RFI Responses Amendment 0001 2023 5 24.docx

DOCX document 17 KB Posted

Attached to
NEOB Long Wing 6th and 7th Floors Modernization Federal contract opportunity
Solicitation number
47PM1023R0013
Issued by
General Services Administration Public Buildings Service

About this file

This federal solicitation requests design-build proposals for the modernization of the sixth and seventh floors of the Northeast and Southeast wings of the National Archives Building. Offerors must submit qualification proposals by May 30th, 2023 at 11:00 AM Eastern Time as an electronic submission. The General Services Administration will evaluate the submissions and select up to three firms to invite for Phase Two. Phase Two proposals will include pricing and detailed technical approaches, with a response time of three weeks. This two-phase solicitation conducted under FAR 36.3 is set aside for small businesses. If selected for Phase Two, offerors will receive additional documentation including attachments listed in the solicitation. Non-price evaluation factors are only required in Phase Two submissions. No pricing is to be included in Phase One qualification proposals.

View the file

Other files for this federal contract opportunity

Other files attached to NEOB Long Wing 6th and 7th Floors Modernization, newest first.
File Type Posted
Solicitation Amendment 47PM1023R0013_0001 2023 5 24.pdf PDF
RFP 47PM1023R0013-2023-05-22.pdf PDF
WM NEOB 6th and 7th Floor Modernization 2023 01 23.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

47PM1023R0013, NEOB LONG WING 6TH & 7TH FLOORS MODERNIZATION, PHASE I, RFI RESPONSES

1. Section I.H. Receipt of Qualifications defines the submission time and date due. Both email addresses and a physical address have been provided. Please confirm if electronic submission OR hard copy submission is acceptable, or if both are required.

ONLY AN ELECTRONIC PROPOSAL WILL BE ACCEPTABLE.

2. If, in response to Question 1, only a hard copy submission is acceptable, with the Memorial Day holiday occurring on 29MAY23, will the Offeror’s be able to successfully deliver proposal documents to the address provided within the solicitation?

ONLY AN ELECTRONIC PROPOSAL WILL BE ACCEPTABLE. AMENDMENT 0001 EXTENDS PHASE I OFFER DUE DATE TO MAY 30, 2023, AT 11:00 AM.

3. If the proposal must be submitted in hard copy, the SF 1442 requires the original plus one copy. Section II.B Proposal Format of the solicitation states ONE copy of each document must be submitted. Please confirm correct quantity.

ONLY ONE COPY OF EACH DOCUMENT MUST BE SUBMITTED PER SECTION II.B PROPOSAL FORMAT.

4. The due date for Phase I is listed as Monday, 05/29/2023. As this is Memorial Day, could you please extend the due date to Thursday, 06/01/2023?

AMENDMENT 0001 EXTENDS PHASE I OFFER DUE DATE TO MAY 30, 2023, AT 11:00 AM.

5. Could you please send a template for the GSA 527 Financial Form?

GSA 527 FINANCIAL FORM ATTACHED. Reminder, the 527 is only required for Phase II.

6. Are the VI.G. Non‐Price Factors listed on page 13 of the RFP due with Phase I or will these be due with Phase II?

THE NON-PRICE FACTORS ARE DUE WITH PHASE II.

7. For the bid submission, could you please clarify if hard copies are required?

ONLY AN ELECTRONIC PROPOSAL WILL BE ACCEPTABLE.

8. The #6 Attachments listed in the RFP on page 119 – can these be provided?

THESE DOCUMENTS WILL BE PROVIDED TO THE 3 VENDORS CHOSEN FOR PHASE II.

9. This Phase 1 solicitation was released on 22 May and states that Phase 1 proposals are due on 29 May – one week later. Phase 1 proposals will need to include extensive detail. Can the Government confirm if the due date is supposed to be 29 June – and if not, would the Government consider extending the due date to 29 June, to afford offerors the customary 30 days to develop proposals?

AMENDMENT 0001 EXTENDS THE PHASE 1 OFFER DUE DATE TO MAY 30, 2023, AT 11:00 AM.

10. The Phase 1 solicitation requires offerors to provide a detailed risk management approach narrative. This narrative is typically applicable to Phase 2 submissions, at which time pricing, detail, schedule development, design approach material, and input from team members and subcontractors is more readily available and applicable. Especially considering the short, one-week time available to develop proposals, would the Government amend the solicitation to require this information in Phase 2?

The 2 Phase Design-Build of FAR 36.303-1 states that the first phase shall include a technical approach, but not detailed design or technical information. Phase I in this solicitation is requesting that the offeror demonstrate their understanding of this specific project, and the plan to mitigate the risks associated. If chosen for Phase II, a more extensive technical proposal (with a 3-week turnaround time) will be issued.