4999-Addendum3_03252026.pdf

PDF 1 MB Posted

Attached to
Open Market Competitive Sealed Bidding IL|26-557THA-ENGCO-P-96701
Contract number
26-557THA-ENGCO-P-96701
Issued by
Illinois

About this file

Addendum No. 3 to Contract RR-25-4999 is issued by the Illinois State Toll Highway Authority for a bridge rehabilitation project on the Tri-State Tollway (I-294/I-94) between Touhy Avenue and Waukegan Road, spanning from I-294 Mile Post 42.1 to I-94 Mile Post 27.8. The addendum was issued on March 25, 2026, with bids to be received through electronic bidding via BidBuy until 10:30 A.M. local time on April 3, 2026.

The addendum revises the Schedule of Prices by removing nine traffic control-related adjustment items (999ADJ47, 999ADJ49, 999ADJ51, 999ADJ53, 999ADJ55, 999ADJ57, 999ADJ59, 999ADJ61, and 999ADJ63) based on an updated Extended Maintenance of Traffic Work and Equipment Rates special provision dated March 20, 2026. The revised pricing schedule (pages P-8R and P-9R) retains adjustment items for traffic control equipment including arrow boards ($13.32 each), barricades ($1.00 to $2.35 each), work zone signs ($2.00 each), temporary concrete barriers ($0.50 to $1.47 per unit), and information signing ($0.25 per square foot). The contingency work and Contractor's Quality Program total $216,300.00. Payment for extended maintenance of traffic equipment is limited to a maximum of 180 days beyond the original Substantial Completion Date on a force account basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois State Toll Highway Authority Contract No. RR-25-4999 Addendum 3 Page 1 of 2 March 25, 2026

ADDENDUM NO. 3

TO

CONTRACT REQUIREMENTS

FOR CONTRACT RR-25-4999

ILLINOIS STATE TOLL HIGHWAY AUTHORITY

Date: 3/25/2026

For which bids will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time on April 3, 2026.

NOTICE OF REVISION TO CONTRACT

NOTES:

1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-8R and P-9R which have been revised and included as part of the Schedule of Prices.

2. The following revised Special Provision pages are included in the Contract with this Addendum: J-107R, J-108R, and J-109R.

Illinois State Toll Highway Authority Contract No. RR-25-4999 Addendum 3 Page 2 of 2 March 25, 2026

CHANGES TO THE CONTRACT REQUIREMENTS

CHANGES TO THE ADVERTISEMENT FOR SEALED BID

Change #1 Required Documents, Volume I, replace pages P-8 and P-9 with pages P-8R and P-9R (attached). This replacement contains the following revisions:

1.1. Removed various traffic control-related adjustment items (999ADJ47, 999ADJ49, 999ADJ51, 999ADJ53, 999ADJ55, 999ADJ57, 999ADJ59, 999ADJ61 and 999ADJ63) based on revised Extended Maintenance of Traffic Work and Equipment Rates (Illinois Tollway) special provision.

Change #2 Special Provisions, Volume II, replace pages J-107 through J-109 with pages J-107R through J-109R. This replacement contains the following revisions (attached):

2.1. Replaced Extended Maintenance of Traffic Work and Equipment Rates (Illinois Tollway) special provision with latest version dated March 20, 2026.

END OF ADDENDUM CHANGES

S.P.

PAY ITEM

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

28100630 BROKEN CONCRETE DUMPED RIPRAP SQ YD 75

GBSP 52000030 PREFORMED JOINT SEAL 2 1/2" FOOT 224

52100520 ANCHOR BOLTS, 1" EACH 128

BDE 53212754

STRUCTURAL REPAIR OF CONCRETE (DEPTH

EQUAL TO OR LESS THAN 5 INCHES)

SQ FT 1

70600280

IMPACT ATTENUATORS, TEMPORARY (SEVERE

USE, NARROW), TEST LEVEL 3

EACH 2

GBSP X0322194

POLYMER MODIFIED PORTLAND CEMENT

MORTAR

SQ FT 68

* X5210015

ELASTOMERIC BEARING ASSEMBLY, TYPE I

(SPECIAL)

EACH 56

* X5230154

CLEANING BRIDGE SCUPPERS AND

DOWNSPOUTS

EACH 6

* X5870015 BRIDGE DECK CONCRETE SEALER SQ FT 2,800

* X7010216

TRAFFIC CONTROL AND PROTECTION,

(SPECIAL)

L SUM 1

* X8900104 TEMPORARY TRAFFIC SIGNAL TIMING EACH 9

GBSP Z0001899 JACK AND REMOVE EXISTING BEARINGS EACH 56

GBSP Z0007101

CONTAINMENT AND DISPOSAL OF LEAD PAINT

CLEANING RESIDUES NO. 1

L SUM 1

SCHEDULE OF PRICES

I-294 MILE POST 42.1 TO I-94 MILE POST 27.8

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT RR-25-4999

TRI-STATE TOLLWAY (I-294/I-94)

BRIDGE REHABILITATION

TOUHY AVENUE TO WAUKEGAN ROAD

Contract RR-25-4999 P - 5 March 25, 2026

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

SCHEDULE OF PRICES

I-294 MILE POST 42.1 TO I-94 MILE POST 27.8

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT RR-25-4999

TRI-STATE TOLLWAY (I-294/I-94)

BRIDGE REHABILITATION

TOUHY AVENUE TO WAUKEGAN ROAD

GBSP Z0010501 CLEANING AND PAINTING STEEL BRIDGE NO. 1 L SUM 1

D1 Z0073200 TEMPORARY SHORING AND CRIBBING EACH 4

* JI618002 REGRADE AGGREGATE SLOPE PAVING SQ YD 2,698

* JI701001 DETOUR SIGNING, LOCATION 1 L SUM 1

* JI704001

TEMPORARY CONCRETE BARRIER, CROSS-

BOLT CONNECTION

FOOT 725

* * JS120815 CLEAN EXISTING SCUPPER EACH 1

* * JS121200 LOW PRESSURE EPOXY INJECTION FOOT 331

* * JS670B00 FIELD OFFICE, TYPE B CAL MO 7

* * JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1

* JS701010 MAINTENANCE OF TRAFFIC L SUM 1

** JS782022 BARRIER WALL REFLECTORS, TYPE C EACH 10

* JT503040

STRUCTURAL REPAIR OF CONCRETE (DEPTH

EQUAL TO OR LESS THAN 5 IN.)

SQ FT 139

* JT503041

STRUCTURAL REPAIR OF CONCRETE (DEPTH

GREATER THAN 5 IN.)

SQ FT 8

* JT503100 FIBER WRAP REPAIR SQ FT 128

* JT503102 BEAM END ENCASEMENT EACH 4

* JT524010 APPLY CONCRETE SEALANT SQ FT 37,989

TOTAL AMOUNT OF CORE WORK

Contract RR-25-4999 P - 6 March 25, 2026

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

SCHEDULE OF PRICES

I-294 MILE POST 42.1 TO I-94 MILE POST 27.8

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT RR-25-4999

TRI-STATE TOLLWAY (I-294/I-94)

BRIDGE REHABILITATION

TOUHY AVENUE TO WAUKEGAN ROAD

* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $ 66,300.00 $ 66,300.00

* JT154008

UNFORESEEN ADDITIONAL MAINTENANCE OF

TRAFFIC

UNIT 50,000 $ 1.00 $ 50,000.00

* JT154067

CONTRACT ALLOWANCE FOR

CONSTRUCTIONWORKS APPRENTICES

UNIT 25,000 $ 1.00 $ 25,000.00

* JT154103

ALLOWANCE FOR RAILROAD FLAGGING AND

SERVICES

UNIT 75,000 $ 1.00 $ 75,000.00

999NEG04

NON-COMPLIANCE WITH TOLLWAY

MAINTENANCE OF TRAFFIC PER TOLLWAY

SUPPL. SPEC. 701.08(a)

INC/DAY (2,500.00)$

999NEG05

FAILURE TO RESPOND TO RE-ESTABLISH

DEVICES PER TOLLWAY SUPPL. SPEC.

701.08(b)

OCCUR (2,500.00)$

999NEG06

FAILURE TO REPAIR IMPACT ATTENUATORS,

TEMPORARY PER TOLLWAY SUPPL. SPEC.

701.08(c)

OCCUR (2,500.00)$

999NEG07

LOSS OR DAMAGE TO TOLLWAY OWNED

DEVICES PER TOLLWAY SUPPL. SPEC.

701.08(d)

SQ FT (100.00)$

999NEG08

FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC

PER TOLLWAY SUPPL. SPEC. 701.08(e)(a)

15 MINUTES (3,000.00)$

999NEG09

FAILURE TO OPEN TRAFFIC LANES TO TRAFFIC

PER TOLLWAY SUPPL. SPEC. 701.08(e)(b)

15 MINUTES (5,000.00)$

999NEG20

DAMAGES TO ILLINOIS TOLLWAY'S

OPERATIONAL FACILITIES PER S.P. 115.5 - TRI-

STATE

OCCUR (10,000.00)$

999NEG30

DAMAGES TO ILLINOIS TOLLWAY'S

OPERATIONAL FACILITIES PER S.P. 115.5 - ALL

ROADWAYS OFF-PEAK

OCCUR (2,000.00)$

999NEG31

DAMAGE TO ELECTRICAL FACILITIES PER

TOLLWAY SUPPL. SPEC. 107.30 (b)

INC/DAY (1,000.00)$

999NEG32

LIQUIDATED DAMAGES FOR DELAY IN

SUBMITTAL OF PROGRESS SCHEDULE PER

TOLLWAY SUPPL. SPEC. 108.02 (e)

DAY (300.00)$

999NEG34

NON-COMPLIANCE WITH RESPONSIBILITY FOR

CONSTRUCTION HAULING EQUIPMENT PER

TOLLWAY SUPPL. SPEC. 105.15

DAY (1,000.00)$

999NEG36

FAILURE TO COMPLY WITH OCCUPANCY DATE

OR PROVIDE COMPLETE FACILITIES. FIELD

OFFICE OR LAB PER TOLLWAY SUPPL. SPEC.

670.01 (b)

DAY (500.00)$

NEGATIVE

Contract RR-25-4999 P - 7 March 25, 2026

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

SCHEDULE OF PRICES

I-294 MILE POST 42.1 TO I-94 MILE POST 27.8

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT RR-25-4999

TRI-STATE TOLLWAY (I-294/I-94)

BRIDGE REHABILITATION

TOUHY AVENUE TO WAUKEGAN ROAD

999NEG44

LIQUIDATED DAMAGES FOR NON-COMPLETION

PER S.P. 105.1.1

CAL DAY (6,000.00)$

999NEG45

LIQUIDATED DAMAGES FOR NON-COMPLETION

PER S.P. 105.1.2

CAL DAY (6,000.00)$

999NEG49

DAMAGE TO FIBER OPTIC UTILITIES PER S.P.

115.3

OCCUR (10,000.00)$

999NEG53

NON-COMPLIANCE WITH CONTRACTOR

QUALITY PROGRAM SPECIAL PROVISION

OCCUR (1,000.00)$

* 999ADJ45

CONSTRUCTIONWORKS APPRENTICES WAGE

RATE PAYMENT

HOUR $ 15.00

* 999ADJ46 ARROW BOARD EACH $ 13.32

* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH $ 1.00

* 999ADJ50 TYPE III BARRICADE EACH $ 2.35

* 999ADJ52 PLASTIC DRUM EACH $ 1.25

* 999ADJ54 FLASHER LIGHT EACH $ 0.20

* 999ADJ56 STEADY BURN LIGHT EACH $ 0.30

ADJUSTMENTS

Contract RR-25-4999 P - 8R March 25, 2026

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

SCHEDULE OF PRICES

I-294 MILE POST 42.1 TO I-94 MILE POST 27.8

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT RR-25-4999

TRI-STATE TOLLWAY (I-294/I-94)

BRIDGE REHABILITATION

TOUHY AVENUE TO WAUKEGAN ROAD

* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH $ 1.70

* 999ADJ60 CMS, SOLAR POWERED EACH $ 45.70

* 999ADJ62 SIGNS, WORK ZONE EACH $ 2.00

* 999ADJ64

TEMPORARY MODULAR GLARE SCREEN (12.5

FT. SECTION)

UNIT $ 0.60

* 999ADJ65

TEMPORARY CONCRETE BARRIER (12.5 FT.

SECTION)

UNIT $ 0.83

* 999ADJ66

TEMPORARY CONCRETE BARRIER (10.0 FT.

SECTION)

UNIT $ 0.50

* 999ADJ67

TEMPORARY CONCRETE BARRIER, CROSS

BOLT CONNECTION (12.5 FT. SECTION)

UNIT $ 1.47

* 999ADJ68 TEMPORARY SAND MODULE ATTENUATOR EACH $ 18.33

* 999ADJ69

IMPACT ATTENUATOR, TEMPORARY (SEVERE

USE, NARROW), TEST LEVEL 3

EACH $ 18.33

* 999ADJ70

IMPACT ATTENUATOR, TEMPORARY (SEVERE

USE, WIDE), TEST LEVEL 3

EACH $ 18.33

* 999ADJ71

TEMPORARY INFORMATION SIGNING-GROUND

MOUNTED, 24 SQ FT IN AREA OR LESS

SQ FT $ 0.25

Contract RR-25-4999 P - 9R March 25, 2026

NO.

DESIGNATION UNIT QUANTITY

UNIT PRICE

DOLLAR

AMOUNT

DOLLAR

SCHEDULE OF PRICES

I-294 MILE POST 42.1 TO I-94 MILE POST 27.8

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY

CONTRACT RR-25-4999

TRI-STATE TOLLWAY (I-294/I-94)

BRIDGE REHABILITATION

TOUHY AVENUE TO WAUKEGAN ROAD

* 999ADJ72

TEMPORARY INFORMATION SIGNING-GROUND

MOUNTED, GREATER THAN 24 SQ FT IN AREA

SQ FT $ 0.25

* 999ADJ73

TEMPORARY INFORMATION SIGNING-

OVERHEAD, 24 SQ FT IN AREA OR LESS

SQ FT $ 0.25

* 999ADJ74

TEMPORARY INFORMATION SIGNING-

OVERHEAD, GREATER THAN 24 SQ FT IN AREA

SQ FT $ 0.25

TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP) $ 216,300.00

BID CREDIT

AWARD CRITERIA

S.P. COLUMN LEGEND

INDICATES SPECIAL PROVISION (PROJECT SPECIFIC OR TOLLWAY STANDARD) *

INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS **

INDICATES IDOT SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS ***

INDICATES IDOT BDE SPECIAL PROVISION BDE

INDICATES IDOT GBSP SPECIAL PROVISION GBSP

INDICATES DISTRICT 1 SPECIAL PROVISION D1

TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK +

CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID

Contract RR-25-4999 P - 10 March 25, 2026

Contract RR-25-4999 J-107R March 25, 2026

EXTENDED MAINTENANCE OF TRAFFIC WORK AND EQUIPMENT RATES (Illinois Tollway)

Effective: September 1, 2021 Revised: March 20,2026

Description. This work shall consist of performing work zone traffic control and protection work as specified in the Contract Documents beyond the original Substantial Completion Date. In addition, maintenance of traffic related equipment rates are established that apply to extra work.

Method of Measurement & Basis of Payment.

Payment will be made on a force account basis in accordance with Article 109.04 of the Illinois Tollway Supplement Specifications. Payment rates for devices will be made at the unit Rate Per Day in the below table.

Should the Contractor qualify for such payment, a corresponding adjustment amount will then be made to UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC.

In all cases, payment for devices will be made for a maximum of 180 days beyond the original Substantial Completion Date shown in the approved baseline schedule.

The below rates reflect equipment usage only. Additional costs for realignment, repairs, maintenance, or replacement of these devices shall be reimbursed according to Illinois Tollway Supplemental Specifications Article 109.04, Payment for Extra Work.

Item number Device Description Unit Rate Per Day

999ADJ46 Arrow Board Each $13.32

999ADJ48 Type I or Type II Barricade Each $1.00

999ADJ50 Type III Barricade Each $2.35

999ADJ52 Plastic Drum Each $1.25

999ADJ54 Flasher Light Each $0.20

999ADJ56 Steady Burn Light Each $0.30

999ADJ58 Hi-intensity Light, Sign Mounted Each $1.70

999ADJ60 CMS, Solar Powered Each $45.70

999ADJ62 Signs, Work Zone Each $2.00

999ADJ64

Temporary Modular Glare Screen (12.5 Ft.

Section)

Unit $0.60

999ADJ65 Temporary Concrete Barrier (12.5 Ft. Section) Unit $0.83

999ADJ66

Temporary Concrete Barrier (10.0 Ft. Section)

Unit

$0.50

Contract RR-25-4999 J-108R March 25, 2026

999ADJ67

Temporary Concrete Barrier, Cross Bolt Connection (12.5 Ft. Section)

Unit $1.47

999ADJ68 Temporary Sand Module Attenuator Each $18.33

999ADJ69

Impact Attenuator, Temporary (Severe Use, Narrow), Test Level 3

Each $18.33

999ADJ70

Impact Attenuator, Temporary (Severe Use, Wide), Test Level 3

Each $18.33

999ADJ71

Temporary Information Signing-Ground Mounted, 24 Sq Ft in area or less

Sq Ft $0.25

999ADJ72

Temporary Information Signing-Ground Mounted, Greater than 24 Sq Ft in area

Sq Ft $0.25

999ADJ73

Temporary Information Signing-Overhead, 24 Sq Ft in area or less

Sq Ft $0.25

999ADJ74

Temporary Information Signing-Overhead, Greater than 24 Sq Ft in area

Sq Ft $0.25

Contract RR-25-4999 J-109R March 25, 2026

PAGE INTENTIONALLY LEFT BLANK

File details come from the government source that posted it. Updated .