLIANCE WITH THE TEXAS BOARD OF
ARCHITECTURAL EXAMINERS' RULES. THESE
DOCUMENTS ARE NOT FOR CONSTRUCTION
Exhibit L -Data Cage Finish-out Study
U P
DN
UP
F E
C
FEC
FEC
DN
F E
C
DCLB
DCLA
DCLB
DCLB
UPS-B
+68"
UPS-A
+68"
R.S. EPO CABINET
+63"
TCC EPO CABINET
+63"
+68"
S
MAINT. SWITCH
J
+78"
+59"
S
SUPPRESSION SYSTEM ABORT
S
TCCD EPO
S
R.S. EPO
OS
+96"
S S
S S
S
S WATER DECT. SYS.
+66"
SMOKE INDICATOR BOARD
+72"
KP
+72"
LOS +112"
+48"
S
SUPPRESSION SYS. ABORT
OS
+118"
DCLB
+64"+64"
AIR SAMPLING SMOKE
DETECTOR SYSTEM
S
SUPPRESSION SYS. ABORT
S
R.S. PDV EPO
S
TCC PDV EPO
OS
+114"
S
SUPPRESSION
SYSTEM ABORT
+48"
J
+48"
OS
+116"
S
RADIO SHACK
PDV EPO
S
TCC PDV EPO
K
+42"
DCLB
+64"
+64"
AIR SAMPLING SMOKE
DETECTOR SYSTEM
DCLB
DCLB
DCLA
DCLB
DCLA
DCLB
PPP-842-33
+112"
DCLA
DCLB
DCLB
DCLA
J
DCLA
DCLB
EPO BUTTON
EPO BUTTON
OS
+116"
J
J
DCLB
PPP-842-33
+110"
DCLA
+110"
LOS
DCLB
DCLA
+48"
SUPPRESSION SYSTEM ABORT
OS
+114"
EPO BUTTON
EPO BUTTON
DCLB
CIRCA
CORNING
GE
GE INTERLOGIX
AIR SAMPLING
SMOKE DETECTOR
SYSTEM
EMPTY SLOT FOR
ELECTRICAL CORDS (TYP.)
STORAGE-TEK
U.P.
U.P.
U.P.
U.P.
U.P.
PDU-A2
CYBEREX
PDU-A2
CYBEREX
UNITED
POWER
(TYP.)
U.P.
U.P.
U.P.
U.P.
U.P.
PDU-A1
PDU-B1
U.P.
ATC-1
+68"
DCUPSA-2
+78"
DCUPSB-2
+78"
DCUPSA-1
+78"
DCUPSB-1
+78"
LOS
RPP-1
PDU-A1/B1
6/3
RPP-7
PDU-A2/B2
2/5
RPP-3
PDU-A1/B1
1/5
RPP-2
PDU-A1/B1
5/6
RPP-8
PDU-A2/B2
4/6
RPP-4
PDU-A1/B1
4/4
RPP-5
PDU-A2/B2
5/2
RPP-6
PDU-A2/B2
1/3
RPP-9
PDU-A2/B2
6/1
DCMA2DCMB2
O A
H U
B
DATA TOWERS (TYP.)
UNKNOWN PANEL
K
CODE BLUE
S
F
K
CODE BLUE
S
YAGGI ENGINEERING, INC.
Exhibit L -Data Cage Finish-out Study
OPEN
TO
ABOVE
FEC
U P
DN
UP
F E
C
FEC
FEC
DN
F E
C
SP
SP
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
C
PANEL CIRC
RPP2 B2#26
C
C
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
J
PANEL
CIRCUIT
ELEVATION
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
J
PANEL
CIRCUIT
ELEVATION
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
PANEL CIRC
RPP-1A29
C
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
PANEL CIRC
RPP2 B2#26
C
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
C
PANEL CIRC
RPP2 B2#26
C
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
PANEL CIRC
RPP-1A29
C
C
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
SP
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
C
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
J
PANEL
CIRCUIT
ELEVATION
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
C
C
C C
C
C
C
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
C
C
PANEL
CIRCUIT
ELEV
DESCRIPTION
VOLTS
PWRSYS
AMPS
COMM
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
DESCRIPTION
VOLTS
POWER_SYSTEM
AMPS
COMMENTS
CEILING
CARRIER
LABEL
C
CCCC
YAGGI ENGINEERING, INC.
Exhibit L -Data Cage Finish-out Study
| E1.pdf |
| Sheets and Views |
| Layout1 |
| E2.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .